Article
Publication date: 4 October 2022

Shumank Deep, Thayaparan Gajendran, Marcus Jefferies, Venkata Suresh Uggina and Sanjay Patil

Research on strategic procurement was mostly focussed on the clients' and main contractors' perspectives, while limited work had been done from a subcontractor's perspective. The…

Abstract

Purpose

Research on strategic procurement was mostly focussed on the clients' and main contractors' perspectives, while limited work had been done from a subcontractor's perspective. The paper hypothesises that “strategic capability” influences the latent constructs of power, dependence and collaboration in the main contractor–subcontractor relationship. Therefore, the purpose of this study is to investigate the influence of a subcontractor's strategic capabilities on power, dependence and collaboration.

Design/methodology/approach

A survey questionnaire was developed and distributed amongst the subcontractors in Australia, and 212 complete responses were received. Then second order confirmatory factor analysis and partial least square structure equation modelling (PLS-SEM) analysis were performed to test the hypothesised relationships.

Findings

The findings support “strategic capabilities” as a construct expressive of a subcontractor's unique market position and good business reputation. The findings also suggest that strategically capable subcontractors enhance their potential for forming partnerships with main contractors through dependence (StratC. → Dep., β = 0.84; Effect Size (ES) = 0.713; p < 0.01), collaboration (StratC. → Collab., β = 0.84; ES = 0.697; p < 0.01) and bargaining power (StratC. → Pow., β = 0.83; ES = 0.672; p < 0.01).

Originality/value

The study is one of its kind to explore the impact of a subcontractor's strategic capability on their bargaining power, dependability and ability to form collaborations. Furthermore, results indicate that the “strategic capabilities” of subcontractors can strongly influence their ability to create “dependence”, foster “collaboration” and exert “power” over a main contractor. The findings can help improve the strategic procurement decision-making processes of both subcontractors and main contractors to build better business relationships.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 March 2024

Duc-Anh Le, Chau Ngoc Dang, Long Le-Hoai and Viet Quoc Hoang

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing…

Abstract

Purpose

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing several considerable challenges (e.g. long implementation time). Thus, this study aims to identify critical success factors (CSFs) in ODA education projects and investigate the influences of CSFs on ODA project performance measured by 11 nonprofit outcomes (NPOs).

Design/methodology/approach

A comprehensive literature review and expert interviews were conducted to compile a list of 35 potential success factors for ODA education projects. Using a survey questionnaire, 143 valid responses were collected from practitioners joining ODA projects in Vietnam. Various statistical methods (e.g. mean score method, Spearman rank correlation test, analysis of variance test, factor analysis and regression analysis) were used to analyze the collected data.

Findings

This research identified seven CSFs for ODA education projects in Vietnam: comprehensive project management competency (C1), clarity and compliance in project execution (C2), transparency and committed funding (C3), external context conditions (C4), well-controlled design and project management procedures (C5), preparations in equipment and complexity insight (C6) and punctual site delivery (C7). Furthermore, the results of regression analysis indicated that comprehensive project management competency (C1) and transparency and committed funding (C3) could significantly affect various NPOs.

Originality/value

This study offers significant insights for practitioners (e.g. project managers) to improve ODA projects’ performance and effectiveness in the education and training sector of a developing country context (like Vietnam).

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 16 August 2023

Matthew Ikuabe, Clinton Aigbavboa, Chimay Anumba and Ayodeji Emmanuel Oke

Through its advanced computational capabilities, cyber–physical systems (CPS) proffer solutions to some of the cultural challenges plaguing the effective delivery of facilities…

Abstract

Purpose

Through its advanced computational capabilities, cyber–physical systems (CPS) proffer solutions to some of the cultural challenges plaguing the effective delivery of facilities management (FM) mandates. This study aims to explore the drivers for the uptake of CPS for FM functions using a qualitative approach – the Delphi technique.

Design/methodology/approach

Using the Delphi technique, the study selected experts through a well-defined process entailing a pre-determined set of criteria. The experts gave their opinions in two iterations which were subjected to statistical analyses such as the measure of central tendency and interquartile deviation in ascertaining consensus among the experts and the Mann–Whitney U test in establishing if there is a difference in the opinions given by the experts.

Findings

The study’s findings show that six of the identified drivers of the uptake of CPS for FM were attributed to be of very high significance, while 12 were of high significance. Furthermore, it was revealed that there is no significant statistical difference in the opinions given by experts in professional practice and academia.

Practical implications

The study’s outcome provides the requisite insight into the propelling measures for the uptake of CPS for FM by organisations and, by extension, aiding digital transformation for effective FM delivery.

Originality/value

To the best of the authors’ knowledge, evidence from the literature suggests that no study has showcased the drivers of the incorporation of CPS for FM. Hence, this study fills this gap in knowledge by unravelling the significant propelling measures of the integration of CPS for FM functions.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 21 March 2023

Matthew Ikuabe, Clinton Ohis Aigbavboa, Chimay Anumba and Ayodeji Emmanuel Oke

The quest for improved facilities management (FM) delivery is receiving immense focus through the incorporation of innovative technologies such as cyber-physical systems (CPS)…

1164

Abstract

Purpose

The quest for improved facilities management (FM) delivery is receiving immense focus through the incorporation of innovative technologies such as cyber-physical systems (CPS). The system’s high computational capabilities can aid in the abatement of some of the challenges plaguing FM functions. However, the requisite ingredients for the uptake of the system for FM have still not gained scholarly attention. Because performance measurement is a vital index in determining the outcome of FM methods, this study aims to investigate the influence of performance measurement indicators that are influential to the uptake of CPS for delivering FM functions.

Design/methodology/approach

A qualitative technique was adopted using the Delphi technique. The panel of experts for the study was selected through a well-defined process based on stipulated criteria. The experts gave their opinions in two rounds before consensus was attained on the identified performance measurement indicators, whereas methods of data analysis were measures of central tendency, inter-quartile deviation and Mann–Whitney U test.

Findings

Results from this study showed that 11 of the performance indicators were of very high significance in the determination of the uptake of CPS for FM functions, whereas 5 of the indicators were proven to be of high significance. Furthermore, there was no statistical difference in the opinions of the experts based on their affiliation with academic institutions and professional practice.

Practical implications

The findings of this study contribute practically by aiding policymakers, facility managers and relevant stakeholders with the vital knowledge of delivery mandates for efficient FM services that can spur the uptake of digital technologies such as CPS.

Originality/value

This study contributes to the body of knowledge as it unveils a roadmap of the expected performance output and its accompanying evaluation that would drive the adoption of a promising technology such as CPS in the delivery of FM tasks.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 17 May 2022

Douglas Aghimien, Clinton Aigbavboa, Ayodeji Emmanuel Oke and John Aliu

Digitalisation, which involves the use of digital technologies in transforming an organisation’s activities, transcends just the acquiring of emerging digital tools. Having the…

1567

Abstract

Purpose

Digitalisation, which involves the use of digital technologies in transforming an organisation’s activities, transcends just the acquiring of emerging digital tools. Having the right people to drive the implementation of these technologies and attaining strategic organisational goals is essential. While most studies have focused on the use of emerging technologies in the construction industry, less attention has been given to the ‘people’ dimension. Therefore, this study aims to assess the people-related features needed for construction digitalisation.

Design/methodology/approach

The study adopted pragmatic thinking using a mixed-method approach. A Delphi was used to achieve the qualitative aspect of the research, while a questionnaire survey conducted among 222 construction professionals was used to achieve the quantitative aspect. The data gathered were analysed using frequency, percentage, mean item score, Kruskal–Wallis H test, exploratory factor analysis and confirmatory factor analysis.

Findings

Based on acceptable reliability, validity and model fit indices, the study found that the people-related factors needed for construction digitalisation can be grouped into technical capability of personnel, attracting and retaining digital talent and organisation’s digital culture.

Practical implications

The findings offer valuable benefits to construction organisations as understanding these identified people features can help lead to better deployment of digital tools and the attainment of the digital transformation.

Originality/value

This study attempts to fill the gap in the shortage of literature exploring the people dimension of construction digitalisation. The study offers an excellent theoretical backdrop for future works on digital talent for construction digitalisation, which has gained less attention in the current construction digitalisation discourse.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 3 April 2024

Michael Nii Addy, Evans Teye Addo, Sulemana Fatoama Abdulai, Titus Ebenezer Kwofie, Clinton Ohis Aigbavboa and Anita Odame Adade-Boateng

E-procurement has the advantage of improving the overall performance of construction project delivery. The purose of this study is to uncover the factors influencing e-procurement…

Abstract

Purpose

E-procurement has the advantage of improving the overall performance of construction project delivery. The purose of this study is to uncover the factors influencing e-procurement acceptance in the public sector of Ghana’s construction industry (GCI). Using an extended unified theory of acceptance and use of technology (UTAUT 2), variables that promote the acceptance of e-procurement in GCI were explored.

Design/methodology/approach

Data was collected using a mixed method strategy. In the first stage, a semi-structured interview was used to collect, assess and optimize the UTAUT2 model. Thematic analysis was used on the qualitative data, leading to modification of the proposed UTAUT2 model. The study subsequently used a questionnaire survey using the extended UTAUT2 model. Survey data was analyzed using structural equation modelling (SEM), leading to the identification and validation of factors that facilitate e-procurement acceptance in Ghanaian construction as well as the impact of these factors.

Findings

The findings of the study reveal that five independent constructs of the proposed UTAUT2 model significantly affects the behavioural intention of practitioners to accept and use e-procurement in the construction industry in Ghana.

Practical implications

The study will be of utility to government agencies, contracting organizations and other construction stakeholders in developing policy and programmes to support e-procurement acceptance within the sector.

Originality/value

This is a new extended UTAUT2 model that is applicable to technology acceptance within the public sector in sub-Saharan Africa.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 16 May 2024

Oscar Kwame Kwasafo, Emmanuel Adinyira and Kofi Agyekum

This paper investigates the impact of green construction procurement practices (GCPPs) on circular economy (CE) success by identifying environmentally sustainable procurement…

Abstract

Purpose

This paper investigates the impact of green construction procurement practices (GCPPs) on circular economy (CE) success by identifying environmentally sustainable procurement practices that can promote a CE in the construction industry. The goal was to promote circularity in construction through GCPPs.

Design/methodology/approach

A quantitative research approach was adopted and purposively selected 100 respondents for a cross-sectional questionnaire survey. Data from the questionnaire survey were analysed using mean score ranking, One-sample t-test and regression analysis.

Findings

The study found that using on-site systematic waste management, project stakeholder commitment and support for green practices and environmental requirements in technical specifications, significantly impact CE success in construction, with a 12.8% variance in CE when green procurement is practised. This implies that GCPPs have positive repercussions on CE success, where the CE success is expected to change as GCPPs levels increase.

Practical implications

The study provides insights into green procurement, promoting its use in infrastructure development and aiding clients, particularly in the government sector with insights into the challenges and practices involved in green procurement. Practitioners can also benefit from better implementing CE strategies to draft and manage contracts for infrastructure projects that prioritize circularity.

Originality/value

The limited impact of GCPPs on advancing CE principles in construction suggests policy and practice must strengthen procurement requirements to fully leverage spending and drive the sector’s transition towards a circular model. Also, novel insight is provided into the most effective types of GCPPs for promoting CE success, aiding policymakers in optimizing construction procurement strategies.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 21 July 2022

Anna-Therése Järvenpää, Johan Larsson and Per Erik Eriksson

This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.

Abstract

Purpose

This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.

Design/methodology/approach

Semi-structured interviews about six infrastructure projects were conducted to identify respondents’ views on innovation possibilities. These possibilities were then analyzed from an organizational control perspective within principal–agent relationships between the Swedish Transport Administration (STA) and their contractors.

Findings

How the client uses control systems affects innovation possibilities. Relying on process control could negatively affect innovation opportunities, whereas output control could have a positive influence. In addition, social control seems to have a weak effect, as the STA appears not to use social control to facilitate joint innovation. Public clients must comply with the Public Procurement Act and, therefore, retain the requirements specified in the tendering documents. Much of the steering of the execution is connected to the ex ante phase (before signing the contract), which affects innovation possibilities in the design and execution phases for the contractor.

Research limitations/implications

This study was conducted with only one client, thus limiting its generalizability. However, the findings provide an important stepping stone to further investigation into balancing control systems and creating innovation possibilities in a principal–agent relationship.

Originality/value

Although public procurement has increasingly been emphasized as a major potential source of innovation, studying how a public client’s use of organizational control systems affects innovation possibilities in the construction sector has received scant attention.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 19 April 2024

Atupakisye Mwakolo, Meshack Siwandeti, Leticia Mahuwi and Baraka Israel

The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various…

Abstract

Purpose

The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various dimensions of PGG, including transparency, accountability, competition and integrity, this study provides insights into how these factors contribute to the successful achievement of VfM outcomes in public construction projects.

Design/methodology/approach

The data were sourced from 203 construction project practitioners from 24 selected procuring entities in Tanzania using a census approach and a cross-sectional questionnaire survey. Confirmatory factor analysis (CFA) and structural equation modelling (SEM) were used for data analysis.

Findings

The findings of the study revealed a positive and significant impact of various dimensions of PGG on VfM. Specifically, transparency, accountability, competition and integrity were positively and significantly related to VfM, with p-values <0.001. Based on the study findings, we conclude that PGG is an important predictor of VfM achievement in public construction projects.

Practical implications

The study offers policy implications for streamlined PGG and VfM achievement in public construction projects. It is suggested that procuring entities can enhance VfM by enforcing compliance with the principles of PGG throughout the entirety of construction projects. In this case, streamlined legislative frameworks and control mechanisms are crucial components that could enhance PGG and the achievement of VfM.

Originality/value

This study contributes to the academic literature on the strategic role of PGG in enhancing VfM achievement. This is one of the research domains, which has not been adequately researched, particularly in Tanzania’s context. In addition, the study provides valuable insights to policymakers, practitioners and stakeholders involved in public construction projects to improve project outcomes and resource allocation.

Details

LBS Journal of Management & Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0972-8031

Keywords

Open Access
Article
Publication date: 6 July 2022

Klara Granheimer, Tina Karrbom Gustavsson and Per Erik Eriksson

Prior research has emphasised the importance of the early phases of construction projects, as well as the difficulties of procuring engineering services – especially due to the…

Abstract

Purpose

Prior research has emphasised the importance of the early phases of construction projects, as well as the difficulties of procuring engineering services – especially due to the uncertainties. Despite that, studies on the public procurement of engineering services are scarce. Although scholars have shown that uncertainty may affect the choice of control modes, the level of uncertainty that characterises services is not addressed by the two task characteristics: knowledge of the transformation process and output measurability. The purpose is to investigate organisational control in public procurement of engineering services.

Design/methodology/approach

The existing control model was adjusted in this study by conceptually adding uncertainty as a third aspect to the two task characteristics. A single case study of the Swedish Transport Administration was used. The empirical data, comprising 14 interviews with managers from the client and engineering consulting companies, were analysed using flexible pattern matching and visual mapping approaches and then illustrated using the model.

Findings

The public client did not base its choice of control modes on uncertainty, but rather on the other two task characteristics. Consequently, the service providers argued that the chosen control modes reduced their creativity, increased their financial risks and caused unclear responsibilities. This study therefore shows that uncertainty is an important factor to consider in the choice of control modes, both from a theoretical perspective and from the service providers' point of view. The developed model may therefore be useful for researchers as well as practitioners.

Originality/value

This study is the first attempt to add uncertainty as a task characteristic when choosing control modes. The results contribute to the scarce control literature regarding the procurement of engineering services for construction projects and the procurement of other services with high uncertainty.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords