Article
Publication date: 10 September 2024

Francis Kamewor Tetteh, Dennis Amoako Kwatia, David Asante, Andrews Kyeremeh and Prince Elton Nyame

The paper examines the influence of procurement capabilities (skills) and procurement planning on project success in Ghana. The paper further examines the mediating role of…

Abstract

Purpose

The paper examines the influence of procurement capabilities (skills) and procurement planning on project success in Ghana. The paper further examines the mediating role of procurement planning.

Design/methodology/approach

Drawing insights from human capital theory, a model of four hypotheses was developed and validated. The proposed model was validated using survey data from 200 procurement and construction professionals at construction firms in Ghana. The data gathered was analysed using structural equation modelling. Confirmatory factor analysis using Amos software was conducted to establish reliability and validity of the constructs. Hayes process was employed to test the structural model.

Findings

Our study revealed that procurement capabilities and procurement planning directly improve project success in the construction sector in Ghana. We found procurement planning acts as a pathway for achieving greater success in construction projects.

Originality/value

This study is among the very few attempts to demonstrate how project success could be enhanced through developing procurement capabilities for effective procurement planning. Theoretically, this study is among the first attempts to theorise the effect of procurement capabilities and planning on project success from the human capital perspective. Our findings also offer practical insight to practitioners in the construction setting by emphasising the need to pay crucial attention to capabilities and planning in the quest to enhance project success in the construction setting. The findings indicate that building capabilities alone is not enough; rather, the ability to deploy such capabilities for effective procurement planning is necessary for driving project success.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 26 March 2024

Keyu Chen, Beiyu You, Yanbo Zhang and Zhengyi Chen

Prefabricated building has been widely applied in the construction industry all over the world, which can significantly reduce labor consumption and improve construction…

Abstract

Purpose

Prefabricated building has been widely applied in the construction industry all over the world, which can significantly reduce labor consumption and improve construction efficiency compared with conventional approaches. During the construction of prefabricated buildings, the overall efficiency largely depends on the lifting sequence and path of each prefabricated component. To improve the efficiency and safety of the lifting process, this study proposes a framework for automatically optimizing the lifting path of prefabricated building components using building information modeling (BIM), improved 3D-A* and a physic-informed genetic algorithm (GA).

Design/methodology/approach

Firstly, the industry foundation class (IFC) schema for prefabricated buildings is established to enrich the semantic information of BIM. After extracting corresponding component attributes from BIM, the models of typical prefabricated components and their slings are simplified. Further, the slings and elements’ rotations are considered to build a safety bounding box. Secondly, an efficient 3D-A* is proposed for element path planning by integrating both safety factors and variable step size. Finally, an efficient GA is designed to obtain the optimal lifting sequence that satisfies physical constraints.

Findings

The proposed optimization framework is validated in a physics engine with a pilot project, which enables better understanding. The results show that the framework can intuitively and automatically generate the optimal lifting path for each type of prefabricated building component. Compared with traditional algorithms, the improved path planning algorithm significantly reduces the number of nodes computed by 91.48%, resulting in a notable decrease in search time by 75.68%.

Originality/value

In this study, a prefabricated component path planning framework based on the improved A* algorithm and GA is proposed for the first time. In addition, this study proposes a safety-bounding box that considers the effects of torsion and slinging of components during lifting. The semantic information of IFC for component lifting is enriched by taking into account lifting data such as binding positions, lifting methods, lifting angles and lifting offsets.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 October 2023

Mohamed Saad Bajjou and Anas Chafi

Lean construction (LC) consists of very effective techniques; however, its implementation varies considerably from one industry to another. Although numerous lean initiatives do…

Abstract

Purpose

Lean construction (LC) consists of very effective techniques; however, its implementation varies considerably from one industry to another. Although numerous lean initiatives do exist in the construction industry, the research topic related to LC implementation is still unexplored due to the scarcity of validated assessment frameworks. This study aims to provide the first attempt in developing a structural model for successful LC implementation.

Design/methodology/approach

This study developed a Lean construction model (LCM) by critically reviewing seven previous LC frameworks from different countries, defining 18 subprinciples grouped into 6 major principles and formulating testable hypotheses. The questionnaire was pre-tested with 12 construction management experts and revised by 4 specialized academics. A pilot study with 20 construction units enhanced content reliability. Data from 307 Moroccan construction companies were collected to develop a measurement model. SPSS V. 26 was used for Exploratory Factor Analysis, followed by confirmatory factor analysis using AMOS version 23. Finally, a structural equation model statistically assessed each construct's contribution to the success of LC implementation.

Findings

This work led to the development of an original LCM based on valid and reliable LC constructs, consisting of 18 measurement items grouped into 6 LC principles: Process Transparency, People involvement, Waste elimination, Planning and Continuous improvement, Client Focus and Material/information flow and pull. According to the structural model, LC implementation success is positively influenced by Planning and Scheduling/continuous improvement (β = 0.930), followed by Elimination of waste (β = 0.896). Process transparency ranks third (β = 0.858). The study demonstrates that all these factors are mutually complementary, highlighting a positive relationship between LC implementation success and the holistic application of all LC principles.

Originality/value

To the best of the authors’ knowledge, this study is the first attempt to develop a statistically proven model of LC based on structural equation modelling analysis, which is promising for stimulating construction practitioners and researchers for more empirical studies in different countries to obtain a more accurate reflection of LC implementation. Moreover, the paper proposes recommendations to help policymakers, academics and practitioners anticipate the key success drivers for more successful LC implementation.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 June 2024

Hossam Wefki, Mona Salah, Emad Elbeltagi, Asser Elsheikh and Rana Khallaf

Given the growing interest in modern construction techniques and the emergence of innovative technologies, construction site layout planning research has progressively been…

Abstract

Purpose

Given the growing interest in modern construction techniques and the emergence of innovative technologies, construction site layout planning research has progressively been investigating approaches to adopt innovative concepts and incorporate renewed approaches to improve widespread efficiency. This research develops a decision-making tool that optimizes construction site layout plans. The developed model targets two main objectives: minimizing material transportation costs and maximizing safety by optimally placing facilities on construction sites.

Design/methodology/approach

A novel approach is devised based on the integration of Building Information Modeling and Generative Design (BIM-GD). This engine is used to optimize the multi-objective site layout problems to identify layout alternatives in the early project stages. Parametric modeling uses Dynamo to construct the model and explore constraints initially. Finally, the GD environment is utilized to create different design alternatives, and then the decision-making procedure selects the most appropriate design alternative. Additionally, a case study is applied to validate the effectiveness of the developed model.

Findings

The results indicate the effectiveness of the proposed GD tool and its potential for more complex applications. The GD engine examined optimal layout plans, balancing different objectives and adhering to appointed geometric constraints. A case study was conducted to assess the model's effectiveness and showcase its suitability. Construction Site Layout Planning (CSLP) is an essential step in design that can influence considerable aspects, such as material transportation expenses and different safety standards on the site. Employing visual programming for parametric modeling within Dynamo-Revit creates an expedient and user-friendly platform for planning engineers who may require more programming expertise to create and program algorithmic models visually. Utilizing GD in CSLP has proven to be a powerful tool with consequential prospects for improving applications and executing more models.

Practical implications

The findings from this framework are intended to help construction practitioners select the most appropriate site layout during early project stages while incorporating different safety criteria inside construction sites to alleviate actual safety risks.

Originality/value

A new approach is proposed that utilizes an integrated BIM-GD engine to optimize multi-objective site layout problems. This approach targets two main objectives: minimizing material transportation costs and maximizing safety by optimally placing facilities in construction sites.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 January 2024

Nasim Babazadeh, Jochen Teizer, Hans-Joachim Bargstädt and Jürgen Melzner

Construction activities conducted in urban areas are often a source of significant noise disturbances, which cause psychological and health issues for residents as well as…

200

Abstract

Purpose

Construction activities conducted in urban areas are often a source of significant noise disturbances, which cause psychological and health issues for residents as well as long-term auditory impairments for construction workers. The limited effectiveness of passive noise control measures due to the close proximity of the construction site to surrounding neighborhoods often results in complaints and eventually lawsuits. These can then lead to delays and cost overruns for the construction projects.

Design/methodology/approach

The paper proposes a novel approach to integrating construction noise as an additional dimension into scheduling construction works. To achieve this, a building information model, including the three-dimensional construction site layout object geometry, resource allocation and schedule information, is utilized. The developed method explores further project data that are typically available, such as the assigned equipment to a task, its precise location, and the estimated duration of noisy tasks. This results in a noise prediction model by using noise mapping techniques and suggesting less noisy alternative ways of construction. Finally, noise data obtained from sensors in a case study contribute real values for validating the proposed approach, which can be used later to suggest solutions for noise mitigation.

Findings

The results of this study indicate that the proposed approach can accurately predict construction noise given a few available parameters from digital project planning and sensors installed on a construction site. Proactively integrating construction noise control measures into the planning process has benefits for both residents and construction managers, as it reduces construction noise-related disturbances, prevents unexpected legal issues and ensures the health and well-being of the workforce.

Originality/value

While previous research has concentrated on real-time data collection using sensors, a more effective solution would also involve addressing and mitigating construction noise during the pre-construction work planning phase.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 27 August 2024

Harun Turkoglu, Emel Sadikoglu, Sevilay Demirkesen, Atilla Damci and Serra Acar

The successful completion of linear infrastructure construction projects such as railroads, roads, tunnels, and pipelines relies heavily on decision-making processes during…

Abstract

Purpose

The successful completion of linear infrastructure construction projects such as railroads, roads, tunnels, and pipelines relies heavily on decision-making processes during planning phase. Professionals in the construction industry emphasize that determining the starting point of a linear infrastructure construction project is one of the most important decisions to be made in the planning phase. However, the existing literature does not specifically focus on selection of the starting point of the segments to be constructed. Therefore, it is of utmost importance to develop a multi-criteria decision-making (MCDM) model to support selection of the starting point of the segments to be constructed in linear infrastructure construction projects.

Design/methodology/approach

Based on the characteristics of the railroad projects and insights gathered from expert interviews, the appropriate criteria for the model were determined. Once the criteria were determined, a decision hierarchy was developed and the weights of the criteria (w_i) were calculated using DEcision MAking Trial and Evaluation Laboratory (DEMATEL) method. Then, Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS), COmplex PRoportional Assessment (COPRAS), and evaluation based on distance from average solution (EDAS) methods were used. The alternatives were ranked in terms of their priority with TOPSIS method based on relative closeness (Ci) of each alternative to the ideal solution, COPRAS method based on quantitative utility (Ui) for each alternative and EDAS method based on evaluation score (ASi) for all alternatives. The results were compared with each other.

Findings

The study reveals the effects of all criteria on the proposed model. The results of DEMATEL method indicated that quantity of aggregate (w_i = 0.075), ballast (w_i = 0.071), and sub-ballast (w_i = 0.069) are the most important criteria in starting location selection for railroads, where earthquake (w_i = 0.046), excavation cost (w_i = 0.054), and longest distance from borrow pit (w_i = 0.055) were found to be less important criteria. The starting location alternatives were ranked based on TOPSIS, COPRAS and EDAS methods. The A-1 alternative was selected as the most appropriate alternative (Ci = 0.64; Ui = 100%; ASi = 0.81), followed by A-6 alternative (Ci = 0.61; Ui = 97%; ASi = 0.73) and A-7 alternative (Ci = 0.59; Ui = 94%; ASi = 0.60). Even tough different methods were used, they provided compatible results where the same ranking was achieved except three alternatives.

Originality/value

This study identifies novel criteria for the starting location selection of railroad construction based on the data of a railroad project. This study uses different methods for selecting the starting location. Considering the project type and its scope, the model can be used by decision-makers in linear infrastructure projects for which efficient planning and effective location selection are critical for successful operations.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 July 2024

Saad Sarhan, Stephen Pretlove, Faris Elghaish, Sandra Matarneh and Alan Mossman

While stress, anxiety and depression rank as the second leading cause of work-related ill health in the UK construction sector, there exists a scarcity of empirical studies…

Abstract

Purpose

While stress, anxiety and depression rank as the second leading cause of work-related ill health in the UK construction sector, there exists a scarcity of empirical studies explicitly focused on investigating the sources of occupational stress among construction workers and professionals at both the construction project and supply chain levels. This study seeks to identify and investigate the primary stressors (sources of stress) in UK construction projects and to propose effective strategies for preventing or reducing stress in this context.

Design/methodology/approach

The study adopted a qualitative multi-methods research approach, comprising the use of a comprehensive literature review, case study interviews and a focus group. It utilised an integrated deductive-inductive approach theory building using NVivo software. In total, 19 in-depth interviews were conducted as part of the case-study with a well-rounded sample of construction professionals and trade supervisors, followed by a focus group with 12 policy influencers and sector stakeholders to evaluate the quality and transferability of the findings of the study.

Findings

The results reveal seven main stressors and 35 influencing factors within these 7 areas of stress in a UK construction project, with “workflow interruptions” emerging as the predominant stressor. In addition, the results of the focus-group, which was conducted with a sample of 12 prominent industry experts and policy influencers, indicate that the findings of the case study are transferrable and could be applicable to other construction projects and contexts. It is, therefore, recommended that these potential stressors be addressed by the project team as early as possible in construction projects. Additionally, the study sheds empirical light on the limitations of the critical path method and identifies “inclusive and collaborative planning” as a proactive strategy for stress prevention and/or reduction in construction projects.

Research limitations/implications

The findings of this study are mainly based on the perspectives of construction professionals at managerial and supervisory levels. It is, therefore, suggested that future studies are designed to focus on capturing the experiences and opinions of construction workers/operatives on the site.

Practical implications

The findings from this study have the potential to assist decision-makers in the prevention of stress within construction projects, ultimately enhancing workforce performance. It is suggested that the findings could be adapted for use as Construction Supply Chain Management Standards to improve occupational stress management and productivity in construction projects. The study also provides decision-makers and practitioners with a conceptual framework that includes a list of effective strategies for stress prevention or reduction at both project and organisational levels. It also contributes to practice by offering novel ideas for incorporating occupational stress and mental health considerations into production planning and control processes in construction.

Originality/value

To the best of the authors’ knowledge, this is the first, or one of the very few studies, to explore the concept of occupational stress in construction at the project and supply chain levels. It is also the first study to reveal “workflow” as a predominant stressor in construction projects. It is, therefore, suggested that both academic and industry efforts should focus on finding innovative ways to enhance workflow and collaboration in construction projects, to improve the productivity, health and well-being of their workforce and supply chain. Further, it is suggested that policymakers should consider the potential for incorporating “workflow” into the HSE's Management Standards for stress prevention and management.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 6 June 2023

Oluwaseun Akindele, Saheed Ajayi, Adekunle S. Oyegoke, Hafiz A. Alaka and Temitope Omotayo

Notwithstanding the Geographical Information System (GIS) being a fast-emerging green area of a digital revolution, the available studies focus on different subject areas of…

Abstract

Purpose

Notwithstanding the Geographical Information System (GIS) being a fast-emerging green area of a digital revolution, the available studies focus on different subject areas of application in the construction industry, with no study that clarifies its knowledge strands. Hence, this systematic review analyses GIS core area of application, its system integration patterns, challenges and future directions in the construction industry.

Design/methodology/approach

A systematic review approach was employed, using the Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA) checklist. A total of 60 articles published between 2011 and 2022 were identified, thoroughly reviewed and analysed using thematic analysis.

Findings

The analysis revealed spatial planning and design, construction-task tracking, defect detection and safety monitoring as its four main application-based areas. The findings showed that the adoption of GIS technology is rapidly expanding and being utilised more in building projects to visual-track construction activities. The review discovered an integrated pattern involving data flow from a device and window-form application to GIS, the pathways to data exchange between platforms to platforms, where ArcGIS is the most used software. Furthermore, the study highlighted the lack of interoperability between heterogeneous systems as the crux impediment to adopting GIS in the built environment.

Originality/value

The research provides a deep insight into possible areas where GIS is adopted in the construction industry, identifying areas of extensive and limited application coverage over a decade. Besides, it demystifies possible pathways for future integration opportunities of GIS with other emerging technologies within the construction industry.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 23 January 2024

Dilan Weerasooriya, K.A.T.O Ranadewa and B.A.K.S Perera

Cyber-physical systems (CPS) enable the synergistic integration of virtual models with the physical environment. This integration is gaining recognition for its potential to…

Abstract

Purpose

Cyber-physical systems (CPS) enable the synergistic integration of virtual models with the physical environment. This integration is gaining recognition for its potential to enhance construction project information management, thereby contributing to improved cost management in construction. Similarly, quantity surveyor (QS) plays a key role in construction projects by estimating and monitoring construction costs. Consequently, this research aims to explore redefining the role of QSs by integrating CPS.

Design/methodology/approach

The research adopted an interpretivism stance to collect and analyse data. Two rounds of 21 and 19 semi-structured interviews were conducted, with experts selected through heterogeneous purposive sampling. Code-based content analysis was used to analyse the data using NVivo12. MS Visio data visualisation tool was used to present the findings.

Findings

It is empirically proven the potential of CPS to facilitate nine key roles of QSs in all stages of the RIBA plan of work through the identification of 15 CPS applications and technologies. Nine key roles of QSs that CPS can facilitate were identified as preliminary estimation, measurement and quantification, contract administration, preparation of BOQ, interim valuation and payments, tender and contract documentation, cost planning, cost control and procurement advice. The study explored how adopting CPS technologies can transform traditional quantity surveying practices and enhance their value within the construction industry.

Originality/value

The findings add to the body of knowledge by redefining the role of QS through the integration of CPS for the first time and then by highlighting the usages of CPS in the construction industry rather than limiting it to a specific sector of the construction industry, as previous studies have done. This research uncovers several other research arenas on CPS as being the very first research to evaluate CPS to facilitate key roles of QSs. The findings can enhance the awareness and the practical implementation of CPS by intervening to form more partnerships among application developers and industry leaders.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 22 January 2024

Md. Tareq Hossain Khondoker, Md. Mehrab Hossain and Ayan Saha

Due to its longer length compared to other construction materials and distinctive stacking patterns, obtaining construction steel bars in congested construction sites with limited…

Abstract

Purpose

Due to its longer length compared to other construction materials and distinctive stacking patterns, obtaining construction steel bars in congested construction sites with limited storage capacity becomes challenging. Lack of storage space in crowded places prompts the need for building steel bar storage choice optimization. Therefore, this study aims to optimize the construction steel bar procurement plan by providing when and how much rebar to order and how to stack different sizes of rebar considering limited storage capacity.

Design/methodology/approach

A novel approach has been presented in this paper by integrating 4D building information modelling (BIM) and mixed-integer linear programming (MILP). This technique uses BIM to retrieve material quantities, including rebar, during the design phase. Following that, activities are scheduled depending on the duration determined by crew productivity data and material quantity. Then, based on the prior price, the price of each unit of rebar is projected for the duration of construction using the exponential smoothing method. After that, the MILP approach is used to generate an optimal steel bar procurement plan for limited storage space following the scheduled rebar-related operations.

Findings

The developed strategy minimizes overall procurement costs and ensures the storage of rebar as per standard guidelines. An optimal rebar procurement and storage plan to construct a six-storied RC frame has been presented in this paper as a demonstrative example to show the effectiveness of the proposed method.

Originality/value

This work partially satisfies a long-sought research need for establishing a comprehensive construction steel bar procurement system, making it a very useful source of information for practitioners and researchers. The proposed method can be used to minimize a key performance limitation that the conventional rebar procurement practice for crowded building sites may experience.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords