Search results
1 – 10 of over 5000Onaopepo Adeniyi, Niraj Thurairajah and Feyisetan Leo-Olagbaye
Practitioners have reported a minimal and non-use of building information modelling (BIM), especially in small and medium-sized organisations and BIM infant construction…
Abstract
Purpose
Practitioners have reported a minimal and non-use of building information modelling (BIM), especially in small and medium-sized organisations and BIM infant construction industries. This development calls for a reappraisal of organisations’ strength in capabilities required for BIM uptake towards the target of global construction digitalisation. This study aims to assess the BIM Level 2 uptake capability of organisations in a BIM infant construction industry and identify the underlying interactions between the capability criteria.
Design/methodology/approach
The study used a multivariable analysis of fifteen descriptors identified from the people, process, policy, finance and technology domain. Data collection was done in the BIM infant construction industry in Nigeria. Verification of the descriptors and an evaluation of BIM uptake capability in organisations was done. Seventy-three responses were received within the selected context, and data analysis was done with mean weighting and exploratory factor analysis. Maximum Likelihood extraction and Direct Oblimin rotation were used.
Findings
Factor analysis revealed three factors that explained 53.28% of the total variance in the BIM Level 2 uptake capability of construction organisations. The factors are workforce capacity and continuous development, an affinity for innovation and strength in physical and operational facilities.
Research limitations/implications
This study provides an overarching and insightful discussion on BIM uptake capability and construction digitalisation with evidence from a BIM-infant construction industry.
Practical implications
The findings of this study are a piece of valuable empirical evidence on Level 2 BIM uptake capability. This empirical situation analysis will inform the advocacy for the advancement of BIM and enhanced utilisation of building information. Evidence on the capability performance of the BIM infant industry has been revealed.
Originality/value
The outcome is expected to stir debate on the preparedness of organisations to further exploit the benefits of BIM in the BIM infant construction industry. Examination of the capability for a particular phase of BIM is scanty in the literature.
Details
Keywords
Douglas Aghimien, Clinton Aigbavboa, Ayodeji Emmanuel Oke and John Aliu
Digitalisation, which involves the use of digital technologies in transforming an organisation’s activities, transcends just the acquiring of emerging digital tools. Having the…
Abstract
Purpose
Digitalisation, which involves the use of digital technologies in transforming an organisation’s activities, transcends just the acquiring of emerging digital tools. Having the right people to drive the implementation of these technologies and attaining strategic organisational goals is essential. While most studies have focused on the use of emerging technologies in the construction industry, less attention has been given to the ‘people’ dimension. Therefore, this study aims to assess the people-related features needed for construction digitalisation.
Design/methodology/approach
The study adopted pragmatic thinking using a mixed-method approach. A Delphi was used to achieve the qualitative aspect of the research, while a questionnaire survey conducted among 222 construction professionals was used to achieve the quantitative aspect. The data gathered were analysed using frequency, percentage, mean item score, Kruskal–Wallis H test, exploratory factor analysis and confirmatory factor analysis.
Findings
Based on acceptable reliability, validity and model fit indices, the study found that the people-related factors needed for construction digitalisation can be grouped into technical capability of personnel, attracting and retaining digital talent and organisation’s digital culture.
Practical implications
The findings offer valuable benefits to construction organisations as understanding these identified people features can help lead to better deployment of digital tools and the attainment of the digital transformation.
Originality/value
This study attempts to fill the gap in the shortage of literature exploring the people dimension of construction digitalisation. The study offers an excellent theoretical backdrop for future works on digital talent for construction digitalisation, which has gained less attention in the current construction digitalisation discourse.
Details
Keywords
Prachi Vinod Ingle, Mahesh Gangadhar and M.D. Deepak
In recent times, there has been a lot of research focused on performance measurement (PM) in project-based sectors. However, there are very few studies that were reported on the…
Abstract
Purpose
In recent times, there has been a lot of research focused on performance measurement (PM) in project-based sectors. However, there are very few studies that were reported on the significance of PM in the construction sector. Keeping track of an organization in achieving organizations goals and objectives seems an important way. One of the major challenges faced by the industry is unavailable of an appropriate PM system for assessing organizational performance. Most of the PM approaches consider the traditional project triangle assessment of project success. Based on the limitations identified in existing PM models, the purpose of this paper is to develop a comprehensive PM model, i.e. Modified Project Quarter Back Rating (MPQR) applicable for construction projects.
Design/methodology/approach
A detailed list of performance areas as a method for PM is analyzed in the construction industry context. Also, industry-specific professionals conducted semi-structured interviews to assess whether these performance areas are sufficient to measure and understand the PM systems.
Findings
The research finding focuses on developing the MPQR model that considers both financial and non-financial areas for performance assessment to provide a holistic assessment of project performance.
Practical implications
MPQR model provides an opportunity to set the benchmark for overall performance for construction organizations.
Originality/value
The findings of the study are expected to provide guidelines to construction professionals for implementing the performance model that will improve performance in the construction industry.
Details
Keywords
Hoang Nguyen Ngoc, Eslam Mohammed Abdelkader, Abobakr Al-Sakkaf, Ghasan Alfalah and Tarek Zayed
The construction industry is facing an enormous number of challenges due to continuous advancements in construction technologies and techniques. Hence, construction management…
Abstract
Purpose
The construction industry is facing an enormous number of challenges due to continuous advancements in construction technologies and techniques. Hence, construction management theories have to confront critical newly issues concerning market globalization and construction innovations. The key factor to address these challenges is to ameliorate the competitive abilities of the competing construction firms. In this context, measuring competitiveness of construction firms is an efficacious approach to amplify their competitive growth and profitability. To this end, the purpose of this research paper is to design a three-tier multi-criteria decision making model for competitiveness assessment and benchmarking of construction companies, meanwhile tackling a wide range of essential factors and attributes that covers broad aspects of the present competitive market.
Design/methodology/approach
In the first tier, four new pillars (4P) of competitiveness assessment are introduced for construction firms, namely, organization performance, project performance, environment and client and innovation and development. These pillars are able to aid in construction firms’ management on both long and short term basis. Hence, 21 key competitive factors and eighty key competitive criteria are identified, incorporated and analyzed in this research study. The second tier encapsulates carrying out a questionnaire survey in the Canadian and Vietnamese market to garner two main sets of information. The first set of information incorporates responses of the pairwise comparisons between competitiveness factors and criteria. The second set involves gathering utility scores pertinent to each competitiveness criteria. The developed model then leverages the use of analytical hierarchy process to scrutinize the relative importance priorities of competitiveness factors and criteria. The third tier of the developed model encompasses the use of multi-attribute utility theory to compute competitiveness scores for construction companies through blending criteria’ relative importance weights alongside their respective utility functions. In addition, the third tier comprises conducting a sensitivity analysis to derive the most important criteria influencing the overall competitiveness of construction companies. The developed model is tested and validated using three case studies; one construction company from Canada and two construction companies from Vietnam.
Findings
Results demonstrated that the developed model has a potential to render a synthesized and methodical performance evaluation for the competitive ability of a given construction company. Furthermore, it was found that Vietnamese companies are more considerate towards pillars pertaining to environment and client while Canadian companies are more attentive towards innovation and development. The outcome of sensitivity analysis revealed that effectiveness of cost management highly affects the competitive ability of Vietnamese companies while effectiveness of cost management exhibits the most significant influence on the competitive of Canadian companies.
Practical implications
The developed model can benefit construction companies to understand their competitiveness in their market and diagnose their strengths and weaknesses. It is also can be useful in efficient utilization of their limited resources and development of sustainable and long-term strategic plans strategic plans, which consequently leads to maintaining better position in their dynamic business markets.
Originality/value
Literature review manifests that reported competitiveness assessment models and practices are not able to address present challenges, technologies and developments in construction market.
Details
Keywords
Esther Oluwadamilola Olufemi Rotimi, Funmilayo Ebun Rotimi, C.W. Chathurani Silva and Itohan Esther Aigwi
There are several technologies positively impacting the management of construction projects. Building information modelling (BIM) is one such technology, slowly changing project…
Abstract
Purpose
There are several technologies positively impacting the management of construction projects. Building information modelling (BIM) is one such technology, slowly changing project delivery. However, enhancing knowledge transfer (KT) within the construction industry is crucial because of the characteristic slow uptake of innovation. Therefore, this study aims to establish the effectiveness of the KT mechanism for BIM implementation in construction organisations.
Design/methodology/approach
This study adopted a quantitative research method where a structured questionnaire was distributed to construction professionals. A partial least square structural equation modeling path analysis was used to test the direct and indirect relationships of computer self-efficacy (CS), perceived ease of use (PEOU), KT and BIM usage.
Findings
This study found that CS could improve KT, which will, in turn, increase the implementation of BIM within construction organisations. However, in terms of KT, individuals’ confidence and ability to use BIM inspires them to share the knowledge of BIM they had received through training. Furthermore, this study found that the ease of interacting, learning and being skilful with BIM may not necessarily ensure the actual transfer of knowledge.
Originality/value
This study provides valuable insights into KTs (BIM implementation) in the construction industry. It will enhance the use of BIM systems and related knowledge through effective training amongst construction practitioners. Other previous studies have focused on challenges and barriers to BIM implementation, this study goes deeper into establishing the effectiveness of the KT mechanism for BIM implementation in construction organisations.
Details
Keywords
Haonan Qi, Zhipeng Zhou, Javier Irizarry, Xiaopeng Deng, Yifan Yang, Nan Li and Jianliang Zhou
This study aims to modify the human factors analysis and classification system (HFACS) to make it suitable for collapse accident analysis in construction. Based upon the modified…
Abstract
Purpose
This study aims to modify the human factors analysis and classification system (HFACS) to make it suitable for collapse accident analysis in construction. Based upon the modified HFACS, distribution patterns of causal factors across multiple levels were discerned among causal factors of various stakeholders at construction sites. It explored the correlations between two causal factors from different levels and further determined causation paths from two perspectives of level and stakeholder.
Design/methodology/approach
The main research framework consisted of data collection, coding and analysis. Collapse accident reports were collected with adequate causation information. The modified HFACS was utilized for coding causal factors across all five levels in each case. A hybrid approach with two perspectives of level and stakeholder was proposed for frequency analysis, correlation analysis and path identification between causal factors.
Findings
Eight causal factors from external organizations at the fifth level were added to the original HFACS. Level-based correlation analyses and path identification provided safety managers with a holistic view of inter-connected causal factors across five levels. Stakeholder-based correlation analyses between causal factors from the fifth level and its non-adjacent levels were implemented based on client, government and third parties. These identified paths were useful for different stakeholders to develop specific safety plans for avoiding construction collapse accidents.
Originality/value
This paper fulfils an identified need to modify and utilize the HFACS model for correlation analysis and path identification of causal factors resulting in collapse accidents, which can provide opportunities for tailoring preventive and protective measures at construction sites.
Details
Keywords
Tim Neerup Themsen, Peter Holm Jacobsen and Kjell Tryggestad
This paper aims to advance recent literature on the performativity of accounting by examining how project accounting affects a project organization’s ability to deliver a relevant…
Abstract
Purpose
This paper aims to advance recent literature on the performativity of accounting by examining how project accounting affects a project organization’s ability to deliver a relevant project outcome, such as a product or a building, for a receiving client organization.
Design/methodology/approach
The paper draws on a longitudinal case study of a 41.4-billion-kroner (5.5-billion-euro) Danish project of constructing 16 new public hospitals. Its objective was to reduce the average unit costs and improve the quality of patient care. Each hospital construction was managed by a separate project organization and handed over to a separate receiving hospital organization. The project organizations applied a common approach to project accounting. The paper relies on Michel Callon’s concepts of performativity and sociotechnical agencement – approaching project accounting as an arrangement of devices.
Findings
The paper shows that the project-accounting agencement simultaneously supported and undermined the project organizations’ ability to deliver hospitals relevant to the receiving hospital organizations. The agencement performed hospital designs, disciplined project actors and guided decision-making, thus supporting the overall work of the project organizations. It also, however, compelled the project organizations to compromise on hospital designs when unexpected events occurred. These compromises led to the delivery of hospitals, which largely prevented the receiving hospital organizations from achieving the project’s objective.
Originality/value
This paper advances our limited understanding of the dynamic and complex relationship between project accounting and the relevance of project outcomes. It introduces the concept of a “contronymity device” to capture the way project accounting simultaneously produces two opposing consequences, both supporting and undermining the enactment of a particular reality. The paper lastly enriches our understanding of how project-accounting devices impact hospital organizations’ operating cost structures and challenge patient care capabilities.
Details
Keywords
Siraj Ahmed, Jukka Majava and Kirsi Aaltonen
The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE…
Abstract
Purpose
The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE implementation in construction projects.
Design/methodology/approach
A qualitative research approach with abductive reasoning was adopted. The empirical data were collected from the construction industry in the United Arab Emirates (UAE).
Findings
The results reveal that clients, consultants and contractors have limited awareness, knowledge and motivation to implement CE in construction projects. The absence of incentives to design projects following CE principles, lack of involvement of contractors and suppliers, non-use of materials that use CE principles and current procurement strategies are the main challenges for the implementation of CE in the UAE.
Originality/value
Previous research offers limited knowledge on CE and its implementation in construction projects particularly from a procurement strategy perspective. The findings of the study provide new knowledge of the benefits, challenges and role of procurement strategy for implementing CE. It is suggested that collaborative and partnering-based procurement methods are needed to facilitate the effective implementation of CE.
Details
Keywords
Yazeed A. Alragabah and Mohd. Ahmed
There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of…
Abstract
Purpose
There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of this paper is to assess the impact of CSFs on the government construction projects in Saudi Arabia. The success factors are investigated from a broader consideration of failure criteria, from consideration of most effectiveness in successful project completion and also from consideration of the impact of implementing control processes for successful project completion.
Design/methodology/approach
This study has analysed the impact of success factors on construction projects in Saudi Arabia using a descriptive methodology. An exhaustive literature survey is undertaken to identify the success and failure factors related to government construction projects in Saudi Arabia. The survey data are sorted out and analysed by cost, schedule, technical, context and finance dimensions of the projects based on project types, engineering complexity, size, modality, jurisdictional control and funding approach. To evaluate the influence of success factors implementation, qualitative data were collected in a survey via a web-based questionnaire that was sent to officials working and occupying a responsible position in national project guidelines organizations and in government construction organizations in Saudi Arabia. In all, 28 CSFs were identified, ranked and evaluated for their impact on project success. The four identified factors belong to process categories of construction projects, nine factors belong to management of construction projects and 15 success factors are identified for impact assessment of implementation in construction projects.
Findings
The study's findings have identified and ranked the top five CSFs that significantly influence project outcomes, including meeting time targets, adhering to financial budgets, delivering desired outcomes for all stakeholders, effectively managing risks and assembling the appropriate team while optimizing resource allocation. Additionally, the research indicates that hindrances to projects primarily stem from execution, economic, human and political factors. The study advocates for strict controls over incomplete engineering designs and advises against contractors independently handling design work to ensure project success. Additionally, addressing contractors' qualifications and financial matters is crucial for project success. By highlighting these CSFs and challenges, the research provides actionable insights to enhance project management practices in the construction industry.
Research limitations/implications
This study is limited to the infrastructure projects constructed by governmental bodies with the participation of officials from government organizations. Further study, including private projects and officials working on private projects, may be needed to generalized the research outcome.
Originality/value
Numerous studies have investigated CSFs in construction projects, but few have examined their relevance to Saudi Arabian government projects. This study aims to fill this gap by identifying key CSFs specific to Saudi Arabian public sector construction projects and assessing their impact on project success. It advocates for stringent controls in the Saudi Arabian construction sector, emphasizing the importance of preventing incomplete or altered engineering designs by contractors to increase the success rate of public sector projects. This research offers practical insights to stakeholders, advancing project management practices in Saudi Arabia's construction sector for improved outcomes and resource utilization.
Details
Keywords
Innocent Chigozie Osuizugbo, Opeyemi Olanrewaju Oyeyipo and Aduragbemi Deborah Olojo
This study investigates the drivers of CSR practices among construction companies in Lagos, Nigeria.
Abstract
Purpose
This study investigates the drivers of CSR practices among construction companies in Lagos, Nigeria.
Design/methodology/approach
This research adopted a questionnaire survey to achieve the aim. A purposefully chosen group of managing directors, directors, other senior construction experts or management personnel working for small, medium and large-sized construction enterprises in Nigeria were given questionnaires to complete. 196 questionnaires were issued, out of which 103 were properly completed and returned, with a return percentage of 61% which served as the basis for this study. Utilizing both descriptive and inferential statistics, the collected data were examined.
Findings
The results from the study revealed that “vision of the founder”, “creating public attention”, “competitive advantage” and “business strategy” were the top most four drivers of CSR initiatives among construction companies in Lagos, Nigeria. The results also showed that, there is a statistically significant degree of agreement between various categories of construction companies in Lagos, Nigeria regarding the drivers of CSR initiatives.
Originality/value
The study contributes more effectively to CSR studies by highlighting the drivers of CSR initiatives in construction companies. The finding would facilitate the adoption and implementation of CSR initiatives in construction organizations. The adoption of best CSR practices fosters strong relationship among construction companies, project stakeholders and communities.
Details