Search results

1 – 10 of over 7000
Article
Publication date: 25 July 2024

Saad Sarhan, Stephen Pretlove, Faris Elghaish, Sandra Matarneh and Alan Mossman

While stress, anxiety and depression rank as the second leading cause of work-related ill health in the UK construction sector, there exists a scarcity of empirical studies…

Abstract

Purpose

While stress, anxiety and depression rank as the second leading cause of work-related ill health in the UK construction sector, there exists a scarcity of empirical studies explicitly focused on investigating the sources of occupational stress among construction workers and professionals at both the construction project and supply chain levels. This study seeks to identify and investigate the primary stressors (sources of stress) in UK construction projects and to propose effective strategies for preventing or reducing stress in this context.

Design/methodology/approach

The study adopted a qualitative multi-methods research approach, comprising the use of a comprehensive literature review, case study interviews and a focus group. It utilised an integrated deductive-inductive approach theory building using NVivo software. In total, 19 in-depth interviews were conducted as part of the case-study with a well-rounded sample of construction professionals and trade supervisors, followed by a focus group with 12 policy influencers and sector stakeholders to evaluate the quality and transferability of the findings of the study.

Findings

The results reveal seven main stressors and 35 influencing factors within these 7 areas of stress in a UK construction project, with “workflow interruptions” emerging as the predominant stressor. In addition, the results of the focus-group, which was conducted with a sample of 12 prominent industry experts and policy influencers, indicate that the findings of the case study are transferrable and could be applicable to other construction projects and contexts. It is, therefore, recommended that these potential stressors be addressed by the project team as early as possible in construction projects. Additionally, the study sheds empirical light on the limitations of the critical path method and identifies “inclusive and collaborative planning” as a proactive strategy for stress prevention and/or reduction in construction projects.

Research limitations/implications

The findings of this study are mainly based on the perspectives of construction professionals at managerial and supervisory levels. It is, therefore, suggested that future studies are designed to focus on capturing the experiences and opinions of construction workers/operatives on the site.

Practical implications

The findings from this study have the potential to assist decision-makers in the prevention of stress within construction projects, ultimately enhancing workforce performance. It is suggested that the findings could be adapted for use as Construction Supply Chain Management Standards to improve occupational stress management and productivity in construction projects. The study also provides decision-makers and practitioners with a conceptual framework that includes a list of effective strategies for stress prevention or reduction at both project and organisational levels. It also contributes to practice by offering novel ideas for incorporating occupational stress and mental health considerations into production planning and control processes in construction.

Originality/value

To the best of the authors’ knowledge, this is the first, or one of the very few studies, to explore the concept of occupational stress in construction at the project and supply chain levels. It is also the first study to reveal “workflow” as a predominant stressor in construction projects. It is, therefore, suggested that both academic and industry efforts should focus on finding innovative ways to enhance workflow and collaboration in construction projects, to improve the productivity, health and well-being of their workforce and supply chain. Further, it is suggested that policymakers should consider the potential for incorporating “workflow” into the HSE's Management Standards for stress prevention and management.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 19 December 2022

Avirag Bajpai and Subhas C. Misra

This study aims to identify and rank the key success factors linked with digitalization in the Indian construction sector. Because the construction firms in India are in the early…

Abstract

Purpose

This study aims to identify and rank the key success factors linked with digitalization in the Indian construction sector. Because the construction firms in India are in the early stages of implementing digitalization in their operations, it provides a framework from which they may focus on the effectiveness of digitalization.

Design/methodology/approach

This research study examines 12 success factors related to digitalization in construction, which are derived from various sectors. Furthermore, experts from the construction industry and academia have validated these factors with respect to the Indian construction sector. The multi-criteria decision-making techniques are further used to examine the interrelationship, ranking and weightage of digitalization success. Finally, the success factors are validated through a questionnaire-based empirical study followed by ranking using a t-test. The results from both approaches (company-specific and generalized) are compared and discussed.

Findings

This research identifies that selecting appropriate digital methods and techniques is a critical success factor as far as digitalization in the Indian construction scenario is concerned. Besides that, continuous monitoring and control in digital implementation significantly impact other factors.

Research limitations/implications

While similar results are obtained from approaches adopted in the study, a few success factors appear to differ in terms of their ranking position. Further studies can explore the finer details that can explain the behavior pattern. This study can also be extended by assessing the structural relationship among the identified factors that can throw more light on the dynamics of the continuation of digitalization in construction which can further help in formulating policies or digitalization rollout.

Practical implications

The outcome of this study sheds light on construction business knowledge by stressing key success elements connected to digitalization in construction processes in the Indian construction sector. Moreover, this study shows that the success of digitalization in construction is similar to that of transformation in the information technology industry, where adopting suitable digital methods and techniques plays a vital role in the transformation process.

Originality/value

Despite the multiple benefits of construction digitalization, limited research focuses on digitalization success factors, making this study unique. Furthermore, this study demonstrates that integrating Fuzzy decision-making trial and evaluation laboratory and maximum mean de-entropy approaches may be used to successfully prioritize success factors in the nascent stage of construction digitalization.

Details

Construction Innovation , vol. 24 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Book part
Publication date: 1 July 2024

Bernard Arthur-Aidoo, Princess Naa Kwarkai Quartey, Perry Ransgreg Nunoo and Alex Kwaku Adzinku

Gender equality and women's empowerment are essential for social progress and sustainable development. Gender equality and women's empowerment initiatives have gained traction in…

Abstract

Gender equality and women's empowerment are essential for social progress and sustainable development. Gender equality and women's empowerment initiatives have gained traction in the formerly male-dominated construction sector in recent years. The purpose of this part of the book is to discuss the difficulties that women in the construction industry experience, the value of women's empowerment and the methods that may be used to achieve gender equality in the field.

Details

Breaking Ground
Type: Book
ISBN: 978-1-83549-638-1

Keywords

Article
Publication date: 30 May 2024

Taofeeq Durojaye Moshood, James O.B. Rotimi, Wajiha Shahzad and Maruf Gbadebo Salimon

Over the past two decades, the construction sector has experienced a surge in projects fueled by substantial government investment in infrastructure. However, amid this growth…

Abstract

Purpose

Over the past two decades, the construction sector has experienced a surge in projects fueled by substantial government investment in infrastructure. However, amid this growth, the industry grapples with persistent challenges. Meeting project deadlines and budgets remains a struggle, impacting the industry’s credibility. Therefore, this research intends to investigate the idea of lean construction in the construction sector and look at the obstacles facing the construction industry in implementing lean construction strategies.

Design/methodology/approach

The insights presented here result from content analysis performed on 206 articles, while the metadata analysis is based on 891 publications.

Findings

This study highlights numerous important characteristics that influence an organization’s capacity to accomplish lean construction using a systematic literature review approach.

Research limitations/implications

For forthcoming research seeking validation, utilizing a mixed-method approach could prove advantageous. Yet, it is crucial to recognize the constraints of the present study, primarily centered on the scope of the literature review.

Practical implications

This assessment will enhance comprehension of the lean construction concept, potentially encouraging the adopting of lean construction practices. Moreover, it could provide insights into effectively applying these methods in practice.

Originality/value

The literature review highlights the necessity for organizations to identify and address potential challenges they might encounter in implementing lean construction. An essential step in overcoming these obstacles involves exploring the concept of lean construction within the sector and assessing the hurdles constraining the implementation of lean construction strategies in the construction industry.

Details

Technological Sustainability, vol. 3 no. 3
Type: Research Article
ISSN: 2754-1312

Keywords

Case study
Publication date: 7 August 2024

Soroush Dehghan Salmasi, Mehran Sepehri and Yashar Dadashzadeh

After reading the case and answering the case assignments, students will be able to understand and explain the challenges and opportunities for engineering, procurement and…

Abstract

Learning outcomes

After reading the case and answering the case assignments, students will be able to understand and explain the challenges and opportunities for engineering, procurement and construction (EPC) contractors and their subcontractors; understand and critically analyse the advantages and disadvantages of insourcing and outsourcing of engineering, procurement and construction in EPC projects; determine which situations merit insourcing or outsourcing within each of engineering, procurement and construction in EPC projects; understand and identify the competencies and qualifications that a subcontractor must possess if any EPC activity is outsourced to them; and develop a decision-making framework to determine which EPC activities must be kept in-house or outsourced in EPC projects.

Case overview/synopsis

In mid-March 2021, PetroSahand International Group, a leading EPC contractor specializing in the oil, gas and petrochemicals industries in Iran, encountered significant challenges with its subcontractors in engineering and construction. These issues resulted in widespread repercussions for the company, including project delays and mounting debts. At the peak of these crises, PetroSahand’s senior management embarked on a thorough examination of whether to insource or outsource various aspects of their operations, such as engineering, procurement and construction. Their objective was twofold: to prevent similar setbacks in future projects and to navigate existing projects with minimal disruption to the company’s reputation. To address this critical dilemma, PetroSahand enlisted the expertise of a consulting team from Sharif University of Technology. Comprising esteemed professors, graduates and students from one of Iran’s most respected institutions, this team undertook an exhaustive analysis of the insourcing versus outsourcing debate across EPC domains. Subsequently, they presented their comprehensive findings, thereby confronting PetroSahand’s senior management with a pivotal choice regarding the optimal approach for each activity.

Complexity academic level

The audience of this work is undergraduate and graduate students who are enrolled in project management courses, both fundamentals and advanced. In addition, this case helps senior managers of EPC contractors gain a deeper and more comprehensive understanding of insourcing or outsourcing different project activities.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 7: Management science.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Open Access
Article
Publication date: 13 September 2022

Oliver Disney, Mattias Roupé, Mikael Johansson and Alessio Domenico Leto

Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design…

5984

Abstract

Purpose

Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design process, BIM becomes obsolete as focus shifts to producing static 2D-drawings, which leads to a lack of trust in BIM. In Scandinavia, a concept known as Total BIM has emerged, which is a novel “all-in” approach where BIM is the single source of information throughout the project. This paper's purpose is to investigate the overall concept and holistic approach of a Total BIM project to support implementation and strategy work connected to BIM.

Design/methodology/approach

Qualitative data were collected through eight semi-structured interviews with digitalization leaders from the case study project. Findings were analyzed using a holistic framework to BIM implementation.

Findings

The Total BIM concept was contingent on the strong interdependences between commonly found isolated BIM uses. Four main success factors were identified, production-oriented BIM as the main contractual and legally binding construction document, cloud-based model management, user-friendly on-site mobile BIM software and strong leadership.

Originality/value

A unique case is studied where BIM is used throughout all project phases as a single source of information and communication platform. No 2D paper drawings were used on-site and the Total BIM case study highlights the importance of a new digitalized construction process.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 12 April 2024

Kyudong Kim, Helena R. Tiedmann and Kasey M. Faust

The COVID-19 pandemic caused significant societal changes and altered how much of the construction industry operates. This study investigates the impacts of pandemic-related…

Abstract

Purpose

The COVID-19 pandemic caused significant societal changes and altered how much of the construction industry operates. This study investigates the impacts of pandemic-related changes, how these changes may apply to different companies, and which changes should continue post-pandemic.

Design/methodology/approach

We aim to identify pandemic-driven changes that have affected the construction workplace and the advantages and challenges associated with them. We then make recommendations for what could and should endure through the pandemic and beyond, and under what circumstances. To achieve this objective, we conducted both qualitative and quantitative analyses of 40 semi-structured interviews with US-based construction professionals.

Findings

Identified through these interviews were 21 pandemic-driven changes across six categories: management and planning, technology, workforce, health and safety, supply chain, and contracts. This study noted both positive and negative impacts of the changes on cost, schedule, productivity, collaboration, employee retention, flexibility, quality, and risk mitigation. Participants indicated that some changes should remain after the pandemic and others (e.g. select safety measures, schedule adjustments) should be temporary.

Originality/value

By incorporating these lessons learned into recommendations, the findings of this study will help businesses identify and implement the most appropriate improvements for their organizations. The findings also provide policymakers with valuable insights on how to promote innovation in the construction industry and potentially enact more effective policies during crises to drive long-term improvements.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 3 July 2023

Siraj Ahmed, Jukka Majava and Kirsi Aaltonen

The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE…

4482

Abstract

Purpose

The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE implementation in construction projects.

Design/methodology/approach

A qualitative research approach with abductive reasoning was adopted. The empirical data were collected from the construction industry in the United Arab Emirates (UAE).

Findings

The results reveal that clients, consultants and contractors have limited awareness, knowledge and motivation to implement CE in construction projects. The absence of incentives to design projects following CE principles, lack of involvement of contractors and suppliers, non-use of materials that use CE principles and current procurement strategies are the main challenges for the implementation of CE in the UAE.

Originality/value

Previous research offers limited knowledge on CE and its implementation in construction projects particularly from a procurement strategy perspective. The findings of the study provide new knowledge of the benefits, challenges and role of procurement strategy for implementing CE. It is suggested that collaborative and partnering-based procurement methods are needed to facilitate the effective implementation of CE.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 9 September 2024

Muhammad Asfund Khalid, Muhammad Usman Hassan, Fahim Ullah and Khursheed Ahmed

The debate around automation through digital technologies has gathered traction in line with the advancement of Industry 4.0. Blockchain-powered construction progress payment has…

Abstract

Purpose

The debate around automation through digital technologies has gathered traction in line with the advancement of Industry 4.0. Blockchain-powered construction progress payment has emerged as an area that can benefit from such automation. However, the challenges inherent in real-time construction payment processes cannot be solely mitigated by blockchain. Including building information modeling (BIM)-based schedule information stored in decentralized storage linked with a smart contract (SC) can allow the efficient administration of payments. Accordingly, this study aims to present an integrated BIM-blockchain system (BBS) to administer decentralized progress payments in construction projects.

Design/methodology/approach

A mixed-method approach is adopted, including an extensive literature review, development of the integrated BBS, and a case study with 13 respondents to test and validate the BBS. This study proposes a BBS that extracts the invoices from BIM and pushes them to the decentralized app (dApp) for digital payment to the contractor through the Ethereum blockchain. The Solc npm package was used to compile the backend SC. Next.js was used to create the front end of the dApp. The Web3 npm package is paramount in developing a dApp. A total of 13 construction professionals working on the case study project were engaged through a questionnaire survey to comment on and validate the proposed BBS. A descriptive analysis was conducted on the case study data to apprehend the responses of expert professionals.

Findings

The proposed BBS creates an SC, enables sender verification, checks contract complaints, verifies bills, and processes the currency flow based on a coded payment logic. After passing the initial checks, the bill amount is processed and made available for the contractor to claim. Every activity on dApp leaves its trace on the blockchain ledger. A control mechanism for accepting or rejecting the invoice is also incorporated into the system. The case study-based validation confirmed that the proposed BBS could increase payment efficiency (92.3%), tackle financial misconduct (84.6%), ensure transparency and audibility (92.4%), and ensure payment security (61%) in construction projects. A total of 46.2% of respondents were skeptical of the BBS because of its dependency on cryptocurrencies. A further 23.1% of respondents indicated that the price fluctuation of cryptocurrencies is a major barrier to BBS adoption. Others highlighted the absence of legal frameworks for cryptocurrencies’ usage.

Originality/value

This study opens the avenue for the application of dApp for autonomous contract management and progress payments, which is flexible with applications across various construction processes. Overall, it is a potential solution to the endemic problem of cash flow that has devastating consequences for all project stakeholders. This is also aligned with the goals of Industry 4.0, where process automation is a key focus. The study provides a practice application for automated progress payments that can be leveraged in construction projects across the globe.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 17 July 2024

Patrick John Bruce, Victor Hrymak, Carol Bruce and Joseph Byrne

The purpose of this study is to provide evidence to support an emerging theory that interpersonal conflict is the primary cause of workplace stress among a self-selected sample of…

Abstract

Purpose

The purpose of this study is to provide evidence to support an emerging theory that interpersonal conflict is the primary cause of workplace stress among a self-selected sample of Irish construction managers.

Design/methodology/approach

Eighteen construction managers working in Ireland were recruited for this study. Using semi-structured interviews and interpretative phenomenological analysis as the research methodology, the causes of their workplace stress were investigated.

Findings

Participants reported that the principal cause of their workplace stress was high levels of interpersonal conflict between colleagues. The effects of this interpersonal conflict included avoidance behaviour, ill health, absences from the workplace and loss of productivity issues. Deadlines, penalty clauses, lack of appreciation, cliques, costs, communication, temporary contracts and delays were also reported stressors.

Research limitations/implications

A limitation of the study is the small sample of 18 construction managers and the limited geographical area.

Social implications

The social implications of this study could be to clearly identify that interpersonal conflict may be under reported in the construction industry, and there is a possibility that it is being misclassified as other workplace behaviours such as bullying, harassment and workplace violence. If this is so, this could aid future researchers in addressing this challenging workplace behaviour.

Originality/value

The current consensus in the literature is that the three main causes of workplace stress are bullying, harassment and violence. However, the role and importance of interpersonal conflict as reported in this study, with the exception of North America and China, is not reflected in the wider health and safety research literature. In addition, interpersonal conflict and its reluctance to be reported is largely absent from construction safety research. The findings of this study may be explained if the workplace stress research community is currently misclassifying interpersonal conflict as a manifestation of bullying, harassment or violence. If this is the case, interpersonal conflict needs further research. This is to establish if this cause of construction-related workplace stress needs to be reconsidered as a standalone phenomenon in the wider family of challenging workplace behaviours.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of over 7000