Article
Publication date: 24 October 2022

Na Zhang, Bon-Gang Hwang, Xiaopeng Deng and Fiona Tay

The Singapore construction sector is promoting performance improvement by implementing collaborative contracting (CC). For CC's successful implementation, there is a need to sieve…

Abstract

Purpose

The Singapore construction sector is promoting performance improvement by implementing collaborative contracting (CC). For CC's successful implementation, there is a need to sieve out the critical success factors (CSFs). Hence, this paper aims to explore factors influencing the adoption of CC and investigate the potential performance improvement by implementing CC.

Design/methodology/approach

Based on the literature review, 23 CSFs were identified and packaged to a questionnaire to evaluate the CSF's priority as well as CC's potential impact on the project performance. After prior validation, 165 potential respondents were drawn from survey list by using simple random sampling. Finally, 31 valid responses were received.

Findings

The survey result showed that the top five CSFs are mutual trust, all parties to commit fully, openness between parties, commitment to a win–win attitude and resource availability. The majority of respondents hold that CC implementation would improve overall project performance, decision effectiveness, cost, time, quality and risk performance.

Research limitations/implications

Directors, project managers, contractor managers and site engineers have different perceptions of CSFs. Also rather than meeting the same requirements in the implementation of CC, there are differences among projects with different values.

Originality/value

This study provides an in-depth understanding of the CSFs for industry practitioners adopting CC and CC's potential impact on project performance. This study is also helpful for authorities to formulate effective policies to push the implementation of CC.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 September 2023

Mohammad Mayouf and Ciaran Gilligan

In construction projects, underpayments can be recognised as one of the significant drawbacks that impact the success of a project. Research into underpayments is considered…

Abstract

Purpose

In construction projects, underpayments can be recognised as one of the significant drawbacks that impact the success of a project. Research into underpayments is considered ambiguous and provides a limited reflection of the issue, which makes it complicated to trace how it originates in the first place. This study aims to examine the causes that lead to underpayments and develop a holistic synthesis of underpayments for subcontractors in the lifecycle of a construction project.

Design/methodology/approach

An open-ended and closed-ended questionnaire was used to collect the data using purposeful sampling with 28 construction stakeholders who ranged from main contractors, subcontractors and others (Small medium enterprises SMEs, Consultancies, Clients etc.). Data collected was analysed to trace drivers and the impact of underpayment and suggested mitigation strategies to be identified whilst viewing the perspectives of a main contractor and subcontractor.

Findings

The findings show that the most prominent driver for underpayments is variation disputes followed by cash flow. The research also suggests mitigation strategies such as collaborative working, more robust budget control and early identification of risks as potential remedies to overcome the underpayment issue. The research concludes with a framework that elicits the complexity underlying underpayments for subcontractors in construction projects.

Originality/value

The research evolves the understanding that underpayment is a complex phenomenon, relying heavily on the data/information exchange mechanism between the main contractor and subcontractors. This research provokes the need to understand underpayment further so it can be mitigated.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Open Access
Article
Publication date: 3 July 2023

Siraj Ahmed, Jukka Majava and Kirsi Aaltonen

The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE…

3372

Abstract

Purpose

The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE implementation in construction projects.

Design/methodology/approach

A qualitative research approach with abductive reasoning was adopted. The empirical data were collected from the construction industry in the United Arab Emirates (UAE).

Findings

The results reveal that clients, consultants and contractors have limited awareness, knowledge and motivation to implement CE in construction projects. The absence of incentives to design projects following CE principles, lack of involvement of contractors and suppliers, non-use of materials that use CE principles and current procurement strategies are the main challenges for the implementation of CE in the UAE.

Originality/value

Previous research offers limited knowledge on CE and its implementation in construction projects particularly from a procurement strategy perspective. The findings of the study provide new knowledge of the benefits, challenges and role of procurement strategy for implementing CE. It is suggested that collaborative and partnering-based procurement methods are needed to facilitate the effective implementation of CE.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 31 May 2022

Kari-Pekka Tampio and Harri Haapasalo

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in…

1054

Abstract

Purpose

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in practical projects. The main aim is to describe how these different methods impact value creation.

Design/methodology/approach

Action design research was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the second author acted as an “outside researcher”. Two workshops were organised to evaluate the direct and indirect challenges and benefits of the applied four methods and to explain how different methods enable value creation.

Findings

All the studied methods provide good results in terms of usability and commitment to the aims of the project, thus delivering the direct benefits expected. Process, people and tools logic works well in this case project when applying the methods properly. Significant evidence was provided on secondary deliverables of the methods, and all analysed methods had a significant impact in the area of leading people, clarifying what “focus on people” means and how it is enabled.

Practical implications

Focus on people can be achieved through different operative methods if applied in the right way. It is necessary to select the most suitable methods based on all the direct and indirect deliverables.

Originality/value

This case project offered a platform to analyse integration methods in a real-life project using the collaborative contract method. The authors were able to participate in the analysis by taking action from the very beginning of the project in terms of training, learning, continuous development and coaching of these methods and evaluating the applicability.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 11 April 2024

Xiaowei An, Sicheng Ren, Lunyan Wang and Yehui Huang

The purpose of this paper is to explore the support for multi-party collaboration in project construction provided by building information modeling (BIM). Based on the perspective…

Abstract

Purpose

The purpose of this paper is to explore the support for multi-party collaboration in project construction provided by building information modeling (BIM). Based on the perspective of value co-creation, the research results can provide support for the collaborative application and contract design of BIM platform.

Design/methodology/approach

In this paper, an evolutionary game model involving the owner, designer and constructor is constructed by using prospect theory and evolutionary game theory. Through simulation analysis, the evolution law of the strategy choice of each party in the collaborative application of BIM platform is discussed and the key factors affecting the strategy choice of all parties are analyzed.

Findings

The results show that there is an ideal local equilibrium point with progressive stability in the evolutionary game between the three parties: “the construction party shares information, the designer receives the information and optimizes the project and the owner does not provide incentives”; in addition, the opportunistic behaviors of the design and construction parties, as well as the probability of such behaviors being detected and the subsequent punishment have a significant impact on the evolutionary outcome.

Originality/value

This method can provide support for the collaborative application and contract design of BIM platform.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 February 2023

Sara Rashidian, Robin Drogemuller, Sara Omrani and Fereshteh Banakar

The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving…

Abstract

Purpose

The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving collaboration and delivering construction projects has been acknowledged by construction academics and professionals. Once organizations have fully embraced BIM, IPD and LC integration, a measurement tool such as a maturity model (MM) for benchmarking their progress and setting realistic goals for continuous improvement will be required. In the context of MMs literature, however, no comprehensive analysis of these three construction management methods has been published to reveal the current trends and common themes in which the models have approached each other.

Design/methodology/approach

Therefore, this study integrates systematic literature review (SLR) and thematic analysis techniques to review and categorize the related MMs; the key themes in which the interrelationship between BIM, IPD and LC MMs has been discussed and conceptualized in the attributes; the shared characteristics of the existing BIM, IPD and LC MMs, as well as their strengths and limitations. The Preferred Reporting Items for Systematic Reviews (PRISMA) method has been used as the primary procedure for article screening and reviewing published papers between 2007 and 2022.

Findings

Despite the growth of BIM, IPD and LC integration publications and acknowledgment in the literature, no MM has been established that holistically measures BIM, IPD and LC integration in an organization. This study identifies five interrelated and overlapping themes indicative of the collaboration of BIM, IPD and LC in existing MMs' structure, including customer satisfaction, waste minimization, Lean practices and cultural and legal aspects. Furthermore, the MMs' common characteristics, strengths and limitations are evaluated to provide a foundation for developing future BIM, IPD and LC-related MMs.

Practical implications

This paper examines the current status of research and the knowledge gaps around BIM, IPD and LC MMs. In addition, the highlighted major themes serve as a foundation for academics who intend to develop integrated BIM, IPD, and LC MMs. This will enable researchers to build upon these themes and establish a comprehensive list of maturity attributes fulfilling the BIM, IPD and LC requirements and principles. In addition, the MMs' BIM, IPD and LC compatibility themes, which go beyond themes' intended characteristics in silos, increase industry practitioners' awareness of the underlying factors of BIM, IPD and LC integration.

Originality/value

This review article is the first of a kind to analyze the interaction of IPD, BIM and LC in the context of MMs in current AEC literature. This study concludes that BIM, IPD and LC share several joint cornerstones according to the existing MMs.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 14 February 2022

Salma Husna Zamani, Rahimi A. Rahman, Muhammad Ashraf Fauzi and Liyana Mohamed Yusof

Policymakers are developing government-level pandemic response strategies (GPRS) to assist architecture, engineering and construction (AEC) enterprises. However, the effectiveness…

Abstract

Purpose

Policymakers are developing government-level pandemic response strategies (GPRS) to assist architecture, engineering and construction (AEC) enterprises. However, the effectiveness of the GPRS has not been assessed. Therefore, this study aims to investigate the interrelationships between GPRS and AEC enterprises. To achieve that aim, the study objectives are to compare GPRS effectiveness between small-medium and large AEC enterprises, develop groupings to categorize interrelated GPRS and evaluate the effectiveness of the GPRS and interrelated constructs.

Design/methodology/approach

A systematic literature review and semi-structured interviews with 40 AEC industry professionals were carried out, generating 22 GPRS. Then, questionnaire survey data was collected among AEC professionals. In total, 114 valid survey answers were received and analyzed using the Kruskal–Wallis H test, normalized mean analysis, factor analysis and fuzzy synthetic evaluation.

Findings

Small-medium enterprises have four distinct critical GPRS: “form a special task force to provide support in maneuvering COVID-19,” “provide infrastructure investment budgets to local governments,” “develop employee assistance programs that fit all types of working groups” and “diversify existing supply chain.” Large enterprises have two distinct critical GPRS: “provide help in digitalizing existing construction projects” and “mandate COVID-19 as force majeure.” Eighteen GPRS can be categorized into the following five constructs: “market stability and financial aid,” “enterprise capability management,” “supply chain improvement,” “law and policy resources” and “information and workforce management.” The former two constructs are more effective than other GPRS constructs.

Originality/value

This is the first paper that evaluates the effectiveness of GPRS for AEC enterprises, providing new evidence to policymakers for well-informed decision-making in developing pandemic response strategies.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 27 February 2024

Maryam R. Nezami, Mark L.C. de Bruijne, Marcel J.C.M. Hertogh and Hans L.M. Bakker

Societies depend on interconnected infrastructures that are becoming more complex over the years. Multi-disciplinary knowledge and skills are essential to develop modern…

Abstract

Purpose

Societies depend on interconnected infrastructures that are becoming more complex over the years. Multi-disciplinary knowledge and skills are essential to develop modern infrastructures, requiring close collaboration of various infrastructure owners. To effectively manage and improve inter-organizational collaboration (IOC) in infrastructure construction projects, collaboration status should be assessed continually. This study identifies the assessment criteria, forming the foundation of a tool for assessing the status of IOC in interconnected infrastructure projects.

Design/methodology/approach

A systematic literature study and in-depth semi-structured interviews with practitioners in interconnected infrastructure construction projects in the Netherlands are performed to identify the criteria for assessing the status of IOC in infrastructure construction projects, based on which an assessment tool is developed.

Findings

The identified assessment criteria through the literature and the practitioner’s perspectives results in the designing and development of a collaboration assessment tool. The assessment tool consists of 12 criteria and 36 sub-criteria from three different categories of collaborative capacity: individual, relational, and organizational.

Originality/value

The assessment tool enables practitioners to monitor the status of IOC between infrastructure owners and assists them in making informed decisions to enhance collaboration. The assessment tool provides the opportunity to assess and analyze the status of collaboration based on three categories (i.e., individual, relational, and organizational).

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 March 2023

Titus Ebenezer Kwofie, Florence Akyaa Ellis, Michael Nii Addy, Samuel Amos-Abanyie, Clinton Aigbavboa and Samuel Owusu Afram

The link between relationship typologies and effectiveness of conflict resolution approaches remains to be tested despite its significance in conflict management in construction…

Abstract

Purpose

The link between relationship typologies and effectiveness of conflict resolution approaches remains to be tested despite its significance in conflict management in construction project delivery. By using the four relationships attributes based on the group attachment theory, the purpose of the study was to explore the cluster of relationships among project teams and organisations and the performance of conflict management strategies across these clusters in the Ghanaian construction industry.

Design/methodology/approach

Using a deductive questionnaire survey in the Ghanaian construction industry, a total of 137 responses were gathered and analyzed using cluster analysis, mean scores and ANOVA to reveal the relationship clusters and performance of conflict management strategies across these clusters.

Findings

The results revealed eight relationship clusters that exist among project teams and organisations with distinct influence of roles & tasks function, cognition, emotions and behavior attributes across the relationship clusters. In the aspect of the effectiveness of conflict management strategies, it was noted that the performance of these strategies were significantly different across the groups. For instance, integrating as a conflict management strategy was deemed to be effective in resolving conflict in unitary, adversarial, pluralist, mutuality, collaborative and partnering relationship clusters. In the case of coopetitive and coercive relationships, the performance of integrating as a conflict management strategy was less effective. This study thus has empirically proved that, different relationship clusters of teams and organizations exist within the Ghanaian construction industry, and that they perform different roles & tasks functions, cognition, emotions and behavioural attributes in their formation. Additionally, the performance effectiveness of conflict management strategies differed across the relationship clusters.

Originality/value

By aligning the relationship attributes to the dynamics of relationship clusters experienced in project teams and organisations, relationship quality, suitability and effectiveness of conflict management strategies can be optimized. The findings can inform project teams and stakeholders to develop fit-for-purpose relationship attributes among teams and organisations to enhance team effectiveness, relationship quality and conflict management in the industry.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 3
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 15 May 2023

Kai Hänninen, Jouni Juntunen and Harri Haapasalo

The purpose of this study is to describe latent classes explaining the innovation logic in the Finnish construction companies. Innovativeness is a driver of competitive…

16140

Abstract

Purpose

The purpose of this study is to describe latent classes explaining the innovation logic in the Finnish construction companies. Innovativeness is a driver of competitive performance and vital to the long-term success of any organisation and company.

Design/methodology/approach

Using finite mixture structural equation modelling (FMSEM), the authors have classified innovation logic into latent classes. The method analyses and recognises classes for companies that have similar logic in innovation activities based on the collected data.

Findings

Through FMSEM analysis, the authors have identified three latent classes that explain the innovation logic in the Finnish construction companies – LC1: the internal innovators; LC2: the non-innovation-oriented introverts; and LC3: the innovation-oriented extroverts. These three latent classes clearly capture the perceptions within the industry as well as the different characteristics and variables.

Research limitations/implications

The presented latent classes explain innovation logic but is limited to analysing Finnish companies. Also, the research is quantitative by nature and does not increase the understanding in the same manner as qualitative research might capture on more specific aspects.

Practical implications

This paper presents starting points for construction industry companies to intensify innovation activities. It may also indicate more fundamental changes for the structure of construction industry organisations, especially by enabling innovation friendly culture.

Originality/value

This study describes innovation logic in Finnish construction companies through three models (LC1–LC3) by using quantitative data analysed with the FMSEM method. The fundamental innovation challenges in the Finnish construction companies are clarified via the identified latent classes.

1 – 10 of 814