1 – 10 of 23Oliver Disney, Mattias Roupé, Mikael Johansson and Alessio Domenico Leto
Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design…
Abstract
Purpose
Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design process, BIM becomes obsolete as focus shifts to producing static 2D-drawings, which leads to a lack of trust in BIM. In Scandinavia, a concept known as Total BIM has emerged, which is a novel “all-in” approach where BIM is the single source of information throughout the project. This paper's purpose is to investigate the overall concept and holistic approach of a Total BIM project to support implementation and strategy work connected to BIM.
Design/methodology/approach
Qualitative data were collected through eight semi-structured interviews with digitalization leaders from the case study project. Findings were analyzed using a holistic framework to BIM implementation.
Findings
The Total BIM concept was contingent on the strong interdependences between commonly found isolated BIM uses. Four main success factors were identified, production-oriented BIM as the main contractual and legally binding construction document, cloud-based model management, user-friendly on-site mobile BIM software and strong leadership.
Originality/value
A unique case is studied where BIM is used throughout all project phases as a single source of information and communication platform. No 2D paper drawings were used on-site and the Total BIM case study highlights the importance of a new digitalized construction process.
Details
Keywords
Lina Gharaibeh, Sandra Matarneh, Kristina Eriksson and Björn Lantz
This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on…
Abstract
Purpose
This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on examining the extent, maturity and actual practices of BIM in the Swedish wood construction industry, by analysing practitioners’ perspectives on the current state of BIM and its perceived benefits.
Design/methodology/approach
A qualitative approach was selected, given the study’s exploratory character. Initially, an extensive review was undertaken to examine the current state of BIM utilisation and its associated advantages within the construction industry. Subsequently, empirical data were acquired through semi-structured interviews featuring open-ended questions, aimed at comprehensively assessing the prevailing extent of BIM integration within the Swedish wood construction sector.
Findings
The research concluded that the wood construction industry in Sweden is shifting towards BIM on different levels, where in some cases, the level of implementation is still modest. It should be emphasised that the wood construction industry in Sweden is not realising the full potential of BIM. The industry is still using a combination of BIM and traditional methods, thus, limiting the benefits that full BIM implementation could offer the industry.
Originality/value
This study provided empirical evidence on the current perceptions and state of practice of the Swedish wood construction industry regarding BIM maturity.
Details
Keywords
Andrew Ebekozien, Clinton Aigbavboa, Mohamad Shaharudin Samsurijan, Noor Alyani Nor Azazi and Okechukwu Dominic Saviour Duru
Studies show that building information modelling (BIM) technology can improve construction productivity regarding the design, construction and maintenance of a project life cycle…
Abstract
Purpose
Studies show that building information modelling (BIM) technology can improve construction productivity regarding the design, construction and maintenance of a project life cycle in the 21st century. Revit has been identified as a frequently used tool for delivering BIM in the built environment. Studies about BIM technology via Revit are scarce in training middle-level workforce higher education institutions. Thus, this study aims to investigate the relevance of BIM technology and offer measures to promote digitalisation in Nigeria’s built environment polytechnic undergraduates via Revit.
Design/methodology/approach
Given the unexplored nature of training the middle-level workforce in Nigeria, 37 semi-structured virtual interviews were conducted across Nigeria, and saturation was achieved. The participants were knowledgeable about construction-related BIM. The researchers used a thematic analysis for the collected data and honed them with secondary sources.
Findings
Improved visualisation of design, effective and efficient work productivity, automatic design and quantification, improved database management and collaboration and data storage in the centrally coordinated model, among others, emerged as BIM’s benefits. BIM technology via Revit is challenging, especially in Nigeria’s polytechnic education curriculum. The 24 perceived issues were grouped into government/regulatory agencies-related, polytechnic management-related and polytechnic undergraduate students-related hindrances in Nigeria’s built environment.
Research limitations/implications
This study is limited to BIM implications for Nigeria’s built environment polytechnic undergraduates.
Originality/value
This study contributes to the literature paucity in attempting to uncover perceived issues hindering the implementation of BIM technology via Revit in training Nigeria’s built environment polytechnic undergraduates via a qualitative approach.
Details
Keywords
The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling…
Abstract
Purpose
The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling (BIM). Despite previous research efforts, there is still a gap concerning the multidimensional nature of their integration. Hence, this study aims to fill the mentioned knowledge gap through exploring and comparing the challenges, enablers, techniques as well as benefits of integrating LC with BIM and sustainability in building construction projects.
Design/methodology/approach
A systematic literature review was conducted to fulfill the purpose of this study.
Findings
The findings reveal and compare the challenges, enablers, techniques and benefits of integrating LC with BIM and sustainability in building construction projects. The results suggest that there are eight common challenges for integrating LC with BIM and sustainability, including high initial cost, lack of collaboration, lack of professionals and lack of compatible contractual framework. The discovered challenges, enablers, techniques and benefits seem to be mostly routed in people. The findings also suggest that the synergistic benefits of integrating LC with BIM and sustainability can overcome the common challenges (safety, reliability, productivity, collaboration and quality) in construction projects.
Originality/value
The findings contribute to the literature and practice concerning the integration of LC with BIM and sustainability by exploring, comparing and discussing the relevant challenges, enablers, techniques as well as benefits. Moreover, the findings reveal the significance of the development of people in construction industry, besides processes and technology, as people are always subject of activities in construction while processes and technology are always objects.
Details
Keywords
Samuel Adeniyi Adekunle, Clinton Ohis Aigbavboa and Obuks Augustine Ejohwomu
The implementation of BIM in the construction industry requires the coevolution of the various aspects of the BIM ecosystem. The human dimension is a very important dimension of…
Abstract
Purpose
The implementation of BIM in the construction industry requires the coevolution of the various aspects of the BIM ecosystem. The human dimension is a very important dimension of the ecosystem necessary for BIM implementation. It is imperative to study this aspect of the BIM ecosystem both from the employer perspective and employee availability to provide insights for stakeholders (job seekers, employers, students, researchers, policymakers, higher education institutions, career advisors and curriculum developers) interested in the labour market dynamics.
Design/methodology/approach
To understand the BIM actor roles through the employer lens and the actual BIM actors in the construction industry, this study employed data mining of job adverts from LinkedIn and Mncjobs website. Content analysis was employed to gain insights into the data collected. Also, through a quantitative approach, the existing BIM actor roles were identified.
Findings
The study identified the employers' expectations of BIM actors; however, it is noted that the BIM actor recruitment space is still a loose one as recruiters put out open advertisements to get a large pool of applicants. From the data analysed, it is concluded that the BIM actor role is not an entirely new profession. However, it simply exists as construction industry professionals with BIM tool skills. Also, the professional development route is not well defined yet.
Originality/value
This study presents a realistic angle to BIM actor roles hence enhancing BIM implementation from the human perspective. The findings present an insight into the preferred against the actual.
Details
Keywords
Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa
This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…
Abstract
Purpose
This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.
Design/methodology/approach
A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.
Findings
An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.
Research limitations/implications
The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.
Originality/value
This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.
Judith Fauth, Tanya Bloch and Lucio Soibelman
Building permitting is mostly a manual, labor intensive and time-consuming process. Initiatives for streamlining the process are not always helpful since they often fail to…
Abstract
Purpose
Building permitting is mostly a manual, labor intensive and time-consuming process. Initiatives for streamlining the process are not always helpful since they often fail to address the core problems within the process. A framework for modeling the permitting process can be useful to identify bottlenecks, core challenges and best practices. Hence, the authors aim to demonstrate and validate a previously suggested workflow for permit process modeling using the permitting process in Israel as a test case.
Design/methodology/approach
The authors implement qualitative expert interviews for data acquisition. The collected data are then processed for a qualitative data analysis. The results of the analysis are then validated using a focus group workshop in the field of building permits. In the test case the focus group consisted of Israeli experts.
Findings
The authors present a detailed overview of the as-is building permit process in Israel and the existing challenges. Through this test case, the authors found that the framework is applicable in different countries and that it can provide valuable insights into the core problems within the process. In addition, application of the same framework in different countries can provide comparable results that would allow the authors to identify best practices.
Originality/value
The major contribution of this work is the development and validation of a framework for building permitting process modeling which can be used to identify existing challenges and bottlenecks in the process. Implementing a structured and unified approach provides an opportunity to easily compare processes in different countries to identify best practices.
Details
Keywords
Oluseyi Julius Adebowale and Justus Ngala Agumba
Despite the significance of the construction industry to the nation's economic growth, there is empirical evidence that the sector is lagging behind other industries in terms of…
Abstract
Purpose
Despite the significance of the construction industry to the nation's economic growth, there is empirical evidence that the sector is lagging behind other industries in terms of productivity growth. The need for improvements inspired the industry's stakeholders to consider using emerging technologies that support the enhancement. This research aims to report augmented reality applications essential for contractors' productivity improvement.
Design/methodology/approach
This study systematically reviewed academic journals. The selection of journal articles entailed searching Scopus and Web of Science databases. Relevant articles for reviews were identified and screened. Content analysis was used to classify key applications into six categories. The research results were limited to journal articles published between 2010 and 2021.
Findings
Augmented reality can improve construction productivity through its applications in assembly, training and education, monitoring and controlling, interdisciplinary function, health and safety and design information.
Originality/value
The research provides a direction for contractors on key augmented reality applications they can leverage to improve their organisations' productivity.
Details
Keywords
Andrew Ebekozien, Wellington Didibhuku Thwala, Clinton Ohis Aigbavboa and Mohamad Shaharudin Samsurijan
Studies showed that construction digitalisation could prevent or mitigate accidents rate on sites. Digitalisation applications may prevent or mitigate building project collapse…
Abstract
Purpose
Studies showed that construction digitalisation could prevent or mitigate accidents rate on sites. Digitalisation applications may prevent or mitigate building project collapse (BPC) but with some encumbrances, especially in developing countries. There is a paucity of research on digital technologies application to prevent or mitigate BPC in Nigeria. Thus, the research aims to explore the perceived barriers that may hinder digital technologies from preventing or mitigating building collapse and recommend measures to improve technology applications during development.
Design/methodology/approach
The study is exploratory because of the unexplored approach. The researchers collected data from knowledgeable participants in digitalisation and building collapse in Nigeria. The research employed a phenomenology approach and analysed collected data via a thematic approach. The study achieved saturation at the 29th interviewee.
Findings
Findings show that lax construction digitalisation implementation, absence of regulatory framework, lax policy, unsafe fieldworkers' behaviours, absence of basic infrastructure, government attitude, hesitation to implement and high technology budget, especially in developing countries, are threats to curbing building collapse menace via digitalisation. The study identified technologies relevant to preventing or mitigating building collapse. Also, it proffered measures to prevent or mitigate building collapse via improved digital technology applications during development.
Originality/value
This research contributes to the construction digitalisation literature, especially in developing countries, and investigates the perceived barriers that may hinder digital technologies usage in preventing or mitigating building collapse in Nigeria.
Details
Keywords
Abdul Rauf, Daniel Efurosibina Attoye and Robert H. Crawford
Recently, there has been a shift toward the embodied energy assessment of buildings. However, the impact of material service life on the life-cycle embodied energy has received…
Abstract
Purpose
Recently, there has been a shift toward the embodied energy assessment of buildings. However, the impact of material service life on the life-cycle embodied energy has received little attention. We aimed to address this knowledge gap, particularly in the context of the UAE and investigated the embodied energy associated with the use of concrete and other materials commonly used in residential buildings in the hot desert climate of the UAE.
Design/methodology/approach
Using input–output based hybrid analysis, we quantified the life-cycle embodied energy of a villa in the UAE with over 50 years of building life using the average, minimum, and maximum material service life values. Mathematical calculations were performed using MS Excel, and a detailed bill of quantities with >170 building materials and components of the villa were used for investigation.
Findings
For the base case, the initial embodied energy was 57% (7390.5 GJ), whereas the recurrent embodied energy was 43% (5,690 GJ) of the life-cycle embodied energy based on average material service life values. The proportion of the recurrent embodied energy with minimum material service life values was increased to 68% of the life-cycle embodied energy, while it dropped to 15% with maximum material service life values.
Originality/value
The findings provide new data to guide building construction in the UAE and show that recurrent embodied energy contributes significantly to life-cycle energy demand. Further, the study of material service life variations provides deeper insights into future building material specifications and management considerations for building maintenance.