Article
Publication date: 21 October 2021

Ali Hauashdh, Junaidah Jailani, Ismail Abdul Rahman and Najib Al-Fadhali

The largest share of a building maintenance budget goes towards preventing or repairing building defects. Also, building defects shorten a building’s lifetime, impact the user’s…

Abstract

Purpose

The largest share of a building maintenance budget goes towards preventing or repairing building defects. Also, building defects shorten a building’s lifetime, impact the user’s safety and health, prevent the buildings from performing their functions well and repairing building defects generates waste. Therefore, this study aims to specify the factors that affecting the number of building defects and how to reduce their negative impacts.

Design/methodology/approach

A case study was used as a research strategy and convergent parallel mixed methods were used as research design. Quantitative and qualitative data were collected concurrently, followed by independent analyses of the quantitative and qualitative data, and then merged the two sets of results according to the procedure of using the convergent parallel design. Descriptive statistics analysed quantitative data, whilst qualitative data was analysed by the content analysis technique.

Findings

The findings of this study explored the factors that affect the number of defects in buildings, the significant factors were related to the building’s life cycle in terms of design, construction, operation and maintenance phase; relevant attributes were construction teams, building users and maintenance teams. The study also addressed the approaches to minimise the negative impacts of those factors. Their negative impacts mainly contributed to increased building defects that increase maintenance costs, affect users’ safety and health, reduce buildings’ lifespan and cause environmental impact due to resource extraction.

Originality/value

The existing studies have not adequately addressed the significant factors that affect the number of building defects. Also, emerging technologies and environmental sustainability considerations related to building defects have not been linked in previous related work. Therefore, the present study has contributed to filling this gap.

Article
Publication date: 1 July 2021

Narges Eskandari and Esmatullah Noorzai

Commercial building facility systems are costly, and due to the complexity of operation and maintenance (O&M), some failures can cause irreversible expensive damage. Currently…

Abstract

Purpose

Commercial building facility systems are costly, and due to the complexity of operation and maintenance (O&M), some failures can cause irreversible expensive damage. Currently, few capabilities of building information modeling (BIM) have been used in the facility maintenance operation. The purpose of this paper is to use a tool for making it easier to predict preventable defects in commercial building facility systems by examining a complete BIM.

Design/methodology/approach

To this end, a list of frequent defects in the facility system was achieved by a review of commercial building literature. Then, by examining a complete BIM model, the available methods and tools for O&M facilities during the operation period are identified and analyzed.

Findings

The results of the paper show that the solution presented based on total productive maintenance (TPM) subsets can effectively prevent facility system defects during the operation and maintenance period. An expert team assesses the validation of results.

Originality/value

The findings can help facility managers to adopt measures using TPM methods to prevent defects through an integrated BIM platform. The examination is based on case studies, surveys, expert experience and a thorough literature review.

Article
Publication date: 21 May 2020

Zul-Atfi Ismail

The current maintenance management method affects the efficiency of the complex, high-rise industrialised building system (IBS) building maintenance management projects in…

Abstract

Purpose

The current maintenance management method affects the efficiency of the complex, high-rise industrialised building system (IBS) building maintenance management projects in Malaysia. The usage of a conventional system (paper-based reports/unsystematic database) has various drawbacks, such as IBS component aesthetic and structural defects which occur repeatedly in the building and maintenance of conventional building, lack of integration between maintenance systems and lack of the intelligent capabilities of linking defect diagnosis operations in maintenance affecting various building elements with IBS component defect knowledge. Thus, the purpose of this paper is to focus on the development of a mechanism to improve IBS component defect knowledge transfer in IBS building maintenance projects through the integration of building information modelling (BIM).

Design/methodology/approach

Eight clients/maintenance contractors were selected based on the major problems of using a conventional system to investigate the maintenance management practices in each complex and high-rise IBS building.

Findings

The findings indicated that several computerised systems such as Building Automation System and Supervisory Control and Data Acquisition System are used by a client/maintenance contractor. Moreover, BIM technology awareness was found to be limited, with no implementation in IBS building maintenance till now. The results of this case study were used as a foundation for the development of a prototype system using Computerised Maintenance Management System, Expert System and BIM.

Originality/value

The development of this new system improves IBS component diagnosis knowledge integration with the BIM technology.

Details

International Journal of Building Pathology and Adaptation, vol. 39 no. 1
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 5 March 2020

Zul-Atfi Ismail

The purpose of this paper is to discuss the system approaches and their application for managing IBS building in the context of Malaysian maintenance practice. Currently, the…

Abstract

Purpose

The purpose of this paper is to discuss the system approaches and their application for managing IBS building in the context of Malaysian maintenance practice. Currently, the maintenance management method has affected the efficiency of the complex and high-rise industrialised building system (IBS) building maintenance management in Malaysia. Many issues such as poor service delivery, limited budgets, less competent staff and defect repetition emerged because of the usage of conventional method applications (paper-based form). The data revealed that the practice of maintenance management for complex and high-rise IBS buildings needs to be digitalised.

Design/methodology/approach

This qualitative research was carried out by conducting literature review and semi-structured interviews. Eight major maintenance organisations were selected based on a conventional method of practice in managing maintenance for complex and high-rise IBS buildings. The computerised system was developed using a data flow diagram and coding. Subsequently, the prototype system was tested.

Findings

By having this prototype system, the defect diagnosis and decision-making process become easier, faster and cost-effective in facilitating the maintenance assessment, defect diagnosis and control in relation to IBS building structure components.

Originality/value

In conclusion, the prototype system may improve the effectiveness of maintenance management practices for IBS building structure components in reducing defect design risks such as design calculation error to provide high-quality IBS building structure components for a safe and healthy environment.

Details

Facilities , vol. 39 no. 3/4
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 1 September 2021

Hyun Jeong Koo and James T. O’Connor

In recent decades, professionals in the architecture, engineering and construction industry have come to recognize building information modeling (BIM) as one of the most powerful…

Abstract

Purpose

In recent decades, professionals in the architecture, engineering and construction industry have come to recognize building information modeling (BIM) as one of the most powerful technologies available to ensure successful project outcomes. The purpose of this paper is to explore the benefits of BIM on design defect prevention during the design phase of building projects.

Design/methodology/approach

The authors qualitatively analyzed 160 design defect leading indicators (LIs) to identify key themes for design defect prevention. Then, by matching appropriate BIM functionalities to each key LI theme, they identified BIM-supported key LI themes.

Findings

The result of this paper served as the foundation of a BIM-based key design processes framework, which identifies the necessary data, project parties, actions and applicable BIM functions for preventing particular design defects. In addition, the authors found that BIM implementation can benefit 71.2% of the LIs of the design defects associated with problematic deliverables.

Originality/value

This study establishes the current state of BIM use for design defect prevention and also gives practitioners precisely targeted guidelines for using BIM functions during the design phase for better quality management.

Details

Construction Innovation , vol. 22 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 5 December 2018

Zul-Atfi Ismail

The purpose of this paper is to focus on the development of an integrated computerised maintenance management system to improve the information storage of design and construction…

1302

Abstract

Purpose

The purpose of this paper is to focus on the development of an integrated computerised maintenance management system to improve the information storage of design and construction, diagnostic and defect risk assessments on IBS building through the integration of building information modelling (BIM).

Design/methodology/approach

The methodology used interviews with the IBS building client/maintenance contractor in Malaysia to gather information about maintenance management problems, approaches to address problems, information and communication technology implementation and use of emerging technologies, in addition to prototyping a system development life cycle for system development.

Findings

Relevant process flowchart documents of system development were obtained from the case study and reviewed to assist in providing an automation technique for decision-making and structural defect diagnostic operation through the integration of Visual Basic.Net, MS Access and Autodesk Revit software.

Originality/value

This research focuses on automatic bidirectional communications between an Expert System and BIM on a database level. Adoption of the approaches suggested in the research will enable the system to promote the development of zero IBS building maintenance.

Details

International Journal of Building Pathology and Adaptation, vol. 37 no. 3
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 13 May 2021

Zul-Atfi Bin Ismail

The contemporary practice of conventional maintenance for industrialised building system (IBS) constructions suffers from poor service delivery and defect repetition. A key…

611

Abstract

Purpose

The contemporary practice of conventional maintenance for industrialised building system (IBS) constructions suffers from poor service delivery and defect repetition. A key problem impeding the widespread adoption of emerging technologies is the lack of competent contractors to support the effectiveness of the technology implemented in conventional methods and to ensure returns on investment. The shortcomings of conventional methods are assessed from the perspective of IBS buildings. This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes.

Design/methodology/approach

This paper describes the establishment of key problem areas, the elements involved in implementing good practice and the requirements for integrating maintenance management processes and information databases in the maintenance management system.

Findings

Conventional methods have little emphasis on defect diagnosis tools. They also enhance inadequate strategic decision-making in the analysis of information when attempting to improve the maintenance project outcomes for IBS construction. The characteristics identified in a case study of IBS buildings are presented and analysed.

Originality/value

The conclusions and recommendations drawn from the analysis of the IBS case study are discussed, synthesised and deliberated upon. The approach presented in this paper integrates various aspects of building information modelling technology to facilitate improved execution of IBS maintenance activities.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 August 2017

Zul-Atfi Ismail

The purpose of this paper is to discuss the principles for managing precast concrete (PC) building in the context of Malaysian maintenance practice. A large number of…

1394

Abstract

Purpose

The purpose of this paper is to discuss the principles for managing precast concrete (PC) building in the context of Malaysian maintenance practice. A large number of clients/contractors in a PC building maintenance project faced many issues due to poor service delivery, less-competent contractor and defect repetition. Meanwhile, conventional method practices tend to be ineffective in Malaysian PC building.

Design/methodology/approach

Case studies were used to investigate the practice of maintenance management with eight professional engineers working in the Malaysian PC building maintenance departments.

Findings

Interviews were held with these departments and content analysis was used to identify themes that demonstrate effective PC building maintenance management practice. The frontline approaches (new system development with the integration of BIM) and underlying approach such as decision making in defect diagnosis are presented to address the maintenance management problems on PC building such as defect repetition and less-competent contractor.

Originality/value

The underlying approaches include sustaining existing maintenance quality and providing decision making in diagnosis support while the frontline approaches include the use of emerging technologies, efficient control of building performance-based design and monitor the defect component operation in maintenance.

Details

Industrial Management & Data Systems, vol. 117 no. 7
Type: Research Article
ISSN: 0263-5577

Keywords

Article
Publication date: 27 July 2020

Zul-Atfi Ismail

The purpose of this study is to identify existing weaknesses in precast concrete building maintenance and how to overcome it. The contemporary practice of conventional methods in…

Abstract

Purpose

The purpose of this study is to identify existing weaknesses in precast concrete building maintenance and how to overcome it. The contemporary practice of conventional methods in the pre-cast concrete (PC) building maintenance entails many issues such as PC component aesthetic and structural defects, no integration between maintenance systems and lack the intelligent capabilities of linking defect diagnosis operations in maintenance due to poor service delivery and defect repetition. A key problem impeding the widespread adoption of emerging technologies is the lack of competent contractor supporting the effectiveness of implemented information and communication technology than conventional methods and the returns on investment.

Design/methodology/approach

The shortcomings of conventional methods are assessed from the perspective of PC buildings. Several data were collected through a case study of eight PC buildings from high-rise and complex buildings.

Findings

The conventional methods had significantly little emphasis on defect diagnosis tools. It had also increased the inadequate strategic decision making to analyse information in improving the maintenance project outcomes for PC building.

Originality/value

Building information modelling tools is suggested from findings and lessons learned as a good practice to reduce the repetition of defects on the design specification used and construction practiced.

Details

Journal of Facilities Management , vol. 18 no. 3
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 9 December 2019

Lei Zhu, Ming Shan and Zhao Xu

Although the handover stage is the key transition stage between the construction and operation, there is no critical overview of issues and research at the handover stage…

1071

Abstract

Purpose

Although the handover stage is the key transition stage between the construction and operation, there is no critical overview of issues and research at the handover stage, hindering the achievement of sustainable development of buildings. Therefore, the purpose of this paper is to review the building handover-related issues and research in construction and facility management (FM) journals. The specific objectives of this study include: analyze the research trends and overview the handover-related publications; identify the major research topics on the handover of buildings; identify research gaps and propose future research directions.

Design/methodology/approach

This study opted for a four-step systematic review of papers from the well-known academic journals in the construction and FM respects.

Findings

The results first revealed the increasing research interest in the handover of buildings from the researchers. Moreover, the post-construction defects, poor information fidelity, poor interoperability between building information modeling (BIM) and FM technologies, and insufficient consideration of end users were identified as the most concerned challenges for a building handover. Furthermore, identifying and formalizing information requirements for handover, improving the handover process, and improving the interoperability between BIM and FM were solutions mostly emphasized by researchers.

Research limitations/implications

As the first systematic review of building handover-related issues and research, this study is the building block for future research on this topic. The findings provide guidance for researchers in the construction and FM research community, and help them form useful collaboration for future research opportunities and find future research directions.

Practical implications

The identified significant challenges and potential solutions for a building handover could assist practitioners in making rational decisions on developing or adopting relevant technologies, and reshaping their management patterns and working processes. Moreover, the findings could be severed as evidence for policymakers to initiate policies, such as documents e-submission and timely updating BIMs, to achieve the vision of model-based project delivery.

Originality/value

This study contributed to the body of knowledge of sustainable development by providing a new insight to tackle the hindrance to the smooth transition from the construction to the operation.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 543