Publication date: 25 March 2024

Lama Abu Alieh, M. Reza Hosseini, Igor Martek, Wei Wu and Mehrdad Arashpour

A lack of suitably qualified Building Information Modelling (BIM) professionals is understood to be a major barrier towards higher uptakes of BIM in the Australian construction…

Abstract

Purpose

A lack of suitably qualified Building Information Modelling (BIM) professionals is understood to be a major barrier towards higher uptakes of BIM in the Australian construction industry. In response, Australian universities have tried to integrate the teaching of BIM into construction-related curricula, but with limited success. The acknowledged impediment is the lingering mismatch between what universities offer and what industry actually needs. However, the exact nature of that mismatch has yet to be identified. This study addresses that knowledge gap. It assesses both the current status of BIM competencies among university graduates and explores how BIM education at Australian universities may be improved to deliver BIM work readiness, as required by the industry.

Design/methodology/approach

This paper employed a qualitative research approach, utilizing 17 semi-structured interviews with experts in the Australian BIM industry. The Person-Organization (PO) fit theory, which emphasizes the congruence between individual and organizational characteristics, was utilized as a theoretical framework to examine the compatibility between “demand” and “ability” perspectives. The resulting data were analysed using this theoretical framework to gain insights into the PO fit perspectives in relation to BIM industry practices.

Findings

Findings reveal that graduates are generally competent regarding the use of BIM software. However, employers require much more than software skills, and expect recruits to have the capability to implement BIM as a process according to information management standards. Specifically, graduates are significantly deficient in matters of BIM protocols, collaboration and coordination, information workflows as well as completion and handover procedures.

Originality/value

This study is the first of its kind that bridges the gap between industry expectations and university education, in the Australian context, moving beyond the common discourse in education literature, which is exclusively focused on assessing students’ perceptions about BIM.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 February 2024

Zhaofeng Ye, Maxwell Fordjour Antwi-Afari, Algan Tezel and Patrick Manu

The impact of building information modeling (BIM) on various aspects of project management has attracted much attention in the past decade. However, previous studies have focused…

Abstract

Purpose

The impact of building information modeling (BIM) on various aspects of project management has attracted much attention in the past decade. However, previous studies have focused on a particular facet of project management (e.g., safety, quality, facility management) and within identified target journals. Despite numerous existing studies, there is limited research on the mainstream research topics, gaps and future research directions on BIM in project management. This study aims to conduct a bibliometric and science mapping review of published articles on BIM in project management and to identify mainstream research topics, research gaps and future research directions in this domain.

Design/methodology/approach

A science mapping approach consisting of bibliometric search, scientometric analysis and qualitative discussion was used to analyze 521 journal articles that were retrieved from the Scopus database and related to BIM in project management. In the scientometric analysis, keyword co-occurrence analysis and document analysis were performed. This was followed by a qualitative discussion that seeks to propose a framework summarizing the interconnection between the mainstream research topics, research gaps and future research directions.

Findings

Six mainstream research topics were found including (1) BIM-enabled advanced digital technologies, (2) BIM-based reinforcement and enhancement, (3) BIM and project composition, (4) BIM project elements and attributes, (5) BIM-based collaboration and communication and (6) BIM-based information and data. Moreover, this study discussed six research gaps, namely, (1) integration of BIM and other digital technologies, (2) future maturity of BIM applications in project management, (3) application of BIM in project components and processes, (4) role of BIM application in project elements and attributes, (5) impact of collaboration and communication in BIM application and (6) stability of information and data interaction. Furthermore, future research directions were discussed.

Originality/value

The findings and proposed framework contribute to providing a deeper understanding to researchers, policymakers and practitioners in the development of related research and practice in the domain of BIM in project management, thus, promoting digital transformation in project management. Overall, it adds to the global knowledge domain in BIM and promotes the need for digital and data integration, BIM maturity and BIM collaboration.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 October 2022

Thi-Thao-Nguyen Nguyen, Sy Tien Do, Viet Thanh Nguyen and Thu Anh Nguyen

This study aims to identify the enabling factors for Building Information Modeling (BIM) adoption in Vietnamese construction enterprises and uncover their interrelationships. This…

588

Abstract

Purpose

This study aims to identify the enabling factors for Building Information Modeling (BIM) adoption in Vietnamese construction enterprises and uncover their interrelationships. This will help stakeholders focus on controlling and allocating resources (time, personnel, and costs) appropriately to adopt BIM and differentiate themselves from fierce competition in the architectural, engineering, construction and operations (AECO) industry.

Design/methodology/approach

This study first identifies and evaluates 32 enabling factors for applying BIM in the Vietnamese construction industry according to the TOE extended framework. Afterwards, a hybrid questionnaire survey using a convenient sampling method is conducted to capture stakeholders' views. The exploratory factor analysis (EFA) and the partial least squares structural equation modelling (PLS-SEM) technique are then applied to identify the constructs of the enabling factors and their interrelationships.

Findings

The study extracts six constructs that could have a significant impact on the adoption of BIM in construction enterprises, namely: technical feasibility (TF), human resources and management (HRM), company business vision (CBV), political environment (PE), economic viability (EV), and legal aspects (LA). Based on eleven proposed hypotheses, the analysis results confirm nine hypotheses and show that the HRM, TF, and CBV have the strongest effects on managers in evaluating the factors for BIM.

Originality/value

The results of the study fill the gap in knowledge by discovering the interrelationships among the enabling factors for BIM adoption in construction enterprises. The results might support the construction enterprises and their stakeholders in increasing the application of BIM, and digital transformation in construction industry.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Abstract

Details

Facilities , vol. 42 no. 3/4
Type: Research Article
ISSN: 0263-2772

Open Access
Article
Publication date: 14 June 2022

Samuel Adeniyi Adekunle, Clinton Ohis Aigbavboa and Obuks Augustine Ejohwomu

The implementation of BIM in the construction industry requires the coevolution of the various aspects of the BIM ecosystem. The human dimension is a very important dimension of…

1604

Abstract

Purpose

The implementation of BIM in the construction industry requires the coevolution of the various aspects of the BIM ecosystem. The human dimension is a very important dimension of the ecosystem necessary for BIM implementation. It is imperative to study this aspect of the BIM ecosystem both from the employer perspective and employee availability to provide insights for stakeholders (job seekers, employers, students, researchers, policymakers, higher education institutions, career advisors and curriculum developers) interested in the labour market dynamics.

Design/methodology/approach

To understand the BIM actor roles through the employer lens and the actual BIM actors in the construction industry, this study employed data mining of job adverts from LinkedIn and Mncjobs website. Content analysis was employed to gain insights into the data collected. Also, through a quantitative approach, the existing BIM actor roles were identified.

Findings

The study identified the employers' expectations of BIM actors; however, it is noted that the BIM actor recruitment space is still a loose one as recruiters put out open advertisements to get a large pool of applicants. From the data analysed, it is concluded that the BIM actor role is not an entirely new profession. However, it simply exists as construction industry professionals with BIM tool skills. Also, the professional development route is not well defined yet.

Originality/value

This study presents a realistic angle to BIM actor roles hence enhancing BIM implementation from the human perspective. The findings present an insight into the preferred against the actual.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 September 2022

Diane Zandee, Ambika Zutshi, Andrew Creed and André Nijhof

The paper aims to provide managerial recommendations for implementing circular economy (CE) principles in both organizational and interorganizational contexts, including when…

Abstract

Purpose

The paper aims to provide managerial recommendations for implementing circular economy (CE) principles in both organizational and interorganizational contexts, including when using digital tools, such as building information modeling (BIM) and blockchain. Drawn from the construction sector in the Netherlands, the findings can be generalized to similar sectors where a company may receive multiple inputs as part of its supply chain augmented by digital technologies.

Design/methodology/approach

Design addresses the research question: what are the strategic and tactical approaches of organizations on the CE pathway? Sub-questions target initiatives pursued by participants, and look toward information, roles and functions for supporting the CE process. Applying a multiple-case study approach (21 semi-structured interviews with 29 participants) the paper explores strategic initiatives of construction companies implementing CE pathways. The strength of the research design comes from facilitation of rich and deep qualitative insights from Netherlands-based managers embedded within global supply chains contributing to conceptual mapping. A limitation is data from one country (though representing both national and multinational companies).

Findings

Interviewed managers share guidance for production-related construction companies anchored in materials and product design. Recommendations include to (1) develop both internally and externally the awareness of CE amongst leaders, (2) communicate with internal and external stakeholders for shared vision across the supply chain, (3) start with pilot projects, and (4) ensure product data-integration for CE business models through computer modeling and blockchain for decision-making processes, choices of materials, business model coordination and product (re)design. Continuous learning about CE roles and responsibilities amidst organizational process restructuring is required throughout linear to CE transitions. Extending the time for the CE principles evaluation process would allow for reconsideration of decisions made for CE implemented projects.

Originality/value

A novel CE gameplan with a hurdles and recommendations checklist provides an operational interface with decision making points between internal factors for the host organization and external supply chain partners.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 1 December 2023

Lina Gharaibeh, Sandra Matarneh, Kristina Eriksson and Björn Lantz

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on…

Abstract

Purpose

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on examining the extent, maturity and actual practices of BIM in the Swedish wood construction industry, by analysing practitioners’ perspectives on the current state of BIM and its perceived benefits.

Design/methodology/approach

A qualitative approach was selected, given the study’s exploratory character. Initially, an extensive review was undertaken to examine the current state of BIM utilisation and its associated advantages within the construction industry. Subsequently, empirical data were acquired through semi-structured interviews featuring open-ended questions, aimed at comprehensively assessing the prevailing extent of BIM integration within the Swedish wood construction sector.

Findings

The research concluded that the wood construction industry in Sweden is shifting towards BIM on different levels, where in some cases, the level of implementation is still modest. It should be emphasised that the wood construction industry in Sweden is not realising the full potential of BIM. The industry is still using a combination of BIM and traditional methods, thus, limiting the benefits that full BIM implementation could offer the industry.

Originality/value

This study provided empirical evidence on the current perceptions and state of practice of the Swedish wood construction industry regarding BIM maturity.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 7 March 2024

Mohammed Ali Abd Ali Alsemari and Manu Ramegowda

The oil and gas industry form the main resource of economy in Iraq and constructing any project in such sectors requires a huge amount of expenses due to the unique requirements…

Abstract

Purpose

The oil and gas industry form the main resource of economy in Iraq and constructing any project in such sectors requires a huge amount of expenses due to the unique requirements that oil and gas facilities required in such projects. Therefore, adopting an appropriate technological approach such as building information modeling (BIM) which is unfortunately not adopted yet in Iraq is essential to successfully deliver these projects. Thus, this paper aimed to introduce BIM to Iraq through Basra Oil Company (BOC) which is one of the biggest public oil and gas companies in Iraq.

Design/methodology/approach

The related literature of journals articles, conference proceedings and published reports have been reviewed. As a result, firstly: a hypothesis has been derived that is “If Basra Oil Company (BOC) adopts and applies BIM approach instead of the 2D approach currently used to manage its projects, the company can overcome several constraints in managing its projects that associated with such 2D traditional approach”; secondly: homogenous, consistence and reliable web-based questionnaire has been designed as its Cronbach’s alpha equal to 0.897 and 0.711 for BIM benefits and barriers, respectively. This questionnaire distributed to the BOC related professionals to test such hypothesis by investigating their readiness and accepting of BIM approach and to rank BIM barriers based on five-point Likert scale.

Findings

Based on the analysis using IBM SPSS Statistics 26 of 115 responses, almost 50% of the respondents had experience 11–15 years, while 22.6% had experience more than 15 years in oil and gas industry construction projects. Those participants were from diverse engineering majors that are: 4.3% Architectural Engineers, 31.3% Civil Engineers, 20% Mechanical Engineers, 22.6% Electrical Engineers and 21.7% from other engineering majors. The respondents’ departments demography was 16.5% of design department, 12.2% of construction department, 20.9% of Project Management Department, 12.2% of Maintenance department, 4.3% of HSE Department, 13% of Production Department and 20.9% of “Other Department.” The study resulted in 1: accepting BIM approach to be an alternative of current 2D-traditional approach used by the company to manage and construct its projects, since mean of collected data is (4.4332), Kruskal–Wallis H test significance values were 0.398 and 0.372; and ANOVA test significance values were 0.433 and 0.599 among Engineering Majors groups and Company’s Department groups, respectively. 2: Disclosed and sequenced BIM barriers in the company based on their criticality. 3: verifying reliably how BIM attributes are important to oil and gas construction projects in Iraq, 4: the company top management and company policies are the most critical potential factors to hinder or adopt and implement BIM in the company, 5: while cost is not seen a critical barrier to implement BIM in the oil and gas sector.

Research limitations/implications

The limitation of this study is the excluding of decision makers of BOC, thus more profound future studies need to be conducted where top management and decision makers are involved, particularly the present study demonstrated that support of company top management is the most critical factor which can help the company to adopt (BIM).

Originality/value

The study concludes that BIM approach is valuable for managing projects in oil and gas sector in Iraq and identify the originality in output by using the research method. This noble study provides a leverage for enhanced research to adopt and implement building information modeling (BIM) in Iraq as the study originally demonstrates benefits and identifies the critical barriers in BIM implementation to push the boundaries toward adopt Digitalization and reduce CO2 emission in Iraqi oil and gas sector. The study can be used as evidence and platform to encourage professionals and practitioners to present more sophisticated tools of BIM in the oil and gas industry, especially for facility and operation management. These findings achieved via oil and gas experts, and it is first time to achieve such findings from a case study in Iraqi oil and gas sector.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 28 February 2023

Sara Rashidian, Robin Drogemuller, Sara Omrani and Fereshteh Banakar

The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving…

Abstract

Purpose

The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving collaboration and delivering construction projects has been acknowledged by construction academics and professionals. Once organizations have fully embraced BIM, IPD and LC integration, a measurement tool such as a maturity model (MM) for benchmarking their progress and setting realistic goals for continuous improvement will be required. In the context of MMs literature, however, no comprehensive analysis of these three construction management methods has been published to reveal the current trends and common themes in which the models have approached each other.

Design/methodology/approach

Therefore, this study integrates systematic literature review (SLR) and thematic analysis techniques to review and categorize the related MMs; the key themes in which the interrelationship between BIM, IPD and LC MMs has been discussed and conceptualized in the attributes; the shared characteristics of the existing BIM, IPD and LC MMs, as well as their strengths and limitations. The Preferred Reporting Items for Systematic Reviews (PRISMA) method has been used as the primary procedure for article screening and reviewing published papers between 2007 and 2022.

Findings

Despite the growth of BIM, IPD and LC integration publications and acknowledgment in the literature, no MM has been established that holistically measures BIM, IPD and LC integration in an organization. This study identifies five interrelated and overlapping themes indicative of the collaboration of BIM, IPD and LC in existing MMs' structure, including customer satisfaction, waste minimization, Lean practices and cultural and legal aspects. Furthermore, the MMs' common characteristics, strengths and limitations are evaluated to provide a foundation for developing future BIM, IPD and LC-related MMs.

Practical implications

This paper examines the current status of research and the knowledge gaps around BIM, IPD and LC MMs. In addition, the highlighted major themes serve as a foundation for academics who intend to develop integrated BIM, IPD, and LC MMs. This will enable researchers to build upon these themes and establish a comprehensive list of maturity attributes fulfilling the BIM, IPD and LC requirements and principles. In addition, the MMs' BIM, IPD and LC compatibility themes, which go beyond themes' intended characteristics in silos, increase industry practitioners' awareness of the underlying factors of BIM, IPD and LC integration.

Originality/value

This review article is the first of a kind to analyze the interaction of IPD, BIM and LC in the context of MMs in current AEC literature. This study concludes that BIM, IPD and LC share several joint cornerstones according to the existing MMs.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 16 April 2024

Fathima Sabrina Nazeer, Imriyas Kamardeen and Abid Hasan

Many buildings fail to meet user expectations, causing a performance gap. Pre-occupancy evaluation (PrOE) is believed to have the potential to close the gap. It enables designers…

Abstract

Purpose

Many buildings fail to meet user expectations, causing a performance gap. Pre-occupancy evaluation (PrOE) is believed to have the potential to close the gap. It enables designers to obtain end-user feedback in the design phase and improve the design for better performance. However, PrOE implementation faces challenges due to still maturing knowledgebase. This study aims to understand the state-of-the-art knowledge of PrOE, thereby identifying future research needs to advance the domain.

Design/methodology/approach

A systematic literature review following the Preferred Reporting Items for Systematic Reviews and Meta-Analysis (PRISMA) framework was conducted. A thorough search in five databases and Google Scholar retrieved 90 articles, with 30 selected for systematic review after eliminating duplicates and irrelevant articles. Bibliometric analyses were performed using VOSviewer and Biblioshiny on the article metadata, and thematic analyses were conducted on their contents.

Findings

PrOE is a vehicle for engaging building end-users in the design phase to address the credibility gap caused by the discrepancies between the expected and actual performance of buildings. PrOE has gained limited applications in healthcare, residential, office and educational building design for two broad purposes: design management and marketing. Using virtual reality technologies for PrOE has demonstrated significant benefits. Yet, the PrOE domain needs to mature in multiple perspectives to serve its intended purpose effectively.

Originality/value

This study identifies four knowledge gaps for future research to advance the PrOE domain: (1) developing a holistic PrOE framework, integrating comprehensive performance evaluation criteria, useable at different stages of the design phase and multi-criteria decision algorithms, (2) developing a mixed reality tool, embodying the holistic PrOE framework, (3) formulating a PrOE framework for adaptive reuse of buildings and (4) managing uncertainties in user requirements during the lifecycle in PrOE decisions.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

1 – 10 of 35