Search results

1 – 10 of over 1000
Open Access
Article
Publication date: 28 February 2022

Duncan Maxwell and Rachel Couper

Construction suffers from “peculiarities” that concern the temporary natures of the construction site, project teams and unique product design. Considering the digital…

2097

Abstract

Purpose

Construction suffers from “peculiarities” that concern the temporary natures of the construction site, project teams and unique product design. Considering the digital transformation of construction, new solutions are being investigated that can provide consistent data between changing projects. One such source of data manifests in the tracking of logistics activities across the supply chain. Construction logistics is traditionally considered a site management activity focused solely on the “back end” of projects, but an expanded logistics focus can unlock new avenues of improvement. This study aims to understand the requirements and benefits of such a consistent thread of data.

Design/methodology/approach

From a research project with one of Australia’s largest contracting companies, this paper details a series of construction tracking tests as an empirical case study in using Bluetooth low energy aware tracking technology to capture data across the manufacture, delivery and assembly of a cross-laminated timber structural prototyping project.

Findings

The findings affirm the tracking of expanded logistics data can improve back-end performance in subsequent projects while also demonstrating the opportunity to inform a project’s unique front-end design phase. The case study demonstrates that as the reliability, range and battery life of tracking technologies improve, their incorporation into a broader range of construction activities provides invaluable data for improvement across projects.

Originality/value

As a live case study, this research offers unique insights into the potential of construction tracking to close the data loop from final site assembly back to the early project design phase, thus driving continual improvement from a holistic perspective.

Details

Construction Innovation , vol. 23 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 16 March 2021

Hongjuan Wu, Queena K. Qian, Ad Straub and Henk J. Visscher

The recent promotion of prefabricated housing (PH) in China has resulted in a prosperous period for its implementation. However, transaction costs (TCs) cause low economic…

2246

Abstract

Purpose

The recent promotion of prefabricated housing (PH) in China has resulted in a prosperous period for its implementation. However, transaction costs (TCs) cause low economic efficiency to stakeholders and hinder the further promotion of PH. No relevant study has yet been made to investigate the TCs and their causes in the PH field. This paper identifies critical TCs and explores the influencing factors from the developers' perspective.

Design/methodology/approach

Semi-structured interviews and a questionnaire survey were used to collect data about TCs and influencing factors. The most influential factors are identified with their impacts on particular TCs, yielded from correlation analysis and logistic regression.

Findings

From the developers' perspective in China's PH market, this study identified that the most concerning sources of TCs are: hidden costs arising from disputes, extra workloads from design changes, learning costs, intensive communication and coordination in assembly and unexpected information costs in decision-making. The use of an ordered logistic regression approach indicates that the four most influential factors are: qualification of the general contractor, mandatory local policies, owner type and competitiveness of the developer.

Practical implications

To reduce the TCs, experiencing learning and ensuring the design scheme's complicity are recommended to save information searching and exchanging costs. The implications for the PH developers are for them to: (1) professionalize their own organization and (2) procure high-qualified general contractors. For the policymakers, this means they should improve the clarity of the mandatory local policies for PH step-by-step.

Originality/value

By applying the TCs economic theory, this study explores factors that influence TCs in the PH industry. It sheds light on the influencing mechanism behind the TCs in the context of prefabricated housing.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 17 July 2019

Doris Entner, Thorsten Prante, Thomas Vosgien, Alexandru-Ciprian Zăvoianu, Susanne Saminger-Platz, Martin Schwarz and Klara Fink

The paper aims to raise awareness in the industry of design automation tools, especially in early design phases, by demonstrating along a case study the seamless integration of a…

1764

Abstract

Purpose

The paper aims to raise awareness in the industry of design automation tools, especially in early design phases, by demonstrating along a case study the seamless integration of a prototypically implemented optimization, supporting design space exploration in the early design phase and an in operational use product configurator, supporting the drafting and detailing of the solution predominantly in the later design phase.

Design/methodology/approach

Based on the comparison of modeled as-is and to-be processes of ascent assembly designs with and without design automation tools, an automation roadmap is developed. Using qualitative and quantitative assessments, the potentials and benefits, as well as acceptance and usage aspects, are evaluated.

Findings

Engineers tend to consider design automation for routine tasks. Yet, prototypical implementations support the communication and identification of the potential for the early stages of the design process to explore solution spaces. In this context, choosing from and interactively working with automatically generated alternative solutions emerged as a particular focus. Translators, enabling automatic downstream propagation of changes and thus ensuring consistency as to change management were also evaluated to be of major value.

Research limitations/implications

A systematic validation of design automation in design practice is presented. For generalization, more case studies are needed. Further, the derivation of appropriate metrics needs to be investigated to normalize validation of design automation in future research.

Practical implications

Integration of design automation in early design phases has great potential for reducing costs in the market launch. Prototypical implementations are an important ingredient for potential evaluation of actual usage and acceptance before implementing a live system.

Originality/value

There is a lack of systematic validation of design automation tools supporting early design phases. In this context, this work contributes a systematically validated industrial case study. Early design-phases-support technology transfer is important because of high leverage potential.

Details

Journal of Engineering, Design and Technology , vol. 17 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 29 October 2020

Roland Ortt, Claire Stolwijk and Matthijs Punter

The purpose of this paper is to introduce, summarize and combine the results of 11 articles in a special issue on the implementation of Industry 4.0. Industry 4.0 emerged as a…

9178

Abstract

Purpose

The purpose of this paper is to introduce, summarize and combine the results of 11 articles in a special issue on the implementation of Industry 4.0. Industry 4.0 emerged as a phenomenon about a decade ago. That is why, it is interesting now to explore the implementation of the concept. In doing so, four research questions are addressed: (1) What is Industry 4.0? (2) How to implement Industry 4.0? (3) How to assess the implementation status of Industry 4.0? (4) What is the current implementation status of Industry 4.0?

Design/methodology/approach

Subgroups of articles are formed, around one or more research questions involving the implementation of Industry 4.0. The articles are carefully analyzed to provide comprehensive answers.

Findings

By comparing definitions systematically, the authors show important aspects for defining Industry 4.0. The articles in the special issue explore several cases of manufacturing companies that implemented Industry 4.0. In addition, systematic approaches to aid implementation are described: an approach to combine case-study results to solve new implementation problems, approaches to assess readiness or maturity of companies regarding Industry 4.0 and surveys showing the status of implementation in larger samples of companies as well as showing relationships between company characteristics and type of implementation. Small and large firms differ considerably in their process of implementing Industry 4.0, for example.

Research limitations/implications

This special issue discusses implementation of Industry 4.0. The issue is limited to 11 articles, each of which with its own strengths and limitations.

Practical implications

The practical relevance of the issue is that it focuses on the implementation of Industry 4.0. Cases showing successful implementation, measurement instruments to assess degree of implementation and advice how to build a database with cases together with large-scale studies on the state of implementation do provide a wealth of information with a large managerial relevance.

Originality/value

The paper introduces an original take on Industry 4.0 by focusing on implementation. The special issue contains both literature reviews, articles describing case studies of implementation, articles developing systematic measurement instruments to assess degree of implementation and some articles reporting large-scale studies on the state of implementation of Industry 4.0 and thereby combine several perspectives on implementation of Industry 4.0.

Details

Journal of Manufacturing Technology Management, vol. 31 no. 5
Type: Research Article
ISSN: 1741-038X

Keywords

Open Access
Article
Publication date: 19 March 2018

Josana Gabriele Bolzan Wesz, Carlos Torres Formoso and Patricia Tzortzopoulos

The purpose of this paper is to propose a model for planning and controlling the design process in companies that design, manufacture and assemble prefabricated engineer-to-order…

3979

Abstract

Purpose

The purpose of this paper is to propose a model for planning and controlling the design process in companies that design, manufacture and assemble prefabricated engineer-to-order (ETO) building systems. This model was devised as an adaptation of the Last Planner® System for ETO multiple-project environments.

Design/methodology/approach

Design science research, also known as prescriptive research, was the methodological approach adopted in this research. An empirical study was carried out at the design department of a leading steel fabricator from Brazil, in which the proposed model was implemented in six different design teams.

Findings

The main benefits of the proposed model were shielding design work from variability, encouraging collaborative planning, creating opportunities for learning, increasing process transparency, and flexibility according to project status. Two main factors affected the effectiveness of the implementation process commitment and leadership of design managers, and training on design management and project planning and control core concepts and practices.

Research limitations/implications

Some limitations were identified in the implementation process: similarly to some previous studies (Ballard, 2002; Codinhoto and Formoso, 2005), the success of constraint analysis was still limited; some of the metrics produced (e.g. ABI, causes of planning failures) have not been fully used for process improvement; and systematic feedback about project status was not properly implemented and tested.

Originality/value

The main contributions of this study in relation to traditional design planning and control practices are related to the use of two levels of look-ahead planning, the introduction of a decoupling point between conceptual and detail design, the proposition of new metrics for the Last Planner® System, and understanding the potential role of visual management to support planning and control.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 25 April 2022

Adetayo Olugbenga Onososen and Innocent Musonda

Rapid urbanisation and recent shock events have reiterated the need for resilient infrastructure, as seen in the pandemic. Yet, knowledge gaps in construction robotics and…

4483

Abstract

Purpose

Rapid urbanisation and recent shock events have reiterated the need for resilient infrastructure, as seen in the pandemic. Yet, knowledge gaps in construction robotics and human–robot teams (HRTs) research limit maximising these emerging technologies’ potentials. This paper aims to review the state of the art of research in this area to identify future research directions in HRTs able to aid the resilience and responsiveness of the architecture, engineering and construction (AEC) sector.

Design/methodology/approach

A total of 71 peer-reviewed journal articles centred on robotics and HRTs were reviewed through a quantitative approach using scientometric techniques using Gephi and VOSviewer. Research focus deductions were made through bibliometric analysis and co-occurrence analysis of reviewed publications.

Findings

This study revealed sparse and small research output in this area, indicating immense research potential. Existing clusters signifying the need for further studies are on automation in construction, human–robot teaming, safety in robotics and robotic designs. Key publication outlets and construction robotics contribution towards the built environment’s resilience are discussed.

Practical implications

The identified gaps in the thematic areas illustrate priorities for future research focus. It raises awareness on human factors in collaborative robots and potential design needs for construction resilience.

Originality/value

Rapid urbanisation and recent shock events have reiterated the need for resilient infrastructure, as seen in the pandemic. Yet, knowledge gaps in construction robotics and HRTs research limit maximising these emerging technologies’ potentials. This paper aims to review the state of the art of research in this area to identify future research directions in HRTs able to aid the resilience and responsiveness of the AEC sector.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 10 July 2023

Moses Muhwezi, Henry Mutebi, Samuel Ssekajja Mayanja, Benjamin Tukamuhabwa, Sheila Namagembe and Robert Kalema

Procuring relief products and services is a challenging process for humanitarian organizations (HOs), yet it accounts for approximately 65% of relief operations’ costs (Moshtari…

2821

Abstract

Purpose

Procuring relief products and services is a challenging process for humanitarian organizations (HOs), yet it accounts for approximately 65% of relief operations’ costs (Moshtari et al., 2021). This paper aims to examine how procurement internal controls, materials and purchasing procedure standardization influence information integration and procurement performance.

Design/methodology/approach

In this study, partial least square structural equation models and multigroup analysis were used to analyze data collected from 170 HOs.

Findings

Procurement internal controls and material and purchasing procedure standardization fully mediate between information integration and procurement performance.

Research limitations/implications

The study focuses only on HOs. Since humanitarian procurement projects take place over a period of several years, it is difficult to capture the long-term effects of information integration, procurement internal controls, material and purchasing procedure standardization and procurement performance. In this regard, a longitudinal study could be undertaken, provided that the required resources are available.

Practical implications

Procurement managers should implement information integration practices within acceptable procurement internal controls and standardize material and purchasing procedures to boost procurement performance.

Originality/value

By integrating information through procurement internal controls and standardizing material and purchasing procedures, procurement performance in a humanitarian setting can be systematically optimized.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. 13 no. 4
Type: Research Article
ISSN: 2042-6747

Keywords

Open Access
Article
Publication date: 21 March 2022

Maisam Abbasi and Liz Varga

The purpose of this research is to systematically review the properties of supply chains demonstrating that they are complex systems, and that the management of supply chains is…

3360

Abstract

Purpose

The purpose of this research is to systematically review the properties of supply chains demonstrating that they are complex systems, and that the management of supply chains is best achieved by steering rather than controlling these systems toward desired outcomes.

Design/methodology/approach

The research study was designed as both exploratory and explanatory. Data were collected from secondary sources using a comprehensive literature review process. In parallel with data collection, data were analyzed and synthesized.

Findings

The main finding is the introduction of an inductive framework for steering supply chains from a complex systems perspective by explaining why supply chains have properties of complex systems and how to deal with their complexity while steering them toward desired outcomes. Complexity properties are summarized in four inter-dependent categories: Structural, Dynamic, Behavioral and Decision making, which together enable the assessment of supply chains as complex systems. Furthermore, five mechanisms emerged for dealing with the complexity of supply chains: classification, modeling, measurement, relational analysis and handling.

Originality/value

Recognizing that supply chains are complex systems allows for a better grasp of the effect of positive feedback on change and transformation, and also interactions leading to dynamic equilibria, nonlinearity and the role of inter-organizational learning, as well as emerging capabilities, and existing trade-offs and paradoxical tensions in decision-making. It recognizes changing dynamics and the co-evolution of supply chain phenomena in different scales and contexts.

Details

European Journal of Management Studies, vol. 27 no. 1
Type: Research Article
ISSN: 2183-4172

Keywords

Open Access
Article
Publication date: 6 May 2024

Danusa Silva da Costa, Lucely Nogueira dos Santos, Nelson Rosa Ferreira, Katiuchia Pereira Takeuchi and Alessandra Santos Lopes

The aim was not to perform a systematic review but firstly to search in PubMed, Science Direct, Scopus and Web of Science databases on the papers published in the last five years…

Abstract

Purpose

The aim was not to perform a systematic review but firstly to search in PubMed, Science Direct, Scopus and Web of Science databases on the papers published in the last five years using tools for reviewing the statement of preferred information item for systematic reviews without focusing on a randomized analysis and secondly to perform a bibliometric analysis on the properties of films and coatings added of tocopherol for food packaging.

Design/methodology/approach

On January 24, 2022, information was sought on the properties of films and coatings added of tocopherol for use as food packaging published in PubMed, Science Direct, Scopus and Web of Science databases. Further analysis was performed using bibliometric indicators with the VOSviewer tool.

Findings

The searches returned 33 studies concerning the properties of films and coatings added of tocopherol for food packaging, which were analyzed together for a better understanding of the results. Data analysis using the VOSviewer tool allowed a better visualization and exploration of these words and the development of maps that showed the main links between the publications.

Originality/value

In the area of food science and technology, the development of polymers capable of promoting the extension of the shelf life of food products is sought, so the knowledge of the properties is vital for this research area since combining a biodegradable polymeric material with a natural antioxidant active is of great interest for modern society since they associate environmental preservation with food preservation.

Details

British Food Journal, vol. 126 no. 13
Type: Research Article
ISSN: 0007-070X

Keywords

Open Access
Article
Publication date: 25 September 2018

Ruwini Edirisinghe

The future construction site will be pervasive, context aware and embedded with intelligence. The purpose of this paper is to explore and define the concept of the digital skin of…

24594

Abstract

Purpose

The future construction site will be pervasive, context aware and embedded with intelligence. The purpose of this paper is to explore and define the concept of the digital skin of the future smart construction site.

Design/methodology/approach

The paper provides a systematic and hierarchical classification of 114 articles from both industry and academia on the digital skin concept and evaluates them. The hierarchical classification is based on application areas relevant to construction, such as augmented reality, building information model-based visualisation, labour tracking, supply chain tracking, safety management, mobile equipment tracking and schedule and progress monitoring. Evaluations of the research papers were conducted based on three pillars: validation of technological feasibility, onsite application and user acceptance testing.

Findings

Technologies learned about in the literature review enabled the envisaging of the pervasive construction site of the future. The paper presents scenarios for the future context-aware construction site, including the construction worker, construction procurement management and future real-time safety management systems.

Originality/value

Based on the gaps identified by the review in the body of knowledge and on a broader analysis of technology diffusion, the paper highlights the research challenges to be overcome in the advent of digital skin. The paper recommends that researchers follow a coherent process for smart technology design, development and implementation in order to achieve this vision for the construction industry.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 1000