Search results
1 – 10 of over 17000N. Aishah Abdul-Rahman, Rahimi A. Rahman and Ahmad Rizal Alias
This study aims to develop an interrelation model between critical parameters for assessing the construction readiness (CR) of abandoned housing projects, using Malaysia as a case…
Abstract
Purpose
This study aims to develop an interrelation model between critical parameters for assessing the construction readiness (CR) of abandoned housing projects, using Malaysia as a case study. To achieve that aim, the study objectives are to (1) identify critical parameters for assessing the CR of abandoned housing projects; (2) develop underlying constructs to categorize interrelated critical parameters and (3) assess the influence of the underlying constructs on the CR of abandoned housing projects.
Design/methodology/approach
This study identifies potential parameters for assessing the CR of abandoned housing projects by reviewing existing literature and interviewing industry professionals. Then, the list was used to develop a questionnaire survey. The collected survey data were analyzed using normalized mean analysis to identify the critical parameters. Exploratory factor analysis (EFA) was used to develop underlying constructs to categorize interrelated critical parameters. Finally, the influence of the underlying constructs on the CR of abandoned housing projects was examined through partial least squares structural equation modeling (PLS-SEM).
Findings
The analyses suggest that 21 critical parameters are affecting the CR of abandoned housing projects. The critical parameters can be categorized into four underlying constructs: construction site evaluation, management verification, uncertainties mitigation and document approval. Finally, the analyses confirmed that all four constructs affect the CR of abandoned housing projects.
Originality/value
This study is a pioneering effort to quantitatively analyze the parameters for assessing the CR of abandoned housing projects. The findings significantly benefit researchers and industry professionals by providing a list of critical parameters associated with the CR of abandoned housing projects.
Details
Keywords
Innovation projects are often risky and costly. But not all innovation projects lead to commercialisation; some are abandoned, and these abandoned innovation projects can be…
Abstract
Purpose
Innovation projects are often risky and costly. But not all innovation projects lead to commercialisation; some are abandoned, and these abandoned innovation projects can be classified as a waste of resources. Therefore, this paper studies the influence of different external sources and a firm’s decision to abandon an innovation project. The purpose of this paper is to provide a broader understanding of abandoned projects.
Design/methodology/approach
The data applied are quantitative data and the empirical background is the Danish Innovation Survey 2009. The sample consists of Danish manufacturing firms with ten employees or more (n=840). The results are based on logistic regression analysis.
Findings
Results reveal that firms should consider that the involvement of customers can lead them to abandon innovation projects. However, if firms combine customers with universities, it will decrease the likelihood of innovation projects being abandoned. A more in-depth analysis shows that the involvement of customers from “Europe” (countries in Europe excluding Denmark) and the “US” leads to innovation projects being abandoned while customers from “other countries” (the rest of the world, including China and India) have the opposite effect.
Originality/value
The contribution is to the limited literature on abandoned innovation projects by suggesting that the type of external sources is a significant factor in firms’ decisions to abandon innovation projects. The paper identifies that the involvement of certain external sources leads firms to decide to abandon innovation projects, and that the country of origin of the external sources is an important criterion to consider in relation to a firm’s decision to abandon innovation projects.
Details
Keywords
Hadi Sarvari, Matteo Cristofaro, Daniel W.M. Chan, Norhazilan Md. Noor and Mohammadreza Amini
Completion of abandoned public facility projects is one of the major concerns of governments struggling with budget issues. Various research studies have shown that this can only…
Abstract
Purpose
Completion of abandoned public facility projects is one of the major concerns of governments struggling with budget issues. Various research studies have shown that this can only be solved with the help of the private sector. Therefore, this study aims to investigate the capacity of the private sector to complete abandoned public facility projects through the study of the Water and Wastewater Company in Iran.
Design/methodology/approach
The Delphi survey questionnaires, which were distributed to and responded by a panel of experts – i.e. three groups of employers of the Iranian Water and Wastewater Company, consulting agents and private sector stakeholders engaging with Water and Wastewater Company projects – identified 50 critical factors allowing the private sector to carry out abandoned facility projects. These have been categorized into four components: financial capacities, management competency, knowledge and expertise and resources and facilities. A descriptive survey method was used to determine and prioritize these factors.
Findings
The survey findings indicate that knowledge and expertise are the main important clusters of factors influencing the completion of abandoned public facility projects. The value of these results is essential in providing the sound basis for mutual trust between the private sector and the public sector for greater participation, thereby helping to complete abandoned public facility projects.
Originality/value
To the best of the authors’ knowledge, this is the first study attempting to investigate the capacity of the private sector to complete abandoned public facility projects through an empirical analysis of factors influencing their completion.
Details
Keywords
Thim Wai Chen, Ruzita Azmi and Rohana Abdul Rahman
In response to the housing needs of its people, Malaysia has allowed private housing developer companies to build houses on a sell-then-build basis. Despite having legislation…
Abstract
Purpose
In response to the housing needs of its people, Malaysia has allowed private housing developer companies to build houses on a sell-then-build basis. Despite having legislation designed to protect the interests of purchasers, insolvent housing developers have left behind many uncompleted housing projects with their land charged to financial institutions. Consequently, the affected purchasers will lose their houses when those financial institutions foreclose on the land in the housing projects. In addition, those purchasers remain legally obligated to repay loans taken to finance their house purchase. The housing development laws lack provisions to rehabilitate abandoned housing projects. The purpose of this paper is to explore the viability of rescue mechanisms in the Companies Act 2016, being corporate voluntary arrangement (CVA), judicial management (JM) and schemes of arrangement (SOA), to aid in the rehabilitation of abandoned housing projects in Peninsular Malaysia.
Design/methodology/approach
Doctrinal research is adopted in this paper.
Findings
This research highlights the flexibility of the SOA as a tool to rehabilitate abandoned housing projects. This research also reveals the potential of CVA and in particular, JM with its “public interest” feature, as useful rehabilitation mechanisms once the proposed reforms are adopted.
Originality/value
The authors are hopeful that the suggested reforms will enhance the value of all three rescue mechanisms as rehabilitation tools for abandoned housing projects so as to alleviate the plight of house purchasers.
Details
Keywords
Zamharira Sulaiman, Azlan Shah Ali and Faizah Ahmad
Abandoned buildings which are exposed to weather and human threat may lead to deterioration in building quality. Indirectly, the buyer is not satisfied when the abandoned…
Abstract
Abandoned buildings which are exposed to weather and human threat may lead to deterioration in building quality. Indirectly, the buyer is not satisfied when the abandoned buildings is completed and occupied. This study seeks to assess residents' satisfaction towards residential building quality which was abandoned. This research combined quantitative and qualitative methods. Respondents are randomly selected based on reports and information obtained through the Ministry Housing and Local Government (MHLG) and Local Authority (LA). Subsequently thirty (30) housing projects were selected to answer the questionnaires. Based on thirty (30) housing projects which have been completed, only three (3) housing projects ranged between six (6) months to two (2) years and have been occupied by the buyers. A total of ten (10) developers were interviewed with respect to rehabilitation of abandoned projects. Thus 194 respondents were randomly selected to achieve the objective of the study. The data was analysed through descriptive statistical analysis and inferential statistics. This research demonstrated that abandoned housing project can lead to residents' satisfaction towards building quality. In order to rehabilitate abandoned housing, the study subsequently suggested build then sell approach towards achieving better housing quality.
Details
Keywords
Oluwaseyi Olalekan Alao, Godwin Onajite Jagboro and Akintayo Opawole
This paper aims to determine the effect of the period of abandonment on the final cost and duration of resuscitated tertiary educational building projects as a basis for enhancing…
Abstract
Purpose
This paper aims to determine the effect of the period of abandonment on the final cost and duration of resuscitated tertiary educational building projects as a basis for enhancing the performance metrics of the projects and improving the availability of facilities in tertiary institutions in Nigeria.
Design/methodology/approach
A structured questionnaire was administered on 47 professionals involved in the physical development of construction projects in Osun State public tertiary educational institutions to provide primary data for the study. Secondary data relating to initial and final costs, initial and final completion dates, dates of abandonment, period of abandonment, date of re-award, etc. were obtained from selected resuscitated projects. Data were analyzed using relative significance index and regression analysis.
Findings
The most significant effects of project abandonment were found to be disappointment of populace and over-stretching of existing facilities. The study showed a directly proportional and an exponential effect of period of abandonment on percentage cost overrun of resuscitated projects, which were represented by yc = −329.755 + 19.545x and yc = 6.1662e0.0506x, respectively. A linear relationship between period of abandonment and percentage time overrun was represented by yt = 0.467 + 0.816x.
Research limitations/implications
The fact that the regression equations could not be validated because of paucity of data was identified as a limitation of this study.
Practical implications
This study adds to the body of knowledge on abandonment of building projects from a quantitative perspective. Findings have implications for guiding long-term infrastructure development plans in public tertiary educational institutions.
Originality/value
Maximum threshold at which abandoned projects may be resuscitated at an economic cost was established as 16 months. Findings further suggest that the economy of new construction would outweigh resuscitation of abandoned projects beyond this period.
Details
Keywords
Oluwaseyi Olalekan Alao and Godwin Onajite Jagboro
Abandonment of construction projects is still a burning issue in Nigeria. Beside the poor financing of educational infrastructure, abandonment of construction projects remains a…
Abstract
Purpose
Abandonment of construction projects is still a burning issue in Nigeria. Beside the poor financing of educational infrastructure, abandonment of construction projects remains a significant contributor to the inadequacy of facilities in Nigerian public tertiary educational institutions. The purpose of this paper is, therefore, to assess the causes of abandoned projects specific to public institutions of tertiary education in Nigeria, with a view to providing empirical data that are generalizable to enhancing successful delivery of teaching and research facilities.
Design/methodology/approach
Primary data used for the study were obtained through questionnaires administered to 47 professionals comprising 8 architects, 12 mechanical and electrical engineers, 15 civil/structural engineers, 4 builders and 8 quantity surveyors who were involved in physical development of construction projects in public tertiary educational institutions in Osun State. The data were analyzed using mean analysis, factor analysis and the Kruskal-Wallis (K-W) test.
Findings
The factors most significant to abandonment of tertiary educational institutional projects were delayed payments, fund mismanagement, inadequate budgetary allocation, inadequacy of finance, inflation and bankruptcy of the contractor. Findings also showed that not all factors causing abandonment were significant to tertiary institutional projects. The significant factors clustered under stakeholders’ response capacity, poor financial management, inadequate planning and monitoring, and unexpected occurrences. The K-W test showed significant differences among the categories of tertiary institutions on the ranking of the most significant causes of abandoned projects.
Research limitations/implications
The study was limited to public tertiary educational institutions in Osun State. Further studies could focus on public health institution projects and private tertiary educational projects to improve the body of knowledge on the subject of causative factors for project abandonment.
Practical implications
The study provided implications for effective contract management of public tertiary educational institutional projects, which is a significant step to improving the available teaching and research facilities in Nigerian tertiary institutions.
Originality/value
The study provides implications for effective contract management systems of projects for public tertiary educational institutions, thereby improving the available teaching and research facilities.
Details
Keywords
Mercy Ogunnusi, Huda Salman and Richard Laing
Abandonment poses a range of effects detrimental to the development of a country such as Nigeria. Restoring such infrastructure in a sustainable manner is a challenge identified…
Abstract
Purpose
Abandonment poses a range of effects detrimental to the development of a country such as Nigeria. Restoring such infrastructure in a sustainable manner is a challenge identified in the literature. The aim of this study is to evaluate a novel approach – the technique for order preference by similarity to an ideal solution (TOPSIS) to identify the sustainability criteria for the redevelopment of abandoned infrastructure in Nigeria. The literature evidences use of TOPSIS in various development contexts, but not in the context of redevelopment of abandoned infrastructure.
Design/methodology/approach
This study explores the potential of TOPSIS in the sustainable redevelopment of abandoned infrastructure in Nigeria through a combination of a quantitative method of data collection – questionnaire – and a case study. The case study focuses on the abandoned Federal Government Secretariat in Lagos. One hundred and sixty-one (161) participants responded to the questionnaire. Data collected were analyzed using TOPSIS analytical technique.
Findings
Refurbishment is considered as the most sustainable alternative for the redevelopment of abandoned infrastructure. For criteria consideration, structural integrity and foundation categorized under the technological attributes ranked highest for refurbishment and conversion alternatives. Waste generation and prevention and profitability top the list for demolition and procurement respectively.
Social implications
The social benefit of this study is to bring building considered to be an eyesore back into use.
Originality/value
The findings from the analysis orchestrates the importance of the built environment research concentrating on innovative frameworks for sustainable redevelopment of abandoned structures in the construction industry.
Details
Keywords
Emmanuel Oluwatobi Adebisi, Stephen Okunola Ojo and Oluwaseyi Olalekan Alao
The failure and abandonment of construction projects have proven to be insurmountable problems incessantly militating against the efficient performance of the construction…
Abstract
Purpose
The failure and abandonment of construction projects have proven to be insurmountable problems incessantly militating against the efficient performance of the construction industry in Nigeria. The complexity, technicality and a host of other project execution issues unique to multi-storey building projects do increase their susceptibility to failure and abandonment. Thus, the purpose of this paper is to examine the factors influencing failure and abandonment of multi-storey building projects in Nigeria. This is with a view to provide inferential empirical data that could enhance successful delivery of multi-storey building projects in Nigeria.
Design/methodology/approach
Primary data were used for the study. A structured questionnaire was administered on consultants and contractors’ personnel within Lagos State, Nigeria. A total of 180 copies of the questionnaire were administered ,and 134 copies which represent a combined response rate of 74.4 per cent were retrieved. The data were analysed using frequency distribution and percentages, Mean item score and factor analysis.
Findings
The factors most significant to the failure and abandonment of multi-storey building projects are inadequate funding by the client, improper planning at the pre-construction phase, structural failure in multi-storey building during construction, bankruptcy/business failure of the contractor, improper scheduling of the building project activities and failure to engage qualified professionals with technical expertise and experience. The rated factors clustered under human resources capability, planning and structural quality, contractor selection and variation, insecurity and variation, and force majeure and political risk.
Research limitations/implications
The study was limited to multi-storey building projects in Lagos State, Nigeria. Further studies could focus on specific resuscitation strategies for abandoned multi-storey building projects.
Practical implications
The study provided implications for effective project and contract management of multi-storey building projects which is very paramount to improve the delivery of complex, technical- and capital-intensive building projects in Nigeria.
Originality/value
The study provides specific implications for the management of multi-storey building projects, thereby enhancing the delivery of building projects.
Details
Keywords
Filipe AP Duarte, Maria Jose Madeira, Dulcineia Catarina Moura, Joao Carvalho and Jacinta Raquel Miguel Moreira
This paper aims to analyses barriers as a determinant of ongoing or abandoned innovation activities. The literature exploits barriers as the nature of innovation and its influence…
Abstract
Purpose
This paper aims to analyses barriers as a determinant of ongoing or abandoned innovation activities. The literature exploits barriers as the nature of innovation and its influence on firm’s. The main focus is the Portuguese SMEs and the impacts that act as barriers in the development of innovation activities.
Design/methodology/approach
The database was obtained through the Community Innovation Survey 2010 (CIS 2010) that was coordinated by EUROSTAT. In this sense, a logistic regression model is proposed, which makes it possible to analyse the relations between three or more variables, depending on whether the relationship is one of dependence or interdependence, thus allowing the application of distinct statistical techniques, using 6,160 firms
Findings
There are several sources of information that are associated with the development of innovation projects.
Practical implications
The importance of barriers to the development of innovation activities, as well as it being a decisive factor in the impediment to and abandon of the same, was noted.
Originality/value
This study also demonstrated that each case is different and that a barrier in one firm can at the same time be a window of opportunity for another firm.
Details