Search results

1 – 7 of 7
Open Access
Article
Publication date: 30 May 2024

Edson Oliveira Martins and Guilherme F. Frederico

This study aims to find the main contributions from lean office (LO) that can be applied to the project management field, correlating these two areas toward an improvement in…

33

Abstract

Purpose

This study aims to find the main contributions from lean office (LO) that can be applied to the project management field, correlating these two areas toward an improvement in project management performance.

Design/methodology/approach

This paper uses a systematic literature review as a methodological approach to find the main potential contributions from LO that can be applied to project management.

Findings

This study has selected the 13 most cited potential contributions from LO and its level of occurrence in a systematic literature review (SLR).

Research limitations/implications

This study explores theoretical aspects of LO benefits on project management, and further empirical studies are needed to determine the risks and benefits of the concept listed here.

Practical implications

The practical implications are that the most cited potential contribution from LO to the project management and those can be used as a guidance for project managers.

Originality/value

This article highlights the potential contributions from LO to project management field, which is novelty in the face of the existent literature.

Details

International Journal of Industrial Engineering and Operations Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2690-6090

Keywords

Open Access
Article
Publication date: 12 May 2023

Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…

79542

Abstract

Purpose

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.

Design/methodology/approach

A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.

Findings

An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.

Research limitations/implications

The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.

Originality/value

This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 25 December 2023

Anna Trubetskaya, Alan Ryan, Daryl John Powell and Connor Moore

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk…

Abstract

Purpose

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk volumes. Further capacity gains may be achieved by extending the processing season into the winter, a key enabler for which being the reduction of duration of the winter maintenance overhaul period. This paper aims to investigate if Lean Six Sigma tools and techniques can be used to enhance operational maintenance performance, thereby releasing additional processing capacity.

Design/methodology/approach

Combining the Six-Sigma Define, Measure, Analyse, Improve, Control (DMAIC) methodology and the structured approach of Turnaround Maintenance (TAM) widely used in process industries creates a novel hybrid model that promises substantial improvement in maintenance overhaul execution. This paper presents a case study applying the DMAIC/TAM model to Ireland’s largest dairy processing site to optimise the annual maintenance shutdown. The objective was to deliver a 30% reduction in the duration of the overhaul, enabling an extension of the processing season.

Findings

Application of the DMAIC/TAM hybrid resulted in process enhancements, employee engagement and a clear roadmap for the operations team. Project goals were delivered, and original objectives exceeded, resulting in €8.9m additional value to the business and a reduction of 36% in the duration of the overhaul.

Practical implications

The results demonstrate that the model provides a structure that promotes systematic working and a continuous improvement focus that can have substantial benefits for wider industry. Opportunities for further model refinement were identified and will enhance performance in subsequent overhauls.

Originality/value

To the best of the authors’ knowledge, this is the first time that the structure and tools of DMAIC and TAM have been combined into a hybrid methodology and applied in an Irish industrial setting.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 22 March 2024

Ambra Galeazzo, Andrea Furlan, Diletta Tosetto and Andrea Vinelli

We studied the relationship between job engagement and systematic problem solving (SPS) among shop-floor employees and how lean production (LP) and Internet of Things (IoT…

Abstract

Purpose

We studied the relationship between job engagement and systematic problem solving (SPS) among shop-floor employees and how lean production (LP) and Internet of Things (IoT) systems moderate this relationship.

Design/methodology/approach

We collected data from a sample of 440 shop floor workers in 101 manufacturing work units across 33 plants. Because our data is nested, we employed a series of multilevel regression models to test the hypotheses. The application of IoT systems within work units was evaluated by our research team through direct observations from on-site visits.

Findings

Our findings indicate a positive association between job engagement and SPS. Additionally, we found that the adoption of lean bundles positively moderates this relationship, while, surprisingly, the adoption of IoT systems negatively moderates this relationship. Interestingly, we found that, when the adoption of IoT systems is complemented by a lean management system, workers tend to experience a higher effect on the SPS of their engagement.

Research limitations/implications

One limitation of this research is the reliance on the self-reported data collected from both workers (job engagement, SPS and control variables) and supervisors (lean bundles). Furthermore, our study was conducted in a specific country, Italy, which might have limitations on the generalizability of the results since cross-cultural differences in job engagement and SPS have been documented.

Practical implications

Our findings highlight that employees’ strong engagement in SPS behaviors is shaped by the managerial and technological systems implemented on the shop floor. Specifically, we point out that implementing IoT systems without the appropriate managerial practices can pose challenges to fostering employee engagement and SPS.

Originality/value

This paper provides new insights on how lean and new technologies contribute to the development of learning-to-learn capabilities at the individual level by empirically analyzing the moderating effects of IoT systems and LP on the relationship between job engagement and SPS.

Details

International Journal of Operations & Production Management, vol. 44 no. 6
Type: Research Article
ISSN: 0144-3577

Keywords

Open Access
Article
Publication date: 31 October 2023

Emilia Kääriä and Ahm Shamsuzzoha

This study is focused to support an ongoing development project of the case company's current state and the challenges of the order-to-cash (O2C) process. The O2C process is the…

1601

Abstract

Purpose

This study is focused to support an ongoing development project of the case company's current state and the challenges of the order-to-cash (O2C) process. The O2C process is the most visible process to the customer, and therefore, its punctual and fluent order management is vital. It is observed that the high degree of manual work in the O2C process causes mistakes, delays and rework in the process. The purpose of this article is therefore to analyze the case company's current state of the O2C process as well as to identify the areas of development in this process by deploying the means of Lean Six Sigma tools such as value stream mapping (VSM).

Design/methodology/approach

The study was conducted as a mix of quantitative and qualitative analysis. Based on both the quantitative and qualitative data, a workshop on VSM was organized to analyze the current state of the O2C process of a case company, engaged in the energy and environment sector in Finland.

Findings

The results found that excessive manual work was highly connected to inadequate or incorrect data in pricing and invoicing activities, which resulted in canceled invoices. Canceled invoices are visible to the customer and have a negative impact on the customer experience. This study found that by improving the performance of the O2C process activities and improving communication among the internal and external stakeholders, the whole O2C process can perform more effectively and provide better customer value.

Originality/value

The O2C process is the most visible process to the customer and therefore its punctual and fluent order management is vital. To ensure that the O2C process is operating as desired, suitable process performance metrics need to be aligned and followed. The results gathered from the case company's data, questionnaire interviews, and the VSM workshop are all highlighted in this study. The main practical and managerial implications were to understand the real-time O2C process performance, which is necessary to ensure strong performance and enhance continuous improvement of the O2C process that leads to operational excellence and commercial competitiveness of the studied case company.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 11
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 3 March 2023

Amy B.C. Tan, Desirée H. van Dun and Celeste P.M. Wilderom

With the growing need for employees to be innovative, public-sector organizations are investing in employee training. This study aims to examine the effects of a combined Lean Six…

4829

Abstract

Purpose

With the growing need for employees to be innovative, public-sector organizations are investing in employee training. This study aims to examine the effects of a combined Lean Six Sigma and innovation training, using action learning, on public-sector employees’ creative role identity and innovative work behavior.

Design/methodology/approach

The authors studied a public service agency in Singapore in which a five-day Lean Innovation Training was implemented, using a combination of Lean Six Sigma and Creative Problem-Solving tools, with a simulation on day one and subsequent team-based project coaching, spread over six months. The authors administered pre- and postintervention surveys among all the employees, and initiated group interviews and observations before, during and after the intervention.

Findings

Creative role identity and innovative work behavior had significantly improved six months after the intervention, enabled through senior management’s transformational leadership. The training induced managers to role-model innovative work behaviors while cocreating, with their employees, a renewal of their agency’s core processes. The three completed improvement projects contributed to an innovative work culture and reduced service turnaround time.

Originality/value

Starting with a role-playing simulation on the first day, during which leaders and followers swapped roles, the action-learning type training taught all the organizational members to use various Lean Six Sigma and Creative Problem-Solving tools. This nimble Lean Innovation Training, and subsequent team-based project coaching, exemplifies how advancing the staff’s creative role identity can have a positive impact.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 22 March 2024

Peter E. Johansson, Jessica Bruch, Koteshwar Chirumalla, Christer Osterman and Lina Stålberg

The purpose of this paper is to advance the understanding of paradoxes, underlying tensions and potential management strategies when integrating digital technologies into existing…

Abstract

Purpose

The purpose of this paper is to advance the understanding of paradoxes, underlying tensions and potential management strategies when integrating digital technologies into existing lean-based production systems (LPSs), with the aim of achieving synergies and fostering the development of production systems.

Design/methodology/approach

This study adopts a collaborative management research (CMR) approach to identify patterns of organisational tensions and paradoxes and explore management strategies to overcome them. The data were collected through interviews and focus group interviews with experts on lean and/or digital technologies from the companies, from documents and from workshops with the in-case researchers.

Findings

The findings of this paper provide insights into the salient organisational paradoxes embraced in the integration of digital technologies in LPS by identifying different aspects of the performing, organising, learning and belonging paradoxes. Furthermore, the findings demonstrate the intricacies and relatedness between different paradoxes and their resolutions, and more specifically, how a resolution strategy adopted to manage one paradox might unintentionally generate new tensions. This, in turn, calls for either re-contextualising actions to counteract the drift or the adoption of new resolution strategies.

Originality/value

This paper adds perspective to operations management (OM) research through the use of paradox theory, and we (1) provide a fine-grained perspective on why integration sometimes “fails” and label the forces of internal drift as mechanisms of imbalances and (2) provide detailed insights into how different management and resolution strategies are adopted, especially by identifying re-contextualising actions as a key to rebalancing organisational paradoxes in favour of the integration of digital technologies in LPSs.

Details

International Journal of Operations & Production Management, vol. 44 no. 6
Type: Research Article
ISSN: 0144-3577

Keywords

Access

Only Open Access

Year

Last week (7)

Content type

1 – 7 of 7