Open Access
Article
Publication date: 27 February 2024

Maryam R. Nezami, Mark L.C. de Bruijne, Marcel J.C.M. Hertogh and Hans L.M. Bakker

Societies depend on interconnected infrastructures that are becoming more complex over the years. Multi-disciplinary knowledge and skills are essential to develop modern…

1007

Abstract

Purpose

Societies depend on interconnected infrastructures that are becoming more complex over the years. Multi-disciplinary knowledge and skills are essential to develop modern infrastructures, requiring close collaboration of various infrastructure owners. To effectively manage and improve inter-organizational collaboration (IOC) in infrastructure construction projects, collaboration status should be assessed continually. This study identifies the assessment criteria, forming the foundation of a tool for assessing the status of IOC in interconnected infrastructure projects.

Design/methodology/approach

A systematic literature study and in-depth semi-structured interviews with practitioners in interconnected infrastructure construction projects in the Netherlands are performed to identify the criteria for assessing the status of IOC in infrastructure construction projects, based on which an assessment tool is developed.

Findings

The identified assessment criteria through the literature and the practitioner’s perspectives results in the designing and development of a collaboration assessment tool. The assessment tool consists of 12 criteria and 36 sub-criteria from three different categories of collaborative capacity: individual, relational, and organizational.

Originality/value

The assessment tool enables practitioners to monitor the status of IOC between infrastructure owners and assists them in making informed decisions to enhance collaboration. The assessment tool provides the opportunity to assess and analyze the status of collaboration based on three categories (i.e., individual, relational, and organizational).

Details

Engineering, Construction and Architectural Management, vol. 31 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 1 August 2023

Jacob Guerrero and Susanne Engström

By adopting the “hard” and “soft” project management (PM) approaches from the PM-literature, this paper aims to problematize the expected role of client organizations in driving…

Abstract

Purpose

By adopting the “hard” and “soft” project management (PM) approaches from the PM-literature, this paper aims to problematize the expected role of client organizations in driving innovation in the transport infrastructure sector.

Design/methodology/approach

Addressing a large public client in Sweden, a case study design was initially applied to provide in-depth insights and perspectives of client project managers’ views and experiences of managing projects expected to drive innovation. In this paper, the concepts of “hard” and “soft” are used to discuss empirical findings on challenges associated with adopting a PM-approach for driving innovation in projects. The empirical material consists of interview data, complemented with observations and archival data.

Findings

Findings reveal challenges associated with combining hard and soft approaches, frequently demonstrating difficulties in balancing short-term project expectations with the promotion of innovation. In line with the literature, project managers note that there is a need for soft approaches to promote development and drive innovation. Yet, findings reflect a situation in which operational success criteria predominate, whereas soft approaches are not sufficiently used to create the grounds required for fostering innovation.

Originality/value

Insights are provided into how PM-approaches may impact construction innovation in the infrastructure sector, demonstrating a need for further research on the challenges and implications of applying and combining hard and soft PM-approaches.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 13 February 2024

Kaisu Laitinen, Mika Luhtala, Maiju Örmä and Kalle Vaismaa

Insufficient productivity development in the global and Finnish infrastructure sectors indicates that there are challenges in genuinely achieving the goals of resource efficiency…

1041

Abstract

Purpose

Insufficient productivity development in the global and Finnish infrastructure sectors indicates that there are challenges in genuinely achieving the goals of resource efficiency and digitalization. This study adapts the approach of capability maturity model integration (CMMI) for examining the capabilities for productivity development that reveal the enablers of improving productivity in the infrastructure sector.

Design/methodology/approach

Civil engineering in Finland was selected as the study area, and a qualitative research approach was adopted. A novel maturity model was constructed deductively through a three-step analytical process. Previous research literature was adapted to form a framework with maturity levels and key process areas (KPAs). KPA attributes and their maturity criteria were formed through a thematic analysis of interview data from 12 semi-structured group interviews. Finally, validation and refinement of the model were performed with an expert panel.

Findings

This paper provides a novel maturity model for examining and enhancing the infrastructure sector’s maturity in productivity development. The model brings into discussion the current business logics, relevance of lifecycle-thinking, binding targets and outcomes of limited activities in the surrounding infrastructure system.

Originality/value

This paper provides a new approach for pursuing productivity development in the infrastructure sector by constructing a maturity model that adapts the concepts of CMMI and change management. The model and findings benefit all actors in the sector and provide an understanding of the required elements and means to achieve a more sustainable built environment and effective operations.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 18 July 2023

Andrew Ebekozien, Clinton Aigbavboa, Mohamad Shaharudin Samsurijan, Radin Badarudin Radin Firdaus, Solomon Oisasoje Ayo-Odifiri and Godpower C. Amadi

Several studies have shown that the mechanism of labour-intensive construction (LIC) projects can mitigate high unemployment and create skilled development, especially in…

Abstract

Purpose

Several studies have shown that the mechanism of labour-intensive construction (LIC) projects can mitigate high unemployment and create skilled development, especially in developing nations. The guidelines and practices for implementation may have faced some encumbrances in some countries. Whether the current guidelines and practices for municipal infrastructure support agent (MISA) to execute LIC projects face hindrances in South Africa has yet to receive in-depth studies. Thus, this study attempts to proffer policy solutions to improve the proposed revised guidelines and practices for MISA in LIC project execution in South Africa.

Design/methodology/approach

The study's objectives were accomplished via a combination of 16 virtual interviews of built environment professionals and government officials involved in LIC project execution in South Africa and supported by the analysed documents. A thematic approach was used to analyse the data and presented two main themes.

Findings

Findings show lax enforcement of discretionary funds, lax institutional capacity and inadequate individual skills, among others, as the gaps in existing South Africa's LIC guidelines and practices. Also, policy solutions to address the gaps were proffered.

Practical implications

The suggested feasible policies will improve the proposed revised guidelines and practices for MISA in LIC project execution in South Africa. This guide will promote the development of individual skills, institutional capacities and increase employment across South Africa.

Originality/value

This study promotes the use of LIC to create employment and contribute to proffering measures that will improve the proposed revised third edition of the guidelines and practices for MISA to execute LIC.

Details

Property Management, vol. 42 no. 1
Type: Research Article
ISSN: 0263-7472

Keywords

Open Access
Article
Publication date: 23 April 2024

Anna Kadefors, Kirsi Aaltonen, Stefan Christoffer Gottlieb, Ole Jonny Klakegg, Pertti Lahdenperä, Nils O.E. Olsson, Lilly Rosander and Christian Thuesen

Relational contracting is increasingly being applied to complex and uncertain construction projects. However, it has proved hard to achieve stable performance and industry-level…

Abstract

Purpose

Relational contracting is increasingly being applied to complex and uncertain construction projects. However, it has proved hard to achieve stable performance and industry-level learning in this field. This paper employs an institutional perspective to analyze how legitimacy for relational contracting has been produced and challenged in Denmark, Finland, Norway and Sweden, including implications for dissemination and learning.

Design/methodology/approach

A collaborative case study design is used, where longitudinal accounts of the developments in relational contracting over more than 25 years in four Nordic countries were developed by scholars based in each country. The descriptions are underpinned by literature sources from research, practice and policy.

Findings

The countries share similar problem perceptions that have triggered the de-institutionalization of traditional contracting practices. Models and policies developed elsewhere are important sources of knowledge and legitimacy. Most countries have seen pendulum movements, where dissemination of relational contracting is followed by backlashes when projects fail to meet projected outcomes. Before long, however, relational contracting tends to re-emerge under new labels and in slightly new forms. Such a proliferation of concepts presents further obstacles to learning. Successful institutionalization is found to rely on realistic goals in combination with broad competence development at the organizational and industry levels.

Practical implications

In seeking inspiration from other countries, policymakers should go beyond contract models to also consider strategies to manage industry-level learning.

Originality/value

The paper provides a unique longitudinal cross-country perspective on the field of relational contracting. As such, it contributes to the small stream of literature on long-term institutional change in the construction sector.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 7 May 2024

Yazeed A. Alragabah and Mohd. Ahmed

There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of…

Abstract

Purpose

There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of this paper is to assess the impact of CSFs on the government construction projects in Saudi Arabia. The success factors are investigated from a broader consideration of failure criteria, from consideration of most effectiveness in successful project completion and also from consideration of the impact of implementing control processes for successful project completion.

Design/methodology/approach

This study has analysed the impact of success factors on construction projects in Saudi Arabia using a descriptive methodology. An exhaustive literature survey is undertaken to identify the success and failure factors related to government construction projects in Saudi Arabia. The survey data are sorted out and analysed by cost, schedule, technical, context and finance dimensions of the projects based on project types, engineering complexity, size, modality, jurisdictional control and funding approach. To evaluate the influence of success factors implementation, qualitative data were collected in a survey via a web-based questionnaire that was sent to officials working and occupying a responsible position in national project guidelines organizations and in government construction organizations in Saudi Arabia. In all, 28 CSFs were identified, ranked and evaluated for their impact on project success. The four identified factors belong to process categories of construction projects, nine factors belong to management of construction projects and 15 success factors are identified for impact assessment of implementation in construction projects.

Findings

The study's findings have identified and ranked the top five CSFs that significantly influence project outcomes, including meeting time targets, adhering to financial budgets, delivering desired outcomes for all stakeholders, effectively managing risks and assembling the appropriate team while optimizing resource allocation. Additionally, the research indicates that hindrances to projects primarily stem from execution, economic, human and political factors. The study advocates for strict controls over incomplete engineering designs and advises against contractors independently handling design work to ensure project success. Additionally, addressing contractors' qualifications and financial matters is crucial for project success. By highlighting these CSFs and challenges, the research provides actionable insights to enhance project management practices in the construction industry.

Research limitations/implications

This study is limited to the infrastructure projects constructed by governmental bodies with the participation of officials from government organizations. Further study, including private projects and officials working on private projects, may be needed to generalized the research outcome.

Originality/value

Numerous studies have investigated CSFs in construction projects, but few have examined their relevance to Saudi Arabian government projects. This study aims to fill this gap by identifying key CSFs specific to Saudi Arabian public sector construction projects and assessing their impact on project success. It advocates for stringent controls in the Saudi Arabian construction sector, emphasizing the importance of preventing incomplete or altered engineering designs by contractors to increase the success rate of public sector projects. This research offers practical insights to stakeholders, advancing project management practices in Saudi Arabia's construction sector for improved outcomes and resource utilization.

Details

Frontiers in Engineering and Built Environment, vol. 4 no. 3
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 21 June 2024

Trinh Nguyen-Vo

This research aims to offers a new method for assessing geoeconomic risks in bilateral relations and evaluate the level of such risks from Vietnam’s economic dependency on China.

1285

Abstract

Purpose

This research aims to offers a new method for assessing geoeconomic risks in bilateral relations and evaluate the level of such risks from Vietnam’s economic dependency on China.

Design/methodology/approach

I apply descriptive analysis to identify asymmetrical dependency in Vietnam–China economic relations and propose a geoeconomic risk assessment framework to evaluate risk levels in bilateral economic linkages.

Findings

The proposed geoeconomic risk framework assesses risk levels, which are positively influenced by the degree of asymmetrical relations (vulnerabilities), the net impacts on the receiving economy (impacts) and the sending state’s ability to control economic tools (threats). In contrast, risk levels are negatively affected by the effectiveness of existing mitigation efforts. The framework employs ordinal likelihood scales to rank various risk levels. In the context of Vietnam–China relations, market access for agricultural products and control of the Mekong water emerge as the most risky areas for economic coercion, followed by Chinese official development finance in infrastructure and critical input imports. On the other hand, debt dependency and foreign direct investment in the energy sector are considered more secure areas—less likely targets for economic coercion. Hence, risk mitigation strategies should prioritize reducing asymmetry in vulnerable dependence areas while maintaining current practices in more secure areas.

Originality/value

Methodologically, it introduces a new approach for assessing bilateral geoeconomic risk. Empirically, it provides Vietnam’s policymakers with a comprehensive evaluation of the implications of economic interdependence with China.

Details

Fulbright Review of Economics and Policy, vol. 4 no. 1
Type: Research Article
ISSN: 2635-0173

Keywords

Open Access
Article
Publication date: 23 December 2022

Rouzbeh Shabani, Tobias Onshuus Malvik, Agnar Johansen and Olav Torp

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end…

2458

Abstract

Purpose

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end and managing uncertainty in the construction phase. In contrast, UM components in the design phase have received less attention. This research aims to improve knowledge about the key components of UM in the design phase of large road projects.

Design/methodology/approach

This study adopted a literature review and case study. The literature review was used to identify relevant criteria for UM. These criteria helped to design the interview guide. Multiple case study research was conducted, and data were collected through document study and interviews with project stakeholders in two road projects. Each case's owners, contractors and consultants were interviewed individually.

Findings

The data analysis obtained helpful information on the involved parties, process and exploit tools and techniques during the design phase. Johansen's (2015) framework [(a) human and organisation, (b) process and (c) tools and techniques)] was completed and developed by identifying relevant criteria (such as risk averse or risk-taker, culture and documentation level) for each component. These criteria help to measure UM performance. The authors found that owners and contractors are major formal UM actors, not consultants. Empirical data showed the effectiveness of Web-based tools in UM.

Research limitations/implications

The studied cases were Norwegian, and this study focussed on uncertainties in the project's design phase. Relevant criteria did not cover all the criteria for evaluating the performance of UM. Qualitative evaluation of criteria allows further quantitative analysis in the future.

Practical implications

This paper gave project owners and managers a better understanding of relevant criteria for measuring UM in the owners and managers' projects. The paper provides policy-makers with a deeper understanding of creating rigorous project criteria for UM during the design phase. This paper also provides a guideline for UM in road projects.

Originality/value

This research gives a holistic evaluation of UM by noticing relevant criteria and criteria's interconnection in the design phase.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 21 July 2022

Anna-Therése Järvenpää, Johan Larsson and Per Erik Eriksson

This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.

Abstract

Purpose

This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.

Design/methodology/approach

Semi-structured interviews about six infrastructure projects were conducted to identify respondents’ views on innovation possibilities. These possibilities were then analyzed from an organizational control perspective within principal–agent relationships between the Swedish Transport Administration (STA) and their contractors.

Findings

How the client uses control systems affects innovation possibilities. Relying on process control could negatively affect innovation opportunities, whereas output control could have a positive influence. In addition, social control seems to have a weak effect, as the STA appears not to use social control to facilitate joint innovation. Public clients must comply with the Public Procurement Act and, therefore, retain the requirements specified in the tendering documents. Much of the steering of the execution is connected to the ex ante phase (before signing the contract), which affects innovation possibilities in the design and execution phases for the contractor.

Research limitations/implications

This study was conducted with only one client, thus limiting its generalizability. However, the findings provide an important stepping stone to further investigation into balancing control systems and creating innovation possibilities in a principal–agent relationship.

Originality/value

Although public procurement has increasingly been emphasized as a major potential source of innovation, studying how a public client’s use of organizational control systems affects innovation possibilities in the construction sector has received scant attention.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 1 July 2024

Gonzalo Lizarralde, Benjamín Herazo, David Smith, Lisa Bornstein, Kevin Gould, Elsa Monsalve, Nicolás Ordoñez, Adriana López, Oswaldo López, Roberto Burdiles, Claudio Araneda and Andrés Olivera

Disaster risk reduction is of prime importance in informal settlements in the Global South, where several forms of vulnerability coexist. Policy and official programmes, however…

Abstract

Purpose

Disaster risk reduction is of prime importance in informal settlements in the Global South, where several forms of vulnerability coexist. Policy and official programmes, however, rarely respond to the needs and expectations of citizens and local leaders living in these settlements. Even though these agents constantly attempt to reduce risks in their own way, we know very little about their activities, motivations and effective impact on risk reduction. Here we seek to conceptualize bottom-up initiatives to better grasp their origins, limitations and success.

Design/methodology/approach

Through a four-year action-research project in Colombia, Cuba and Chile, we theorize about the production of change by local agents. Through detailed case studies we explored the activism of 17 local leaders. Through narrative analysis we studied their motivations and explanations. Finally, by documenting 22 initiatives, we revealed effective changes in space.

Findings

In the face of risk and disasters, residents and leaders in informal settings engaged in symbolic, physical and social spaces of interaction. Their actions were guided by trust, emotions, time cycles and activism. Local agency was justified by narratives about risk and climate change that differ from those of authorities and scholars.

Research limitations/implications

There is still limited understanding of bottom-up initiatives in informal settings. It is crucial to conceptualize their origins, limitations and success. The focus on three specific countries necessitates further research for broader applicability and understanding.

Practical implications

A better comprehension of bottom-up actions is crucial for informing policies and programmes aimed at reducing risk in informal settings. Stakeholders must recognize the political, social and cultural roles of these actions for more impactful climate action.

Originality/value

We borrow Simon’s concept of “artefact” to introduce the notion of “Artefacts of Disaster Risk Reduction”, providing insights into the multifaceted nature of bottom-up initiatives. We also emphasize the simultaneous political and phenomenological character of these actions, contributing to a deeper understanding of their origins and impact.

Details

Disaster Prevention and Management: An International Journal, vol. ahead-of-print no. ahead-of-print