Article
Publication date: 6 January 2014

Gary D. Holt

Construction management research (CMR) surveys frequently use questionnaires that employ “Likert-type” items, Likert-items, and Likert scales to capture respondents '…

4252

Abstract

Purpose

Construction management research (CMR) surveys frequently use questionnaires that employ “Likert-type” items, Likert-items, and Likert scales to capture respondents ' self-reported attitudes. This Editorial builds substantially on earlier observations by Holt regarding the significance of appropriate questionnaire response scale design and, use of the relative importance index (RII) method to analyse those data such scales yield. The paper aims to discuss these issues.

Design/methodology/approach

Several RII models are examined by their application to a data set. Objectives include to contrast their practicality in use, compare outputs, highlight limitations of some models and discuss methods of RII data analysis, interrogation and interpretation.

Findings

Principal messages are: all components of response scales should be carefully designed; alternative RII models can produce similar results of analysis; “simple percentage” RII models may not yield “real” percentages; the minimum rating scale integer should accurately reflect its descriptor; only rating scales offering a “0” response, or an “adjusted percentage” RII model can achieve unity; and RII outputs should be interpreted cautiously.

Research limitations/implications

Uncertain application of the RII has been observed within CMR literature, so implications of the Editorial will be of direct relevance to this research community (and beyond).

Originality/value

Aside from that cited above, no additional literature has been identified that specifically links RII usage to CMR.

Details

Construction Innovation, vol. 14 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 21 May 2018

Parvaneh Shahsavand, Akbar Marefat and Majid Parchamijalal

The purpose of this paper is to reveal the main causes of delays in the projects are from the client (relative importance index (RII)=0.716), labor and equipment (RII=0.701) and…

45616

Abstract

Purpose

The purpose of this paper is to reveal the main causes of delays in the projects are from the client (relative importance index (RII)=0.716), labor and equipment (RII=0.701) and contractor (RII=0.698). Hence determining the contractual responsibility of delay is the most likely source of dispute in construction projects and many techniques have been used in the courts to demonstrate the criticalities of a delay event on the project schedule. Therefore, authors try to investigate all process-based techniques of delay claims and evaluated and conformed them with principles by Society of Construction Law (SCL) protocol and Association for the Advancement of Cost Engineering International (AACEI) in order to choose the best techniques based on the specific circumstances of each project.

Design/methodology/approach

This section is divided into two distinct parts: refers to the methods used to assess the perceptions of clients, consultants, and contractors on the relative importance of causes of delay in construction industry; and refers to advantages and disadvantages of various techniques used to analyze delays and their conform with SCL protocol. A questionnaire was developed to assess the perceptions of clients, consultants, and contractors on the relative importance of causes of delay in Iranian construction industry. The respondents were asked to indicate their response category on 78 well-recognized construction delay factors identified by authors.

Findings

In total, 78 causes of delay were identified through research. The identified causes are combined into seven groups. The field survey included 58 contractors, 55 consultants, and 62 client. Data collected were analyzed by RII and Statistical Package for Social Sciences (SPSS). The authors identified main causes of delay and ten most important causes, according to Table AII, from the perspective of three major groups of participants (clients, consultants and contractors). The ranking of categories of causes of delay, according to Table I, were: client-related causes (RII=0.716); labor and equipment category causes (RII=0.701); contractor-related causes (RII=0.698); material-related causes (RII=0.690); design-related causes (RII=0.666); external causes (RII=0.662); and consultant-related causes (RII=0.662). But according to the discussions and given that determining the contractual responsibility of delay is the most likely source of dispute in construction industry and many techniques have been used in the courts to demonstrate the criticalities of a delay event on the project schedule.

Originality/value

All process-based techniques of delay analysis have been present in this paper and categorized in 11 groups. In order to understand the advantages and disadvantages of them by clients, contractor and consultant, a thorough review conducted to reveal the nature of techniques. In the next step, given that selecting the most appropriate technique based on constraints and specific conditions of each project is one of the most important steps to carry out a successful delay analysis. The authors conformed, all process-based techniques of delay analysis, by SCL protocol and AACEI principles. Finally, the result of this match was brought in order to choose the best technique based on the specific circumstances of each project.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 April 2014

Rami Hughes and David Thorpe

The purpose of the research discussed in this paper is to ascertain the perception, from the project manager's viewpoint, of factors affecting construction productivity in the…

2907

Abstract

Purpose

The purpose of the research discussed in this paper is to ascertain the perception, from the project manager's viewpoint, of factors affecting construction productivity in the State of Queensland, Australia.

Design/methodology/approach

The research was conducted by a structured questionnaire that was sent to 89 randomly selected construction project managers in Queensland, Australia. This questionnaire requested background information about the respondents and then sought a score, using a 0-4 Likert scale, from each of them with respect to the importance of 47 factors identified from the literature that were considered likely to affect construction productivity. The factors were stratified into primary factors and secondary factors contributing to three of the primary factors. There were 36 responses. These factors were rated by the respondents and then ranked using a relative importance index approach.

Findings

The research evaluated the relative importance of the primary factors with respect to their effect on construction productivity. The 15 highest ranking factors are discussed. Three factors – rework, poor supervisor competency, and incomplete drawings – were ranked as having a strong effect on construction productivity. There was also an analysis of the secondary factors in relation to three of the primary factors.

Research limitations/implications

The research focused on the State of Queensland in Australia. It had a response rate of 40 per cent. It provides insight into the factors affecting productivity on construction projects in Australia. Further research to investigate the identified factors in depth, using targeted interviews of expert project management professionals, is currently being undertaken.

Practical implications

The construction industry can use the findings in this paper as a basis for improving the productivity of construction projects.

Originality/value

This research is original research, which has highlighted a number of key areas of which construction productivity can be improved.

Details

Construction Innovation, vol. 14 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 19 January 2024

Raveena Marasinghe and Susantha Amarawickrama

This paper examines rent determinants and their relationship with commercial office property rents.

69

Abstract

Purpose

This paper examines rent determinants and their relationship with commercial office property rents.

Design/methodology/approach

The method adopted in this study differs from that of previous studies on this topic. Firstly, based on the survey of the viewpoints of experts, Relative Importance Index (RII) analysis was used to identify rent determinants and to rank and ensure their relevance and validity in the Sri Lankan context. Secondly, sampling of data related to 115 office properties collected from property tenants and landlords located within the central built-up area of Colombo City was conducted using a multi-methods approach to carry out an objective hedonic analysis of office rents.

Findings

This research utilizes RII and hedonic models to provide insights into determinants and relationships. Both analyses confirm that the three top drivers of commercial office rent are distance from the major town center, availability of parking space and the condition of the property. In addition to these three factors, hedonic models reveal that the age of the property and the availability of a conference hall also play a relevant role in explaining office rents. Given the disparities in the findings of the two methods, further examination was able to confirm that factors such as distance from the major town center, parking availability, age of the property, presence of a conference hall, building condition, floor size, business type and type of building are likely to influence commercial office rent. These findings reflect elements such as the quality, newness and better facilities of different office properties.

Practical implications

This systematic study and analysis of office rent for the guidance of real estate investors can support sound investment decisions, potentially leading to more financially sound property development, reduced public debt levels and improved public-private financing. Further, the research findings offer valuable insights to real estate investors, developers and planners regarding location decisions for office development quality enhancements in future office developments.

Originality/value

This research provides fresh insights into the local scale office market, an area where limited evidence currently exists. Further, the methodology adopted provides evidence that hedonic analysis, supported by a multi-method approach, can mitigate the subjective judgments made by professionals.

Details

Journal of Property Investment & Finance, vol. 42 no. 1
Type: Research Article
ISSN: 1463-578X

Keywords

Article
Publication date: 18 April 2023

Iman Youssefi and Tolga Celik

Total risk score (TRS) is considered one of the main indicators for risk evaluation. Several studies attempted to employ different types of risk indices for the evaluation of cost…

Abstract

Purpose

Total risk score (TRS) is considered one of the main indicators for risk evaluation. Several studies attempted to employ different types of risk indices for the evaluation of cost overrun causes. Hence, this study aims at performing a comparative analysis to evaluate the efficiency of three different approaches for TRS calculation.

Design/methodology/approach

Thirty-eight unique causes of cost overrun in urban-related construction projects were identified and a survey was conducted among construction professionals in Iran. The TRS for each cost overrun cause is calculated using single-attribute (SA), double-attribute (DA), and multiple-attribute (MA) approaches, and eventually, causes were ranked. Furthermore, principal component analysis (PCA), logistic regression analysis (LRA), and K-means clustering are utilized to compare the differences in the generated TRS using different approaches.

Findings

The results revealed that the TRS generated through the MA approach demonstrated the highest efficiency in terms of generating correlation between causes and their identified latent constructs, prediction capability, and classification of the influential causes in the same group.

Originality/value

The originality of this study primarily stems from the adoption of statistical approaches in the evaluation of the recently introduced TRS calculation approach in comparison to traditional ones. Additionally, this study proposed a modified application of the relative importance index (RII) for risk prioritization. The results from this study are expected to fulfill the gap in previous literature toward exploring the most efficient TRS calculation approach for those researchers and practitioners who seek to utilize them as a measure to identify the influential cost overrun causes.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 April 2017

Samuel Famiyeh, Charles Teye Amoatey, Ebenezer Adaku and Collins Sena Agbenohevi

In Ghana, the duration of construction projects from inception to completion is becoming a great concern, recently, especially among clients and beneficiaries, because of the…

10326

Abstract

Purpose

In Ghana, the duration of construction projects from inception to completion is becoming a great concern, recently, especially among clients and beneficiaries, because of the rising interest rates, inflation, development plan targets, among other factors. Hence the need to understand the causes of delays and cost overrun in the construction sector has become more important than ever. This study therefore aims to identify the major factors underlying time and cost overruns in projects related to the education sector in Ghana to proffer practical solutions in addressing them.

Design/methodology/approach

The study conducted a survey among clients’ consultants and representatives of the contractors working on about 60 government school projects. A relative importance index was used to determine the relative effects of the factors causing construction time and cost overruns.

Findings

The key factors causing construction time overrun were: financial problems, unrealistic contract durations imposed by clients, poorly defined project scope, client-initiated variations, under-estimation of project cost by consultants, poor inspection/supervision of projects by consultants. Other factors were underestimation of project complexity by contractors, poor site management, inappropriate construction methods used by contractors and delays in the issuance of permits by government agencies. Factors affecting cost overruns were financial difficulty by client, delays in payments of completed works, variations in designs, lack of communications plans, poor feasibility and project analysis, poor financial management on site and material price fluctuations.

Research limitations/implications

The research was limited to only the educational sector projects.

Practical implications

Practically, this study highlights for the construction sector the critical factors causing project time and cost overruns in Ghana. Identification of these factors provides the basis for pragmatic solutions to enhance the chances of project success.

Social implications

The identification and solutions to project time and cost overruns, especially for educational sector projects, contribute toward making public goods more affordable and accessible to most citizens, particularly in developing countries.

Originality/value

This study contributes to the debate on factors causing project time and cost overruns in the construction sector especially from a developing country’s perspective.

Details

Journal of Engineering, Design and Technology, vol. 15 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 April 2022

Mohammad Nafe Assafi, Md. Ikramul Hoque and Md. Mehrab Hossain

Construction delay always causes massive damage to the advancing construction industries, which is no different in the case of Bangladeshi construction industries. This paper aims…

Abstract

Purpose

Construction delay always causes massive damage to the advancing construction industries, which is no different in the case of Bangladeshi construction industries. This paper aims to investigate the major delay factors causing construction delays in public-funded, mixed and private-funded construction projects of Bangladesh. Also, it offers preventive suggestions from expert stakeholders to reduce the recurrence of delays.

Design/methodology/approach

At first, an extensive literature review was conducted to identify the thirty-seven major delay factors categorized under seven groups. A questionnaire was then developed for survey at ongoing construction projects at a different division of Bangladesh. Next, data from 110 respondents were collected, and the delay factors were ranked based on the Relative Importance Index (RII); lastly, probable solutions were suggested for top-ranked delay factors based on opinions from expert stakeholders in the construction sector of Bangladesh.

Findings

The overall RII ranking of the 37 delay factors showed “Construction mistakes and defective work,” “Contract modifications by the client” and “Adverse weather condition” as the top three factors causing the delay. For public-funded projects, “Construction mistakes and defective work” and “Slow decision making by a consultant” are the top delay factors. For mixed projects, “Slow decision making of the client” and “Construction mistakes and defective work ranked top, and for private-funded projects, “Financial problems and payment delay of the client” and “Adverse weather condition” ranked top. These nuances of ranking in individual project types ascertain that the causes of delay vary in terms of project features.

Practical implications

The outcome of this project will help identify the significant delay factors based on their severity of effectiveness associated with public-funded, mixed and private-funded projects in Bangladesh. The suggestions regarding preventing these delay factors obtained through the opinions of expert stakeholders can help reduce the effect of these delays in the context of Bangladesh and in countries where the similarity in construction environment prevails.

Originality/value

Previously, studies on construction delays in Bangladesh focused mainly on identifying the delays using qualitative analysis techniques. This study is based on a unique methodology of integrating quantitative research on delay factor identification and qualitative research on preventive measures following the opinions gathered from expert stakeholders in the construction sector.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 9 July 2020

Binoy BV, Naseer MA and Anil Kumar PP

Land value is a measure of the specific features of a property, excluding buildings and other developments. Land value varies depending on the economic, geographic and political…

Abstract

Purpose

Land value is a measure of the specific features of a property, excluding buildings and other developments. Land value varies depending on the economic, geographic and political aspects of a particular location. The primary purpose of the paper is to identify the general and location-specific attributes impacting property prices in urban Kerala.

Design/methodology/approach

The objective of the current study was achieved through a three-cycle Delphi survey and relative importance index (RII) approach. The experts who aided in the survey had a mutual interest in the subject but came from different backgrounds like property valuation, real estate, urban and environmental planning. The initial group of variables identified from the literature was expanded and scrutinized in the first cycle of the Delphi survey. The variables were grouped into five major categories and 13 subcategories based on the literature and expert opinion. In the subsequent stages, the short-listed variables were rated on a seven-point Likert scale until a consensus was attained. The top-ranked variables were identified through the RII method as the critical factors influencing land value in urban Kerala.

Findings

The results indicate that road accessibility and proximity to nuisance sources are the most crucial parameters. The outcome of the study will provide a better understanding of the dynamics of land value and the influencing factors in urban areas.

Originality/value

Previous studies do not give much consideration for the location-specific variability on the influencing parameters. Property management research has not considered the usage of expert opinion and RII for variable selection.

Details

Property Management, vol. 38 no. 5
Type: Research Article
ISSN: 0263-7472

Keywords

Article
Publication date: 3 August 2010

Adnan Enshassi, Sherif Mohamed and Ala'a El Karriri

The purpose of this paper is to identify and rank the factors that affect the bid/no bid decision according to their relative importance from the perspective of the contracting…

1464

Abstract

Purpose

The purpose of this paper is to identify and rank the factors that affect the bid/no bid decision according to their relative importance from the perspective of the contracting parties operating in the Gaza Strip, Palestine.

Design/methodology/approach

The objectives of this research were investigated through a postal questionnaire, which covered a randomly selected sample of 63 contractors, 29 clients and 13 consultants operating in the construction industry in the Gaza strip. The questionnaire was structured based on related literature, the pilot study and actual factors affecting bidders' decisions to bid or not that arise from special conditions in the Gaza Strip. A total of 78 factors that affect the bid/no bid decision were identified. These factors were then ranked according to their relative importance to contracting parties operating in the Gaza Strip, Palestine.

Findings

The results illustrate that the financial capability of the contractors, the financial capability of the clients, the financial values of the project, the due date of the payments, the availability of construction raw materials in local markets, and the stability of the construction industry were the most critical factors affecting the bid/no bid decision, as agreed by all respondents.

Originality/value

The paper provides supportive practical solutions for contractors, clients and consultants to enhance and improve bidding decisions. It is recommended that clients and consultants consider the financial capabilities, technical capabilities and staff competencies of the contractors during the awarding stage, and not simply focus on the lowest bid.

Details

Journal of Financial Management of Property and Construction, vol. 15 no. 2
Type: Research Article
ISSN: 1366-4387

Keywords