Search results

1 – 5 of 5
Article
Publication date: 28 August 2023

Biao Liu, Qiao Wang, Y.T. Feng, Zongliang Zhang, Quanshui Huang, Wenxiang Tian and Wei Zhou

3D steady heat conduction analysis considering heat source is conducted on the fundamental of the fast multipole method (FMM)-accelerated line integration boundary element method…

Abstract

Purpose

3D steady heat conduction analysis considering heat source is conducted on the fundamental of the fast multipole method (FMM)-accelerated line integration boundary element method (LIBEM).

Design/methodology/approach

Due to considering the heat source, domain integral is generated in the traditional heat conduction boundary integral equation (BIE), which will counteract the well-known merit of the BEM, namely, boundary-only discretization. To avoid volume discretization, the enhanced BEM, the LIBEM with dimension reduction property is introduced to transfer the domain integral into line integrals. Besides, owing to the unsatisfactory performance of the LIBEM when it comes to large-scale structures requiring massive computation, the FMM-accelerated LIBEM (FM-LIBEM) is proposed to improve the computation efficiency further.

Findings

Assuming N and M are the numbers of nodes and integral lines, respectively, the FM-LIBEM can reduce the time complexity from O(NM) to about O(N+ M), and a full discussion and verification of the advantage are done based on numerical examples under heat conduction.

Originality/value

(1) The LIBEM is applied to 3D heat conduction analysis with heat source. (2) The domain integrals can be transformed into boundary integrals with straight line integrals by the LIM. (3) A FM-LIBEM is proposed and can reduce the time complexity from O(NM) to O(N+ M). (4) The FM-LIBEM with high computational efficiency is exerted to solve 3D heat conduction analysis with heat source in massive computation successfully.

Details

Engineering Computations, vol. 40 no. 7/8
Type: Research Article
ISSN: 0264-4401

Keywords

Article
Publication date: 4 July 2022

Ying Zhao, Wei Chen, Zhuzhang Yang, Zongliang Li and Yong Wang

Risk factors related delay hinder the schedule performance of most construction projects in the world. It is a critical challenge to realize the advantages of prefabricated…

Abstract

Purpose

Risk factors related delay hinder the schedule performance of most construction projects in the world. It is a critical challenge to realize the advantages of prefabricated construction projects (PCPs) under the negative effect of schedule delay. This paper aims to propose an exhaustive list of risk factors impeding the progress of PCPs and evaluate the collected risk factors based on the cause–effect relations. The ultimate goal is to improve the understanding of the complex relations among various risk factors related delay in PCPs, and also offer managers a reference on aspect of schedule risk management.

Design/methodology/approach

This paper proposes a hybrid method of GT–DEMATEL–ISM, that is combing grounded theory, DEMATEL (decision-making trial and evaluation laboratory) and ISM (Interpretative Structural Modeling), to collect, evaluate and structure risk factors related delay for PCPs. The research procedure of this methodology is divided into three stages systematically involving qualitative and quantitative analysis. In the first stage, GT is utilized to implement qualitative analysis to collect the risk factors leading to schedule delay in PCPs. While, the quantitative analysis is to analyze and evaluate the collected risk factors based on the cause–effect relations in the next two stages evaluation by the DEMATEL focuses on quantifying the priority and intensity of the relations between factors. Additionally, ISM is employed to construct the hierarchical structure and graphically represent the pairwise relations between factors.

Findings

The outcome of qualitative investigation by grounded theory proposes a theoretical framework of risk factors related delay for PCPs. The framework contains three levels of category, namely, core category, main category and initial category and provides a list of risk factors related delay. Following this finding, evaluation results by the DEMATEL classify factors into cause and effect groups and determine 11 critical delay risk factors. Meanwhile, the findings show that risks referring to organizational management issue foremost impact the progress of PCPs. Furthermore, a systemic multilevel hierarchical structure model is visually constructed by ISM to present the pairwise linkages of critical factors. The model provides the risk transmission chains to map the spread path of delay impact in the system.

Originality/value

The contribution of the study involves twofold issues. Methodologically, this research proposes a hybrid method GT–DEMATEL–ISM used to identify and analyze factors for a complex system. It is also applicable to other fields facing similar problems that require collecting, evaluating and structuring certain elements as a whole in a comprehensive perspective. The theoretical contribution is to fill the relevant research gap of the existing body of knowledge. To the best knowledge of the authors, this paper is the first attempt to integrate qualitative and quantitative research for risk analysis related delay and take the insight into the whole process of PCPs covering off-site manufacture and on-site construction. Furthermore, the analysis of findings provided both a micro view focusing on individual risk factor and a managerial view from a systematic level. The findings also contribute the effective information to improve the risk management related schedule delay in PCPs.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Abstract

Details

Energy Security in Times of Economic Transition: Lessons from China
Type: Book
ISBN: 978-1-83982-465-4

Article
Publication date: 1 January 2015

Dongfeng Liu

Using Shanghai F1 as an example, this research seeks to examine the impact of mega-events on host city image from the perspective of international students. Leisure facilities and…

Abstract

Using Shanghai F1 as an example, this research seeks to examine the impact of mega-events on host city image from the perspective of international students. Leisure facilities and service were the most positive image impact perceived by the respondents, followed by affective city images as well as opportunities and convenience. International students tended to disagree that F1 would result in any crime and security problems and were unsure about any negative impact on environment and daily life. Some of the image factors were significantly related to intention to work in the city or the willingness to recommend the city.

Details

International Journal of Sports Marketing and Sponsorship, vol. 16 no. 2
Type: Research Article
ISSN: 1464-6668

Keywords

Open Access
Article
Publication date: 15 October 2021

Bangxi Li, Chong Liu, Feng Zhao and Yanghua Huang

In the current literature, there is little systematic research on the relationship among adjustment of the income distribution, change in economic structure and improvement of…

Abstract

Purpose

In the current literature, there is little systematic research on the relationship among adjustment of the income distribution, change in economic structure and improvement of macroeconomic efficiency.

Design/methodology/approach

This paper expands Marx's reproduction schema into the “Marx–Sraffa” three-department structure table comprising fixed capital, general means of production and means of consumption and employs China's input–output table from 1987 to 2015 to portray the relationship between income distribution and macroeconomic efficiency under investment-driven growth.

Findings

This paper calculates the wage–profit curve of China's economy and evaluates the space of macroeconomic efficiency improvement in China based on the deviation between actual and potential income distribution structure.

Originality/value

The results show that there is a downward trend of the profit rate, which meets Marx's theoretical prediction, and the decline in the profit rate is mainly attributed to an increase in the organic composition of capital arising from the rapid growth of fixed capital investment under extended growth. The analysis of macroeconomic efficiency shows that the space for improving macroeconomic efficiency is extremely limited under traditional growth pattern and that China must transform its economic development pattern and foster new economic growth drivers.

Details

China Political Economy, vol. 4 no. 1
Type: Research Article
ISSN: 2516-1652

Keywords

1 – 5 of 5