Publication date: 25 October 2021

Yaser Gamil and Ismail Abd Rahman

The purpose of this paper is to develop a structural relationship model to study the relationship between causes and effects of poor communication and information exchange in…

14273

Abstract

Purpose

The purpose of this paper is to develop a structural relationship model to study the relationship between causes and effects of poor communication and information exchange in construction projects using Smart-PLS.

Design/methodology/approach

The first method of this research is to identify the causes and effects factors of poor communication in construction projects from the extant of literature. The data used to develop the model was collected using a questionnaire survey, which targeted construction practitioners in the Malaysian construction industry. A five-point Likert type scale was used to rate the significance of the factors. The factors were classified under their relevant construct/group using exploratory factor analysis. A hypothetical model was developed and then transformed into Smart-PLS in which the hypothetical model suggested that each group of the cause factors has a direct impact on the effect groups. The hypothesis was tested using t-values and p-values. The model was assessed for its inner and outer components and achieved the threshold criterion. Further, the model was verified by engaging 14 construction experts to verify its applicability in the construction project setting.

Findings

The study developed a structural equation model to clarify the relationships between causes and effects of poor communication in construction projects. The model explained the degree of relationships among causes and effects of poor communication in construction projects.

Originality/value

The published academic and non-academic literature introduced many studies on the issue of communication including the definitions, importance, barriers to effective communication and means of poor communication. However, these studies ended up only on the general issue of communication lacking an in-depth investigation of the causes and effects of poor communication in the construction industry. The study implemented advanced structural modeling to study the causes and effects. The questionnaire, the data and concluding results fill the identified research gap of this study. The addressed issue is also of interest because communication is considered one of the main knowledge areas in construction management.

Details

Journal of Facilities Management , vol. 21 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Open Access
Article
Publication date: 25 April 2022

Hooman Sadeh, Claudio Mirarchi, Farzad Shahbodaghlou and Alberto Pavan

Occupational Safety and Health Administration (OSHA) of the U.S. government ensures that all health and safety regulations, protecting the workers, are enforced. OSHA officers…

1399

Abstract

Purpose

Occupational Safety and Health Administration (OSHA) of the U.S. government ensures that all health and safety regulations, protecting the workers, are enforced. OSHA officers conduct inspections and assess fines for non-compliance and regulatory violations. Literature discussion on the economic impact of OSHA inspections with COVID-19 related citations for the construction sector is lacking. This study aims to investigate the relationships between the number of COVID-19 cases, construction employment and OSHA citations and it further evaluates the total and monthly predicted cost impact of OSHA citations associated with COVID-19 violations.

Design/methodology/approach

An application of multiple regression analysis, a supervised machine learning linear regression model, based on K-fold cross validation sampling and a probabilistic risk-based cost estimate Monte Carlo simulation were utilized to evaluate the data. The data were collected from numerous websites including OSHA, Centers for Disease Control and the World Health Organization.

Findings

The results show that as the monthly construction employment increased, there was a decrease in OSHA citations. Conversely, the cost impact of OSHA citations had a positive relationship with the number of COVID-19 cases. In addition, the monthly cost impact of OSHA COVID-19 related citations along with the total cost impact of citations were predicted and analyzed.

Originality/value

The application of the two models on cost analysis provides a thorough comparison of predicted and overall cost impact, which can assist the contractors to better understand the possible cost ramifications. Based on the findings, it is suggested that the contractors include contingency fees within their contracts, hire safety managers to implement specific safety protocols related to COVID-19 and request a safety action plan when qualifying their subcontractors to avoid potential fines and citations.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Abstract

Details

Journal of Intelligent Manufacturing and Special Equipment, vol. 4 no. 1
Type: Research Article
ISSN: 2633-6596

Open Access
Article
Publication date: 16 April 2024

Richard Kadan and Jan Andries Wium

Due to the uniqueness of individual construction projects, identifying the dominant risk factors is needed for risk mitigation in ongoing and future projects. This study aims to…

Abstract

Purpose

Due to the uniqueness of individual construction projects, identifying the dominant risk factors is needed for risk mitigation in ongoing and future projects. This study aims to identify the dominant construction supply chain risk (CSCR) factors, based on studies conducted between 2002 and 2022.

Design/methodology/approach

The study adopts the preferred reporting items for systematic reviews and meta-analysis (PRISMA) procedure to identify, screen and select relevant articles in order to provide a bibliography and annotation of the prevalent risks in the supply chains. A descriptive analysis of the findings then follows.

Findings

The study’s findings have highlighted the three most prevalent risks in the construction supply chain (poor communication across project teams, changes in foreign currency rate, unfavorable climate conditions) as reported in literature, that project teams need to pay closer attention to and take proactive steps to mitigate.

Research limitations/implications

Due to limitations imposed by the chosen research methodology, tools, time frame and article availability, the study was unable to examine all CSCR-related papers.

Practical implications

The results will serve as a useful roadmap for risk/supply chain managers in the construction industry to take strategically proactive steps towards allocating resources for CSCR mitigation efforts.

Social implications

Context-specific research on the impact of social and cultural risks on the construction supply chain would be beneficial, due to emerging social network risk factors and the complex socio-cultural settings.

Originality/value

There is presently no study that has reviewed extant studies to identify and compile the dominant risk factors (DRFs) associated with the supply chain of construction projects for ranking in the supply chain risk management process.

Details

Frontiers in Engineering and Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2634-2499

Keywords

1 – 4 of 4