Search results

11 – 20 of 98
Book part
Publication date: 17 November 2023

Simon Ofori Ametepey, Clinton Ohis Aigbavboa and Wellington Didibhuku Thwala

The pursuit of sustainable development goals (SDGs) is the primary driver of road infrastructure development (RID), but multiple parties are involved in the process, causing…

Abstract

The pursuit of sustainable development goals (SDGs) is the primary driver of road infrastructure development (RID), but multiple parties are involved in the process, causing confusion. To effectively manage stakeholder processes, Jeffry (2009) proposed a framework based on a preventative double-path relationship between stakeholders and institutions. Bal et al. (2013) proposed a five-stage framework for stakeholder management, which includes identifying key players and issues, conducting analysis and plans, tightening restraints on making promises, creating a plan and soliciting input from interested parties, and monitoring its effectiveness. Successful stakeholder management for sustainable road infrastructure project (SRIP) implementation has been shown to have several benefits, such as enhanced understanding of the fiscal position, improving status, building relationships, developing trust, and enduring collaborative relationships, distributing skills and practices, and recognizing and mitigating threats and vulnerabilities. Infrastructure projects involving roads include a range of complex activities, and it is essential for infrastructure projects to evaluate potential project partners prior to making a final decision. Dealing with many stakeholders and maintaining a reasonable degree of concordance between their interests is crucial for fruitful endeavours. It is important for project groups and partners to have a shared understanding of the project’s goals and solicit their input and for a precise approach to identify and manage project partners throughout the execution phase. However, RID is still in its infancy when it comes to managing stakeholders and relationships. Stakeholder management has been ad hoc due to a lack of standardized methodologies, approaches, strategies, and processes, and infrastructure development procedures should include a systematic approach to managing stakeholders. The bulk of SRIP implementation needs come from stakeholders, making project partners crucial. The sustainable development (SD) strategy emphasizes the importance of SRIP execution to stakeholders, such as architects, quantity surveyors, conservationists, environmentalists, regional managers, project managers, suppliers, subcontractors, and sustainability consultants. This section of the research addressed the omissions of previously analysed comprehensive factors in SID models and frameworks, including climate change response, public involvement, and stakeholder management. Strategies for filling these gaps were discussed. An analysis of relevant academic literature was conducted.

Details

Sustainable Road Infrastructure Project Implementation in Developing Countries: An Integrated Model
Type: Book
ISBN: 978-1-83753-811-9

Keywords

Open Access
Article
Publication date: 13 October 2023

Clinton Ohis Aigbavboa, Lawrence Yao Addo, Andrew Ebekozien, Wellington Didibhuku Thwala and Bernard Martins Arthur-Aidoo

Access to clean drinking water is a major encumbrance in developing countries. In Ghana, urban water supply is below internationally recognised standards, especially among the…

Abstract

Purpose

Access to clean drinking water is a major encumbrance in developing countries. In Ghana, urban water supply is below internationally recognised standards, especially among the urban poor, sub-urban and rural communities. Stakeholders and institutional inefficiencies may be hindrances facing the Ghanaian water supply process. Therefore, this study aims to appraise the motivational factors and outcome of stakeholders’ engagement and identify the factors that influence effective institutional management of urban water supply in Ghana.

Design/methodology/approach

Sequential exploratory mixed methods were adopted and analysed to proffer answers to the research questions. Nineteen participants and 521 respondents were sampled for the qualitative and quantitative phases.

Findings

Findings reveal that the institutional processes and stakeholder engagement significantly influence the effectiveness of the management of urban water supply in Ghana. Findings identified 35 motivational factors and categorised them into the health of the population, socio-economic, technological and innovation trends, policy reform and adaptive governance. Also, the 22 institutional factors identified were categorised into three groups: regulatory framework, ethics for managing water supply and the culture of managing water supply.

Originality/value

Besides the study addressing the theoretical gap regarding which variables are germane in influencing the effective management of urban water supply, the study may be among the top studies that have appraised the role of stakeholders in the institutional management of urban water supply in Ghana.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Open Access
Article
Publication date: 24 August 2023

Andrew Ebekozien, Wellington Didibhuku Thwala, Clinton Ohis Aigbavboa and Mohamad Shaharudin Samsurijan

Studies showed that construction digitalisation could prevent or mitigate accidents rate on sites. Digitalisation applications may prevent or mitigate building project collapse…

Abstract

Purpose

Studies showed that construction digitalisation could prevent or mitigate accidents rate on sites. Digitalisation applications may prevent or mitigate building project collapse (BPC) but with some encumbrances, especially in developing countries. There is a paucity of research on digital technologies application to prevent or mitigate BPC in Nigeria. Thus, the research aims to explore the perceived barriers that may hinder digital technologies from preventing or mitigating building collapse and recommend measures to improve technology applications during development.

Design/methodology/approach

The study is exploratory because of the unexplored approach. The researchers collected data from knowledgeable participants in digitalisation and building collapse in Nigeria. The research employed a phenomenology approach and analysed collected data via a thematic approach. The study achieved saturation at the 29th interviewee.

Findings

Findings show that lax construction digitalisation implementation, absence of regulatory framework, lax policy, unsafe fieldworkers' behaviours, absence of basic infrastructure, government attitude, hesitation to implement and high technology budget, especially in developing countries, are threats to curbing building collapse menace via digitalisation. The study identified technologies relevant to preventing or mitigating building collapse. Also, it proffered measures to prevent or mitigate building collapse via improved digital technology applications during development.

Originality/value

This research contributes to the construction digitalisation literature, especially in developing countries, and investigates the perceived barriers that may hinder digital technologies usage in preventing or mitigating building collapse in Nigeria.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 4 May 2023

Andrew Ebekozien, Clinton Aigbavboa, Matthew Ikuabe and Wellington Didibhuku Thwala

Nigeria has one of the highest graduate unemployment rates in Africa, and there is no comprehensive policy framework to address it. Evidence shows that integrating craftsmanship…

Abstract

Purpose

Nigeria has one of the highest graduate unemployment rates in Africa, and there is no comprehensive policy framework to address it. Evidence shows that integrating craftsmanship into higher education academic programmes can enhance graduate employability. Therefore, there is a need to integrate it into the built environment programmes at institutions in Nigeria. The built environment craftmanship (BEC) in Nigeria's HEIs may have had some challenges, although studies about these challenges are scarce. In this regard, the study investigated BEC's perceived encumbrances and proffered measures to integrate craftsmanship skills in Nigerian HEIs built environment programmes.

Design/methodology/approach

The research adopted a qualitative research design using a virtual interview approach to solicit data from 34 experts across Nigeria. An exploratory approach was used to engage selected HEIs in Nigeria and thematic analysis was adopted to analyse the collected data, and saturation was achieved.

Findings

The study findings indicate that integrating BEC in built environment programmes will enhance graduate employment. However, possible encumbrances like institutional frameworks, funding, infrastructural development and pedagogical and social-cultural issues were found to be affecting BEC's integration into built environment programmes at higher education in Nigeria.

Research limitations/implications

Future studies should explore more detailed large-scale investigations about integrating craftsmanship into higher education institution (HEI) programmes.

Originality/value

Given the dearth of pragmatic studies on the built environment graduates' unemployment in Nigeria, this research contributes to the academic community debates on reducing graduates' unemployment via BEC in HEIs.

Details

Education + Training, vol. 65 no. 3
Type: Research Article
ISSN: 0040-0912

Keywords

Article
Publication date: 4 May 2023

Andrew Ebekozien, Clinton Ohis Aigbavboa, Samuel Adeniyi Adekunle, John Aliu and Wellington Didibhuku Thwala

Studies show that the twenty-first-century construction industry needs reskilling and upskilling tools to train large numbers of the workforce for better-integrated project…

Abstract

Purpose

Studies show that the twenty-first-century construction industry needs reskilling and upskilling tools to train large numbers of the workforce for better-integrated project delivery. Evidence shows that digitisation via the fourth industrial revolution (4IR) technology can play a critical role in reskilling and competency demand. Attempting to use digital technology may have had some challenges. Studies about the perceived hindrances facing Nigeria's built environment professionals (BEP) reskilling and upskilling needs in the workplace via 4IR technologies are scarce. Thus, the study investigated the perceived encumbrances facing Nigeria's BEP training needs and proffered measures to improve their performance in the workplace via 4IR technologies.

Design/methodology/approach

The researchers engaged BEP in Lagos and Abuja, Nigeria. Regarding the data collection, a qualitative research design was adopted. The study achieved saturation after 32 virtual interviews. A thematic analysis was adopted for the collected data.

Findings

The study shows that using 4IR for reskilling and upskilling will enhance integrated project delivery. But the level of usage in training needs is low. Findings identified the various ways reskilling and upskilling could be achieved. Also identified are the major built environment areas that require 4IR training. Findings highlighted possible encumbrances facing the use of 4IR technologies by Nigerian BEP for reskilling and upskilling needs in the workplace and proffered feasible measures to improve 4IR usage for training needs.

Research limitations/implications

The study is restricted to the perceived encumbrances and proffers measures to improve BEP reskilling and upskilling needs via 4IR technologies via a qualitative method. Future research is required to validate the findings and test the proposed framework that emerged from the study.

Practical implications

The study confirms that reskilling and upskilling measures are required at all skill levels and may lead to economic growth. The paper would advance Nigerian higher educational accreditation agencies and various BEP regulatory bodies to review the curriculum and incorporate 4IR as a component or module.

Originality/value

The thematic network analysis and proposed framework could be utilised to stimulate Nigeria's BEP reskilling and upskilling needs in the workplace via 4IR technologies. It would stir main stakeholders, especially government policymakers, to facilitate programmes to improve 4IR technologies usage.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Content available

Abstract

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Article
Publication date: 10 July 2020

Falaq Assad Nazir, David John Edwards, Mark Shelbourn, Igor Martek, Wellington Didibhuku Didibhuku Thwala and Hatem El-Gohary

Housing completions in the UK have fallen to 125,000 annually, while government targets have risen to 300,000. This dramatic shortfall raises concerns as to whether current…

4448

Abstract

Purpose

Housing completions in the UK have fallen to 125,000 annually, while government targets have risen to 300,000. This dramatic shortfall raises concerns as to whether current traditional construction approaches remain appropriate. This study aims to compare the traditional approach with modular construction, with a view to assessing whether a shift in construction systems offers the potential to alleviate the UK's domestic housing crisis.

Design/methodology/approach

A comprehensive interpretivist review of the available relevant literature is undertaken on construction methods within the UK; advantages and disadvantages. A bibliometric analysis is conducted to extract trends and findings relevant to the comparison at hand. The database is Web of Science; the analysis software is the VOS viewer.

Findings

The research illustrates that the UK housing market is in a state of crisis. A toxic combination of a rising UK population combined falling rates of housing delivery has resulted in an ever-widening housing supply gap. The construction industry’s capacity to meet this observed dearth in supply is further exacerbated by a number of chronic factors such as: falling participation in the construction sector workforce; lowering skill levels; reducing profitability; time to delivery pressures; and cost blow-outs.

Originality/value

While much information on the various construction methods are available, including comparative material, this study is the first to assemble the various comparative parameters regarding traditional and modular UK residential construction in one place. Thus, this study provides a definitive assessment of the relative advantages and disadvantages of these forms of construction.

Details

Journal of Engineering, Design and Technology , vol. 19 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 13 November 2019

Iman Farah Mohamed, David John Edwards, Monica Mateo-Garcia, Glenn Costin and Wellington Didibhuku Didibhuku Thwala

The purpose of this paper is to explore contemporary attitudes amongst UK construction professionals regards fire safety post the Grenfell Tower disaster. Specifically, the…

2170

Abstract

Purpose

The purpose of this paper is to explore contemporary attitudes amongst UK construction professionals regards fire safety post the Grenfell Tower disaster. Specifically, the research examines practitioner’s perceptions of fire safety design, material specification, construction and maintenance of high-rise blocks throughout a building’s whole life cycle.

Design/methodology/approach

A multi-methodology approach was adopted that utilises a mix of research methods. Extant literature and media content is used as a secondary data source, providing a more insightful interpretivist analysis – the results of which guided the development of the survey’s main question set. Primary survey data are sourced from structured interviews and questionnaires completed by participating industry professionals and built environment undergraduate students using non-representative sampling methods. In addition, a Grenfell Tower special advisory panel member was interviewed to add further validity to the overall findings.

Findings

The quantitative findings present evidence to suggest that the Grenfell disaster (and media storm that has surrounded this event) has raised the general level of fire safety knowledge and competency amongst construction professionals. However, qualitative feedback from the special advisory panel member suggests specific fire prevention knowledge remains elusive within both industry and taught programmes at Higher Education Institutes. As a consequence, changes in the taught curriculum are proposed together with an extension of the role of facilities managers in practice to cover fire safety in greater depth.

Originality/value

This paper provides thoughtful insights into the contemporary discourse on fire safety within the UK construction industry. The research also provides critical suggestions to both industry and policy makers which seek to prevent a repeat tragedy occurring again.

Details

International Journal of Building Pathology and Adaptation, vol. 38 no. 3
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 28 April 2020

Charlotte Dixon, David John Edwards, Monica Mateo-Garcia, Joseph Lai, Wellington Didibhuku Didibhuku Thwala and Mark Shelbourn

This study aims to investigate the behaviour of building users and how this impacts upon building energy performance. Specifically, the work examines the behavioural traits of…

Abstract

Purpose

This study aims to investigate the behaviour of building users and how this impacts upon building energy performance. Specifically, the work examines the behavioural traits of able-bodied users of a large higher education building who erroneously access and egress the building using doorways intended for disabled users.

Design/methodology/approach

An inductive methodological approach is adopted that uses grounded theory to devise new insights into building users’ access and egress habits. Structured interviews are conducted to collect primary data from 68 building users of a large educational building over a four-week period. Responses to questions posed provide the basis for a tabularisation of behavioural traits.

Findings

Reasons for able-bodied building users’ preferences to using disabled access are identified and discussed; these are thematically grouped under the headings of apathy, convenience, emergency, ergonomics, ignorance and phobia. Building upon these findings, the research then offers insights into the approaches that could be adopted to change the erroneous behaviours. These approaches include education of building users on the impact their behaviour has upon building performance and environmental pollution, more stringent regulation to penalise repeat offenders and changes to building entrance design using obtrusive (i.e. radio frequency identification tags) and unobstrusive control measures (i.e. a second entrance doorway or slower opening mechanism).

Originality/value

To the best of the author’s knowledge, this study is the first of its kind to investigate the rationale for able-bodied building users erroneously using disabled persons’ access and egress doorways within a building, which as a consequence, inadvertently reduces the building’s environmental performance.

Details

Facilities, vol. 38 no. 9/10
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 4 October 2021

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Didibhuku Thwala and Ramabodu Molusiwa

The COVID-19 pandemic came with a lot of stress, uncertainty and disruption for managing the construction supply chain (CSC). The disruption in return caused weak resilience of…

1200

Abstract

Purpose

The COVID-19 pandemic came with a lot of stress, uncertainty and disruption for managing the construction supply chain (CSC). The disruption in return caused weak resilience of CSC activities. Unfortunately, the existing models for managing CSC focus on preparedness and recovery while neglecting the visibility perspective of resilience CSC. Towards creating a resilience CSC, this study modelled construction 4.0 as the vaccine for supply chain resilience in the construction industry.

Design/methodology/approach

A survey questionnaire was used to collect data randomly from construction stakeholders. The questionnaire was analysed with a structural equation model analysis using SmartPLS while conducting tests such as path coefficient analysis, discriminant analysis and importance-performance analysis.

Findings

This study discovered that construction 4.0 is a significant tool and vaccine for ensuring visibility, recovery and adaptation within the supply chain. Construction 4.0 will function as a vaccine for ensuring resilience because of its capacity to optimise CSC management by introducing an evidence-based management approach and less dependent on implicit knowledge. Towards reaping the full potential of construction 4.0, it should be adopted as a moderating variable.

Research limitations/implications

The research is limited by the use of a single methodology (quantitative) without including a qualitative method to understand better and explore the impact of construction 4.0 on CSC resilience. The qualitative part can be carried out by conducting interviews targeted at construction stakeholders.

Practical implications

In spite of the limitations, the findings of this study contributed to building a more responsive and resilient CSC during the pandemic period. Furthermore, this study also presented the crucial construction 4.0 technology capable of ensuring resilience within the CSC.

Originality/value

This paper presents a model for applying construction 4.0 as a vaccine for ensuring CSC resilience during the COVID-19 pandemic period. This study contributed to ensuring that decisions made within the CSC adopt an evidence-based approach.

Details

Journal of Engineering, Design and Technology , vol. 20 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

11 – 20 of 98