Search results

21 – 30 of over 4000
Article
Publication date: 6 April 2020

Annan Jiang, Shuai Zheng and Shanyong Wang

This paper aims at the problem of surrounding rock excavation damage zone of tunneling in the rich water region, this paper aims to propose a new seepage-stress-damage coupling…

Abstract

Purpose

This paper aims at the problem of surrounding rock excavation damage zone of tunneling in the rich water region, this paper aims to propose a new seepage-stress-damage coupling model and studied the numerical algorithm. This reflects the characteristics of rock damage evolution, accompanied by plastic flow deformation and multi-field interaction.

Design/methodology/approach

First of all, rock elastoplastic damage constitutive model based on the Drucker–Prager criterion is established, the fully implicit return mapping algorithm is adopted to realize the numerical solution. Second, based on the relation between damage variation and permeability coefficient, the rock stress-seepage-damage model and multi-field coupling solving iterative method are presented. Finally, using the C++ language compiled the corresponding programs and simulated tunnel engineering in the rich water region.

Findings

Results show that difference evolution-based back analysis inversed damage parameters well, at the same time the established coupling model and calculating program have more advantages than general conventional methods. Multiple field coupling effects should be more considered for the design of tunnel support.

Originality/value

The proposed method provides an effective numerical simulation method for the construction of the tunnel and other geotechnical engineering involved underground water problems.

Details

Engineering Computations, vol. 37 no. 8
Type: Research Article
ISSN: 0264-4401

Keywords

Article
Publication date: 20 October 2020

Ruipeng Tong, Hui Zhao, Na Zhang, Hongwei Li, Xiaolong Wang and Hongqing Yang

The purpose of this study is to establish a modified accident causation model for highway construction accidents (ACM-HC) and describe the establishment process of the ACM-HC.

Abstract

Purpose

The purpose of this study is to establish a modified accident causation model for highway construction accidents (ACM-HC) and describe the establishment process of the ACM-HC.

Design/methodology/approach

Based on the 2–4 Model, a framework of the ACM-HC was constructed, and the accident causal factors (CF) were extracted from four aspects of human, material, environment and management. In addition, association rule mining (ARM) was introduced to analyze accident investigation reports to obtain the interrelationships between the factors. Based on the framework, factors and ARM results, the ACM-HC was established. Finally, the ACM-HC was verified with a tunnel collapse accident.

Findings

Both the external and internal causes of contractor cause accidents. The flaws of safety management of other stakeholders are external causes. In terms of the internal causes, there are four stages: direct causes, indirect causes, radical causes and root causes. More specifically, the direct causes refer to the unsafe acts and the unsafe conditions; ineffective safety supervision and poor individual factors of frontline workers constitute the indirect causes; the radical causes lie in the flaws of construction procedures and technical schemes; the root causes are related to the poor individual factors of decision makers and managers.

Originality/value

The ACM-HC expresses the causes, sequence and mechanism of highway construction accidents in a visual way. In addition, this study describes a process of using a qualitative–quantitative hybrid approach to establish a modified ACM, which provides a different perspective for the establishment of an ACM.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 June 1977

The only similarity between the construction of wind tunnel models and elementary woodwork is the name of the work itself. VFW‐Fokker, for instance, uses computers both for the…

Abstract

The only similarity between the construction of wind tunnel models and elementary woodwork is the name of the work itself. VFW‐Fokker, for instance, uses computers both for the design and the NC production of the models. That is why this sector also fits into the many‐sided structure of an aerospace company. The first wind tunnel model of the Airbus B 10X version with supercritical wing was recently manufactured at the Varel plant. It was developed in the civil component programme (Ziviles Komponenten‐Programm ZKP) carried out by the German aviation industry under the co‐ordination of VFW‐Fokker.

Details

Aircraft Engineering and Aerospace Technology, vol. 49 no. 6
Type: Research Article
ISSN: 0002-2667

Article
Publication date: 24 September 2019

Farman Afzal, Shao Yunfei, Mubasher Nazir and Saad Mahmood Bhatti

In the past decades, artificial intelligence (AI)-based hybrid methods have been increasingly applied in construction risk management practices. The purpose of this paper is to…

7305

Abstract

Purpose

In the past decades, artificial intelligence (AI)-based hybrid methods have been increasingly applied in construction risk management practices. The purpose of this paper is to review and compile the current AI methods used for cost-risk assessment in the construction management domain in order to capture complexity and risk interdependencies under high uncertainty.

Design/methodology/approach

This paper makes a content analysis, based on a comprehensive literature review of articles published in high-quality journals from the years 2008 to 2018. Fuzzy hybrid methods, such as fuzzy-analytical network processing, fuzzy-artificial neural network and fuzzy-simulation, have been widely used and dominated in the literature due to their ability to measure the complexity and uncertainty of the system.

Findings

The findings of this review article suggest that due to the limitation of subjective risk data and complex computation, the applications of these AI methods are limited in order to address cost overrun issues under high uncertainty. It is suggested that a hybrid approach of fuzzy logic and extended form of Bayesian belief network (BBN) can be applied in cost-risk assessment to better capture complexity-risk interdependencies under uncertainty.

Research limitations/implications

This study only focuses on the subjective risk assessment methods applied in construction management to overcome cost overrun problem. Therefore, future research can be extended to interpret the input data required to deal with uncertainties, rather than relying solely on subjective judgments in risk assessment analysis.

Practical implications

These results may assist in the management of cost overrun while addressing complexity and uncertainty to avoid chaos in a project. In addition, project managers, experts and practitioners should address the interrelationship between key complexity and risk factors in order to plan risk impact on project cost. The proposed hybrid method of fuzzy logic and BBN can better support the management implications in recent construction risk management practice.

Originality/value

This study addresses the applications of AI-based methods in complex construction projects. A proposed hybrid approach could better address the complexity-risk interdependencies which increase cost uncertainty in project.

Details

International Journal of Managing Projects in Business, vol. 14 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 26 July 2018

Bashar Abdal Noor and Sirong Yi

Building information modeling (BIM) is a process of generating and managing building data during the building’s life cycle. To increase productivity in building design and…

1911

Abstract

Purpose

Building information modeling (BIM) is a process of generating and managing building data during the building’s life cycle. To increase productivity in building design and construction, BIM uses three-dimensional (3D) real-time, dynamic building modeling software. Because of its versatile features, BIM use is on the rise and researchers are exploring its application in new disciplines. The purpose of this study is to map out how BIM is used in the construction industry, while identifying and highlighting the research gaps in the literature.

Design/methodology/approach

To investigate the status quo of knowledge about BIM, the authors conducted a comprehensive literature review. They applied and extended a methodology for reviewing BIM-related publications through a four-dimensional meta-analysis system and its categories, which has been partially adapted previously.

Findings

Majority of studies applying BIM for the construction phase of civil engineering projects were done within universities; none used BIM for the construction of intermediate railway stations.

Practical implications

To increase the construction efficiency of intermediate railway stations, applying the BIM concept for generation and management of station data should be considered for future research.

Originality/value

Furthermore, one of the main goals of this research paper is to explore the adoption of BIM in civil engineering construction projects, in particular the construction of intermediate railway stations.

Article
Publication date: 13 December 2022

Zhenhua Luo, Juntao Guo, Jianqiang Han and Yuhong Wang

Prefabricated technology is gradually being applied to the construction of subway stations due to its characteristic of mechanization. However, the prefabricated subway station in…

Abstract

Purpose

Prefabricated technology is gradually being applied to the construction of subway stations due to its characteristic of mechanization. However, the prefabricated subway station in China is in the initial stage of development, which is prone to construction safety issues. This study aims to evaluate the construction safety risks of prefabricated subway stations in China and formulate corresponding countermeasures to ensure construction safety.

Design/methodology/approach

A construction safety risk evaluation index system for the prefabricated subway station was established through literature research and the Delphi method. Furthermore, based on the structure entropy weight method, matter-element theory and evidence theory, a hybrid evaluation model is developed to evaluate the construction safety risks of prefabricated subway stations. The basic probability assignment (BPA) function is obtained using the matter-element theory, the index weight is calculated using the structure entropy weight method to modify the BPA function and the risk evaluation level is determined using the evidence theory. Finally, the reliability and applicability of the evaluation model are verified with a case study of a prefabricated subway station project in China.

Findings

The results indicate that the level of construction safety risks in the prefabricated subway station project is relatively low. Man risk, machine risk and method risk are the key factors affecting the overall risk of the project. The evaluation results of the first-level indexes are discussed, and targeted countermeasures are proposed. Therefore, management personnel can deeply understand the construction safety risks of prefabricated subway stations.

Originality/value

This research fills the research gap in the field of construction safety risk assessment of prefabricated subway stations. The methods for construction safety risk assessment are summarized to establish a reliable hybrid evaluation model, laying the foundation for future research. Moreover, the construction safety risk evaluation index system for prefabricated subway stations is proposed, which can be adopted to guide construction safety management.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 August 2021

Elham Mahmoudi, Marcel Stepien and Markus König

A principle prerequisite for designing and constructing an underground structure is to estimate the subsurface's properties and obtain a realistic picture of stratigraphy…

Abstract

Purpose

A principle prerequisite for designing and constructing an underground structure is to estimate the subsurface's properties and obtain a realistic picture of stratigraphy. Obtaining direct measure of these values in any location of the built environment is not affordable. Therefore, any evaluation is afflicted with uncertainty, and we need to combine all available measurements, observations and previous knowledge to achieve an informed estimate and quantify the involved uncertainties. This study aims to enhance the geotechnical surveys based on a spatial estimation of subsoil to customised data structures and integrating the ground models into digital design environments.

Design/methodology/approach

The present study's objective is to enhance the geotechnical surveys based on a spatial estimation of subsoil to customised data structures and integrating the ground models into digital design environments. A ground model consisting of voxels is developed via Revit-Dynamo to represent spatial uncertainties employing the kriging interpolation method. The local arrangement of new surveys are evaluated to be optimised.

Findings

The visualisation model's computational performance is modified by using an octree structure. The results show that it adapts the structure to be modelled more efficiently. The proposed concept can identify the geological models' risky locations for further geological investigations and reveal an optimised experimental design. The modifications criteria are defined in global and local considerations.

Originality/value

It provides a transparent and repeatable approach to construct a spatial ground model for subsequent experimental or numerical analysis. In the first attempt, the ground model was discretised by a grid of voxels. In general, the required computing time primarily depends on the size of the voxels. This issue is addressed by implementing octree voxels to reduce the computational efforts. This applies especially to the cases that a higher resolution is required. The investigations using a synthetic soil model showed that the developed methodology fulfilled the kriging method's requirements. The effects of variogram parameters, such as the range and the covariance function, were investigated based on some parameter studies. Moreover, a synthetic model is used to demonstrate the optimal experimental design concept. Through the implementation, alternative locations for new boreholes are generated, and their uncertainties are quantified. The impact of the new borehole on the uncertainty measures are quantified based on local and global approaches. For further research to identify the geological models' risky spots, the development of this approach with additional criteria regarding the search neighbourhood and consideration of barriers and trends in real cases (by employing different interpolation methodologies) should be considered.

Details

Smart and Sustainable Built Environment, vol. 10 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 7 June 2023

Ping Li, Yi Liu and Sai Shao

This paper aims to provide top-level design and basic platform for intelligent application in China high-speed railway.

Abstract

Purpose

This paper aims to provide top-level design and basic platform for intelligent application in China high-speed railway.

Design/methodology/approach

Based on the analysis for the future development trends of world railway, combined with the actual development needs in China high-speed railway, The definition and scientific connotation of intelligent high-speed railway (IHSR) are given at first, and then the system architecture of IHSR are outlined, including 1 basic platform, 3 business sectors, 10 business fields, and 18 innovative applications. At last, a basic platform with cloud edge integration for IHSR is designed.

Findings

The rationality, feasibility and implementability of the system architecture of IHSR have been verified on and applied to the Beijing–Zhangjiakou high-speed railway, providing important support for the construction and operation of the world’s first IHSR.

Originality/value

This paper systematically gives the definition and connotation of the IHSR and put forward the system architecture of IHSR for first time. It will play the most important role in the design, construction and operation of IHSR.

Details

Railway Sciences, vol. 2 no. 2
Type: Research Article
ISSN: 2755-0907

Keywords

Article
Publication date: 23 November 2023

Ruizhen Song, Xin Gao, Haonan Nan, Saixing Zeng and Vivian W.Y. Tam

This research aims to propose a model for the complex decision-making involved in the ecological restoration of mega-infrastructure (e.g. railway engineering). This model is based…

Abstract

Purpose

This research aims to propose a model for the complex decision-making involved in the ecological restoration of mega-infrastructure (e.g. railway engineering). This model is based on multi-source heterogeneous data and will enable stakeholders to solve practical problems in decision-making processes and prevent delayed responses to the demand for ecological restoration.

Design/methodology/approach

Based on the principle of complexity degradation, this research collects and brings together multi-source heterogeneous data, including meteorological station data, remote sensing image data, railway engineering ecological risk text data and ecological restoration text data. Further, this research establishes an ecological restoration plan library to form input feature vectors. Random forest is used for classification decisions. The ecological restoration technologies and restoration plant species suitable for different regions are generated.

Findings

This research can effectively assist managers of mega-infrastructure projects in making ecological restoration decisions. The accuracy of the model reaches 0.83. Based on the natural environment and construction disturbances in different regions, this model can determine suitable types of trees, shrubs and herbs for planting, as well as the corresponding ecological restoration technologies needed.

Practical implications

Managers should pay attention to the multiple types of data generated in different stages of megaproject and identify the internal relationships between these multi-source heterogeneous data, which provides a decision-making basis for complex management decisions. The coupling between ecological restoration technologies and restoration plant species is also an important factor in improving the efficiency of ecological compensation.

Originality/value

Unlike previous studies, which have selected a typical section of a railway for specialized analysis, the complex decision-making model for ecological restoration proposed in this research has wider geographical applicability and can better meet the diverse ecological restoration needs of railway projects that span large regions.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 October 2004

Andreas Hartmann and Gerhard Girmscheid

In the last few years an increasing demand for integrated services could be recognised on the construction market. For construction firms this means that there is a wider scope…

Abstract

In the last few years an increasing demand for integrated services could be recognised on the construction market. For construction firms this means that there is a wider scope for achieving advantages in competition. Based on a research project on the innovation behaviour of two Swiss contractors this paper presents the innovation potential of integrated services and the advantages and disadvantages of the present organizational structure of medium‐sized contractors with respect to the usage of this potential. Moreover, possibilities for construction firms to build up and benefit from internal and external co‐operation and to generate innovative constructional solutions are discussed. It is concluded that an innovative construction industry requires the ability of construction firms to co‐operate.

Details

Engineering, Construction and Architectural Management, vol. 11 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

21 – 30 of over 4000