Search results
1 – 10 of 787Leticia Mahuwi and Baraka Israel
Understanding the interplay between transparency, accountability and e-procurement and their collective contribution to anti-corruption efforts in public procurement is crucial…
Abstract
Purpose
Understanding the interplay between transparency, accountability and e-procurement and their collective contribution to anti-corruption efforts in public procurement is crucial for developing effective strategies and policies. This research seeks to investigate whether e-procurement plays a significant role in enhancing transparency and accountability and subsequently reducing corruption risks in the public pharmaceutical procurement system.
Design/methodology/approach
The study employed a cross-sectional questionnaire survey to gather data from 274 procurement personnel and pharmacists working in 28 government-owned hospitals in the Southern Highlands of Tanzania. The collected data were then analysed using confirmatory factor analysis (CFA) and the Hayes PROCESS macro to test the study hypotheses.
Findings
The study findings revealed a negative and significant relationship between transparency and procurement corruption (ß = −0.117, p < 0.008). Moreover, accountability negatively and significantly affects procurement corruption (ß = −0.162, p = 0.006). Furthermore, the findings indicate that, at a high degree of e-procurement system implementation, transparency and accountability have a stronger impact on procurement anti-corruption measures.
Practical implications
Policymakers and decision-makers should implement robust mechanisms that enhance transparency, accountability and anti-corruption efforts. These may include providing clear and accessible information on procurement processes, efficient mechanisms for monitoring and reporting procurement irregularities and continuous improvement of e-procurement systems. By incorporating these measures and nurturing collaboration amongst procurement stakeholders, it becomes possible to foster a procurement environment characterised by integrity, fairness, accountability and reduced corruption.
Originality/value
Whilst previous studies delved into exploring the effect of transparency and accountability on procurement anti-corruption, the novelty of this study is the inclusion of e-procurement as a moderating variable in the relationship between transparency, accountability and anti-corruption. By so doing, this study adds to the existing body of knowledge regarding anti-corruption measures and offers valuable practical insights for policymakers and professionals aiming to enhance transparency, accountability and ethical conduct within the public pharmaceutical procurement system.
Details
Keywords
Siraj Ahmed, Jukka Majava and Kirsi Aaltonen
The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE…
Abstract
Purpose
The purpose of this study is to investigate the benefits and challenges of implementing circular economy (CE), as well as shed light on the influence of procurement strategy in CE implementation in construction projects.
Design/methodology/approach
A qualitative research approach with abductive reasoning was adopted. The empirical data were collected from the construction industry in the United Arab Emirates (UAE).
Findings
The results reveal that clients, consultants and contractors have limited awareness, knowledge and motivation to implement CE in construction projects. The absence of incentives to design projects following CE principles, lack of involvement of contractors and suppliers, non-use of materials that use CE principles and current procurement strategies are the main challenges for the implementation of CE in the UAE.
Originality/value
Previous research offers limited knowledge on CE and its implementation in construction projects particularly from a procurement strategy perspective. The findings of the study provide new knowledge of the benefits, challenges and role of procurement strategy for implementing CE. It is suggested that collaborative and partnering-based procurement methods are needed to facilitate the effective implementation of CE.
Details
Keywords
Eleni Papadonikolaki, Algan Tezel, Ibrahim Yitmen and Per Hilletofth
Rapid advancements in blockchain technology transform various sectors, attracting the attention of industrialists, practitioners, policymakers and academics, and profoundly affect…
Abstract
Purpose
Rapid advancements in blockchain technology transform various sectors, attracting the attention of industrialists, practitioners, policymakers and academics, and profoundly affect construction businesses through smart contracts and crypto-economics. This paper explores the blockchain innovation ecosystem in construction.
Design/methodology/approach
Through a qualitative study of 23 diverse interviewees, the study explores how open or closed the blockchain innovation ecosystem in construction is and who its emerging orchestrators are.
Findings
The data showed that construction aims towards an open innovation blockchain ecosystem, although there are elements of hybridisation and closedness, each system pointing out to different orchestrators.
Practical implications
The study has implications for governments and large companies in construction, showing that open innovation initiatives need to be encouraged by policymakers through rules, regulations and government-sponsored demonstrator projects.
Social implications
The data showed that there is lack of readiness for business model change to support open innovation blockchain ecosystems in construction.
Originality/value
This is the first study applying the open innovation theory in the construction industry and sheds light into the phenomenon of blockchain, suggesting routes for further democratisation of the technology for policymakers and practitioners.
Details
Keywords
The purpose of this study is to investigate how procurement strategies may be designed to facilitate exploration and exploitation in construction projects.
Abstract
Purpose
The purpose of this study is to investigate how procurement strategies may be designed to facilitate exploration and exploitation in construction projects.
Design/methodology/approach
This paper is based on a literature review of organizational research and construction management literature together with a brief interview study of Swedish clients and contractors.
Findings
The theoretical and empirical findings propose that small and simple projects with low uncertainty and scarce resources may focus on exploitation to enhance short-term efficiency through traditional procurement strategies including delivery systems that separate the actors and their activities (i.e. pure design-build- or design-bid-build-contracts), fixed price payment and price focus in bid evaluation. Large complex projects with high uncertainty and customization benefit from combining exploration and exploitation to enhance sustainable performance. This requires collaborative procurement strategies including joint specification through early contractor involvement, cost reimbursement coupled with incentive-based payment, bid evaluation based on multiple criteria and collaborative tools and activities in partnering arrangements.
Research limitations/implications
This paper contributes to organizational learning literature by pinpointing the need for integrating procurement strategies that enhance combination of exploration and exploitation. The main contribution to the construction management literature involves the investigation of how procurement strategies may affect exploration and exploitation, as identified and articulated in the propositions developed in this paper.
Practical implications
From a practical perspective, the findings highlight the importance of tailoring procurement strategies to project characteristics to enhance a suitable balance between exploration and exploitation in construction projects.
Originality/value
The explicit focus on the operational project-level is uncommon but relevant in organizational learning literature.
Details
Keywords
Diego Vega, Ala Arvidsson and Félicia Saïah
This study investigated how organizations can maintain their supply chain (SC) resilience in situations where high-impact shocks cannot be absorbed and what capabilities are…
Abstract
Purpose
This study investigated how organizations can maintain their supply chain (SC) resilience in situations where high-impact shocks cannot be absorbed and what capabilities are needed. The article is an empirical exploration of a socio-ecological view of resilience in the SC context.
Design/methodology/approach
The case under study in this article is that of Médecins sans Frontières (MSF) and MSF's reconfiguration of its supply management processes in response to the supply shocks during the coronavirus disease 2019 (COVID-19) pandemic. In total, 503 internal documents and ERP extractions from six databases from late 2019 to September 2020, 43 semi-structured interviews and a 3-round policy Delphi process were used to investigate this phenomenon.
Findings
The authors' results show that throughout the pandemic, MSF adapted its procurement and supply processes to cope with supply shortages at both the international and local levels of the SC. This was possible due to the organization's capacity to use its exploitation and exploration capabilities of the organization at the same time.
Research limitations/implications
This research is based on the single in-depth case study of a medical aid organization. Further research should investigate this phenomenon in commercial companies with similar or different organizational structures.
Originality/value
This study constitutes a first attempt to empirically demonstrate that the four phases of the adaptive cycle put forth in the panarchy theory constitute a suitable representation of the reconfigurations that SCs follow in response to a high-impact shock. The study also adds to the growing body of knowledge on resilience by including ambidexterity as a mechanism to achieve resilience.
Details
Keywords
Șerban Filipon and Violeta Simionescu
Competency frameworks can support public procurement capacity development and performance. However, literature on connecting professionalisation with national procurement contexts…
Abstract
Purpose
Competency frameworks can support public procurement capacity development and performance. However, literature on connecting professionalisation with national procurement contexts is limited. This paper aims to explain and conceptualise recent Romanian experience with developing bespoke competency frameworks at national level for public procurement that reflect the features of the Romanian public procurement system. The approach used could guide in broad-brush, mutatis mutandis, other (national) public procurement systems with comparable features, mainly those seeking a shift from a rather administrative function of public procurement towards a strategic function.
Design/methodology/approach
This case study reflects on the methodology used for analysing the Romanian public procurement environment in EU context to develop bespoke professionalisation instruments, and on ways to integrate competency management approaches in Romanian public procurement culture. That methodological mix has been mainly qualitative and constructionist, within an applied research approach. It combined desk research with empirical research and included legal research in this context.
Findings
A principled, methodological and pragmatic approach tailored to the procurement environment in question is essential for developing competency frameworks capable to resonate to and address the specific practical needs of that procurement system.
Social implications
Competency frameworks can uphold societal objectives through public procurement.
Originality/value
Using valuable insights into the development of the Romanian public procurement competency frameworks, the paper provides a conceptual framework for instilling competency management approaches to public procurement professional development where the latter is governed by a rather distinct, public administration, paradigm. This conceptual framework can guide other public procurement systems and stimulate further research.
Details
Keywords
This paper aims to examine how different contextual contingency factors and organizational goals influence construction clients’ decision-making when procuring contractors in the…
Abstract
Purpose
This paper aims to examine how different contextual contingency factors and organizational goals influence construction clients’ decision-making when procuring contractors in the housing sector. More specifically, it investigates how clients’ choice of procurement strategies and organizational control systems is contingent upon various contextual factors and organizational goals.
Design/methodology/approach
It is based on an explorative interview study of clients and contractors in the Swedish housing sector underpinned by a review of organizational control literature.
Findings
The client's knowledge and resources, as well as project complexity and uncertainty, are the most important contextual contingency factors, while property management and sustainable development are the most important organizational goals that housing clients consider when designing procurement strategies.
Research limitations/implications
The paper contributes to the understanding of how construction clients choose procurement strategies, by providing new insights into effects of the mentioned contextual contingency factors and organizational goals on clients’ choice of control systems through their procurement strategies.
Practical implications
Property owners who continuously procure housing projects with sustainability requirements and high degrees of complexity and uncertainty should develop knowledge and resources related to their client role, to enable the design and implementation of appropriate procurement strategies.
Originality/value
Novel aspects of the paper are the demonstration of the value of a holistic approach, considering both contextual contingency factors and organizational goals, when selecting control systems and explicit discussion of how the client's knowledge and resources influence possibilities to implement different control systems.
Details
Keywords
Juliana Parise Baldauf, Carlos Torres Formoso and Patricia Tzortzopoulos
This paper proposes a method for managing client requirements with the use of Building Information Modelling (BIM). The development of healthcare projects demands a large amount…
Abstract
Purpose
This paper proposes a method for managing client requirements with the use of Building Information Modelling (BIM). The development of healthcare projects demands a large amount of requirements information, in order to deal with a diversity of clients and frequents changes in healthcare services. The proposed method supports healthcare design by adopting a process-based approach for client requirements management, with the aim of improving value generation.
Design/methodology/approach
Design Science Research was the methodological approach adopted in this investigation. The main outcome of this study emerged from an empirical study carried out in a healthcare project in Brazil.
Findings
The proposed method involves three stages: (1) capturing and processing requirements; (2) product and requirements modelling, which involves the connection between requirements and the BIM 3-D model and (3) supporting design solution refinement, through the communication of requirements and the assessment of design in relation to updated client requirements information.
Originality/value
This study explores client requirements management from a process perspective, proposing activities and their interdependences and possible sources of data, including healthcare services information. The main theoretical contributions are related to the understanding of the nature and complexity of the information involved in client requirements management, and how this can be modelled.
Details
Keywords
Achmad Nurmandi and Sunhyuk Kim
– The purpose of this paper is to investigate the implementation of initiative e-procurement in decentralized system on Indonesia’s local government system.
Abstract
Purpose
The purpose of this paper is to investigate the implementation of initiative e-procurement in decentralized system on Indonesia’s local government system.
Design/methodology/approach
The authors combine quantitative and qualitative methods. The central finding of this research is that human resources are the pivotal factors that determine the performance of local e-procurement in three cities. This research focusses on three local governments in Indonesia – Yogyakarta City, Tangerang City, and Kutaikartanegara Regency.
Findings
The central finding of this research is that human resources are the pivotal factors that determine the performance of local e-procurement in three cities. However, Tangerang City is going institutionalization phase in e-procurement initiative to ensure its sound local regulation.
Research limitations/implications
There are several limitations to this study including the recent nature of decentralized procurement in Indonesia, limited standardized and disaggregated data on local government procurement expenditures and performance.
Practical implications
The study recommends that human resources management in procurement needs to be addressed by both local and central government.
Originality/value
e-Procurement is an important instrument for preventing corruption in goods and services procurement. Indonesia has been implementing an e-procurement policy since 2008 based on a Presidential Decree. The president has issued annual orders (presidential instructions), and all central ministries and local governments have been required to comply with them to obtain their budget through the e-procurement system. However, as of 2012 fiscal year, only around 10.26 percent of the central government institution procurement budget and 10 percent of the local government procurement budget in Indonesia went through the e-procurement system, with wide variations among cities.
Details
Keywords
Christine Mary Harland, Louise Knight, Andrea S. Patrucco, Jane Lynch, Jan Telgen, Esmee Peters, Tünde Tátrai and Petra Ferk
The procurement and supply of crucial healthcare products in the early stages of the COVID-19 emergency were chaotic. To prepare for future crises, we must be able to describe…
Abstract
Purpose
The procurement and supply of crucial healthcare products in the early stages of the COVID-19 emergency were chaotic. To prepare for future crises, we must be able to describe what went wrong, and why, and map out ways to build agility and resilience. How can this be done effectively, given the highly complex and diverse network of actors across governments, care providers and supply chains, and the extreme uncertainty and dynamism in the procurement system and supplier markets? The purpose of this study was to capture learning from practitioners in “real time” in a way that could frame and inform capacity building across healthcare systems with varying procurement and supply management maturity.
Design/methodology/approach
This exploratory study involved interviews with 58 senior public procurement practitioners in central and regional governments, NGOs and leaders of professional organizations from 23 countries, very early in the COVID crisis. Following the first, inductive phase of analysis leading to five descriptive dimensions, the awareness-motivation-capability (A-M-C) framework was applied in a further round of coding, to understand immediate challenges faced by procurement practitioners, how the complex, multi-level procurement system that shaped their motivations to respond and critical capabilities required to face these challenges.
Findings
Developments across 23 countries and practitioners' learning about procurement and supply in the pandemic crisis can be captured in five overarching themes: governance and organization, knowledge and skills, information systems, regulation and supply base issues. Together these themes cover the strengths and gaps in procurement and supply capability encountered by procurement leaders and front-line personnel. They highlight the various facets of structure, resource and process which constitute organizational capability. However, to account better for the highly dynamic situation characterized by both unprecedented rivalry and cooperation, analysts must also pay attention to actors' emerging awareness of the situation and their rapidly changing motivations.
Originality/value
The application of the A-M-C framework is unique in the healthcare supply chain and disaster management literature. It enables a comprehensive overview of healthcare procurement from a system perspective. This study shows how increasing system preparedness for future emergencies depends both on developing critical capabilities and understanding how awareness and motivation influence the effective deployment of those capabilities.
Details