The purpose of this paper is to develop a structural relationship model to study the relationship between causes and effects of poor communication and information exchange in…
Abstract
Purpose
The purpose of this paper is to develop a structural relationship model to study the relationship between causes and effects of poor communication and information exchange in construction projects using Smart-PLS.
Design/methodology/approach
The first method of this research is to identify the causes and effects factors of poor communication in construction projects from the extant of literature. The data used to develop the model was collected using a questionnaire survey, which targeted construction practitioners in the Malaysian construction industry. A five-point Likert type scale was used to rate the significance of the factors. The factors were classified under their relevant construct/group using exploratory factor analysis. A hypothetical model was developed and then transformed into Smart-PLS in which the hypothetical model suggested that each group of the cause factors has a direct impact on the effect groups. The hypothesis was tested using t-values and p-values. The model was assessed for its inner and outer components and achieved the threshold criterion. Further, the model was verified by engaging 14 construction experts to verify its applicability in the construction project setting.
Findings
The study developed a structural equation model to clarify the relationships between causes and effects of poor communication in construction projects. The model explained the degree of relationships among causes and effects of poor communication in construction projects.
Originality/value
The published academic and non-academic literature introduced many studies on the issue of communication including the definitions, importance, barriers to effective communication and means of poor communication. However, these studies ended up only on the general issue of communication lacking an in-depth investigation of the causes and effects of poor communication in the construction industry. The study implemented advanced structural modeling to study the causes and effects. The questionnaire, the data and concluding results fill the identified research gap of this study. The addressed issue is also of interest because communication is considered one of the main knowledge areas in construction management.
Details
Keywords
Aravindh Devandran, Felicita J. Davis and Michael Sammanasu Joseph
This study aims to determine and investigate the main causes of construction project delays. Construction projects are more intricate and associated with significant levels of…
Abstract
Purpose
This study aims to determine and investigate the main causes of construction project delays. Construction projects are more intricate and associated with significant levels of risk owing to cost overruns. These overruns frequently lead to delays, incomplete work or other related challenges. Building delays are a prevalent problem in the building sector of developing nations. These delays prolong the duration of projects and result in increased costs and conflicts among stakeholders. A conceptual model consisting of the factors causing the delays in heating, ventilation and air conditioning (HVAC) projects was developed and tested in this study.
Design/methodology/approach
A comprehensive data collection process was undertaken. A meticulously designed survey was distributed to a diverse cohort of 294 participants, including contractors and sub-contractors from Chennai, Tamil Nadu. The data was collected using stratified sampling, ensuring a representative sample. The data was then analysed using ordinary least squares multiple regression.
Findings
The findings of this study have significant implications for the construction industry. They indicate that factors related to sales, clients, design, procurement, finance and labour all contribute to delays in HVAC projects. Understanding these factors can help stakeholders in the industry to better manage and mitigate project delays.
Originality/value
This study is unique because it is a perceptual study of stakeholders. It provides valuable information for analysing and assessing project performance by identifying the primary causes of HVAC project delays. To the best of the authors’ knowledge, the study conducted on HVAC projects is the first of its kind and hence makes a pivotal contribution to the literature on construction projects. Additionally, the study will assist policymakers and consultants in taking necessary steps to minimize delays.
Details
Keywords
Inimbom Walter Isang and David Ojimaojo Ebiloma
Covid-19 pandemic have raised serious health concerns, work disruptions and job loss. Thus, Nigeria’s Covid-19 challenges can hinder project performance in the construction…
Abstract
Purpose
Covid-19 pandemic have raised serious health concerns, work disruptions and job loss. Thus, Nigeria’s Covid-19 challenges can hinder project performance in the construction sector. By integrating the principle of sustainable construction, it can minimise the environmental and socio-economic impact of Covid-19. This research therefore aims at developing strategies to achieve sustainable project performance in the post-Covid era in Nigeria.
Design/methodology/approach
A qualitative research method was used. Data was collected from 13 stakeholders in the built environment. Percentages and thematic analysis were used to analyse data from the interviews.
Findings
The study reveals that stakeholders are encountering operational and financial challenges: Increased price of materials, labour and material shortage and project delays were key operational challenges. The financial challenges were related to increased construction cost, reduced profit and payment delays. To address these challenges, the study developed managerial, contractual and governmental strategies: Market survey and bulk purchase, remote working and adherence to Covid-19 protocols were among the key managerial strategies. For the contractual strategies: contracts reviews, smart contracts, working overtime and night shift were developed, while governmental strategies included provision of funds, loans and incentives for workers.
Originality/value
The study deduced that while environmental sustainability was employed to address the Covid-19 challenges, the economic and social aspects were found to be under-utilized. Therefore, the study concluded that a holistic application of environmental, economic and social sustainability themes while incorporating managerial, contractual and governmental strategies is significant for achieving sustainable project performance in the post-Covid era in Nigeria.
Details
Keywords
Gabriel Castelblanco, Jose Guevara and Alberto De Marco
Global crises have become increasingly recurrent events that jeopardize public-private partnerships (PPPs). In this context, the purpose of this paper is to expose the PPP-crisis…
Abstract
Purpose
Global crises have become increasingly recurrent events that jeopardize public-private partnerships (PPPs). In this context, the purpose of this paper is to expose the PPP-crisis research agenda by combining bibliometric and network analyses.
Design/methodology/approach
The PPP literature associated with global crises between the 2008 global financial crisis and 2022 was analyzed in three stages: (1) paper selection and screening for the inclusion/exclusion of articles relevant to this research, (2) semantic network development for examining thematic relationships among selected papers by considering the co-occurrence of keywords within the chosen studies and (3) calculation of network metrics for analysis.
Findings
The paper identified six research avenues for the PPP-crisis agenda: public interest, relational governance, risk management, user-pay PPPs, crisis management and financial performance. The PPP-crisis literature has spread significantly in the last five years driven by the case study approaches on a national or regional basis. Conversely, non-crisis periods generate room to strengthen user-pay PPPs and relational governance. The pandemic and post-pandemic times shared the priorities of the 2008 financial crisis but also strengthened the management of the risks and the structural drivers of the global crisis.
Originality/value
This study demonstrates that during global crisis periods, the public interest and financial performance gain relevance in a detriment of structural solutions to social legitimacy erosion of PPPs because of the urgency of giving tools to the public and private sectors to tackle the financial issues, which steer future issues for PPPs.
Details
Keywords
Guus Keusters, Frédérique Batelaan, Froukje SleeswijkVisser, Erik-Jan Houwing and Hans Bakker
The increasing complexity of civil engineering projects necessitates focusing on new competencies of project participants. Based on the research on team performance and design…
Abstract
Purpose
The increasing complexity of civil engineering projects necessitates focusing on new competencies of project participants. Based on the research on team performance and design processes that are more closely linked to the relevance of the project context, it is hypothesised that empathic abilities could play an important role in the performance of civil engineering projects. Therefore, this study aims to investigate whether performance can be improved by focusing on empathic abilities during the integrated design phase.
Design/methodology/approach
Semi-structured in-depth interviews with experts were conducted to explore the relevance of empathic abilities and their interaction with performance in a real-life infrastructure project. The project team’s empathy level was measured by means of a survey using Davis’ Interpersonal Reactivity Index method. Finally, differences between expected and measured levels of empathy were analysed.
Findings
The results provide insights into how empathic abilities interact with performance. The measurement indicates that, on average, professionals in the civil engineering industry score relatively low on empathy. In addition, differences were identified between the expected distribution and the measured empathy levels of the team, implying a potential for improvement, in particular by increasing the empathic abilities of the project management and increasing gender diversity.
Originality/value
To the best of the authors’ knowledge, this study is the first to investigate a relationship between empathy and the performance of civil engineering projects. The results provide initial insights into the empathic ability of civil engineering project teams and the potential of empathy to improve performance. Furthermore, from an empathy perspective, this study advocates increasing the gender diversity of project teams to improve performance.
Details
Keywords
Andrew Ebekozien, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala, Mohamed Ahmed Hafez and Mohamad Shaharudin Samsurijan
Despite advancements in construction digitalisation and alternative building technologies, cost overrun is still a challenge in the construction industry. The inflation rate is…
Abstract
Purpose
Despite advancements in construction digitalisation and alternative building technologies, cost overrun is still a challenge in the construction industry. The inflation rate is increasing, especially in developing countries, and is critical in cost overrun matters. It can deviate construction built-up rate components. This may thwart improving construction-related Sustainable Development Goals (SDGs). Studies concerning the impact of the inflation rate on construction-related SDGs are scarce in developing countries, including Nigeria. The study investigated the impact of inflation on Nigeria’s construction projects and their outcome on SDGs and suggested possible ways to improve achievement of construction-related SDGs and their targets.
Design/methodology/approach
The researchers employed a qualitative research design. This is because of the study’s unexplored dimension. The researchers engaged 35 participants across major cities in Nigeria via semi-structured virtual and face-to-face interviews. The research utilised a thematic method for collated data and accomplished saturation.
Findings
Findings reveal that the impact of inflation on construction projects, if not checked, could hinder achieving construction-related SDGs in Nigeria. This is because of the past three years of hyperinflation that cut across major construction components. It shows that the upward inflation rate threatens achieving construction-related SDGs and proffered measures to mitigate inflation and, by extension, enhance achieving construction-related SDGs. This includes a downward review of the Monetary Policy Rate, control of exchange rate volatility and addressing insecurity to restore FDIs and FPIs confidence.
Originality/value
Besides suggesting possible solutions to mitigate hyperinflation on construction components to improve achieving construction-related SDGs, findings will stipulate government policymakers put measures in place through favourable fiscal and monetary policy implementation and encourage moving from a consumption to a production nation.
Details
Keywords
Atupakisye Mwakolo, Meshack Siwandeti, Leticia Mahuwi and Baraka Israel
The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various…
Abstract
Purpose
The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various dimensions of PGG, including transparency, accountability, competition and integrity, this study provides insights into how these factors contribute to the successful achievement of VfM outcomes in public construction projects.
Design/methodology/approach
The data were sourced from 203 construction project practitioners from 24 selected procuring entities in Tanzania using a census approach and a cross-sectional questionnaire survey. Confirmatory factor analysis (CFA) and structural equation modelling (SEM) were used for data analysis.
Findings
The findings of the study revealed a positive and significant impact of various dimensions of PGG on VfM. Specifically, transparency, accountability, competition and integrity were positively and significantly related to VfM, with p-values <0.001. Based on the study findings, we conclude that PGG is an important predictor of VfM achievement in public construction projects.
Practical implications
The study offers policy implications for streamlined PGG and VfM achievement in public construction projects. It is suggested that procuring entities can enhance VfM by enforcing compliance with the principles of PGG throughout the entirety of construction projects. In this case, streamlined legislative frameworks and control mechanisms are crucial components that could enhance PGG and the achievement of VfM.
Originality/value
This study contributes to the academic literature on the strategic role of PGG in enhancing VfM achievement. This is one of the research domains, which has not been adequately researched, particularly in Tanzania’s context. In addition, the study provides valuable insights to policymakers, practitioners and stakeholders involved in public construction projects to improve project outcomes and resource allocation.
Details
Keywords
Gro Holst Volden and Bjorn Andersen
The purpose of this paper is to study public project governance frameworks in various ministries and agencies in Norway, following the introduction of such a framework on the…
Abstract
Purpose
The purpose of this paper is to study public project governance frameworks in various ministries and agencies in Norway, following the introduction of such a framework on the topmost level (i.e. the cabinet) which applies to the very largest projects.
Design/methodology/approach
The study is methodologically designed as a qualitative assessment of project governance frameworks that apply to state-funded investment projects in selected sectors, based on data gathered through document reviews and interviews.
Findings
The study finds that all of the agencies have introduced their own project governance frameworks, which are basically consistent with the recommendations from the project management literature and with the cabinet’s overall requirements in Norway. By contrast, only one ministry has taken a formalized role as a project owner. Governance tasks thus seem to be extensively delegated to the subordinate agencies. This even includes strategic tasks such as project selection and portfolio management, and implies there is a risk that public project governance has a narrow and internal focus.
Originality/value
The paper is a first step toward a better understanding of public project governance as a hierarchical system and the relationship between project owners on three levels, the cabinet, the sectoral ministry, and the government agency.
Details
Keywords
Andrew Ebekozien, Clinton Aigbavboa, Mohamad Shaharudin Samsurijan, Mohamed Ahmed Hafez Ahmed, Opeoluwa Akinradewo and Igbebo Omoh-Paul
The construction industry is unique but with uncertainties. This is because of the operating environment. This intricacy gives rise to several construction risks and is compounded…
Abstract
Purpose
The construction industry is unique but with uncertainties. This is because of the operating environment. This intricacy gives rise to several construction risks and is compounded in developing countries’ turbulent times. If not managed, these risks enhanced in turbulent times could negatively impact the Nigerian construction projects’ cost, time, quality, and performance. Hence, this study investigated the perceived encumbrances facing construction risk management techniques and identified measures to promote sustainable-based construction risk management in turbulent times.
Design/methodology/approach
The researchers adopted a qualitative approach and achieved saturation with 28 participants. The participants were government policymakers, quantity surveyors in government ministries/agencies/departments, consultant engineers, consultant architects, consultant and contracting quantity surveyors, and construction contractors knowledgeable about construction risk management. The research employed a thematic analysis for the study’s data.
Findings
Findings identified turbulent times related to the industry and major techniques for managing construction project risks in the Nigerian construction industry. It revealed lax adoption and implementation of practices. Also, the study identified major encumbrances facing construction risk and proffered initiatives that would promote sustainable-based construction risk management in turbulent times.
Originality/value
This study investigates encumbrances and suggests measures to promote construction project risk management in turbulent times in Nigeria. Also, the study contributes to the literature’s paucity, uncovering perceived encumbrances and evolving organisations’ management styles to imbed sustainable-based risk management practices by qualitative research design method.
Details
Keywords
Henry Oluchukwu Ikediego, Mustafa Ilkan, A. Mohammed Abubakar and Festus Victor Bekun
There is growing interest in innovative online problem-solving models such as crowdsourcing to serve individuals, firms and the society as a whole. Crowdsourcing is the…
Abstract
Purpose
There is growing interest in innovative online problem-solving models such as crowdsourcing to serve individuals, firms and the society as a whole. Crowdsourcing is the combination of efforts from various sets of individuals who are either volunteering or working part-time for socioeconomic production, basically in the cyber world. This hybrid work model is already in use by businesses and entrepreneurs; some of the platforms include Amazon mechanical Turk, 99designs, Hit RECORD and Design Crowd.
Design/methodology/approach
Much has been parleyed and published, and this is primarily because of the efficient socioeconomic potentials crowdsourcing offers.
Findings
This paper addressed the following three questions to help have a better understanding of crowdsourcing: who can perform crowdsourcing? why it is relevant to crowdsource in this present proliferated internet age and if there are going to be some changes in the future and the last but not the least what can be done to promote it in the society?
Originality/value
This paper discusses the three W’s and concludes with challenges facing the crowdsourcing work model.