Article
Publication date: 26 March 2024

Jing An, Suicheng Li and Xiao Ping Wu

Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study…

Abstract

Purpose

Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study focuses on resource-constrained project scheduling in multi-project environments. The research simplifies the problem by adopting a single-project perspective using gain coefficients.

Design/methodology/approach

It employs uncertainty theory and multi-objective programming to construct a model. The optimal solution is identified using Matlab, while LINGO determines satisfactory alternatives. By combining these methods and considering actual construction project situations, a compromise solution closely approximating the optimal one is derived.

Findings

The study provides fresh insights into modeling and resolving resource-constrained project scheduling issues, supported by real-world examples that effectively illustrate its practical significance.

Originality/value

The research highlights three main contributions: effective resource utilization, project prioritization and conflict management, and addressing uncertainty. It offers decision support for project managers to balance resource allocation, resolve conflicts, and adapt to changing project demands.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 January 2024

Xin Zou and Zhuang Rong

In repetitive projects, repetition offers more possibilities for activity scheduling at the sub-activity level. However, existing resource-constrained repetitive scheduling…

Abstract

Purpose

In repetitive projects, repetition offers more possibilities for activity scheduling at the sub-activity level. However, existing resource-constrained repetitive scheduling problem (RCRSP) models assume that there is only one sequence in performing the sub-activities of each activity, resulting in an inefficient resource allocation. This paper proposes a novel repetitive scheduling model for solving RCRSP with soft logic.

Design/methodology/approach

In this paper, a constraint programming model is developed to solve the RCRSP using soft logic, aiming at the possible relationship between parallel execution, orderly execution or partial parallel and partial orderly execution of different sub activities of the same activity in repetitive projects. The proposed model integrated crew assignment strategies and allowed continuous or fragmented execution.

Findings

When solving RCRSP, it is necessary to take soft logic into account. If managers only consider the fixed logic between sub-activities, they are likely to develop a delayed schedule. The practicality and effectiveness of the model were verified by a housing project based on eight different scenarios. The results showed that the constraint programming model outperformed its equivalent mathematical model in terms of solving speed and solution quality.

Originality/value

Available studies assume a fixed logic between sub-activities of the same activity in repetitive projects. However, there is no fixed construction sequence between sub-activities for some projects, e.g. hotel renovation projects. Therefore, this paper considers the soft logic relationship between sub-activities and investigates how to make the objective optimal without violating the resource availability constraint.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 September 2023

Behzad Paryzad and Kourosh Eshghi

This paper aims to conduct a fuzzy discrete time cost quality risk in the ambiguous mode CO2 tradeoff problem (FDTCQRP*TP) in a megaproject based on fuzzy ground.

Abstract

Purpose

This paper aims to conduct a fuzzy discrete time cost quality risk in the ambiguous mode CO2 tradeoff problem (FDTCQRP*TP) in a megaproject based on fuzzy ground.

Design/methodology/approach

A combinatorial evolutionary algorithm using Fuzzy Invasive Weed Optimization (FIWO) is used in the discrete form of the problem where the parameters are fully fuzzy multi-objective and provide a space incorporating all dimensions of the problem. Also, the fuzzy data and computations are used with the Chanas method selected for the computational analysis. Moreover, uncertainty is defined in FIWO. The presented FIWO simulation, its utility and superiority are tested on sample problems.

Findings

The reproduction, rearrangement and maintaining elite invasive weeds in FIWO can lead to a higher level of accuracy, convergence and strength for solving FDTCQRP*TP fuzzy rules and a risk ground in the ambiguous mode with the emphasis on the necessity of CO2 pollution reduction. The results reveal the effectiveness of the algorithm and its flexibility in the megaproject managers' decision making, convergence and accuracy regarding CO2 pollution reduction.

Originality/value

This paper offers a multi-objective fully fuzzy tradeoff in the ambiguous mode with the approach of CO2 pollution reduction.

Details

Engineering Computations, vol. 40 no. 9/10
Type: Research Article
ISSN: 0264-4401

Keywords

Article
Publication date: 6 February 2024

S. P. Sreenivas Padala and Prabhanjan M. Skanda

The purpose of this paper is to develop a building information modelling (BIM)-based multi-objective optimization (MOO) framework for volumetric analysis of buildings during early…

Abstract

Purpose

The purpose of this paper is to develop a building information modelling (BIM)-based multi-objective optimization (MOO) framework for volumetric analysis of buildings during early design stages. The objective is to optimize volumetric spaces (3D) instead of 2D spaces to enhance space utilization, thermal comfort, constructability and rental value of buildings

Design/methodology/approach

The integration of two fundamental concepts – BIM and MOO, forms the basis of proposed framework. In the early design phases of a project, BIM is used to generate precise building volume data. The non-sorting genetic algorithm-II, a MOO algorithm, is then used to optimize extracted volume data from 3D BIM models, considering four objectives: space utilization, thermal comfort, rental value and construction cost. The framework is implemented in context of a school of architecture building project.

Findings

The findings of case study demonstrate significant improvements resulting from MOO of building volumes. Space utilization increased by 30%, while thermal comfort improved by 20%, and construction costs were reduced by 10%. Furthermore, rental value of the case study building increased by 33%.

Practical implications

The proposed framework offers practical implications by enabling project teams to generate optimal building floor layouts during early design stages, thereby avoiding late costly changes during construction phase of project.

Originality/value

The integration of BIM and MOO in this study provides a unique approach to optimize building volumes considering multiple factors during early design stages of a project

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 8 November 2022

Junlong Peng and Xiang-Jun Liu

This research is aimed to mainly be applicable to expediting engineering projects, uses the method of inverse optimization and the double-layer nested genetic algorithm combined…

Abstract

Purpose

This research is aimed to mainly be applicable to expediting engineering projects, uses the method of inverse optimization and the double-layer nested genetic algorithm combined with nonlinear programming algorithm, study how to schedule the number of labor in each process at the minimum cost to achieve an extremely short construction period goal.

Design/methodology/approach

The method of inverse optimization is mainly used in this study. In the first phase, establish a positive optimization model, according to the existing labor constraints, aiming at the shortest construction period. In the second phase, under the condition that the expected shortest construction period is known, on the basis of the positive optimization model, the inverse optimization method is used to establish the inverse optimization model aiming at the minimum change of the number of workers, and finally the optimal labor allocation scheme that meets the conditions is obtained. Finally, use algorithm to solve and prove with a case.

Findings

The case study shows that this method can effectively achieve the extremely short duration goal of the engineering project at the minimum cost, and provide the basis for the decision-making of the engineering project.

Originality/value

The contribution of this paper to the existing knowledge is to carry out a preliminary study on the relatively blank field of the current engineering project with a very short construction period, and provide a path for the vast number of engineering projects with strict requirements on the construction period to achieve a very short construction period, and apply the inverse optimization method to the engineering field. Furthermore, a double-nested genetic algorithm and nonlinear programming algorithm are designed. It can effectively solve various optimization problems.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 March 2024

Yan Zhou and Chuanxu Wang

Disruptions at ports may destroy the planned ship schedules profoundly, which is an imperative operation problem that shipping companies need to overcome. This paper attempts to…

Abstract

Purpose

Disruptions at ports may destroy the planned ship schedules profoundly, which is an imperative operation problem that shipping companies need to overcome. This paper attempts to help shipping companies cope with port disruptions through recovery scheduling.

Design/methodology/approach

This paper studies the ship coping strategies for the port disruptions caused by severe weather. A novel mixed-integer nonlinear programming model is proposed to solve the ship schedule recovery problem (SSRP). A distributionally robust mean conditional value-at-risk (CVaR) optimization model was constructed to handle the SSRP with port disruption uncertainties, for which we derive tractable counterparts under the polyhedral ambiguity sets.

Findings

The results show that the size of ambiguity set, confidence level and risk-aversion parameter can significantly affect the optimal values, decision-makers should choose a reasonable parameter combination. Besides, sailing speed adjustment and handling rate adjustment are effective strategies in SSRP but may not be sufficient to recover the schedule; therefore, port skipping and swapping are necessary when multiple or longer disruptions occur at ports.

Originality/value

Since the port disruption is difficult to forecast, we attempt to take the uncertainties into account to achieve more meaningful results. To the best of our knowledge, there is barely a research study focusing on the uncertain port disruptions in the SSRP. Moreover, this is the first paper that applies distributionally robust optimization (DRO) to deal with uncertain port disruptions through the equivalent counterpart of DRO with polyhedral ambiguity set, in which a robust mean-CVaR optimization formulation is adopted as the objective function for a trade-off between the expected total costs and the risk.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Book part
Publication date: 16 January 2024

Ayodeji E. Oke and Seyi S. Stephen

Connected machines are the automation of several types of machines connected towards beneficial growth of sustainable construction especially in the era of the Fourth Industrial…

Abstract

Connected machines are the automation of several types of machines connected towards beneficial growth of sustainable construction especially in the era of the Fourth Industrial Revolution. This chapter gave an insight into the emergence of digitalisation in the construction sector and the importance of connected machines in sustainable construction. It further elucidated its mode of operations, devices applicable, drivers and challenges for its full application in construction and benefits on construction projects. It finally gave a conclusion on its urgent need for full incorporation due to its technological benefits for present and future construction works.

Details

A Digital Path to Sustainable Infrastructure Management
Type: Book
ISBN: 978-1-83797-703-1

Keywords

Open Access
Article
Publication date: 13 March 2024

Lina Gharaibeh, Kristina Eriksson and Björn Lantz

Perceived benefits of building information modelling (BIM) have been discussed for some time, but cost–benefit benchmarking has been inconsistent. The purpose of this paper is to…

Abstract

Purpose

Perceived benefits of building information modelling (BIM) have been discussed for some time, but cost–benefit benchmarking has been inconsistent. The purpose of this paper is to investigate BIM feasibility and evaluate investment worth to elucidate and develop the current understanding of BIM merit. The aim of the study is to propose a research agenda towards a more holistic perspective of BIM use incorporating quantifying investment return.

Design/methodology/approach

An in-depth examination of research patterns has been conducted to identify challenges in the assessment of the investment value and return on investment (ROI) for BIM in the construction industry. A total of 75 research articles were considered for the final literature review. An evaluation of the literature is conducted using a combination of bibliometric analysis and systematic reviews.

Findings

This study, which analysed 75 articles, unveils key findings in quantifying BIM benefits, primarily through ROI calculation. Two major research gaps are identified: the absence of a standardized BIM ROI method and insufficient exploration of intangible benefits. Research focus varies across phases, emphasizing design and construction integration and exploring post-construction phases. The study categorizes quantifiable factors, including productivity, changes and rework reduction, requests for information reduction, schedule efficiency, safety, environmental sustainability and operations and facility management. These findings offer vital insights for researchers and practitioners, enhancing understanding of ’BIM’s financial benefits and signalling areas for further exploration in construction.

Originality/value

The ’study’s outcomes offer the latest insights for researchers and practitioners to create effective approaches for quantifying ’BIM’s financial benefits. Additionally, the proposed research agenda aims to improve the current limited understanding of BIM feasibility and investment worth evaluation. Results of the study could assist practitioners in overcoming limitations associated with BIM investment and economic evaluations in the construction industry.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 25 November 2022

Zhijia You

The existing literature has been mainly focused on local problems but without an overall framework for studying the top-level planning of intelligent construction from a…

Abstract

Purpose

The existing literature has been mainly focused on local problems but without an overall framework for studying the top-level planning of intelligent construction from a systematic perspective. The purpose of this paper is to fill this gap.

Design/methodology/approach

This research adopts a deductive research approach.

Findings

This research proposes a reference architecture and related business scenario framework for intelligent construction based on the existing theory and industrial practice.

Originality/value

The main contribution of this research is to provide a useful reference to the Chinese government and industry for formulating digital transformation strategies, as well as suggests meaningful future research directions in the construction industry.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 December 2023

Weixin Zhang, Zhao Liu, Yu Song, Yixuan Lu and Zhenping Feng

To improve the speed and accuracy of turbine blade film cooling design process, the most advanced deep learning models were introduced into this study to investigate the most…

Abstract

Purpose

To improve the speed and accuracy of turbine blade film cooling design process, the most advanced deep learning models were introduced into this study to investigate the most suitable define for prediction work. This paper aims to create a generative surrogate model that can be applied on multi-objective optimization problems.

Design/methodology/approach

The latest backbone in the field of computer vision (Swin-Transformer, 2021) was introduced and improved as the surrogate function for prediction of the multi-physics field distribution (film cooling effectiveness, pressure, density and velocity). The basic samples were generated by Latin hypercube sampling method and the numerical method adopt for the calculation was validated experimentally at first. The training and testing samples were calculated at experimental conditions. At last, the surrogate model predicted results were verified by experiment in a linear cascade.

Findings

The results indicated that comparing with the Multi-Scale Pix2Pix Model, the Swin-Transformer U-Net model presented higher accuracy and computing speed on the prediction of contour results. The computation time for each step of the Swin-Transformer U-Net model is one-third of the original model, especially in the case of multi-physics field prediction. The correlation index reached more than 99.2% and the first-order error was lower than 0.3% for multi-physics field. The predictions of the data-driven surrogate model are consistent with the predictions of the computational fluid dynamics results, and both are very close to the experimental results. The application of the Swin-Transformer model on enlarging the different structure samples will reduce the cost of numerical calculations as well as experiments.

Research limitations/implications

The number of U-Net layers and sample scales has a proper relationship according to equation (8). Too many layers of U-Net will lead to unnecessary nonlinear variation, whereas too few layers will lead to insufficient feature extraction. In the case of Swin-Transformer U-Net model, incorrect number of U-Net layer will reduce the prediction accuracy. The multi-scale Pix2Pix model owns higher accuracy in predicting a single physical field, but the calculation speed is too slow. The Swin-Transformer model is fast in prediction and training (nearly three times faster than multi Pix2Pix model), but the predicted contours have more noise. The neural network predicted results and numerical calculations are consistent with the experimental distribution.

Originality/value

This paper creates a generative surrogate model that can be applied on multi-objective optimization problems. The generative adversarial networks using new backbone is chosen to adjust the output from single contour to multi-physics fields, which will generate more results simultaneously than traditional surrogate models and reduce the time-cost. And it is more applicable to multi-objective spatial optimization algorithms. The Swin-Transformer surrogate model is three times faster to computation speed than the Multi Pix2Pix model. In the prediction results of multi-physics fields, the prediction results of the Swin-Transformer model are more accurate.

Details

International Journal of Numerical Methods for Heat & Fluid Flow, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0961-5539

Keywords

1 – 10 of 155