Search results

1 – 10 of over 3000
Article
Publication date: 22 March 2019

Mustapha Munir, Arto Kiviniemi and Stephen W. Jones

Currently, building information modelling (BIM) is largely seen as a 3D model, not as an information model or information management tool. This wrong perception of BIM and low…

1758

Abstract

Purpose

Currently, building information modelling (BIM) is largely seen as a 3D model, not as an information model or information management tool. This wrong perception of BIM and low interest in 3D asset management (AM) is one of the major reasons for the slow adoption by clients in the architectural, engineering and construction (AEC) industry. The purpose of this paper is to identify the techniques and strategies of streamlining AM systems for BIM-based integration, and how the information is captured from physical assets towards BIM-based integration for clients to derive value from BIM investments.

Design/methodology/approach

A qualitative case study strategy was used to study the strategic implementation process of integrating BIM with AM systems and the business value of BIM in AM by a large asset owner in the UK.

Findings

The paper identifies key strategies in the adoption of BIM-based processes by an asset owner, the implementation process, the challenges and the benefits attained. Several barriers were identified as the challenges of adopting BIM-based processes in AM: complexity and cost associated with BIM; irrelevance of 3D geometric data in AM processes; nature of asset ownership structure; managing the asset handover process; managing change within the organisation. Organisations will have to consider the following issues in streaming asset information with BIM: the development for a clear strategy prior to adoption; connecting the strategy to the business goals; and conducting the discovery exercise to identify organisational information needs.

Originality/value

The research addresses a significant gap in the development of techniques and strategies for asset owners to streamline BIM with AM systems and derive business value from such integration. The research context is a case study involving a large owner-operator in the UK that has been able to derive value from BIM systems in their AM processes. The key value of the paper is improving asset owners’ understanding of BIM in AM by demonstrating the implementation strategies, linkage to organisational objectives, challenges, value management process and business value of BIM in AM. Another contribution of the paper is improving the understanding of BIM, which is usually viewed as 3D models and that 3D geometric data do not have much value for AM tasks.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 May 2019

Mustapha Munir, Arto Kiviniemi, Stephen Finnegan and Stephen W. Jones

The purpose of this paper is to investigate the processes, tools and techniques of strategic asset information management (AIM) for built assets, and how the asset information…

1132

Abstract

Purpose

The purpose of this paper is to investigate the processes, tools and techniques of strategic asset information management (AIM) for built assets, and how the asset information content enhances the proficiency of asset managers to effectively manage their assets throughout their life cycle by utilising building information modelling (BIM) and asset management (AM) systems. For most asset managers, the problem is not the lack of information about their assets, but the abundance of it, and most especially the absence of established processes and protocols to effectively manage large sets of asset data. Therefore, it is crucial to develop a strategy to control and manage this information in order for asset managers to harness its potential and realise value from their organisation’s information assets..

Design/methodology/approach

A qualitative case study strategy was used to investigate the effective management of asset data in an AIM system. Seven sets of interviews were conducted and nine respondents were interviewed. These were analysed through qualitative thematic analysis using the NVivo software.

Findings

The paper identifies six dimensions of value that BIM contributes to AM, which are: management, commerce, efficiency, industry, user and technology value. Also, the paper demonstrates that there is real value to be derived by the asset owner from the effective management of asset information. The study highlights that the value of BIM is not inherent but would require many other processes to deliver value to the organisation.

Originality/value

The key value of the paper is that it identifies important techniques for managing asset data and how asset information is collected, organised, stored, controlled, analysed, secured, shared and reported within a virtual AIM system for strategic management-based decisions.

Details

Facilities , vol. 38 no. 3/4
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 1 September 2020

Mustapha Munir, Arto Kiviniemi, Stephen W. Jones and Stephen Finnegan

The purpose of this paper is to investigate and identify the activity systems that drive building information modelling (BIM) business value in asset management (AM). The…

Abstract

Purpose

The purpose of this paper is to investigate and identify the activity systems that drive building information modelling (BIM) business value in asset management (AM). The utilisation of BIM has widened in scope, functionality, flexibility and interoperability to support the AM business process. However, research concerning BIM business value in AM has been inadequate despite its considerable potential and significance in the attainment of organisational objectives. The realisation of BIM business value requires a concerted effort by the asset owner to be able to determine and appraise the critical activities that drive business value in AM.

Design/methodology/approach

The study adopted a qualitative research approach based on a multi-case study strategy that aimed to identify the key business processes that drive BIM business value in AM. The study involved a three-stage research design using interviews and document analysis to facilitate a cross-case analysis from the perspective of the activity systems and dimensions of BIM governance.

Findings

The paper identified six critical activity systems that drive BIM business value for an asset owner: BIM strategy, contract management, lifecycle management, maintenance management, work-order management and value realisation management. The study found that the most developed activity system is the BIM strategy, and the least is value realisation management across all cases. Also, the paper points out that the most proficient BIM governance dimension is process, and the least is people across the three cases. The study noted that the ability of an asset owner to realise BIM business value has maturity undertones and that the asset owner could derive BIM business value, if the six activity systems are effectively executed and continuously improved to an advanced stage of maturity.

Originality/value

An original contribution of the study is the development of the understanding of asset owners in relation to the discovery of key activity systems that drive BIM business value in AM. Another significant contribution of this paper is the demonstration of a novel approach to evaluate organisational maturity of asset owners from the perspectives of the activity systems and BIM governance dimensions of people, process and technology.

Details

Journal of Facilities Management , vol. 18 no. 5
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 21 November 2016

Yang Zou, Arto Kiviniemi and Stephen W. Jones

The purpose of this paper is to address the current theoretical gap in integrating knowledge and experience into Building Information Model (BIM) for risk management of bridge…

2540

Abstract

Purpose

The purpose of this paper is to address the current theoretical gap in integrating knowledge and experience into Building Information Model (BIM) for risk management of bridge projects by developing a tailored Risk Breakdown Structure (RBS) and formalising an active link between the resulting RBS and BIM.

Design/methodology/approach

A three-step approach is used in this study to develop a tailored RBS for bridge projects and a conceptual model for the linkage between the RBS and BIM. First, the integrated bridge information model is in concept separated into four levels of contents (LOCs) and six technical systems based on analysis of the Industry Foundation Classes specification, a critical review of previous studies and authors’ project experience. The second step develops a knowledge-based risk database through an extensive collection of risk data, a process of data mining, and further assessment and translation of data. A critical analysis is conducted in the last step to determine on which level the different risks should be allocated to bridge projects and to propose a conceptual model for linking the tailored RBS to the four LOCs and six technical systems of BIM.

Findings

The findings suggest that the traditional method and BIM can be merged as an integrated solution for risk management by establishing the linkage between RBS and BIM. This solution can take advantage of both the traditional method and BIM for managing risks. On the one hand, RBS enables risk information to be stored in a formal structure, used and communicated effectively. On the other hand, some features of BIM such as 3D visualisation and 4D construction scheduling can facilitate the risk identification, analysis, and communication at an early project stage.

Research limitations/implications

A limitation is that RBS is a qualitative technique and only plays a limited role in quantitative risk analysis. As a result, when implementing this proposed method, further techniques may be needed for assisting quantitative risk analysis, evaluation, and treatment. Another limitation is that the proposed method has not yet been implemented for validation in practice. Hence, recommendations for future research are to: improve the quantitative risk analysis and treatment capabilities of this proposed solution; develop computer tools to support the solution; integrate the linkage into a traditional workflow; and test this solution in some small and large projects for validation.

Practical implications

Through linking risk information to BIM, project participants could check and review the linked information for identifying potential risks and seeking possible mitigation measures, when project information is being transferred between different people or forwarded to the next phase.

Originality/value

This study contributes to the theoretical development for aligning traditional methods and BIM for risk management, by introducing a new conceptual model for linking RBS to BIM.

Details

Engineering, Construction and Architectural Management, vol. 23 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Content available
Article
Publication date: 21 November 2016

Timo Hartmann

416

Abstract

Details

Engineering, Construction and Architectural Management, vol. 23 no. 6
Type: Research Article
ISSN: 0969-9988

Abstract

Details

The Handbook of Road Safety Measures
Type: Book
ISBN: 978-1-84855-250-0

Book part
Publication date: 25 November 2019

Candace Jones, Ju Young Lee and Taehyun Lee

Microfoundations of institutions are central to constructing place – the interplay of location, meaning, and material form. Since only a few institutional studies bring…

Abstract

Microfoundations of institutions are central to constructing place – the interplay of location, meaning, and material form. Since only a few institutional studies bring materiality to the fore to examine the processes of place-making, how material forms interact with people to institutionalize or de-institutionalize the meaning of place remains a black box. Through an inductive and historical study of Boston’s North End neighborhood, the authors show how material practices shaped place-making and institutionalized, or de-institutionalized, the meaning of the North End. When material practices symbolically encoded meanings of diverse audiences into the church, it created resonance and enabled the building’s meanings to withstand environmental change and become institutionalized as part of the North End’s meaning as a place. In contrast, when the material practices restricted meaning to a specific audience, it limited resonance when the environment changed, was more likely to be demolished and, thus, erased rather than institutionalized into the meaning of the North End as a place.

Details

Microfoundations of Institutions
Type: Book
ISBN: 978-1-78769-127-8

Keywords

Abstract

Organizational researchers studying well-being – as well as organizations themselves – often place much of the burden on employees to manage and preserve their own well-being. Missing from this discussion is how – from a human resources management (HRM) perspective – organizations and managers can directly and positively shape the well-being of their employees. The authors use this review to paint a picture of what organizations could be like if they valued people holistically and embraced the full experience of employees’ lives to promote well-being at work. In so doing, the authors tackle five challenges that managers may have to help their employees navigate, but to date have received more limited empirical and theoretical attention from an HRM perspective: (1) recovery at work; (2) women’s health; (3) concealable stigmas; (4) caregiving; and (5) coping with socio-environmental jolts. In each section, the authors highlight how past research has treated managerial or organizational support on these topics, and pave the way for where research needs to advance from an HRM perspective. The authors conclude with ideas for tackling these issues methodologically and analytically, highlighting ways to recruit and support more vulnerable samples that are encapsulated within these topics, as well as analytic approaches to study employee experiences more holistically. In sum, this review represents a call for organizations to now – more than ever – build thriving organizations.

Details

Research in Personnel and Human Resources Management
Type: Book
ISBN: 978-1-80455-046-5

Keywords

Abstract

Details

Review of Marketing Research
Type: Book
ISBN: 978-0-85724-728-5

Article
Publication date: 1 April 2003

Georgios I. Zekos

Aim of the present monograph is the economic analysis of the role of MNEs regarding globalisation and digital economy and in parallel there is a reference and examination of some…

89975

Abstract

Aim of the present monograph is the economic analysis of the role of MNEs regarding globalisation and digital economy and in parallel there is a reference and examination of some legal aspects concerning MNEs, cyberspace and e‐commerce as the means of expression of the digital economy. The whole effort of the author is focused on the examination of various aspects of MNEs and their impact upon globalisation and vice versa and how and if we are moving towards a global digital economy.

Details

Managerial Law, vol. 45 no. 1/2
Type: Research Article
ISSN: 0309-0558

Keywords

1 – 10 of over 3000