Article
Publication date: 12 February 2024

Udara Willhelm Abeydeera Lebunu Hewage, Jayantha Wadu Mesthrige and Eric G. Too

This study explores the current status of risk management (RM) in Sri Lanka and the obstacles in implementing RM in Sri Lankan small construction projects.

Abstract

Purpose

This study explores the current status of risk management (RM) in Sri Lanka and the obstacles in implementing RM in Sri Lankan small construction projects.

Design/methodology/approach

The current research study adopted a quantitative research method. Using a purposeful sampling strategy, 100 construction companies engaged in small construction projects in Sri Lanka were selected and a questionnaire was distributed among top managerial employees of these companies. Employees belonging to 47 companies responded to the survey which provided information relating to 812 construction projects. The collected data were analyzed using the RM implementation index (RMII) and other quantitative measures such as mean, median and percentages.

Findings

The research findings indicated that RM incorporation was at a lower degree in small construction projects in Sri Lanka. The findings further indicated that RM incorporation was relatively high in the public construction projects compared to the private construction projects. The main obstacles identified through the survey for RM implementation were: “lack of funding”, “lack of time”, “low profit margin”, “not economical” and “lack of knowledge”.

Research limitations/implications

The study was limited to exploring RM implementation in small construction projects in Sri Lanka. The study was limited to the building construction companies under the 150-million-rupee (approx. below 450,000 USD) financial limit registered with the construction industry development authority in Sri Lanka.

Originality/value

RM in small construction projects in developing countries is a relatively less explored domain. Sri Lankan construction industry is another relatively less explored domain in terms of new management technique implementation such as RM and value management. The quantitative approach used for the study revealed that RM implementation is at a lower degree in the small construction projects. Moreover, several obstacles pertaining to RM implementation were recognized through this study. These findings will be useful for the construction stakeholders to overcome the recognized barriers and effectively use RM in their respective construction projects.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 24 November 2022

Xianbo Zhao

This study collected the bibliographic data of 2034 journal articles published in 2000–2021 from Web of Science (WoS) core collection database and adopted two bibliometric…

544

Abstract

Purpose

This study collected the bibliographic data of 2034 journal articles published in 2000–2021 from Web of Science (WoS) core collection database and adopted two bibliometric analysis methods, namely historiography and keyword co-occurrence, to identify the evolution trend of construction risk management (CRM) research topics.

Design/methodology/approach

CRM has been a key issue in construction management research, producing a big number of publications. This study aims to undertake a review of the global CRM research published from 2000 to 2021 and identify the evolution of the research topics relating to CRM.

Findings

This study found that risk analysis methods have shifted from simply ranking risks in terms of their relative importance or significance toward examining the interrelationships among risks, and that the objects of CRM research have shifted from generic construction projects toward specified types of construction projects (e.g. small projects, underground construction projects, green buildings and prefabricated projects). In addition, researchers tend to pay more attention to an individual risk category (e.g. political risk, safety risk and social risk) and integrate CRM into cost, time, quality, safety and environment management functions with the increasing adoption of various information and communication technologies.

Research limitations/implications

This study focused on the journal articles in English in WoS core collection database only, thus excluding the publications in other languages, not indexed by WoS and conference proceedings. In addition, the historiography focused on the top documents in terms of document strength and thus ignored the role of the documents whose strengths were a little lower than the threshold.

Originality/value

This review study is more inclusive than any prior reviews on CRM and overcomes the drawbacks of mere reliance on either bibliometric analysis results or subjective opinions. Revealing the evolution process of the CRM knowledge domain, this study provides an in-depth understanding of the CRM research and benefits industry practitioners and researchers.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 February 2024

Sara S. Badran and Ayman Bahjat Abdallah

The present research aims to investigate how lean project management (LPM) and agile project management (APM) affect project performance outcomes in the construction sector in…

Abstract

Purpose

The present research aims to investigate how lean project management (LPM) and agile project management (APM) affect project performance outcomes in the construction sector in Jordan. This study focuses on six key project performance outcomes, namely cost, time, quality, client satisfaction, innovation and responsiveness.

Design/methodology/approach

The present study employed a quantitative approach to achieve the research objectives. Accordingly, a multi-item survey questionnaire was prepared to gather data from 392 project managers from construction companies in Jordan. The study’s model showed acceptable levels regarding reliability, validity, fit indices and discriminant validity. In order to test the hypotheses of this study, path analysis was employed using Amos 24.0 software.

Findings

LPM demonstrated a remarkably high positive impact on cost performance. It also positively affected quality performance and client satisfaction. However, LPM insignificantly affected time, innovation and responsiveness performance measures. On the other hand, APM showed a notably high positive impact on innovation and responsiveness. The findings also revealed that APM positively impacted quality performance and client satisfaction. In addition, APM negatively impacted cost performance and insignificantly impacted time performance.

Originality/value

This study is one of the first comprehensive studies to empirically examine the impact of both LPM and APM on various project performance outcomes in the construction industry in the context of a developing country. It reveals some similarities and differences between LPM and APM with regard to their impacts on project management outcomes. The findings are expected to guide managers in selecting the appropriate project management approach based on the desired performance outcomes. Accordingly, it offers important implications for project managers in construction companies.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 February 2024

Chau Ngoc Dang, Warit Wipulanusat, Peem Nuaklong and Boonsap Witchayangkoon

In developing countries, construction organizations are seeking to effectively implement green innovation strategies. Thus, this study aims to assess the importance of green…

Abstract

Purpose

In developing countries, construction organizations are seeking to effectively implement green innovation strategies. Thus, this study aims to assess the importance of green innovation practices and develop a measurement model for quantifying the green innovation degrees of construction firms.

Design/methodology/approach

A mixed-methods research approach is adopted. First, an extensive literature review is performed to identify potential green innovation items, which are then used to design a preliminary questionnaire. Next, expert interviews are conducted to pilot-test this questionnaire. Subsequently, by using a convenience non-probability sampling method, 88 valid responses are collected from construction firms in Vietnam. Then, one-sample and independent-samples t tests are employed to assess the importance of green innovation practices. Fuzzy synthetic evaluation (FSE) is also applied to quantitatively compare such practices. Finally, green innovation level (GIL) is proposed to measure the green innovation indexes and validated by a case study of seven construction firms.

Findings

This study identifies 13 green innovation variables, of which several key practices are highlighted for small/medium and large construction firms. The results of FSE analysis indicate that green process innovation is the most vital green category in construction firms, followed by green product and management innovations, respectively. As a quantitative measure, GIL could allow construction firms to frequently evaluate their green innovation indexes, thereby promoting green innovation practices comprehensively. Hence, construction firms would significantly enhance green competitive advantages and increasingly contribute to green and sustainable construction developments.

Originality/value

This research is one of the first attempts to integrate various green innovation practices into a comprehensive formulation. The established indexes offer detailed green innovation evaluations, which could be considered as valuable references for construction practitioners. Furthermore, a reliable and practical tool (i.e. GIL) is proposed to measure the GILs of construction firms in developing countries.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 13 March 2024

Lina Gharaibeh, Kristina Eriksson and Björn Lantz

Perceived benefits of building information modelling (BIM) have been discussed for some time, but cost–benefit benchmarking has been inconsistent. The purpose of this paper is to…

Abstract

Purpose

Perceived benefits of building information modelling (BIM) have been discussed for some time, but cost–benefit benchmarking has been inconsistent. The purpose of this paper is to investigate BIM feasibility and evaluate investment worth to elucidate and develop the current understanding of BIM merit. The aim of the study is to propose a research agenda towards a more holistic perspective of BIM use incorporating quantifying investment return.

Design/methodology/approach

An in-depth examination of research patterns has been conducted to identify challenges in the assessment of the investment value and return on investment (ROI) for BIM in the construction industry. A total of 75 research articles were considered for the final literature review. An evaluation of the literature is conducted using a combination of bibliometric analysis and systematic reviews.

Findings

This study, which analysed 75 articles, unveils key findings in quantifying BIM benefits, primarily through ROI calculation. Two major research gaps are identified: the absence of a standardized BIM ROI method and insufficient exploration of intangible benefits. Research focus varies across phases, emphasizing design and construction integration and exploring post-construction phases. The study categorizes quantifiable factors, including productivity, changes and rework reduction, requests for information reduction, schedule efficiency, safety, environmental sustainability and operations and facility management. These findings offer vital insights for researchers and practitioners, enhancing understanding of ’BIM’s financial benefits and signalling areas for further exploration in construction.

Originality/value

The ’study’s outcomes offer the latest insights for researchers and practitioners to create effective approaches for quantifying ’BIM’s financial benefits. Additionally, the proposed research agenda aims to improve the current limited understanding of BIM feasibility and investment worth evaluation. Results of the study could assist practitioners in overcoming limitations associated with BIM investment and economic evaluations in the construction industry.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 9 January 2024

Benjamin Boahene Akomah and Prasanna Venkatesan Ramani

This paper aims to identify the unidimensionality and reliability of 84 factors that influence the performance of construction projects and develop a confirmatory factor analysis…

Abstract

Purpose

This paper aims to identify the unidimensionality and reliability of 84 factors that influence the performance of construction projects and develop a confirmatory factor analysis (CFA) model.

Design/methodology/approach

The study adopted a deductive research approach and started by identifying the positive factors that influence construction project performance. This was followed by the modification of the identified factors. After that, a questionnaire was developed out of the factors for data collection. Exploratory factor analysis was used to establish the factor structure of the positive factors, and this was verified using CFA afterwards. A model fit analysis was performed to determine the goodness of fit of the hypothesised model, followed by the development of the confirmatory model.

Findings

The study demonstrated substantial correlation in the data, sufficient unidimensionality and internal reliability. In addition, the estimated fit indices suggested that the postulated model adequately described the sample data.

Practical implications

The paper revealed that performance can be enhanced if stakeholders identify and leverage the positive factors influencing performance. The paper suggests that project stakeholders, particularly government, project owners, consultants and construction firms, can improve project performance by critically examining economic and financial systems (EFS), regulation and policy-making systems (RPS), effective management practices (EMP) and project implementation strategies (PIS).

Originality/value

The contribution of this paper to the present literature is identifying the positive factors and developing the confirmatory factor model. The model comprised 42 positive variables under four indicators: EMP, RPS, PIS and EFS.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 15 May 2023

Kai Hänninen, Jouni Juntunen and Harri Haapasalo

The purpose of this study is to describe latent classes explaining the innovation logic in the Finnish construction companies. Innovativeness is a driver of competitive…

16146

Abstract

Purpose

The purpose of this study is to describe latent classes explaining the innovation logic in the Finnish construction companies. Innovativeness is a driver of competitive performance and vital to the long-term success of any organisation and company.

Design/methodology/approach

Using finite mixture structural equation modelling (FMSEM), the authors have classified innovation logic into latent classes. The method analyses and recognises classes for companies that have similar logic in innovation activities based on the collected data.

Findings

Through FMSEM analysis, the authors have identified three latent classes that explain the innovation logic in the Finnish construction companies – LC1: the internal innovators; LC2: the non-innovation-oriented introverts; and LC3: the innovation-oriented extroverts. These three latent classes clearly capture the perceptions within the industry as well as the different characteristics and variables.

Research limitations/implications

The presented latent classes explain innovation logic but is limited to analysing Finnish companies. Also, the research is quantitative by nature and does not increase the understanding in the same manner as qualitative research might capture on more specific aspects.

Practical implications

This paper presents starting points for construction industry companies to intensify innovation activities. It may also indicate more fundamental changes for the structure of construction industry organisations, especially by enabling innovation friendly culture.

Originality/value

This study describes innovation logic in Finnish construction companies through three models (LC1–LC3) by using quantitative data analysed with the FMSEM method. The fundamental innovation challenges in the Finnish construction companies are clarified via the identified latent classes.

Article
Publication date: 9 May 2024

Saeed Reza Mohandes, Atul Kumar Singh, Abdulwahed Fazeli, Saeed Banihashemi, Mehrdad Arashpour, Clara Cheung, Obuks Ejohwomu and Tarek Zayed

Previous research has demonstrated that Digital Twins (DT) are extensively employed to improve sustainable construction methods. Nonetheless, their uptake in numerous nations is…

Abstract

Purpose

Previous research has demonstrated that Digital Twins (DT) are extensively employed to improve sustainable construction methods. Nonetheless, their uptake in numerous nations is still constrained. This study seeks to identify and examine the digital twin’s implementation barriers in construction building projects to augment operational performance and sustainability.

Design/methodology/approach

An iterative two-stage approach was adopted to explore the phenomena under investigation. General DT Implementation Barriers were first identified from extant literature and subsequently explored using primary questionnaire survey data from Hong Kong building industry professionals.

Findings

Survey results illustrated that Lack of methodologies and tools, Difficulty in ensuring a high level of performance in real-time communication, Impossibility of directly measuring all data relevant to the DT, need to share the DT among multiple application systems involving multiple stakeholders and Uncertainties in the quality and reliability of data are the main barriers for adopting digital twins' technology. Moreover, Ginni’s mean difference measure of dispersion showed that the stationary digital twin’s barriers adoption is needed to share the DT among multiple application systems involving multiple stakeholders.

Practical implications

The study’s findings offer valuable guidance to the construction industry. They help stakeholders adopt digital twins' technology, which, in turn, improves cost efficiency and sustainability. This adoption reduces project expenses and enhances environmental responsibility, providing companies a competitive edge in the industry.

Originality/value

This research rigorously explores barriers to Digital Twin (DT) implementation in the Hong Kong construction industry, employing a systematic approach that includes a comprehensive literature review, Ranking Analysis (RII) and Ginni’s coefficient of mean difference (GM). With a tailored focus on Hong Kong, the study aims to identify, analyze and provide novel insights into DT implementation challenges. Emphasizing practical relevance, the research bridges the gap between academic understanding and real-world application, offering actionable solutions for industry professionals, policymakers and researchers. This multifaceted contribution enhances the feasibility and success of DT implementation in construction projects within the Architecture, Engineering and Construction (AEC) sector.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 6 July 2022

Xin Xia and Pengcheng Xiang

Managers of megaprojects face social risk management challenges throughout the various design, construction, and operation stages, owing to the various conflicts of interest among…

Abstract

Purpose

Managers of megaprojects face social risk management challenges throughout the various design, construction, and operation stages, owing to the various conflicts of interest among stakeholders, public skepticism, and opposition. However, most existing studies have not focused on the dynamic analysis of integrating social risks in these stages. This study developed a dynamic analysis approach to explore the dynamics of critical social risk factors and related stakeholders of megaprojects and built the managerial maps for various stakeholders.

Design/methodology/approach

Based on the social analysis network (SNA), a dynamic network analysis approach for understanding the dynamics of social risk and related stakeholders has been developed by literature and case analysis. The approach comprises the following steps: (1) generating social risk–stakeholder networks in different stages; (2) analysis of the critical stakeholders and social risk factors; (3) dynamic analysis of social risk factors; and (4) developing social risk management maps for various stakeholders. To verify the feasibility and effectiveness of the approach, 40 megaprojects from China were analyzed.

Findings

According to the results, the local government is a critical stakeholder during all stages, inadequate information promotion (IIP) and imperfect communication and coordination mechanism (ICCM) are key social risk sources throughout the megaproject life cycle. Furthermore, the management maps for government organizations, project implementation groups, and external stakeholders were constructed.

Originality/value

This research has three contributions. First, a dynamic analysis approach of stakeholder-associated social risks in megaprojects is developed, which enriches the social risk management theory of megaprojects and provides inspiration for future research focus. Second, the social risk–stakeholder networks and critical social risks in different stages are confirmed to provide a more valid and accurate picture of social risk management in megaprojects. Third, the social risk managerial maps for different stakeholders built in this research will be beneficial for governments, project implementation groups, and external stakeholders to optimize management strategies.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 December 2022

Qing-Wen Zhang, Pin-Chao Liao, Mingxuan Liang and Albert P.C. Chan

Quality failures in grid infrastructure construction would cause large-scale collapses in power supply and additional expenditures by reworks and repairs. Learning from quality…

Abstract

Purpose

Quality failures in grid infrastructure construction would cause large-scale collapses in power supply and additional expenditures by reworks and repairs. Learning from quality failures (LFQF) extracts experience from previous quality events and converts them into preventive measures to reduce or eliminate future construction quality issues. This study aims to investigate the influence factors of LFQF in the construction of grid infrastructure.

Design/methodology/approach

The related factors of LFQF, including quality management (QM) practices, quality rectification, and individual learning, were identified by reviewing literature about organizational learning and extracting experience from previous failures. A questionnaire survey was distributed to the grid companies in North, Northeast, Northwest, East, Central, and Southwest China. 381 valid responses collected and analyzed using structural equation modeling (SEM) to test the influence of these factors on LFQF.

Findings

The SEM results support that QM practices positively affect individual learning and LFQF. Quality rectification indirectly impacts LFQF via individual learning, while the results did not support the direct link between quality rectification and LFQF.

Practical implications

The findings strengthen practical insights into extracting experience from poor-quality issues and continuous improvement. The contributory factors of LFQF found in this study benefit the practitioners by taking effective measures to enhance organizational learning capability and improve the long-term construction quality performance in the grid infrastructure industry.

Originality/value

Existing research about the application of LFQF still stays at the explorative and conceptual stage. This study investigates the related factors of LFQF, including QM practices, quality rectification, and individual learning, extending the model development of learning from failures (LFF) in construction QM.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 4000