Book part
Publication date: 1 May 2019

Marco A. Bragadin and Kalle Kähkönen

This paper is based on research addressing quality of construction schedules. The paper aims to structure a Schedule Health Assessment method and present it as a means to carry…

Abstract

Purpose

This paper is based on research addressing quality of construction schedules. The paper aims to structure a Schedule Health Assessment method and present it as a means to carry out the evaluation of construction schedules.

Design/Methodology/Approach

The development of the Schedule Health assessment method can be characterised as constructive research. The structuring of the method is based on analysis of factors forming the overall quality of construction schedules. The method has been tested in a proof of concept study. This comprised a case study in which four master schedules developed by junior production managers were evaluated using the Schedule Health assessment method.

Findings

It is possible to construct a method for the quality evaluation of construction schedules.

Research Limitations/Implications

The completed testing is still rather limited since it is based merely on experiences of junior production managers with a single case.

Practical Implications

The Schedule Health assessment method can in a useful manner make the quality evaluation of construction schedules easy to approach and effective process.

Originality/Value

This research has produced a novel method for the quality evaluation of construction schedules.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Open Access
Article
Publication date: 14 March 2024

Zabih Ghelichi, Monica Gentili and Pitu Mirchandani

This paper aims to propose a simulation-based performance evaluation model for the drone-based delivery of aid items to disaster-affected areas. The objective of the model is to…

172

Abstract

Purpose

This paper aims to propose a simulation-based performance evaluation model for the drone-based delivery of aid items to disaster-affected areas. The objective of the model is to perform analytical studies, evaluate the performance of drone delivery systems for humanitarian logistics and can support the decision-making on the operational design of the system – on where to locate drone take-off points and on assignment and scheduling of delivery tasks to drones.

Design/methodology/approach

This simulation model captures the dynamics and variabilities of the drone-based delivery system, including demand rates, location of demand points, time-dependent parameters and possible failures of drones’ operations. An optimization model integrated with the simulation system can update the optimality of drones’ schedules and delivery assignments.

Findings

An extensive set of experiments was performed to evaluate alternative strategies to demonstrate the effectiveness for the proposed optimization/simulation system. In the first set of experiments, the authors use the simulation-based evaluation tool for a case study for Central Florida. The goal of this set of experiments is to show how the proposed system can be used for decision-making and decision-support. The second set of experiments presents a series of numerical studies for a set of randomly generated instances.

Originality/value

The goal is to develop a simulation system that can allow one to evaluate performance of drone-based delivery systems, accounting for the uncertainties through simulations of real-life drone delivery flights. The proposed simulation model captures the variations in different system parameters, including interval of updating the system after receiving new information, demand parameters: the demand rate and their spatial distribution (i.e. their locations), service time parameters: travel times, setup and loading times, payload drop-off times and repair times and drone energy level: battery’s energy is impacted and requires battery change/recharging while flying.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2042-6747

Keywords

Open Access
Article
Publication date: 12 January 2024

Patrik Jonsson, Johan Öhlin, Hafez Shurrab, Johan Bystedt, Azam Sheikh Muhammad and Vilhelm Verendel

This study aims to explore and empirically test variables influencing material delivery schedule inaccuracies?

Abstract

Purpose

This study aims to explore and empirically test variables influencing material delivery schedule inaccuracies?

Design/methodology/approach

A mixed-method case approach is applied. Explanatory variables are identified from the literature and explored in a qualitative analysis at an automotive original equipment manufacturer. Using logistic regression and random forest classification models, quantitative data (historical schedule transactions and internal data) enables the testing of the predictive difference of variables under various planning horizons and inaccuracy levels.

Findings

The effects on delivery schedule inaccuracies are contingent on a decoupling point, and a variable may have a combined amplifying (complexity generating) and stabilizing (complexity absorbing) moderating effect. Product complexity variables are significant regardless of the time horizon, and the item’s order life cycle is a significant variable with predictive differences that vary. Decoupling management is identified as a mechanism for generating complexity absorption capabilities contributing to delivery schedule accuracy.

Practical implications

The findings provide guidelines for exploring and finding patterns in specific variables to improve material delivery schedule inaccuracies and input into predictive forecasting models.

Originality/value

The findings contribute to explaining material delivery schedule variations, identifying potential root causes and moderators, empirically testing and validating effects and conceptualizing features that cause and moderate inaccuracies in relation to decoupling management and complexity theory literature?

Details

International Journal of Operations & Production Management, vol. 44 no. 13
Type: Research Article
ISSN: 0144-3577

Keywords

Open Access
Book part
Publication date: 1 May 2019

Gunnar Lucko and Yi Su

Construction projects operate within a risky environment. It materialises as delays, which must be prevented or mitigated to avoid becoming amplified into late completion. But…

Abstract

Purpose

Construction projects operate within a risky environment. It materialises as delays, which must be prevented or mitigated to avoid becoming amplified into late completion. But previous research has largely ignored how structural complexity of the underlying network schedules shapes their resilience.

Design/Methodology/Approach

This research hypothesizes that schedule structure plays a vital role in its ability to absorb or propagate delays. The impact of activity-level local risk factors is represented via activity duration distributions, i.e. probability density functions. The impact of project-level global risk factors is more challenging because they arise via interactions between multiple activities.

Findings

Modelling resilience to local and global risk factors can employ a matrix approach. Simulation shows that delay amplification depends on local structure, not global complexity.

Research Limitations/Implications

Criticality had merely relied upon a single deterministic analysis of a network schedule to categorize activities as having zero or nonzero float from fixed relative duration a dependency structure. Repeated probabilistic analysis with sampled durations gives criticality indices of activities. This research limits itself to network schedules with point-wise relations between activities.

Practical Implications

Managers can use this knowledge to develop schedules that protect their expected project duration with a suitable structural complexity.

Originality/Value

Contributions to the body of knowledge are as follows: It converts the dependency structure into a reachability matrix and adds a correlation matrix to capture how the predecessor performance may impact its successors. It correlates criticality of activities with structural complexity indices. And it ranks activities objectively by their cruciality, i.e. potential delay propagation.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Open Access
Article
Publication date: 9 October 2023

Mingyao Sun and Tianhua Zhang

A real-time production scheduling method for semiconductor back-end manufacturing process becomes increasingly important in industry 4.0. Semiconductor back-end manufacturing…

Abstract

Purpose

A real-time production scheduling method for semiconductor back-end manufacturing process becomes increasingly important in industry 4.0. Semiconductor back-end manufacturing process is always accompanied by order splitting and merging; besides, in each stage of the process, there are always multiple machine groups that have different production capabilities and capacities. This paper studies a multi-agent based scheduling architecture for the radio frequency identification (RFID)-enabled semiconductor back-end shopfloor, which integrates not only manufacturing resources but also human factors.

Design/methodology/approach

The architecture includes a task management (TM) agent, a staff instruction (SI) agent, a task scheduling (TS) agent, an information management center (IMC), machine group (MG) agent and a production monitoring (PM) agent. Then, based on the architecture, the authors developed a scheduling method consisting of capability & capacity planning and machine configuration modules in the TS agent.

Findings

The authors used greedy policy to assign each order to the appropriate machine groups based on the real-time utilization ration of each MG in the capability & capacity (C&C) planning module, and used a partial swarm optimization (PSO) algorithm to schedule each splitting job to the identified machine based on the C&C planning results. At last, we conducted a case study to demonstrate the proposed multi-agent based real-time production scheduling models and methods.

Originality/value

This paper proposes a multi-agent based real-time scheduling framework for semiconductor back-end industry. A C&C planning and a machine configuration algorithm are developed, respectively. The paper provides a feasible solution for semiconductor back-end manufacturing process to realize real-time scheduling.

Details

IIMBG Journal of Sustainable Business and Innovation, vol. 1 no. 1
Type: Research Article
ISSN: 2976-8500

Keywords

Open Access
Article
Publication date: 31 December 2020

Cheng-Wei Lin, Wan-Chi Jackie Hsu and Hui-Ju Su

The shipper selects a suitable shipping route and plans for a voyage in order to import and export cargo on the basis of published sailing schedules. The reliability of the…

Abstract

The shipper selects a suitable shipping route and plans for a voyage in order to import and export cargo on the basis of published sailing schedules. The reliability of the sailing schedule will influence the shipper’s logistics expense, which means that the logistics costs will depend on the reliability of schedules published by container shipping companies. Therefore, it is important to consider factors which can cause delays would for container ships sailing on sea routes. The reliability of published sailing schedules can be affected by a number of different factors. This study adopts the multi-criteria decision making (MCDM) method to estimate the importance of the delaying factors in a sailing schedule. In addition, the consistent fuzzy preference relations (CFPR) method is applied to identify the subjective importance (weights) of the delaying factors. The entropy weight method combined with the actual performance of the container shipping company are both used when estimating the objective importance (weights) of the delaying factors. According to the analysis results, the criteria can be divided into four quadrants with different management implications, which indicate that instructions for chase strategy, sailing schedule control, fleet allocation, transship operation arrangement and planning for ports in routes are often ignored by container shipping companies. Container shipping companies should consider adjusting their operational strategies, which would greatly improve their operational performance.

Details

Journal of International Logistics and Trade, vol. 18 no. 4
Type: Research Article
ISSN: 1738-2122

Keywords

Open Access
Article
Publication date: 9 July 2021

Ben Vinod

The static world of flight scheduling where schedules rarely change once published is becoming more responsive with schedule change updates leading up to the departure date due to…

10091

Abstract

Purpose

The static world of flight scheduling where schedules rarely change once published is becoming more responsive with schedule change updates leading up to the departure date due to demand volatility and unpredictable demand patterns. Innovation in cash flow generation will take center stage to operate the business in these uncertain times. Forecasting demand for future flights is a challenge since historical demand patterns are not meaningful which requires a new adaptive robust revenue management approach that monitors key metrics, detects anomalies and quickly takes corrective action when performance targets cannot be achieved.

Design/methodology/approach

The novel COVID-19 pandemic decimated the travel industry in 2020 and continues to plague us with no end in sight. With the steep drop in revenues, airlines need to adapt to a new marketing planning process of scheduling, pricing and revenue management that is more nimble to adapt quickly to changing market conditions. This new approach will continue to be relevant in a post-COVID-19 world during and after economic recovery.

Findings

A methodology for airline revenue planning: scheduling, airline pricing and revenue management, has been proposed that will also work in a post-COVID-19 era.

Research limitations/implications

The limitation of the proposed model is that it needs to be applied in practice to determine the true benefits of this novel approach to airline revenue planning.

Practical implications

Flight scheduling will rely more on clean sheet scheduling, schedule revisions and close in refleeting to better match demand to supply. The office of the chief financial officer will have a permanent task force to monitor cash flow and come up with innovative solutions to generate cash flow for liquidity. Adaptive robust revenue management workflows will be integrated into traditional revenue management workflows in the future for competitive advantage.

Social implications

In a post-COVID-19 world it is anticipated that airline business processes will transform to be nimbler and more proactive in making timely decisions at a greater velocity.

Originality/value

The approach to airline revenue planning for scheduling, pricing and revenue management is a new business process that does not exist today at scale in the airline industry.

Open Access
Article
Publication date: 5 May 2022

Jia He, Na Yan, Jian Zhang, Yang Yu and Tao Wang

This paper aims to optimize the charging schedule for battery electric buses (BEBs) to minimize the charging cost considering the time-of-use electricity price.

1296

Abstract

Purpose

This paper aims to optimize the charging schedule for battery electric buses (BEBs) to minimize the charging cost considering the time-of-use electricity price.

Design/methodology/approach

The BEBs charging schedule optimization problem is formulated as a mixed-integer linear programming model. The objective is to minimize the total charging cost of the BEB fleet. The charge decision of each BEB at the end of each trip is to be determined. Two types of constraints are adopted to ensure that the charging schedule meets the operational requirements of the BEB fleet and that the number of charging piles can meet the demand of the charging schedule.

Findings

This paper conducts numerical cases to validate the effect of the proposed model based on the actual timetable and charging data of a bus line. The results show that the total charge cost with the optimized charging schedule is 15.56% lower than the actual total charge cost under given conditions. The results also suggest that increasing the number of charging piles can reduce the charging cost to some extent, which can provide a reference for planning the number of charging piles.

Originality/value

Considering time-of-use electricity price in the BEBs charging schedule will not only reduce the operation cost of electric transit but also make the best use of electricity resources.

Details

Journal of Intelligent and Connected Vehicles, vol. 5 no. 2
Type: Research Article
ISSN: 2399-9802

Keywords

Open Access
Book part
Publication date: 18 July 2022

Fabian Akkerman, Eduardo Lalla-Ruiz, Martijn Mes and Taco Spitters

Cross-docking is a supply chain distribution and logistics strategy for which less-than-truckload shipments are consolidated into full-truckload shipments. Goods are stored up to…

Abstract

Cross-docking is a supply chain distribution and logistics strategy for which less-than-truckload shipments are consolidated into full-truckload shipments. Goods are stored up to a maximum of 24 hours in a cross-docking terminal. In this chapter, we build on the literature review by Ladier and Alpan (2016), who reviewed cross-docking research and conducted interviews with cross-docking managers to find research gaps and provide recommendations for future research. We conduct a systematic literature review, following the framework by Ladier and Alpan (2016), on cross-docking literature from 2015 up to 2020. We focus on papers that consider the intersection of research and industry, e.g., case studies or studies presenting real-world data. We investigate whether the research has changed according to the recommendations of Ladier and Alpan (2016). Additionally, we examine the adoption of Industry 4.0 practices in cross-docking research, e.g., related to features of the physical internet, the Internet of Things and cyber-physical systems in cross-docking methodologies or case studies. We conclude that only small adaptations have been done based on the recommendations of Ladier and Alpan (2016), but we see growing attention for Industry 4.0 concepts in cross-docking, especially for physical internet hubs.

Open Access
Article
Publication date: 1 February 2023

Tareq Babaqi and Béla Vizvári

The total capacity of ambulances in metropolitan cities is often less than the post-disaster demand, especially in the case of disasters such as earthquakes. However, because…

Abstract

Purpose

The total capacity of ambulances in metropolitan cities is often less than the post-disaster demand, especially in the case of disasters such as earthquakes. However, because earthquakes are a rare occurrence in these cities, it is unreasonable to maintain the ambulance capacity at a higher level than usual. Therefore, the effective use of ambulances is critical in saving human lives during such disasters. Thus, this paper aims to provide a method for determining how to transport the maximum number of disaster victims to hospitals on time.

Design/methodology/approach

The transportation-related disaster management problem is complex and dynamic. The practical solution needs decomposition and a fast algorithm for determining the next mission of a vehicle. The suggested method is a synthesis of mathematical modeling, scheduling theory, heuristic methods and the Voronoi diagram of geometry. This study presents new elements for the treatment, including new mathematical theorems and algorithms. In the proposed method, each hospital is responsible for a region determined by the Voronoi diagram. The region may change if a hospital becomes full. The ambulance vehicles work for hospitals. For every patient, there is an estimated deadline by which the person must reach the hospital to survive. The second part of the concept is the way of scheduling the vehicles. The objective is to transport the maximum number of patients on time. In terms of scheduling theory, this is a problem whose objective function is to minimize the sum of the unit penalties.

Findings

The Voronoi diagram can be effectively used for decomposing the complex problem. The mathematical model of transportation to one hospital is the P‖ΣUj problem of scheduling theory. This study provides a new mathematical theorem to describe the structure of an algorithm that provides the optimal solution. This study introduces the notion of the partial oracle. This algorithmic tool helps to elaborate heuristic methods, which provide approximations to the precise method. The realization of the partial oracle with constructive elements and elements proves the nonexistence of any solution. This paper contains case studies of three hospitals in Tehran. The results are close to the best possible results that can be achieved. However, obtaining the optimal solution requires a long CPU time, even in the nondynamic case, because the problem P‖ΣUj is NP-complete.

Research limitations/implications

This research suggests good approximation because of the complexity of the problem. Researchers are encouraged to test the proposed propositions further. In addition, the problem in the dynamic environment needs more attention.

Practical implications

If a large-scale earthquake can be expected in a city, the city authorities should have a central control system of ambulances. This study presents a simple and efficient method for the post-disaster transport problem and decision-making. The security of the city can be improved by purchasing ambulances and using the proposed method to boost the effectiveness of post-disaster relief.

Social implications

The population will be safer and more secure if the recommended measures are realized. The measures are important for any city situated in a region where the outbreak of a major earthquake is possible at any moment.

Originality/value

This paper fulfills an identified need to study the operations related to the transport of seriously injured people using emergency vehicles in the post-disaster period in an efficient way.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. 13 no. 1
Type: Research Article
ISSN: 2042-6747

Keywords