Search results

11 – 20 of 47
Article
Publication date: 14 June 2019

Hakeem Owolabi, Lukumon Oyedele, Hafiz Alaka, Muhammad Bilal, Saheed Ajayi, Olugbenga Akinade and Alirat Agboola

Although the UK Guarantee Scheme for Infrastructures (UKGSI) was introduced in 2012 to address the huge financing gap for critical infrastructures, PFI sponsors have so far…

Abstract

Purpose

Although the UK Guarantee Scheme for Infrastructures (UKGSI) was introduced in 2012 to address the huge financing gap for critical infrastructures, PFI sponsors have so far guaranteed only few projects. Many stakeholders in the project finance industry have blamed this situation on lack of general understanding of strategies for harnessing the benefits of the government guarantee scheme. The purpose of this paper is to investigate the perspectives of UK’s PFI/PPP stakeholders on critical factors influencing approval for government guarantees using the UKGSI as a focal point.

Design/methodology/approach

Using a mixed methodology approach, this study identified 26 important criteria used in evaluating government guarantee applications through focus group discussions with PFI stakeholders. The identified criteria were then put in questionnaire survey to 195 respondents within the UK PFI/PPP industry.

Findings

Through factor analysis, five critical factors determining successful government guarantee application were unravelled. These include: compliance with UK National Infrastructure Plan; demonstration of project bankability and risk management; value for money; proof of projects’ dependence on government guarantee; and certainty of planning commission’s approval.

Originality/value

Results of this study will facilitate an in-depth understanding of critical factors necessary for accessing government guarantee scheme for PFI/PPPs, while also improving the bankability of potential PFI projects.

Details

World Journal of Entrepreneurship, Management and Sustainable Development, vol. 15 no. 3
Type: Research Article
ISSN: 2042-5961

Keywords

Article
Publication date: 17 May 2024

Ali M. Saad, Hasan D. Badran, Saheed Ajayi and Saad Sarhan

The construction industry has embraced building information modelling (BIM) as a practical methodology towards digitalisation. However, critics believe BIM has reached a plateau…

Abstract

Purpose

The construction industry has embraced building information modelling (BIM) as a practical methodology towards digitalisation. However, critics believe BIM has reached a plateau in addressing distinctive construction challenges. As a result, literature has seen an increase in the development and use of BIM-based plugins. Overall, the plugins have been critical in delivering custom-built solutions to longstanding construction challenges. The purpose of this study is to empirically investigate this trend and the potential barriers undermining the wider development of BIM plugins, by that contributing to a stimulating research topic and a growing knowledge gap.

Design/methodology/approach

Methodologically, this study used a quantitative approach to collect data through a carefully designed questionnaire. This study achieved a sample size of 39 experts who have been involved in developing, experimenting and publishing BIM-based plugins for specific construction activities.

Findings

The findings led to the identification of the key barriers to using BIM-based plugins and the identification of the key strategies to overcome them across the three situational awareness (SA) phases. Results also suggest that the development and use of plugins are destined to increase, and the research community can now rely on the insights of this paper as a departure point to address the technological plateau in BIM-related research.

Originality/value

To the best of the authors’ knowledge, this is the first study to empirically identify and assess the barriers undermining the wider development of BIM-based plugins. This study contributes to theory by building on SA, by challenging existing wisdom and fostering new knowledge around strategies to overcome the evaluated barriers.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 8 February 2024

Suhaib Arogundade, Mohammed Dulaimi, Saheed Ajayi and Ali Saad

The decisions of contractors could impact the reduction of construction carbon footprint. These decisions are linked to the belief of contractors which equally affects how they…

Abstract

Purpose

The decisions of contractors could impact the reduction of construction carbon footprint. These decisions are linked to the belief of contractors which equally affects how they behave while delivering projects. This study aims to investigate the behavioural tendencies of contractors that could lead to carbon minimisation during the execution of construction projects.

Design/methodology/approach

An industry survey was performed amongst 41 UK construction professionals. Spearman’s correlation and factor analysis were used to analyse the data.

Findings

The result of the Spearman’s correlation gave rise to 14 contractors’ carbon reduction behaviour (CCRB) variables and their factor analysis yielded two distinct factors, namely, contractors’ consummate carbon reduction behaviour and contractors’ pragmatic carbon reduction behaviour. The findings suggest that in the UK, contractors are willing to take voluntary practical steps to decrease the carbon footprint of construction projects.

Practical implications

This finding might be unexpected to construction stakeholders, especially construction clients who may believe that infusing strict carbon reduction obligations in contracts is sufficient in nudging contractors to lessen the carbon impact of projects.

Originality/value

The study attempted to quantitatively derive CCRB, thereby extending the breadth of knowledge in the construction carbon reduction domain.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 10 April 2024

Adekunle Sabitu Oyegoke, Saheed Ajayi, Muhammad Azeem Abbas and Stephen Ogunlana

The lack of a proper register to store, match and display information on the adapted property has led to a waste of resources and prolonged delays in matching the disabled and…

Abstract

Purpose

The lack of a proper register to store, match and display information on the adapted property has led to a waste of resources and prolonged delays in matching the disabled and elderly people with appropriate properties. This paper presents the development of a Housing Adaptations Register with user-matching functionalities for different mobility categories. The developed system accurately captures and documents adapted home information to facilitate the automated matching of disabled/aged applicants needing an adapted home with suitable property using banding, mobility and suitability index.

Design/methodology/approach

A theoretical review was conducted to identify parameters and develop adaptations register construct. A survey questionnaire approach to rate the 111 parameters in the register as either moderate, desirable or essential before system development and application. The system development relied on DSS modelling to support data-driven decision-making based on the decision table method to represent property information for implementing the decision process. The system is validated through a workshop, four brainstorming sessions and three focus group exercises.

Findings

Development of a choice-based system that enables the housing officers or the Housing Adaptations Register coordinators to know the level of adaptation to properties and match properties quickly with the applicants based on their mobility status. The merits of the automated system include the development of a register to capture in real-time adapted home information to facilitate the automated matching of disabled/aged applicants. A “choice-based” system that can map and suggest a property that can easily be adapted and upgraded from one mobility band to the other.

Practical implications

The development of a housing adaptation register helps social housing landlords to have a real-time register to match, map and upgrade properties for the most vulnerable people in our society. It saves time and money for the housing associations and the local authorities through stable tenancy for adapted homes. Potentially, it will promote the independence of aged and disabled people and can reduce their dependence on social and healthcare services.

Originality/value

This system provides the local authorities with objective and practical tools that may be used to assess, score, prioritise and select qualified people for appropriate accommodation based on their needs and mobility status. It will provide a record of properties adapted with their features and ensure that matching and eligibility decisions are consistent and uniform.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 16 March 2023

Sambo Lyson Zulu, Ali Saad, Saheed Ajayi, Maria Unuigbe and Mohammed Dulaimi

Due to the practical complexity and fragmented nature of the construction industry, digitalisation, like other innovations, is not easily achieved. This study aims to explore…

Abstract

Purpose

Due to the practical complexity and fragmented nature of the construction industry, digitalisation, like other innovations, is not easily achieved. This study aims to explore organisational influences on digitalisation within construction firms.

Design/methodology/approach

The study uses structured open-ended questions as a data collection tool for a qualitative investigation. The qualitative approach enabled participants to express their inputs and maximise the diversity of data, offering new insights and discussions that are distinct from previous works.

Findings

Construction professionals from 22 organisations provided their perspectives on digital transformation and their organisations. Under four constructs – structure, culture, leadership and internal processes, findings uncovered 16 determinants critical to digitalisation in construction firms. The study offers a theoretical perspective supported by empirical data to explore the complex dynamics and internal interactions of organisational influence on the uptake of digitalisation in the construction industry.

Originality/value

This paper offers arguments from a theoretical lens by applying the organisational influence model and capturing the variables under each construct in an exploratory manner to highlight the reasoning behind the low digital uptake in construction firms. This research aids academia and practice on the pressure points responsible for enhancing, or undermining, digital uptake in construction firms at an organisational level.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 28 February 2023

Jamiu A. Dauda, Saheed Ajayi, Temitope Omotayo, Olayiwola O. Oladiran and Olusegun M. Ilori

Small- and medium-sized enterprises (SMEs) within the construction sector are highly vulnerable to disruptions caused by political and economic decisions or even pandemics. This…

Abstract

Purpose

Small- and medium-sized enterprises (SMEs) within the construction sector are highly vulnerable to disruptions caused by political and economic decisions or even pandemics. This study evaluated the current operations of selected SMEs providing engineering design and consultancy services against Toyota Production System (TPS) lean tool. The purpose is to juxtapose SME operations and processes with TPS to ascertain the level of their operations conformity to the established TPS lean thinking tool.

Design/methodology/approach

This study used a qualitative data collection and analysis approach to evaluate the current processes of participating SMEs against Liker's 14 management principles of TPS. The data collected were analysed using thematic analysis to identify patterns and themes that emerged from the qualitative data.

Findings

The analysis revealed that focus on short-term goals, immediate profit and duplication of effort resulting from insufficient collaboration is currently creating waste in participating SMEs' operations. Hence, the implementation of TPS was recommended as a lean tool and a framework based on TPS lean tool was developed for improving the operations of SMEs.

Research limitations/implications

The study is limited to SMEs operating only as consultants providing project planning design within the construction industry. Data collection is limited to qualitative even though observations would improve the outcome of the study.

Originality/value

The study advances contemporary issues in promoting lean implementation in construction sector and developed an improved framework based on the TPS to enhance the performance of SME construction businesses.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 10 May 2021

Adekunle Sabitu Oyegoke, Robert Powell, Saheed Ajayi, Godawatte Arachchige Gimhan Rathnagee Godawatte and Temidayo Akenroye

This paper aims to identify and analyse the factors affecting the selection of effective cost control techniques in the UK construction industry and assess their importance. The…

1578

Abstract

Purpose

This paper aims to identify and analyse the factors affecting the selection of effective cost control techniques in the UK construction industry and assess their importance. The study examines these key areas; the factors that have significant impacts on cost overruns, the most effective cost control techniques and the factors for selecting cost control techniques for a project.

Design/methodology/approach

The study relies on a mixed-method research approach; a qualitative exploration of the most effective cost control techniques and the factors affecting the selection of cost control techniques, followed by a questionnaire survey and follow-up interviews. Relative importance index (RII) is used for ranking the factors.

Findings

The budgeting technique is ranked first with-0.821RII, followed by cost forecasting-0.800RII and cashflow monitoring-00.733RII, as the most effective cost control techniques. On factors that influenced the choice of the techniques used, cost information/cost-related factors are ranked first with-0.611RII, followed by the size of the company-0.509RII and the effectiveness of the technique-0.572RII.

Research limitations/implications

Although the scope of the study was limited to the UK construction industry, the results could be interpreted for critical learning in other developed/developing countries.

Originality/value

Identifying and ranking the factors affecting the selection of effective cost control techniques in the UK construction industry has been the focal point of this study. The study also proposes a simple but effective model which can be used for critical learning on mitigating cost overruns and the effective use of cost control techniques in the construction industry.

Details

Journal of Financial Management of Property and Construction , vol. 27 no. 2
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 10 April 2023

Sambo Lyson Zulu, Ali M. Saad, Saheed O. Ajayi, Mohammed Dulaimi and Maria Unuigbe

In the past decade, transforming key processes and activities towards a more digital nature has been the focus of most industries to exploit the associated advantages. Despite…

Abstract

Purpose

In the past decade, transforming key processes and activities towards a more digital nature has been the focus of most industries to exploit the associated advantages. Despite that, organisations in the construction sector are lagging the list of early adopters. The slow rate of a fundamental digital transformation is being linked to the challenges facing an effective leadership. The purpose of this paper is, therefore, to shed light on the barriers to digital leadership enactment in the construction industry. Limited research has empirically analysed and discussed these barriers to explain the low transformation rate in the existing body of knowledge.

Design/methodology/approach

This paper empirically investigates the perspectives of construction industry professionals acquiring various roles in the industry. This study captured the views of 38 participants, adopting a qualitative methodological approach to detail the barriers and explain the slow digital transformation rate.

Findings

Findings are grouped into five themes: leadership characteristics, management and organisational issues, resource constraints, technological issues and risk perceptions. The findings are helpful to business leaders, researchers, trainers and educators to develop measures to encourage leaders in the industry to be at the forefront of digital transformation in their organisations.

Originality/value

Literature, however, is discreet in reflecting the challenges and barriers facing today's leadership in facilitating digital transformation among construction stakeholders. This paper provides insights into the variables that may be undermining wider digital adoption across the construction sector's organisations.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 30 July 2020

Mohammad Ittshaam Zaheer, Saheed O. Ajayi, Sambo Lyson Zulu, Adekunle Oyegoke and Hadi Kazemi

This study aims to investigate the various competencies a graduate should hold to prepare them for graduate building surveying roles from employers’ perspective.

1026

Abstract

Purpose

This study aims to investigate the various competencies a graduate should hold to prepare them for graduate building surveying roles from employers’ perspective.

Design/methodology/approach

This study uses a sequential exploratory mixed-method approach by informing a quantitative study with the finding from a qualitative study.

Findings

Based on exploratory factor analysis, the study found that 13 essential competencies are valued by the employers when recruiting building surveying graduates, as they are requisites for effective job performance. Personal management skills, technical surveying knowledge and knowledge of the Royal Institute of Chartered Surveyor standards are the essential competencies based on the level of variance extracted by the three components. Other competency categories include client management skills, being goal-driven and self-motivated, optimistic personality traits, strong mental resilience, building maintenance and management knowledge and time management skills, among others that are explained in the paper.

Originality/value

The essential competencies were dependent on maintaining a balance between knowledge, skills and personality-based competencies. Measures and approaches for gaining the essential competencies, as well as their level of significance, are further discussed. The study will be of significant benefits to employers of graduate building surveyors, academic institutions that are seeking to improve their graduate employability, as well as students who are preparing for the world of work.

Details

Journal of Engineering, Design and Technology , vol. 19 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 12 August 2022

Muhammad Azeem Abbas, Saheed O. Ajayi, Adekunle Sabitu Oyegoke and Hafiz Alaka

Master information delivery plan (MIDP) is a key requirement for building information modelling (BIM) execution plan (BEP) that enlists all information deliverables in BIM-based…

2716

Abstract

Purpose

Master information delivery plan (MIDP) is a key requirement for building information modelling (BIM) execution plan (BEP) that enlists all information deliverables in BIM-based project, containing information about what would be prepared, when, by who, as well as the procedures and protocols to be used. In a well-conceived BEP, the MIDP facilitates collaboration among stakeholders. However, current approaches to generating MIDP are manual, making it tedious, error-prone and inconsistent, thereby limiting some expected benefits of BIM implementation. The purpose of this study is to automate the MIDP and demonstrate a collaborative BIM system that overcomes the problems associated with the traditional approach.

Design/methodology/approach

A BIM cloud-based system (named Auto-BIMApp) involving naming that automated MIDP generation is presented. A participatory action research methodology involving academia and industry stakeholders is followed to design and validate the Auto-BIMApp.

Findings

A mixed-method experiment is conducted to compare the proposed automated generation of MIDP using Auto-BIMApp with the traditional practice of using spreadsheets. The quantitative results show over 500% increased work efficiency, with improved and error-free collaboration among team members through Auto-BIMApp. Moreover, the responses from the participants using Auto-BIMApp during the experiment shows positive feedback in term of ease of use and automated functionalities of the Auto-BIMApp.

Originality/value

The replacement of traditional practices to a complete automated collaborative system for the generation of MIDP, with substantial productivity improvement, brings novelty to the present research. The Auto-BIMApp involve multidimensional information, multiple platforms, multiple types and levels of users, and generates three different representations of MIDP.