Open Access
Article
Publication date: 10 August 2021

Tom A.E. Aben, Wendy van der Valk, Jens K. Roehrich and Kostas Selviaridis

Inter-organisational governance is an important enabler for information processing, particularly in relationships undergoing digital transformation (DT) where partners depend on…

13451

Abstract

Purpose

Inter-organisational governance is an important enabler for information processing, particularly in relationships undergoing digital transformation (DT) where partners depend on each other for information in decision-making. Based on information processing theory (IPT), the authors theoretically and empirically investigate how governance mechanisms address information asymmetry (uncertainty and equivocality) arising in capturing, sharing and interpreting information generated by digital technologies.

Design/methodology/approach

IPT is applied to four cases of public–private relationships in the Dutch infrastructure sector that aim to enhance the quantity and quality of information-based decision-making by implementing digital technologies. The investigated relationships are characterised by differing degrees and types of information uncertainty and equivocality. The authors build on rich data sets including archival data, observations, contract documents and interviews.

Findings

Addressing information uncertainty requires invoking contractual control and coordination. Contract clauses should be precise and incentive schemes functional in terms of information requirements. Information equivocality is best addressed by using relational governance. Identifying information requirements and reducing information uncertainty are a prerequisite for the transformation activities that organisations perform to reduce information equivocality.

Practical implications

The study offers insights into the roles of both governance mechanisms in managing information asymmetry in public–private relationships. The study uncovers key activities for gathering, sharing and transforming information when using digital technologies.

Originality/value

This study draws on IPT to study public–private relationships undergoing DT. The study links contractual control and coordination as well as relational governance mechanisms to information-processing activities that organisations deploy to reduce information uncertainty and equivocality.

Details

International Journal of Operations & Production Management, vol. 41 no. 7
Type: Research Article
ISSN: 0144-3577

Keywords

Open Access
Article
Publication date: 5 October 2023

Babitha Philip and Hamad AlJassmi

To proactively draw efficient maintenance plans, road agencies should be able to forecast main road distress parameters, such as cracking, rutting, deflection and International…

Abstract

Purpose

To proactively draw efficient maintenance plans, road agencies should be able to forecast main road distress parameters, such as cracking, rutting, deflection and International Roughness Index (IRI). Nonetheless, the behavior of those parameters throughout pavement life cycles is associated with high uncertainty, resulting from various interrelated factors that fluctuate over time. This study aims to propose the use of dynamic Bayesian belief networks for the development of time-series prediction models to probabilistically forecast road distress parameters.

Design/methodology/approach

While Bayesian belief network (BBN) has the merit of capturing uncertainty associated with variables in a domain, dynamic BBNs, in particular, are deemed ideal for forecasting road distress over time due to its Markovian and invariant transition probability properties. Four dynamic BBN models are developed to represent rutting, deflection, cracking and IRI, using pavement data collected from 32 major road sections in the United Arab Emirates between 2013 and 2019. Those models are based on several factors affecting pavement deterioration, which are classified into three categories traffic factors, environmental factors and road-specific factors.

Findings

The four developed performance prediction models achieved an overall precision and reliability rate of over 80%.

Originality/value

The proposed approach provides flexibility to illustrate road conditions under various scenarios, which is beneficial for pavement maintainers in obtaining a realistic representation of expected future road conditions, where maintenance efforts could be prioritized and optimized.

Details

Construction Innovation , vol. 24 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 23 November 2020

Md. Nazmul Haque, Mustafa Saroar, Md. Abdul Fattah and Syed Riad Morshed

Public-Private Partnership (PPP) is a common practice in both the public and private sectors. PPP has been an important instrument to achieve Sustainable Development Goals (SDGs…

5228

Abstract

Purpose

Public-Private Partnership (PPP) is a common practice in both the public and private sectors. PPP has been an important instrument to achieve Sustainable Development Goals (SDGs) at the national level. However, the role of PPP at the subnational level is often scarcely studied. Using Khulna city of Bangladesh as a case, this paper aims to assess the role of PPP projects in the attainment of SDGs.

Design/methodology/approach

The research was conducted in the Central Business District (CBD) of Khulna, on a total of 4.6 kilometers stretches of road medians in the CBD where landscaping was done through the PPP approach. Besides the collection of secondary data from official records, primary data were collected through site visits, field surveys and interviews of PPP project partners.

Findings

The result shows that 89 percent of the respondents (road users) were pleased with the landscaping done on the road medians. Similarly, about 86 percent of the respondents felt more comfortable and safer to use the roads. Well-maintained road medians allow road-crossing at a regular interval which reduces the chance of an accident. The private parties have installed promotional billboards on the road medians and saved BDT 10.82 million a year. The public authority saves the maintenance budget amounting to BDT 23 million a year. The project achieves a triple-win situation. Despite some limitations, this PPP project has taken Khulna a step forward to achieve SDGs.

Originality/value

The findings have policy implications as the PPP project has enhanced the resilience of Khulna by addressing the relevant SDGs.

Details

Public Administration and Policy, vol. 23 no. 3
Type: Research Article
ISSN: 1727-2645

Keywords

Open Access
Article
Publication date: 10 June 2021

Emilia Nilsson Vestola, Per Erik Eriksson, Johan Larsson and Tina Karrbom Gustavsson

The purpose of this paper is to explore the interdependencies between temporary and permanent aspects of project organizing and how they affect the management of public…

3761

Abstract

Purpose

The purpose of this paper is to explore the interdependencies between temporary and permanent aspects of project organizing and how they affect the management of public infrastructure operation and maintenance (O&M) activities.

Design/methodology/approach

The paper applies a case study approach and uses Lundin and Söderholm's (1995) framework of the temporary organization (with the themes of time, task, team and transition) to distinguish between temporary and permanent aspects of organizing two infrastructure O&M projects.

Findings

This paper adds to the literature on temporary organizations by recognizing a mixture of temporary and permanent aspects of project organizing in an empirical project-level example. In line with previous research, the themes of time, task, team and transition were shown to be interdependent. Furthermore, the paper broadens the theory of temporary organizations by presenting a project organization with significant permanent aspects.

Practical implications

Project managers of public sector projects need to be aware of the possible mixture of temporary and permanent aspects of project organizing. Management of projects that are found to have a mixture of temporary and permanent aspects should combine the perspectives and management practices of both temporary and permanent organizing. Not acknowledging permanent aspects could lead to management that is not adapted to the prerequisites of project organizing in this context.

Originality/value

The findings further develop the literature on temporary organizations by recognizing that there is not only a mixture of temporary and permanent aspects between the temporary organization and its permanent environment but there is also a mixture of temporary and permanent aspects of organizing within project organizations.

Details

International Journal of Managing Projects in Business, vol. 14 no. 7
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 21 December 2021

Mirka Kans and Anders Ingwald

The purpose is to describe new business opportunities within the Swedish railway industry and to support the development of business models that corresponds with the needs and…

2224

Abstract

Purpose

The purpose is to describe new business opportunities within the Swedish railway industry and to support the development of business models that corresponds with the needs and requirements of Industry 4.0, here denoted as Service Management 4.0.

Design/methodology/approach

The study is an in-depth and descriptive case study of the Swedish railway system with specific focus on a railway vehicle maintainer. Public reports, statistics, internal documents, interviews and dialogues forms the basis for the empirical findings.

Findings

The article describes the complex business environment of the deregulated Swedish railway industry. Main findings are in the form of identified business opportunities and new business model propositions for one of the key actors, a vehicle maintainer.

Originality/value

The article provides valuable understanding of business strategy development within complex business environments and how maintenance related business models could be developed for reaching Service Management 4.0.

Details

Journal of Quality in Maintenance Engineering, vol. 29 no. 5
Type: Research Article
ISSN: 1355-2511

Keywords

Open Access
Article
Publication date: 5 April 2024

Olushola Akinshipe, Matthew Ikuabe, Samuel Adeniyi Adekunle and Clinton Aigbavboa

It is no news that Chinese construction companies are highly motivated to invest in Africa in terms of infrastructure and construction. This influx from the beginning of the…

Abstract

Purpose

It is no news that Chinese construction companies are highly motivated to invest in Africa in terms of infrastructure and construction. This influx from the beginning of the millennium marked a game-changer for infrastructural development in most African countries. This study, therefore, explores how the partnership between China and Africa has impacted the construction industry in Africa with a focus on Nigeria.

Design/methodology/approach

A quantitative approach was adapted for the study, which is descriptive in nature, and the primary participants of the study were core construction professionals within the Nigerian construction industry. Data was collected via a structured questionnaire, and multivariate statistics was used to analyse the data.

Findings

The study results revealed that the benefits accrued from Chinese participation in the African construction industry can be classified into three distinct categories: socio-economic development through construction, land transportation system development and construction industry development. The study further revealed that Chinese involvement has been most beneficial to the development of the land transportation system in Nigeria with more investment in the construction and maintenance of roads and railways.

Originality/value

The study will serve as a basis for making informed future decisions on Chinese participation in the Nigerian construction industry as it exposes the impacts of the relationship within the current system. The outcome of this study can be used to refocus the partnership to ensure the optimum development of the local construction industry. The government and other relevant agencies can use the findings from this study to ensure that there is sustainable growth in the local construction industry through Chinese participation.

Details

International Journal of Building Pathology and Adaptation, vol. 42 no. 7
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Article
Publication date: 14 December 2020

Md. Nazmul Haque, Mustafa Saroar, Md. Abdul Fattah, Syed Riad Morshed and Nuzhat Fatema

This paper aims to assess the progress in the provision of basic services in urban slums in Bangladesh during the transition period of millennium development goals (MDGs) to…

1841

Abstract

Purpose

This paper aims to assess the progress in the provision of basic services in urban slums in Bangladesh during the transition period of millennium development goals (MDGs) to sustainable development goals (SDGs).

Design/methodology/approach

The study used a mixed method of research. The empirical part of the research was conducted in three Blocks of Rupsha slum in Khulna city. Randomly selected 120 households were interviewed through a structured questionnaire; three focus group discussion sessions (FGDs) were also conducted. Progress in the slum residents’ access to basic services during the transition from MDGs to SDGs is tacked based on primary data. The User Satisfaction Index (USI) and Network Analysis tools in ArcGIS are used to identify the gaps in service provision.

Findings

Findings show that a very significant proportion of families (56.67%) encounter an acute level of difficulties to gain smooth access to water services. About 89% of respondents have only access to a common or shared toilet facility where one common toilet is used by 20–25 persons. About 31% of families are unable to send their children to primary school even after four years of the adoption of SDGs. Achievements in most indicators of basic services in the slum are in general lower than the national level. Moreover, there exists spatial variability within the same slum. After four years of the transition from MDGs to SDGs, most of the services are poorly satisfying the residents of the Rupsha slum, and water service provision is in worse condition. The findings of this study have unveiled that while achievement in target areas is appreciable at the macro level, at the micro-level; however, good achievement in the provision of few basic services in the low-income settlement is more rhetoric than reality. Therefore, a lot more work needs to be done during the SDG phase to give the slum residents a decent quality of life as they have missed the MDGs’ train.

Originality/value

Study single-out works need to be done during the SDGs phase to give the slum residents a decent quality of life as they have missed the MDGs’ train.

Details

Journal of Humanities and Applied Social Sciences, vol. 4 no. 1
Type: Research Article
ISSN:

Keywords

Open Access
Article
Publication date: 13 February 2024

Kaisu Laitinen, Mika Luhtala, Maiju Örmä and Kalle Vaismaa

Insufficient productivity development in the global and Finnish infrastructure sectors indicates that there are challenges in genuinely achieving the goals of resource efficiency…

1011

Abstract

Purpose

Insufficient productivity development in the global and Finnish infrastructure sectors indicates that there are challenges in genuinely achieving the goals of resource efficiency and digitalization. This study adapts the approach of capability maturity model integration (CMMI) for examining the capabilities for productivity development that reveal the enablers of improving productivity in the infrastructure sector.

Design/methodology/approach

Civil engineering in Finland was selected as the study area, and a qualitative research approach was adopted. A novel maturity model was constructed deductively through a three-step analytical process. Previous research literature was adapted to form a framework with maturity levels and key process areas (KPAs). KPA attributes and their maturity criteria were formed through a thematic analysis of interview data from 12 semi-structured group interviews. Finally, validation and refinement of the model were performed with an expert panel.

Findings

This paper provides a novel maturity model for examining and enhancing the infrastructure sector’s maturity in productivity development. The model brings into discussion the current business logics, relevance of lifecycle-thinking, binding targets and outcomes of limited activities in the surrounding infrastructure system.

Originality/value

This paper provides a new approach for pursuing productivity development in the infrastructure sector by constructing a maturity model that adapts the concepts of CMMI and change management. The model and findings benefit all actors in the sector and provide an understanding of the required elements and means to achieve a more sustainable built environment and effective operations.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 25 December 2023

James Kanyepe and Nyarai Kasambuwa

The purpose of this study is to investigate the influence of institutional dynamics on road accidents and whether this relationship is moderated by information and communication…

Abstract

Purpose

The purpose of this study is to investigate the influence of institutional dynamics on road accidents and whether this relationship is moderated by information and communication technology (ICT).

Design/methodology/approach

The study adopted a quantitative approach with 133 respondents. Research hypotheses were tested in AMOS version 21. In addition, moderated regression analysis was used to test the moderating role of ICT on the relationship between institutional dynamics and road accidents.

Findings

The results show that vehicle maintenance, policy enforcement, safety culture, driver training and driver management positively influence road accidents. Moreover, the study established that ICT moderates the relationship between institutional dynamics and road accidents.

Practical implications

The results of this study serve as a practical guideline for policymakers in the road haulage sector. Managers may gain insights on how to design effective interventions to reduce road accidents.

Originality/value

This research contributes to the existing body of knowledge by exploring previously unexplored moderating paths in the relationship between institutional dynamics and road accidents. By highlighting the moderating role of ICT, the study sheds new light on the institutional dynamics that influence road accidents in the context of road haulage companies.

Details

Journal of Humanities and Applied Social Sciences, vol. 6 no. 1
Type: Research Article
ISSN: 2632-279X

Keywords

Open Access
Article
Publication date: 11 May 2017

Rizwana Shaheen Hussain, Kirti Ruikar, Marcus P. Enoch, Nigel Brien and David Gartside

Diminishing local government budgets and the need to reduce highway works activities necessitate cost effective and efficient processes. The purpose of this paper is to…

6654

Abstract

Purpose

Diminishing local government budgets and the need to reduce highway works activities necessitate cost effective and efficient processes. The purpose of this paper is to investigate streamlining road works administrative processes to enhance coordinated working at Derby City Council.

Design/methodology/approach

Case study research of a local authority was undertaken using business process mapping. Specifically, Swimlane analysis enabled re-engineering of business processes from design stage, to works permit issuance. Process improvement recommendations were validated by nine industry experts through a focus group and semi-structured interviews. A logic map was developed for transferability to other councils, identifying key attributes for a successful administrative road works management process.

Findings

Research revealed inherent silo working and processes built around fragmented IT systems creating process inefficiency. Validation found numerous practices and management styles were culturally embedded and common across councils. Peer reviewed recommendations are made to improve working practices, including improving IT systems, removing process bottlenecks, and training staff.

Research limitations/implications

Whilst road works management policy is generally under-researched, its strategic and negative impacts are widely acknowledged. This study highlights the day-to-day operational problems which are interconnected to the strategic impact, bridging an important gap in knowledge, as well as adding to business process re-engineering literature.

Originality/value

The research adds to a limited body of road works management policy research, and also presents a high-level logic map for councils to adopt as appropriate.

Details

Built Environment Project and Asset Management, vol. 7 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords