Search results

1 – 10 of 50
Open Access
Article
Publication date: 29 April 2024

Linda Salma Angreani, Annas Vijaya and Hendro Wicaksono

A maturity model for Industry 4.0 (I4.0 MM) with influencing factors is designed to address maturity issues in adopting Industry 4.0. Standardisation in I4.0 supports…

43

Abstract

Purpose

A maturity model for Industry 4.0 (I4.0 MM) with influencing factors is designed to address maturity issues in adopting Industry 4.0. Standardisation in I4.0 supports manufacturing industry transformation, forming reference architecture models (RAMs). This paper aligns key factors and maturity levels in I4.0 MMs with reputable I4.0 RAMs to enhance strategy for I4.0 transformation and implementation.

Design/methodology/approach

Three steps of alignment consist of the systematic literature review (SLR) method to study the current published high-quality I4.0 MMs, the taxonomy development of I4.0 influencing factors by adapting and implementing the categorisation of system theories and aligning I4.0 MMs with RAMs.

Findings

The study discovered that different I4.0 MMs lead to varied organisational interpretations. Challenges and insights arise when aligning I4.0 MMs with RAMs. Aligning MM levels with RAM stages is a crucial milestone in the journey toward I4.0 transformation. Evidence indicates that I4.0 MMs and RAMs often overlook the cultural domain.

Research limitations/implications

Findings contribute to the literature on aligning capabilities with implementation strategies while employing I4.0 MMs and RAMs. We use five RAMs (RAMI4.0, NIST-SME, IMSA, IVRA and IIRA), and as a common limitation in SLR, there could be a subjective bias in reading and selecting literature.

Practical implications

To fully leverage the capabilities of RAMs as part of the I4.0 implementation strategy, companies should initiate the process by undertaking a thorough needs assessment using I4.0 MMs.

Originality/value

The novelty of this paper lies in being the first to examine the alignment of I4.0 MMs with established RAMs. It offers valuable insights for improving I4.0 implementation strategies, especially for companies using both MMs and RAMs in their transformation efforts.

Details

Journal of Manufacturing Technology Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-038X

Keywords

Open Access
Article
Publication date: 27 February 2024

Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…

Abstract

Purpose

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.

Design/methodology/approach

Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.

Findings

The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.

Originality/value

Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 1 December 2023

Lina Gharaibeh, Sandra Matarneh, Kristina Eriksson and Björn Lantz

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on…

Abstract

Purpose

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on examining the extent, maturity and actual practices of BIM in the Swedish wood construction industry, by analysing practitioners’ perspectives on the current state of BIM and its perceived benefits.

Design/methodology/approach

A qualitative approach was selected, given the study’s exploratory character. Initially, an extensive review was undertaken to examine the current state of BIM utilisation and its associated advantages within the construction industry. Subsequently, empirical data were acquired through semi-structured interviews featuring open-ended questions, aimed at comprehensively assessing the prevailing extent of BIM integration within the Swedish wood construction sector.

Findings

The research concluded that the wood construction industry in Sweden is shifting towards BIM on different levels, where in some cases, the level of implementation is still modest. It should be emphasised that the wood construction industry in Sweden is not realising the full potential of BIM. The industry is still using a combination of BIM and traditional methods, thus, limiting the benefits that full BIM implementation could offer the industry.

Originality/value

This study provided empirical evidence on the current perceptions and state of practice of the Swedish wood construction industry regarding BIM maturity.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 28 June 2022

Sahar Jawad, Ann Ledwith and Rashid Khan

There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and…

1644

Abstract

Purpose

There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and successfully achieving project objectives has yet to be explored. This research investigates the enablers and barriers that influence the elements of PCS success and drive project objectives.

Design/methodology/approach

This study adopts a mixed approach of descriptive analysis and regression models to explore the impact of six PCS elements on project outcomes. Petroleum and chemical projects in Saudi Arabia were selected as a case study to validate the research model.

Findings

Data from a survey of 400 project managers in Saudi’s petroleum and chemical industry reveal that successful PCS are the key to achieving all project outcomes, but they are particularly critical for meeting project cost objectives. Project Governance was identified as the most important of the six PCS elements for meeting project objectives. A lack of standard processes emerged as the most significant barrier to achieving effective project governance, while having skilled and experienced project team members was the most significant enabler for implementing earned value.

Practical implications

The study offers a direction for implementing and developing PCS as a strategic tool and focuses on the PCS elements that can improve project outcomes.

Originality/value

This research contributes to project management knowledge and differs from previous attempts in two ways. Firstly, it investigates the elements of PCS that are critical to achieving project scope, schedule and cost objectives; secondly, enablers and barriers of PCS success are examined to see how they influence each element independently.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 12 April 2024

Aleš Zebec and Mojca Indihar Štemberger

Although businesses continue to take up artificial intelligence (AI), concerns remain that companies are not realising the full value of their investments. The study aims to…

Abstract

Purpose

Although businesses continue to take up artificial intelligence (AI), concerns remain that companies are not realising the full value of their investments. The study aims to provide insights into how AI creates business value by investigating the mediating role of Business Process Management (BPM) capabilities.

Design/methodology/approach

The integrative model of IT Business Value was contextualised, and structural equation modelling was applied to validate the proposed serial multiple mediation model using a sample of 448 organisations based in the EU.

Findings

The results validate the proposed serial multiple mediation model according to which AI adoption increases organisational performance through decision-making and business process performance. Process automation, organisational learning and process innovation are significant complementary partial mediators, thereby shedding light on how AI creates business value.

Research limitations/implications

In pursuing a complex nomological framework, multiple perspectives on realising business value from AI investments were incorporated. Several moderators presenting complementary organisational resources (e.g. culture, digital maturity, BPM maturity) could be included to identify behaviour in more complex relationships. The ethical and moral issues surrounding AI and its use could also be examined.

Practical implications

The provided insights can help guide organisations towards the most promising AI activities of process automation with AI-enabled decision-making, organisational learning and process innovation to yield business value.

Originality/value

While previous research assumed a moderated relationship, this study extends the growing literature on AI business value by empirically investigating a comprehensive nomological network that links AI adoption to organisational performance in a BPM setting.

Open Access
Article
Publication date: 18 May 2023

Anna Trubetskaya, Alan Ryan and Frank Murphy

This paper aims to introduce a model using a digital twin concept in a cold heading manufacturing and develop a digital visual management (VM) system using Lean overall equipment…

4999

Abstract

Purpose

This paper aims to introduce a model using a digital twin concept in a cold heading manufacturing and develop a digital visual management (VM) system using Lean overall equipment effectiveness (OEE) tool to enhance the process performance and establish Fourth Industrial Revolution (I4.0) platform in small and medium enterprises (SMEs).

Design/methodology/approach

This work utilised plan, do, check, act Lean methodology to create a digital twin of each machine in a smart manufacturing facility by taking the Lean tool OEE and digitally transforming it in the context of I4.0. To demonstrate the effectiveness of process digitisation, a case study was carried out at a manufacturing department to provide the data to the model and later validate synergy between Lean and I4.0 platform.

Findings

The OEE parameter can be increased by 10% using a proposed digital twin model with the introduction of a Level 0 into VM platform to clearly define the purpose of each data point gathered further replicate in projects across the value stream.

Research limitations/implications

The findings suggest that researchers should look beyond conversion of stored data into visualisations and predictive analytics to improve the model connectivity. The development of strong big data analytics capabilities in SMEs can be achieved by shortening the time between data gathering and impact on the model performance.

Originality/value

The novelty of this study is the application of OEE Lean tool in the smart manufacturing sector to allow SME organisations to introduce digitalisation on the back of structured and streamlined principles with well-defined end goals to reach the optimal OEE.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 22 September 2022

Samuel Foli, Susanne Durst and Serdal Temel

Acknowledging, on the one hand, the increasing fragility of supply chains and the number of risks involved in supply chain operations and, on the other hand, the role of small…

2862

Abstract

Purpose

Acknowledging, on the one hand, the increasing fragility of supply chains and the number of risks involved in supply chain operations and, on the other hand, the role of small- and medium-sized enterprises (SMEs) in supply chains and the high exposure of these firms to risks of different types, this study aims to examine the relationship between supply chain risk management (SCRM) and innovation performance in SMEs. Furthermore, the impact of technological turbulence on this relationship was studied to take into account recent technological changes.

Design/methodology/approach

Structural equation modelling was carried out on a sample of Turkish SMEs to test the hypotheses developed.

Findings

The findings presented allow the authors to better understand the link between SCRM and innovation performance in SMEs. More precisely, empirical evidence is provided about the impact of SCRM components such as maturity and ability on innovation performance. Furthermore, the findings show the impact of technological turbulence on both SCRM and innovation performance.

Originality/value

By focusing on SCRM in SMEs, this paper contributes to the body of knowledge with regard to SCRM in general and with regard to SMEs in particular; research on the latter has only started recently. Moreover, by having studied SMEs from a developing country (other than China), this paper helps to develop a broader and more diverse perspective of SCRM.

Details

Journal of Entrepreneurship in Emerging Economies, vol. 16 no. 3
Type: Research Article
ISSN: 2053-4604

Keywords

Content available
Book part
Publication date: 27 May 2024

Angelo Corelli

Abstract

Details

Understanding Financial Risk Management, Third Edition
Type: Book
ISBN: 978-1-83753-253-7

Open Access
Article
Publication date: 18 December 2023

Francesca Ferrè

Value-based healthcare suggested using patient-reported information to complement the information available in the medical records and administrative healthcare data to provide…

Abstract

Purpose

Value-based healthcare suggested using patient-reported information to complement the information available in the medical records and administrative healthcare data to provide insights into patients' perceptions of satisfaction, experience and self-reported outcomes. However, little attention has been devoted to questions about factors fostering the use of patient-reported information to create value at the system level.

Design/methodology/approach

Action research design is carried out to elicit possible triggers using the case of patient-reported experience and outcome data for breast cancer women along their clinical pathway in the clinical breast network of Tuscany (Italy).

Findings

The case shows that communication and engagement of multi-stakeholder representation are needed for making information actionable in a multi-level, multispecialty care pathway organized in a clinical network; moreover, political and managerial support from higher level governance is a stimulus for legitimizing the use for quality improvement. At the organizational level, an external facilitator disclosing and discussing real-world uses of collected data is a trigger to link measures to action. Also, clinical champion(s) and clear goals are key success factors. Nonetheless, resource munificent and dedicated information support tools together with education and learning routines are enabling factors.

Originality/value

Current literature focuses on key factors that impact performance information use often considering unidimensional performance and internal sources of information. The use of patient/user-reported information is not yet well-studied especially in supporting quality improvement in multi-stakeholder governance. The work appears relevant for the implications it carries, especially for policymakers and public sector managers when confronting the gap in patient-reported measures for quality improvement.

Details

The TQM Journal, vol. 36 no. 9
Type: Research Article
ISSN: 1754-2731

Keywords

Open Access
Article
Publication date: 14 June 2022

Samuel Adeniyi Adekunle, Clinton Ohis Aigbavboa and Obuks Augustine Ejohwomu

The implementation of BIM in the construction industry requires the coevolution of the various aspects of the BIM ecosystem. The human dimension is a very important dimension of…

1628

Abstract

Purpose

The implementation of BIM in the construction industry requires the coevolution of the various aspects of the BIM ecosystem. The human dimension is a very important dimension of the ecosystem necessary for BIM implementation. It is imperative to study this aspect of the BIM ecosystem both from the employer perspective and employee availability to provide insights for stakeholders (job seekers, employers, students, researchers, policymakers, higher education institutions, career advisors and curriculum developers) interested in the labour market dynamics.

Design/methodology/approach

To understand the BIM actor roles through the employer lens and the actual BIM actors in the construction industry, this study employed data mining of job adverts from LinkedIn and Mncjobs website. Content analysis was employed to gain insights into the data collected. Also, through a quantitative approach, the existing BIM actor roles were identified.

Findings

The study identified the employers' expectations of BIM actors; however, it is noted that the BIM actor recruitment space is still a loose one as recruiters put out open advertisements to get a large pool of applicants. From the data analysed, it is concluded that the BIM actor role is not an entirely new profession. However, it simply exists as construction industry professionals with BIM tool skills. Also, the professional development route is not well defined yet.

Originality/value

This study presents a realistic angle to BIM actor roles hence enhancing BIM implementation from the human perspective. The findings present an insight into the preferred against the actual.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Access

Only content I have access to

Year

Last week (50)

Content type

1 – 10 of 50