Search results

1 – 10 of 181
Article
Publication date: 8 March 2022

Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu and David John Edwards

In comparison to other countries, power generation in Sub-Saharan Africa is poor. The demand for power has surged in recent times and continues to increase at a fast rate. The…

Abstract

Purpose

In comparison to other countries, power generation in Sub-Saharan Africa is poor. The demand for power has surged in recent times and continues to increase at a fast rate. The public–private partnership (PPP) model has been identified as an option to address the challenges in the power sector. The purpose of this research paper is to critically explore the reasons for entering into PPP power projects in Ghana by the public and private parties.

Design/methodology/approach

Questionnaires were used to elicit responses from respondents using a two-round Delphi survey. From 60 respondents contacted in round one, 48 responses were obtained, and these 48 respondents further took part in round two. Mean score ranking was used to rank the reasons for entering into PPP power projects, while analysis of variance (ANOVA) was run to test significant difference in perceptions among the respondents.

Findings

From round 2 of the Delphi survey, the significant reasons for public sector entering into PPP power projects were as follows: achieving improved value for money, access to additional capital, increased certainty of projects and greater efficiency of project delivery services. For private sector, most significant reasons were as follows: obtaining of investment support, improvement in private sector’s international image and synergy with public sector. From ANOVA analysis, there were significant different perceptions among some of factors on the respondent profile variables and the reasons for entering into PPP power projects, while other factors did not have significant different perception.

Originality/value

Significant reasons for both public and private sectors identified would be incorporated by the government when PPP policy guidelines and laws are reviewed. This will aid in the effective implementation of PPP for power projects.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 14 September 2022

Bingsheng Liu, Juankun Li, Dan Wang, Henry Liu, Guangdong Wu and Jingfeng Yuan

This study aims to develop a collaborative governance framework (CGF) to systematically investigate the impeding factors (IFs) in terms of the operational sustainability of PPPs…

Abstract

Purpose

This study aims to develop a collaborative governance framework (CGF) to systematically investigate the impeding factors (IFs) in terms of the operational sustainability of PPPs. It examines the transmission pattern (i.e. the way in which network members react to each other) of the IFs network.

Design/methodology/approach

Literature review and interview were adopted to identify the IFs. Then, with the data collected from the interview in China, the social network analysis and interpretive structure model were synergised to examine the chain reaction, driving and dependent powers, and hierarchical structure of the identified IFs.

Findings

The results reveal that the cognition, institutional, financial and participation aspects are key barriers confronted by PPP sustainability, and the government plays a leading role in controlling factors causing sustainability-related problems in PPPs. Weak government leadership and institutional environment were identified as the most fundamental reasons triggering a chain of IFs, while project governance and management activities act as bridge nodes that play an intermediary role in the IFs network.

Research limitations/implications

This research contributes to the literature on PPP governance by (1) bridging the literature gap through the development of CGF for explaining the governance of PPP sustainability with a holistic view that considers both macro environment and operational project processes; and (2) identifying the transmission pattern of IFs network which uncovers the underlying dynamics causing the unsustainable operation of PPPs.

Practical implications

This research provides practitioners with a list of key checkpoints for preventing failure escalation, enables decision-makers to prioritise obstacle-mitigation efforts and develop a feasible process to control PPP operation, and offers management countermeasures to remove the key barriers impeding PPP sustainability.

Originality/value

This study is novel for adopting network-oriented techniques to quantify the relative importance of the IFs and examine the transmission pattern of the IFs system. Therefore, it visualises the complex underlying dynamics causing unsustainable PPP operation, identifies root and direct causes of PPP failures, and provides decision-makers with insights into sustaining PPP sustainability from a network-oriented perspective.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 17 October 2023

Sajida and Bevaola Kusumasari

This paper aims to identify the factors affecting the implementation of Public-Private Partnerships (PPPs) in the education sector.

2192

Abstract

Purpose

This paper aims to identify the factors affecting the implementation of Public-Private Partnerships (PPPs) in the education sector.

Design/methodology/approach

Based on Scopus and adopting the protocol of Staples and Niazi (2007), this systematic literature review examined 21 articles on PPPs in the education sector. Content analysis is adopted to identify research gaps and provide information on critical issues in the cases.

Findings

The findings have identified the critical success factors of PPPs in the education sector in 12 countries, revealing varying degrees of success and implementation challenges. They reflect the importance of clear objectives, effective communication, and robust partnerships between the public and private sectors to achieve success. These insights contribute to an in-depth understanding of PPP implementation in education, which can guide future projects.

Originality/value

The critical success factors identified in PPPs implementation in education across various countries may provide a comprehensive worldwide perspective for researchers, practitioners and policymakers.

Details

Public Administration and Policy, vol. 26 no. 3
Type: Research Article
ISSN: 1727-2645

Keywords

Article
Publication date: 24 November 2023

Yongjian Ke, Zhe Cheng, Jingxiao Zhang and Yong Liu

Despite the widespread study and application of public-private partnerships (PPPs) since the 1980s, the field lacks a universally accepted definition that captures the concept's…

Abstract

Purpose

Despite the widespread study and application of public-private partnerships (PPPs) since the 1980s, the field lacks a universally accepted definition that captures the concept's complexity. This study aims to offer a definition and foster a more substantive and comprehensive discourse on PPPs to improve communication and understanding between academics and practitioners from diverse disciplines and legislative backgrounds.

Design/methodology/approach

Grounded in the family-resemblance concept proposed by German philosopher Ludwig Wittgenstein, this study conducts a comprehensive literature review to identify core and non-core elements frequently cited in PPP descriptions. The authors used these findings to develop the PPP sunflower model as a structured framework for defining PPPs.

Findings

The analysis elucidates six core elements consistently present in PPP descriptions: clarity of roles and responsibilities, appropriate risk allocation and sharing, injection of expertise and resources, cooperation and teamwork, a bundle of services, and long-term contracts. Coupled with identified non-core elements, these core components comprise the PPP sunflower model, a structured framework for defining PPPs that accommodates their multi-faceted nature.

Originality/value

The PPP sunflower model distinguishes itself as a unique contribution to the PPP literature. It offers a rigorous theoretical framework that can elucidate the complexity of PPPs for various stakeholders. The model serves as a practical tool for evaluating the authenticity and viability of PPP projects. The study's novelty lies in its adoption of the family-resemblance concept, thereby providing a comprehensive, multi-dimensional framework that enhances the understanding of PPPs across different disciplines and legislative contexts.

Details

Built Environment Project and Asset Management, vol. 14 no. 1
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 12 July 2023

Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu, David J. Edwards and Eric Asamoah

Public-private partnership (PPP) power projects are associated with varying risk factors. This paper aims to develop a fuzzy quantitative risk allocation model (QRAM) to guide…

Abstract

Purpose

Public-private partnership (PPP) power projects are associated with varying risk factors. This paper aims to develop a fuzzy quantitative risk allocation model (QRAM) to guide decision-making on risk allocation in PPP power projects in Ghana.

Design/methodology/approach

A total of 67 risk factors and 9 risk allocation criteria were established from literature and ranked in a two-round Delphi survey using questionnaires. The fuzzy synthetic evaluation method was used in developing the risk allocation model.

Findings

The model’s output variable is the risk allocation proportions between the public body and private body based on their capability to manage the risk factors. Out of the 37 critical risk factors, the public sector was allocated 12 risk factors with proportions = 50%, while the private sector was allocated 25 risk factors with proportions = 50%.

Originality/value

To the best of the authors’ knowledge, this research presents the first attempt in Ghana at endeavouring to develop a QRAM for PPP power projects. There is confidence in the model to efficiently allocate risks emanating from PPP power projects.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 15 December 2023

Zehui Bu, Jicai Liu and Jiaqi Liu

Emotions, understood as evolving mental states, are pivotal in shaping individuals“' decision-making, especially in ambiguous information evaluation, probability estimation of…

Abstract

Purpose

Emotions, understood as evolving mental states, are pivotal in shaping individuals“' decision-making, especially in ambiguous information evaluation, probability estimation of events, and causality analysis. Public–private partnership (PPP) projects represent a confluence of “economic–environmental–social” dimensions, wherein stakeholder behavior follows the sequential progression of “cognition–emotion–action.” Consequently, comprehending the effects of emotional shifts on stakeholder's decision-making processes is vital to fostering the sustainability of PPP projects.

Design/methodology/approach

The paper utilizes rank-dependent expected utility and evolutionary game theory to systematically examine the influence of emotional factors on stakeholders' behavior and decision-making processes within PPP projects. The paper integrates three emotional state functions—optimism, pessimism and rationality—into the PPP framework, highlighting the intricate interactions among the government, private sector, surrounding public and the media. Furthermore, the paper amalgamates the evolutionary pathways of environmental rights incidents with the media's role. Through equilibrium analysis and numerical simulation, the paper delves into the diverse interplay of emotions across different phases of the environmental rights incident, assessing the impact of these emotions on the evolutionary game's equilibrium results.

Findings

Emotions significantly influence the microlevel decisions of PPP stakeholders, adapting continually based on event dynamics and media influences. When the private sector demonstrates optimism and the surrounding public leans toward rationality or pessimism, the likelihood of the private sector engaging in speculative behavior escalates, while the surrounding public refrains from adopting a supervisory strategy. Conversely, when the private sector is pessimistic and the public is optimistic, the system fails to evolve a stable strategy. However, when government regulation intensifies, the private sector opts for a nonspeculative strategy, and the surrounding public adopts a supervisory strategy. Under these conditions, the system attains a relatively optimal state of equilibrium.

Originality/value

The paper develops a game model to examine the evolutionary dynamics between the surrounding public and private sectors concerning environmental rights protection in waste incineration PPP projects. It illuminates the nature of the conflicting interests among project participants, delves into the impact of emotional factors on their decision-making processes and offers crucial perspectives for the governance of such partnerships. Furthermore, this paper provides substantive recommendations for emotional oversight to enhance governance efficacy.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 April 2023

Lachlan McDonald-Kerr and Gordon Boyce

The purpose of this paper is to investigate public disclosures and accountability for government decision-making in the case of a major prison project delivered through a…

Abstract

Purpose

The purpose of this paper is to investigate public disclosures and accountability for government decision-making in the case of a major prison project delivered through a Public–Private Partnership (PPP) in the State of Victoria (Australia).

Design/methodology/approach

The study explores a unique case to provide insights into public disclosures for PPPs in a jurisdiction that is a recognised leader in PPP policy and practice. The analysis is theoretically framed by an understanding of neoliberalism and New Public Management, and draws on data from case-specific reporting, media reporting and public policy, to examine interconnections between accounting, public discourse and accountability.

Findings

The analysis shows how publicly available information relating to key government decisions routinely lacked supporting evidence or explanation, even though areas of subjectivity were recognised in public policy. Accounting was deployed numerically and discursively to present potentially contestable decisions as being based on common-sense “facts”. The implied “truth” status of government reporting is problematised by media disclosure of key issues absent from government disclosures.

Social implications

Under neoliberalism, accountingisation can help depoliticise the public sphere and limit discourse by constructing ostensible “facts” in an inherently contestable arena. By contrast, democratic accountability requires public disclosures that infuse a critical dialogical public sphere.

Originality/value

The paper shows how neoliberalism can be embedded in public policies and institutional practices, and buttressed by the use of accounting. The analysis illuminates the persistence and “failing forward” character of neoliberalism, whereby crises are addressed through further neoliberalisation.

Details

Accounting, Auditing & Accountability Journal, vol. 37 no. 1
Type: Research Article
ISSN: 0951-3574

Keywords

Article
Publication date: 28 June 2022

Robert Osei-Kyei, Timur Narbaev, Michael Atafo-Adabre, Nicholas Chileshe and Joseph Kwame Ofori-Kuragu

The demand for retirement villages globally has been increasing due to the rapid growth in the ageing population in recent years. To address the rising challenges in the…

Abstract

Purpose

The demand for retirement villages globally has been increasing due to the rapid growth in the ageing population in recent years. To address the rising challenges in the retirement market, the public–private partnership (PPP) has become a feasible method to develop retirement villages. This paper aims to survey and examine the key success criteria (SC) for using the PPP approach in the retirement village sector.

Design/methodology/approach

An empirical questionnaire survey was conducted with experts experienced in international PPP and retirement village. The analysis was conducted using one-way analysis of variance, mean score analysis, Kendall’s coefficient of concordance and factor analysis.

Findings

Results indicate that out of the 16 recognized SC, the most significant ones are SC1: “Affordability”, SC11: “Reduced social isolation of residents” and SC14: “Improvement of emotional wellbeing of residents”. Furthermore, results from the factor analysis technique indicate that the 16 SC can be classified into five major factor groupings, and these include SCG1 – “Financial performance of project”; SCG2 – “Adherence to design and technical specifications”; SCG3 – “Adherence to local council/authority’s environmental health and socio-economic requirements”; SCG4 – “Social inclusion and risk management”; and SCG5 – “Advancement in emotional wellbeing and physical health of residents”.

Originality/value

The study will sufficiently assist retirement village stakeholders, retirement village project participants and related government authorities of the best measures to put in place to maintain the sustainable development of the global retirement village market.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 16 September 2022

Ali Mohammad Mirzaee, Towhid Pourrostam, Javad Majrouhi Sardroud, M. Reza Hosseini, Payam Rahnamayiezekavat and David Edwards

Public–private partnerships (PPPs) are notoriously prone to disputes among stakeholders, some of which may unduly jeopardize contract performance. Contract disputes arising in…

Abstract

Purpose

Public–private partnerships (PPPs) are notoriously prone to disputes among stakeholders, some of which may unduly jeopardize contract performance. Contract disputes arising in Iran are often due to inefficiency of PPP concession agreements and practice. This study presents a causal-predictive model of the root causes and preventive measures for inter-organization disputes to enhance the likelihood of achieving desirable performance in PPP projects.

Design/methodology/approach

A theoretical “causal-predictive” model was developed with fourteen hypotheses based on extant literature and contractual agency theory, which resulted in the creation of a pool of 110 published items. Data were obtained from a questionnaire survey with 75 valid responses, completed by 4 stratified groups of Iranian PPP experts. Partial least square structural equation modeling (PLS-SEM) was used for validating the proposed model via a case study.

Findings

Results reveal that the main three factors of PPP desirable performance are as follows: on-time project completion, high quality of activities/products and services for public satisfaction. Further, the most influential factors of the lifecycle problems, construction stage, and preferred risk allocation included risk misallocation, improper payment mechanism and failure to facilitate a timely approval process.

Originality/value

For researchers, the findings contribute to the theory of contractual agency; specifically, how different influences among the model's elements lead to better PPP performance. In practical terms, proposed outcome-based strategies will inform PPP stakeholders to avoid dispute occurrence and thus improve the time, quality and services of projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 March 2023

Isaac Akomea-Frimpong, Xiaohua Jin, Robert Osei-Kyei and Fatemeh Pariafsai

Public–private partnership (PPP), a project financing arrangement between private investors and the public sector, has revolutionized the approach to the funding and development…

Abstract

Purpose

Public–private partnership (PPP), a project financing arrangement between private investors and the public sector, has revolutionized the approach to the funding and development of public infrastructure worldwide. However, the increasing cases of financial risks and poor financial risk management related to the model threaten the sustainability and financial success of PPP projects leading to huge financial investment losses. This study aims to review existing literature to establish the key measures to control the financial risks of sustainable PPP projects.

Design/methodology/approach

A PRISMA-compliant systematic literature review method was used in this study. Data were sourced from academic databases consisting of 56 impactful peer-reviewed journal articles.

Findings

The review outcomes demonstrate 41 critical factors (measures) in mitigating the financial risks of sustainable PPP projects. They include minimum revenue guarantee, strategic alliance with private investors, financial transparency and accountability and sound macroeconomic policies. The principal results of the study were categorized and conceptualized into a financial risk management maturity model for sustainable PPP projects. Lastly, the study reveals that further studies and project policies must focus more on addressing financial challenges relating to climate risks, and health and safety concerns such as COVID-19 outbreak that have negative impacts on PPP projects.

Research limitations/implications

The results provide essential research gaps and directions for future studies on measures to mitigate the financial risks of sustainable PPP projects. However, this study used small but significant existing publications.

Practical implications

A checklist and a conceptual maturity model are provided in this study to help practitioners to learn and improve upon their practices to mitigate the financial risks of sustainable PPP projects.

Originality/value

This study contributes to managerial measures to reduce huge losses in financial investments of PPP projects and the attainment of sustainability in public infrastructure projects with a financial risk maturity model.

Details

Journal of Financial Management of Property and Construction , vol. 28 no. 3
Type: Research Article
ISSN: 1366-4387

Keywords

1 – 10 of 181