Article
Publication date: 2 March 2023

B.H.V.H. Jayamaha, B.A.K.S. Perera, K.D.M. Gimhani and M.N.N. Rodrigo

Enterprise resource planning (ERP) systems that are equipped with numerous features and functionalities help to improve the profitability of construction corporations around the…

Abstract

Purpose

Enterprise resource planning (ERP) systems that are equipped with numerous features and functionalities help to improve the profitability of construction corporations around the world through enhancing the efficiency of the functions related to cost management. Thus, the purpose of this study was to investigate the applicability of ERP systems for cost management of building construction projects in Sri Lanka.

Design/methodology/approach

A qualitative technique was used in this study, which comprised two-round Delphi-based semistructured interviews. Purposive sampling was used to determine the interviewees. Content analysis was used to evaluate the collected data.

Findings

The findings of this study identified the ERP system as a strategic tool for gaining a competitive advantage for an organization while confirming 14 uses of ERP systems and 16 stages of the cost management process. Eighteen issues were finalized at the end of the interview rounds while categorizing the suitable ERP applications at each stage of the cost management process.

Originality/value

Even though there are numerous distinct studies conducted on cost management and ERP systems, there has been a lack of studies conducted on the synergy between these two areas that can be adapted for the building projects in the Sri Lankan context. Therefore, the findings of this study can bring a new paradigm to the Sri Lankan construction sector by influencing the adaption of correct ERP systems at numerous project stages by providing a competitive edge.

Details

Construction Innovation , vol. 24 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 26 June 2023

Petter Haglund and Mats Janné

The construction industry shows an increased interest in how to manage logistics within construction projects. Often construction logistics is outsourced to a logistics service…

1501

Abstract

Purpose

The construction industry shows an increased interest in how to manage logistics within construction projects. Often construction logistics is outsourced to a logistics service provider (LSP). However, construction logistics is normally approached either as a strategic decision or as an operational issue and rarely as a tactical concern. The purpose of this study is to explore how to organize the logistics outsourcing decision at strategic, tactical and operational levels.

Design/methodology/approach

This study is performed as a single-case study within a construction corporation, containing (amongst others) a building contractor (BC) and a construction equipment rental company (CERC) offering logistics services.

Findings

The study shows that to procure construction logistics service successfully, BCs need logistics capabilities at strategic and tactical levels to maintain an alignment between the use of logistics services and operational characteristics. Simultaneously, CERC’s need to design their service offerings to correspond to the needs of the BC.

Research limitations/implications

This study builds on a single-case study of a Swedish construction corporation. Further research is needed to better understand current logistics outsourcing and development practices and how these can be improved to foster better logistics management at the project level.

Practical implications

BCs find suggestions of different logistics organization structures and suitable outsourcing arrangements. CERCs and LSPs can use the findings to understand their customers’ needs and adapt service offerings.

Originality/value

To the best of the authors’ knowledge, this study is one of the first studies of how two companies within a corporation can work together to develop construction logistics service offerings.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 31 May 2022

Kari-Pekka Tampio and Harri Haapasalo

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in…

1304

Abstract

Purpose

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in practical projects. The main aim is to describe how these different methods impact value creation.

Design/methodology/approach

Action design research was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the second author acted as an “outside researcher”. Two workshops were organised to evaluate the direct and indirect challenges and benefits of the applied four methods and to explain how different methods enable value creation.

Findings

All the studied methods provide good results in terms of usability and commitment to the aims of the project, thus delivering the direct benefits expected. Process, people and tools logic works well in this case project when applying the methods properly. Significant evidence was provided on secondary deliverables of the methods, and all analysed methods had a significant impact in the area of leading people, clarifying what “focus on people” means and how it is enabled.

Practical implications

Focus on people can be achieved through different operative methods if applied in the right way. It is necessary to select the most suitable methods based on all the direct and indirect deliverables.

Originality/value

This case project offered a platform to analyse integration methods in a real-life project using the collaborative contract method. The authors were able to participate in the analysis by taking action from the very beginning of the project in terms of training, learning, continuous development and coaching of these methods and evaluating the applicability.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 16 May 2024

Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva

The sustainability of the construction industry is associated with the productivity, profitability and competitiveness of the firms, which are significantly affected by…

1111

Abstract

Purpose

The sustainability of the construction industry is associated with the productivity, profitability and competitiveness of the firms, which are significantly affected by inefficient site supervision and labour management approaches. This study aims to use a case study with mixed methods to evaluate the site supervisory characteristics in labour management, labour performance assessment and labour productivity measurement towards developing meaningful guidelines in polishing construction supervision attributes.

Design/methodology/approach

Well-developed modern apprenticeship elements were applied to 62 construction supervisors who were selected using the snowball sampling method, and their relevant competency characteristics were assessed using a comprehensively developed grading mechanism connected with useful training manuals/tools. Academic reviews, experts’ consultations and other meticulous mixed approaches were applied at different stages of the research plan’s sequential layout.

Findings

The mean performance scores of supervisors indicate proficient-level grades in the competency characteristics related to applying efficient labour management procedures and developing-level grades in designing productivity measurement tools, performing assessments on efficiency and productivity and proposing enhancement practices on efficiency and productivity for site operations. The findings point to a modern generalised guideline that establishes the ranges of supervisory attributes within the scope of the study. The validity, reliability, adaptability and generalisability of the findings were assured by using pertinent statistical tests and professional assessments.

Research limitations/implications

Though the study’s conclusions/findings are primarily applicable to the construction environment of a developing country comparable to the Sri Lankan context, they will considerably impact current/future industrial practices in various other countries and emerging industries.

Originality/value

The research has produced a conceptualised modern tool that guides determining the capacity levels of supervisory attributes for carrying out labour management, labour performance assessment and labour productivity measurement aspects in construction. The research has opened a pump that inflows new values of highly workable supervision features for strengthening the site management structures and filling the industry’s knowledge vacuum in the methodical execution of apprenticeships.

Details

Journal of Responsible Production and Consumption, vol. 1 no. 1
Type: Research Article
ISSN: 2977-0114

Keywords

Open Access
Article
Publication date: 20 May 2024

Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva

Productivity increase is correlated with profitability, sustainability and competitiveness of the construction firms. Recent studies reveal that the primary causes of productivity…

Abstract

Purpose

Productivity increase is correlated with profitability, sustainability and competitiveness of the construction firms. Recent studies reveal that the primary causes of productivity decline are poor usage of scientific and technological advances, ineffective supervision strategies and poor apprenticeship facilities/opportunities. Accordingly, the purpose of this study was to evaluate how well construction supervisors can utilise fundamental science and technological concepts/ideas to increase the efficiency and productivity of construction activities.

Design/methodology/approach

A new strategic layout was designed with the use of potential training guide tools. Based on the designed layout, a new supervisory training programme was developed, and 62 construction supervisors were selected, trained and evaluated in line with six parts of competencies and the relevant learning domains. An assessment guide with different levels of descriptions and criteria was developed through literature analysis and expert interviews. The research tools were verified using comprehensive approaches.

Findings

The overall mean values of supervisors’ performance scores indicate proficient-level grades in the competency characteristics related to taking measurements, generating drawings/designs using manual techniques and computer-aided tools, involving Bill of Quantities (BOQ) preparations and preparing training plans/materials for improving the competencies of labourers on estimation, measurements and understanding drawings. Their proficiency was notably lower in the use of information and communication technology application tools in construction tasks compared to others. The findings point to a modern generalised guideline that establishes the ranges of supervisory attributes associated with science and technology-related applications.

Research limitations/implications

The study outcomes produce conceptualised projections to restructure and revalue the job functions of various working categories by adding new definitions within the specified scope. This may result in constructive benefits to upgrading the current functions associated with urbanisation, sustainability and society. The implementation of the study’s findings/conclusions will have a significant impact on present and future practices in other developing nations and developing industries, even if they are directly applicable to the Sri Lankan construction industry.

Originality/value

Up to certain limits/stages, the study fills not only the knowledge gap in the field of creating protocols and application techniques connected to lifelong learning and skill enhancement/upgrading but also the existing gaps in work attributes and roles of construction supervisors associated with the utilisation of fundamental science and technological concepts/ideas towards reinforcing sustainable and productive site operations.

Details

Urbanization, Sustainability and Society, vol. 1 no. 1
Type: Research Article
ISSN: 2976-8993

Keywords

Open Access
Article
Publication date: 3 July 2024

Anna af Hällström

Managing megaprojects is challenging due to their inherent complexity and uncertainty. Collaborative project delivery models have been introduced as an alternative to traditional…

Abstract

Purpose

Managing megaprojects is challenging due to their inherent complexity and uncertainty. Collaborative project delivery models have been introduced as an alternative to traditional project management in public infrastructure megaprojects and are often realized through collaborative contracts. These project organizations act as institutional arenas for logic interaction as actors with differing institutional backgrounds interact within the project. This paper aims to study the delivery phase of three megaprojects through an institutional lens, investigating the institutional interaction and alignment of logics therein.

Design/methodology/approach

A multiple case study was employed to reach deep insight into the phenomenon. Sixty-one interviews were conducted over 3 cases with representatives from all levels of the project hierarchy. Respondents were selected through snowball sampling. In two cases, observations of the shared project office were conducted. Data analysis built on first-order codes and second-order themes, collected into a theoretical framework.

Findings

The empirical evidence demonstrates the dynamics shaping institutional logics and gives evidence for changing logics in projects with a well-applied collaborative contract. However, there is a risk of resistance and a return to traditional logics since institutional change is slow and an unsuitably applied collaborative contract can lead to adherence to the conventional way of work.

Originality/value

Current research has focused on the regulatory framework and procurement phase of such models, but little attention has been given to the delivery phase and the interaction of conflicting logics. This paper can serve as an exemplar of the different logics found within public infrastructure projects and their interaction and alignment. Contributions include a heightened emphasis on the start of the project as a meeting point for differing institutional logics and the role change necessary when using a collaborative contract.

Open Access
Article
Publication date: 1 August 2023

Jacob Guerrero and Susanne Engström

By adopting the “hard” and “soft” project management (PM) approaches from the PM-literature, this paper aims to problematize the expected role of client organizations in driving…

Abstract

Purpose

By adopting the “hard” and “soft” project management (PM) approaches from the PM-literature, this paper aims to problematize the expected role of client organizations in driving innovation in the transport infrastructure sector.

Design/methodology/approach

Addressing a large public client in Sweden, a case study design was initially applied to provide in-depth insights and perspectives of client project managers’ views and experiences of managing projects expected to drive innovation. In this paper, the concepts of “hard” and “soft” are used to discuss empirical findings on challenges associated with adopting a PM-approach for driving innovation in projects. The empirical material consists of interview data, complemented with observations and archival data.

Findings

Findings reveal challenges associated with combining hard and soft approaches, frequently demonstrating difficulties in balancing short-term project expectations with the promotion of innovation. In line with the literature, project managers note that there is a need for soft approaches to promote development and drive innovation. Yet, findings reflect a situation in which operational success criteria predominate, whereas soft approaches are not sufficiently used to create the grounds required for fostering innovation.

Originality/value

Insights are provided into how PM-approaches may impact construction innovation in the infrastructure sector, demonstrating a need for further research on the challenges and implications of applying and combining hard and soft PM-approaches.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 17 September 2024

Lavagnon Ika, Jack Meredith and Ofer Zwikael

The performance of large-scale projects is often challenged due to major environmental changes that occur during their life. However, literature has paid little attention to the…

Abstract

Purpose

The performance of large-scale projects is often challenged due to major environmental changes that occur during their life. However, literature has paid little attention to the governance adaptations required to respond effectively to these changes. This paper aims to study changes in the project environment over time, the corresponding governance adaptations and their impact on project performance.

Design/methodology/approach

To ensure triangulation between two sources of evidence, we used both primary and secondary data sources and examined 14 projects through 2 studies, the first focused on seven documented, illustrative case projects and the second on interviews with senior and project managers involved in seven additional projects.

Findings

We found the key environmental changes that should trigger appropriate governance adaptations to be market evolutions, technological advancements and sociopolitical events. However, we also found that these necessary governance adaptations are not commonly implemented timely, sufficiently or effectively.

Originality/value

The paper distills the dynamics of large-scale projects in achieving project effectiveness and raises theoretical propositions on the combination of environmental changes and deficient governance adaptations that, over time, turns efficient projects into ineffective projects and discusses implications for theory and practice.

Details

International Journal of Managing Projects in Business, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 12 May 2023

Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…

80182

Abstract

Purpose

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.

Design/methodology/approach

A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.

Findings

An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.

Research limitations/implications

The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.

Originality/value

This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 26 May 2023

Sina Moradi and Piia Sormunen

The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling…

4259

Abstract

Purpose

The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling (BIM). Despite previous research efforts, there is still a gap concerning the multidimensional nature of their integration. Hence, this study aims to fill the mentioned knowledge gap through exploring and comparing the challenges, enablers, techniques as well as benefits of integrating LC with BIM and sustainability in building construction projects.

Design/methodology/approach

A systematic literature review was conducted to fulfill the purpose of this study.

Findings

The findings reveal and compare the challenges, enablers, techniques and benefits of integrating LC with BIM and sustainability in building construction projects. The results suggest that there are eight common challenges for integrating LC with BIM and sustainability, including high initial cost, lack of collaboration, lack of professionals and lack of compatible contractual framework. The discovered challenges, enablers, techniques and benefits seem to be mostly routed in people. The findings also suggest that the synergistic benefits of integrating LC with BIM and sustainability can overcome the common challenges (safety, reliability, productivity, collaboration and quality) in construction projects.

Originality/value

The findings contribute to the literature and practice concerning the integration of LC with BIM and sustainability by exploring, comparing and discussing the relevant challenges, enablers, techniques as well as benefits. Moreover, the findings reveal the significance of the development of people in construction industry, besides processes and technology, as people are always subject of activities in construction while processes and technology are always objects.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords