Article
Publication date: 23 April 2024

Mahmoud Sabry Shided Keniwe, Ali Hassan Ali, Mostafa Ali Abdelaal, Ahmed Mohamed Yassin, Ahmed Farouk Kineber, Ibrahim Abdel-Rashid Nosier, Ola Diaa El Monayeri and Mohamed Ashraf Elsayad

This study focused on exploring the performance factors (PFs) that impact Infrastructure Sanitation Projects (ISSPs) in the construction sector. The aim was twofold: firstly, to…

32

Abstract

Purpose

This study focused on exploring the performance factors (PFs) that impact Infrastructure Sanitation Projects (ISSPs) in the construction sector. The aim was twofold: firstly, to identify these crucial PFs and secondly, to develop a robust performance model capable of effectively measuring and assessing the intricate interdependencies and correlations within ISSPs. By achieving these objectives, the study aimed to provide valuable insights into and tools for enhancing the efficiency and effectiveness of sanitation projects in the construction industry.

Design/methodology/approach

To achieve the study's aim, the methodology for identifying the PFs for ISSPs involved several steps: extensive literature review, interviews with Egyptian industry experts, a questionnaire survey targeting industry practitioners and an analysis using the Relative Importance Index (RII), Pareto principle and analytic network process (ANP). The RII ranked factor importance,  and Pareto identified the top 20% for ANP, which determined connections and interdependencies among these factors.

Findings

The literature review identified 36 PFs, and an additional 13 were uncovered during interviews. The highest-ranked PF is PF5, while PF19 is the lowest-ranked. Pareto principle selected 11 PFs, representing the top 20% of factors. The ANP model produced an application for measuring ISSP effectiveness, validated through two case studies. Application results were 92.25% and 91.48%, compared to actual results of 95.77% and 97.37%, indicating its effectiveness and accuracy, respectively.

Originality/value

This study addresses a significant knowledge gap by identifying the critical PFs that influence ISSPs within the construction industry. Subsequently, it constructs a novel performance model, resulting in the development of a practical computer application aimed at measuring and evaluating the performance of these projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 19 April 2024

Atupakisye Mwakolo, Meshack Siwandeti, Leticia Mahuwi and Baraka Israel

The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various…

Abstract

Purpose

The study aims to explore the role of procurement of good governance (PGG) on value for money (VfM) achievement in public construction projects. By investigating various dimensions of PGG, including transparency, accountability, competition and integrity, this study provides insights into how these factors contribute to the successful achievement of VfM outcomes in public construction projects.

Design/methodology/approach

The data were sourced from 203 construction project practitioners from 24 selected procuring entities in Tanzania using a census approach and a cross-sectional questionnaire survey. Confirmatory factor analysis (CFA) and structural equation modelling (SEM) were used for data analysis.

Findings

The findings of the study revealed a positive and significant impact of various dimensions of PGG on VfM. Specifically, transparency, accountability, competition and integrity were positively and significantly related to VfM, with p-values <0.001. Based on the study findings, we conclude that PGG is an important predictor of VfM achievement in public construction projects.

Practical implications

The study offers policy implications for streamlined PGG and VfM achievement in public construction projects. It is suggested that procuring entities can enhance VfM by enforcing compliance with the principles of PGG throughout the entirety of construction projects. In this case, streamlined legislative frameworks and control mechanisms are crucial components that could enhance PGG and the achievement of VfM.

Originality/value

This study contributes to the academic literature on the strategic role of PGG in enhancing VfM achievement. This is one of the research domains, which has not been adequately researched, particularly in Tanzania’s context. In addition, the study provides valuable insights to policymakers, practitioners and stakeholders involved in public construction projects to improve project outcomes and resource allocation.

Details

LBS Journal of Management & Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0972-8031

Keywords

Article
Publication date: 14 May 2024

Weiling Jiang, Jie Jiang, Igor Martek and Wen Jiang

The success of public–private partnership (PPP) projects is highly correlated to the successful management of risks encountered during the operation phase. PPP projects are…

Abstract

Purpose

The success of public–private partnership (PPP) projects is highly correlated to the successful management of risks encountered during the operation phase. PPP projects are especially exposed to risk due to the long operation period over which revenues need to be generated to recoup substantial initial investment and operational running costs. Despite the critical impact of risk exposure, limited research has been specifically undertaken on the matter of operational risk management. This study seeks to address this oversight by identifying and evaluating operational risk management strategies for PPPs.

Design/methodology/approach

Vulnerability theory is the theoretical lens used, with context drawn from Chinese PPP projects. Based on the data collected from expert interviews and questionnaires, 28 operational risk management strategies are identified. A fuzzy synthetic method is employed to analyze the effectiveness of the 28 strategies.

Findings

The findings reveal that providing an exit mechanism clause into the contract, establishing a comprehensive performance evaluation mechanism and developing a clear compensation mechanism are the top three effective strategies. This study also reveals that risk mitigation approaches that reduce vulnerability prove more effective than attempts to reduce external threats. Specifically, strategies aimed at managing contract, political, technical and financial risk are the most effective.

Originality/value

The findings of this study extend current knowledge regarding the risk management of PPP projects. They also offer a reference by which practitioners may select effective operational risk management pathways and thereby, galvanize the sustainable development of PPPs.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 25 April 2024

Mika Luhtala, Olga Welinder and Elina Vikstedt

This study aims to investigate the adoption of the United Nations’ Sustainable Development Goals (SDGs) as the new performance perspective in cities. It also aims to understand…

Abstract

Purpose

This study aims to investigate the adoption of the United Nations’ Sustainable Development Goals (SDGs) as the new performance perspective in cities. It also aims to understand how accounting for SDGs begins in city administrations by following Power’s (2015) fourfold development schema composed of policy object formation, object elaboration, activity orchestration and practice stabilization.

Design/methodology/approach

Focusing on a network of cities coordinated by the Finnish local government association, we analyzed the six largest cities in Finland employing a holistic multiple case study strategy. Our data consisted of Voluntary Local Reviews (VLRs), city strategies, budget plans, financial statements, as well as results of participant observations and semi-structured interviews with key individuals involved in accounting for SDGs.

Findings

We unveiled the SDG framework as an interpretive scheme through which cities glocalized sustainable development as a novel, simultaneously global and local, performance object. Integration of the new accounts in city management is necessary for these accounts to take life in steering the actions. By creating meaningful alignment and the ability to impact managerial practices, SDGs and VLRs have the potential to influence local actions. Our results indicate further institutionalization progress of sustainability as a performance object through SDG-focused work.

Originality/value

While prior research has focused mainly on general factors influencing the integration of the sustainability agenda, this study provides a novel perspective by capturing the process and demonstrating empirically how new accounts on SDGs are introduced and deployed in the strategic planning and management of local governments.

Details

Journal of Public Budgeting, Accounting & Financial Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1096-3367

Keywords

Article
Publication date: 6 May 2024

Syed Waqas Shah, Denise Mary Jepsen and Sarah Bankins

Despite the deployment of state-of-the-art methodologies for project management, employee turnover in projects remains high. Such turnover has significant costs in terms of…

Abstract

Purpose

Despite the deployment of state-of-the-art methodologies for project management, employee turnover in projects remains high. Such turnover has significant costs in terms of replacing personnel, potential deadline overruns and financial expenditure. Employee turnover in project contexts may stem from time-related issues associated with multiple parallel projects and short deadlines. Using person–environment fit and time congruence theories, this research examines the relationship between employee turnover intentions and individual–organizational (I–O) polychronicity fit, which captures the degree of match between individuals’ and organizational preferences for focusing on multiple tasks simultaneously.

Design/methodology/approach

Survey data were collected from 309 software project employees in Pakistan. Hypotheses were tested using polynomial regressions and response surface modeling.

Findings

I–O polychronicity fit is related to turnover intentions. Turnover intentions are lower when I–O polychronicity fit occurs on the lower end of the polychronicity continuum, whereas turnover intentions are higher when fit is observed on the higher end of the polychronicity continuum. The relationship between I–O polychronicity fit and turnover intentions is significantly explained by exhaustion and perceptions of work overload.

Practical implications

The study’s insights provide recommendations for organizations to optimally manage multitasking to help retain project employees.

Originality/value

These findings extend our understanding of the underlying mechanisms between I–O polychronicity fit and turnover intentions. Furthermore, this research expounds on how employee exhaustion and perceptions of work overload explain the relationship between I–O polychronicity fit and turnover intentions.

Details

International Journal of Manpower, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0143-7720

Keywords

Article
Publication date: 7 May 2024

Haonan Qi, Zhipeng Zhou, Javier Irizarry, Xiaopeng Deng, Yifan Yang, Nan Li and Jianliang Zhou

This study aims to modify the human factors analysis and classification system (HFACS) to make it suitable for collapse accident analysis in construction. Based upon the modified…

Abstract

Purpose

This study aims to modify the human factors analysis and classification system (HFACS) to make it suitable for collapse accident analysis in construction. Based upon the modified HFACS, distribution patterns of causal factors across multiple levels were discerned among causal factors of various stakeholders at construction sites. It explored the correlations between two causal factors from different levels and further determined causation paths from two perspectives of level and stakeholder.

Design/methodology/approach

The main research framework consisted of data collection, coding and analysis. Collapse accident reports were collected with adequate causation information. The modified HFACS was utilized for coding causal factors across all five levels in each case. A hybrid approach with two perspectives of level and stakeholder was proposed for frequency analysis, correlation analysis and path identification between causal factors.

Findings

Eight causal factors from external organizations at the fifth level were added to the original HFACS. Level-based correlation analyses and path identification provided safety managers with a holistic view of inter-connected causal factors across five levels. Stakeholder-based correlation analyses between causal factors from the fifth level and its non-adjacent levels were implemented based on client, government and third parties. These identified paths were useful for different stakeholders to develop specific safety plans for avoiding construction collapse accidents.

Originality/value

This paper fulfils an identified need to modify and utilize the HFACS model for correlation analysis and path identification of causal factors resulting in collapse accidents, which can provide opportunities for tailoring preventive and protective measures at construction sites.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 24 April 2024

Yubing Yu, Hongyan Zeng and Min Zhang

Manufacturers increasingly resort to digital transformation to shape their competitiveness in the digital economy era, while supply chain (SC) collaborative innovation helps them…

Abstract

Purpose

Manufacturers increasingly resort to digital transformation to shape their competitiveness in the digital economy era, while supply chain (SC) collaborative innovation helps them cope with market uncertainties. However, whether and how digital transformation can facilitate SC collaborative innovation remain unclear. To address this gap, we aims to investigate the effects of digital transformation (strategy and capability) on SC collaborative (process and product) innovation and market performance.

Design/methodology/approach

We use partial least squares-structural equation modelling (PLS-SEM) with a sample of 210 Chinese manufacturers to investigate the effects of digital transformation (strategy and capability) on SC collaborative (process and product) innovation and market performance.

Findings

The results show that digital strategy and capability positively impact SC collaborative process and product innovation, which enhances market performance. In addition, SC collaborative innovation mediates the relationship between digital transformation and market performance.

Originality/value

This study contributes to the literature by identifying how digital transformation drives SC collaborative innovation towards improving market performance and providing practical guidance for enterprises in promoting digital transformation and SC collaborative innovation.

Details

European Journal of Innovation Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1460-1060

Keywords

Article
Publication date: 30 April 2024

Daniella Abena Badu and Pietro Micheli

This study aims to examine how different uses of performance measurement systems (PMS) enable or hinder organizational ambidexterity (OA), intended as the simultaneous pursuit of…

Abstract

Purpose

This study aims to examine how different uses of performance measurement systems (PMS) enable or hinder organizational ambidexterity (OA), intended as the simultaneous pursuit of exploitation and exploration.

Design/methodology/approach

Following a qualitative research design, we gathered data through semi-structured interviews, observations and reviews of documents at four departments of an automotive firm.

Findings

We contribute to operations management research and practice by demonstrating how PMS, which are typically associated with exploitation, can also foster exploration and enable organizations to become ambidextrous. Specifically, we show how PMS can be structured and used in more agile ways and, in relation to innovation, we identify which PM practices should be introduced and with what effects and those that should be avoided. We also contribute to organization theory by highlighting how a single management tool can promote the achievement of both exploration and exploitation.

Practical implications

In investigating PMS uses and their effects, we identify several positive practices. For example, we show how managers can use PMS more effectively and how targets could be deployed to stimulate creativity and innovation. We also emphasize the need for managers to opt more often for team incentives rather than individual ones to encourage the collaboration needed for OA.

Originality/value

We provide in-depth insight into how PM tools affect an organization’s ability to pursue exploitation and exploration, thus contributing to research in operations, innovation and organization theory.

Details

International Journal of Operations & Production Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0144-3577

Keywords

Article
Publication date: 10 May 2024

Qianqian Ju, Yan Wang, Hui Liu, Xiaoyun Du and Yifei Li

Stakeholders in complex capital projects are characterized by complicated interactions, adversarial short-term relationships and cooperative demand for deliverables. Unhealthy…

Abstract

Purpose

Stakeholders in complex capital projects are characterized by complicated interactions, adversarial short-term relationships and cooperative demand for deliverables. Unhealthy interfaces between stakeholders often lead to significant interface conflicts, which gradually become apparent in the construction stage. However, stakeholder interface health (SIH) has not been well understood and measured in the construction industry by either scholars or practitioners. It is essential to identify unhealthy interface relationships between stakeholders by comprehensively assessing SIH for enhancing project performance.

Design/methodology/approach

The study provided a comprehensive framework to assess SIH. The assessment was based on Wuli-Shili-Renli theory. Moreover, the CRITIC and Grey-TOPSIS methodologies were applied to precisely evaluate the SIH level. Besides, graph-based interface networks were developed to visualize SIH. At last, the framework was applied to a mass rapid transit project in China to test the validity of the study.

Findings

The result showed that stakeholder interfaces with strict contract constraints are healthier. On the other hand, IM behaviors make up for the soft coordination mechanism without contract constraints to a certain extent. The results of the case study were consistent with the actual project practices. The proposed framework provided a useful IM tool for assessing and visualizing SIH.

Research limitations/implications

The limitation of this study is that only the mass rapid transit project was selected for empirical analysis to validate the effectiveness of the proposed framework. It is recommended that the proposed framework be applied to other types of complex capital projects to further discussions in IM.

Practical implications

Theoretically, this study introduces a comprehensive framework to measure the health of stakeholder interfaces in complex capital projects, which helps to provide a theoretical basis and methodological support for stakeholder interface management.

Social implications

Practically, applying SIH assessment to existing interface management procedures can help the project manager identify interface conflicts between stakeholders in time and eventually contribute to the improvement of PM performance. At the same time, the interface management team tracks the responsibilities of unhealthy interface stakeholders and requires them to take measures to improve the SIH level. Stakeholder interfaces with lower health scores should be given more attention. The proposed framework can serve as a novel IM approach to identify weaknesses in IM and take targeted management measures to alleviate unhealthy stakeholder interface relationships.

Originality/value

The study provides an innovative method for scientifically and accurately assessing SIH. This research can help scholars and practitioners in the project management field facilitate the diagnosis of unhealthy interface relationships and provide decision support for the project management theoretical foundation.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 May 2024

Adam Sadowski, Ryszard Jędrzejczak, Dorota Starzynska and Per Engelseth

This paper aims to show the impact of applied visual management (VM) on performance in logistics operations in the construction industry.

Abstract

Purpose

This paper aims to show the impact of applied visual management (VM) on performance in logistics operations in the construction industry.

Design/methodology/approach

A case study was conducted at a branch of an international company located in Poland on VM implementation in the transport and storage of this firm. Active research was used to include the outlook of top management on the implementation and use of VMs.

Findings

This study demonstrates how VM is an effective way to improve performance in the studied logistics functions. The complex nature of the effect is revealed not only in warehouse and transport operations but also in handling operations, improving operational planning and specializing warehouse teams.

Originality/value

Organizational culture, work discipline and value system in the group of production and warehouse workers is of importance in implementing and efficiently using VM resources. Using a VM is complex.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

Access

Year

Last month (741)

Content type

Earlycite article (741)
1 – 10 of 741