Search results

1 – 10 of 190
Open Access
Article
Publication date: 27 February 2024

Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…

Abstract

Purpose

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.

Design/methodology/approach

Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.

Findings

The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.

Originality/value

Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 28 June 2022

Sahar Jawad, Ann Ledwith and Rashid Khan

There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and…

1668

Abstract

Purpose

There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and successfully achieving project objectives has yet to be explored. This research investigates the enablers and barriers that influence the elements of PCS success and drive project objectives.

Design/methodology/approach

This study adopts a mixed approach of descriptive analysis and regression models to explore the impact of six PCS elements on project outcomes. Petroleum and chemical projects in Saudi Arabia were selected as a case study to validate the research model.

Findings

Data from a survey of 400 project managers in Saudi’s petroleum and chemical industry reveal that successful PCS are the key to achieving all project outcomes, but they are particularly critical for meeting project cost objectives. Project Governance was identified as the most important of the six PCS elements for meeting project objectives. A lack of standard processes emerged as the most significant barrier to achieving effective project governance, while having skilled and experienced project team members was the most significant enabler for implementing earned value.

Practical implications

The study offers a direction for implementing and developing PCS as a strategic tool and focuses on the PCS elements that can improve project outcomes.

Originality/value

This research contributes to project management knowledge and differs from previous attempts in two ways. Firstly, it investigates the elements of PCS that are critical to achieving project scope, schedule and cost objectives; secondly, enablers and barriers of PCS success are examined to see how they influence each element independently.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 May 2024

Weiling Jiang, Jie Jiang, Igor Martek and Wen Jiang

The success of public–private partnership (PPP) projects is highly correlated to the successful management of risks encountered during the operation phase. PPP projects are…

Abstract

Purpose

The success of public–private partnership (PPP) projects is highly correlated to the successful management of risks encountered during the operation phase. PPP projects are especially exposed to risk due to the long operation period over which revenues need to be generated to recoup substantial initial investment and operational running costs. Despite the critical impact of risk exposure, limited research has been specifically undertaken on the matter of operational risk management. This study seeks to address this oversight by identifying and evaluating operational risk management strategies for PPPs.

Design/methodology/approach

Vulnerability theory is the theoretical lens used, with context drawn from Chinese PPP projects. Based on the data collected from expert interviews and questionnaires, 28 operational risk management strategies are identified. A fuzzy synthetic method is employed to analyze the effectiveness of the 28 strategies.

Findings

The findings reveal that providing an exit mechanism clause into the contract, establishing a comprehensive performance evaluation mechanism and developing a clear compensation mechanism are the top three effective strategies. This study also reveals that risk mitigation approaches that reduce vulnerability prove more effective than attempts to reduce external threats. Specifically, strategies aimed at managing contract, political, technical and financial risk are the most effective.

Originality/value

The findings of this study extend current knowledge regarding the risk management of PPP projects. They also offer a reference by which practitioners may select effective operational risk management pathways and thereby, galvanize the sustainable development of PPPs.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 February 2022

Sayed Muhammad Fawad Sharif, Yang Naiding and Sayed Kifayat Shah

Collaborative projects require overlapping skills and capabilities to facilitate knowledge transfer. However, not all kinds of learning are virtuous and some may lead to leakage…

Abstract

Purpose

Collaborative projects require overlapping skills and capabilities to facilitate knowledge transfer. However, not all kinds of learning are virtuous and some may lead to leakage of commercially valuable knowledge. The purpose of this paper is to explain and restrain leakage of organizational competitive knowledge in collaborative projects.

Design/methodology/approach

A total of 398 survey questionnaires are collected from project-based firms in Pakistan. We gathered data from horizontal and vertical collaborations. Analysis is conducted with transaction cost economics lens through Process Macro 3.0.

Findings

Findings suggest that partner’s learning intent (PLI) and distrust positively affect knowledge leakage, whereas human resource management (HRM) practices have negative effect on knowledge leakage. Furthermore, HRM practices negatively moderate the relationship between PLI and knowledge leakage and distrust positively mediates it.

Research limitations/implications

This study integrates HRM with knowledge management to restrain knowledge leakage and contributes to knowledge management and strategic management. This study examines knowledge leakage in the presence of passive opportunism.

Originality/value

This study explains how passive opportunism translates into opportunistic behavior. Besides, effectiveness of HRM practices are least surveyed to restrain passive and active opportunisms.

Details

VINE Journal of Information and Knowledge Management Systems, vol. 54 no. 3
Type: Research Article
ISSN: 2059-5891

Keywords

Article
Publication date: 28 February 2023

Sara Rashidian, Robin Drogemuller, Sara Omrani and Fereshteh Banakar

The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving…

Abstract

Purpose

The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving collaboration and delivering construction projects has been acknowledged by construction academics and professionals. Once organizations have fully embraced BIM, IPD and LC integration, a measurement tool such as a maturity model (MM) for benchmarking their progress and setting realistic goals for continuous improvement will be required. In the context of MMs literature, however, no comprehensive analysis of these three construction management methods has been published to reveal the current trends and common themes in which the models have approached each other.

Design/methodology/approach

Therefore, this study integrates systematic literature review (SLR) and thematic analysis techniques to review and categorize the related MMs; the key themes in which the interrelationship between BIM, IPD and LC MMs has been discussed and conceptualized in the attributes; the shared characteristics of the existing BIM, IPD and LC MMs, as well as their strengths and limitations. The Preferred Reporting Items for Systematic Reviews (PRISMA) method has been used as the primary procedure for article screening and reviewing published papers between 2007 and 2022.

Findings

Despite the growth of BIM, IPD and LC integration publications and acknowledgment in the literature, no MM has been established that holistically measures BIM, IPD and LC integration in an organization. This study identifies five interrelated and overlapping themes indicative of the collaboration of BIM, IPD and LC in existing MMs' structure, including customer satisfaction, waste minimization, Lean practices and cultural and legal aspects. Furthermore, the MMs' common characteristics, strengths and limitations are evaluated to provide a foundation for developing future BIM, IPD and LC-related MMs.

Practical implications

This paper examines the current status of research and the knowledge gaps around BIM, IPD and LC MMs. In addition, the highlighted major themes serve as a foundation for academics who intend to develop integrated BIM, IPD, and LC MMs. This will enable researchers to build upon these themes and establish a comprehensive list of maturity attributes fulfilling the BIM, IPD and LC requirements and principles. In addition, the MMs' BIM, IPD and LC compatibility themes, which go beyond themes' intended characteristics in silos, increase industry practitioners' awareness of the underlying factors of BIM, IPD and LC integration.

Originality/value

This review article is the first of a kind to analyze the interaction of IPD, BIM and LC in the context of MMs in current AEC literature. This study concludes that BIM, IPD and LC share several joint cornerstones according to the existing MMs.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 4 October 2021

Adeel Akmal, Nataliya Podgorodnichenko, Richard Greatbanks, Jeff Foote, Tim Stokes and Robin Gauld

The various quality improvement (QI) frameworks and maturity models described in the health services literature consider some aspects of QI while excluding others. This paper aims…

Abstract

Purpose

The various quality improvement (QI) frameworks and maturity models described in the health services literature consider some aspects of QI while excluding others. This paper aims to present a concerted attempt to create a quality improvement maturity model (QIMM) derived from holistic principles underlying the successful implementation of system-wide QI programmes.

Design/methodology/approach

A hybrid methodology involving a systematic review (Phase 1) of over 270 empirical research articles and books developed the basis for the proposed QIMM. It was followed by expert interviews to refine the core constructs and ground the proposed QIMM in contemporary QI practice (Phase 2). The experts included academics in two academic conferences and 59 QI managers from the New Zealand health-care system. In-depth interviews were conducted with QI managers to ascertain their views on the QIMM and its applicability in their respective health organisations (HOs).

Findings

The QIMM consists of four dimensions of organisational maturity, namely, strategic, process, supply chain and philosophical maturity. These dimensions progress through six stages, namely, identification, ad-hoc, formal, process-driven, optimised enterprise and finally a way of life. The application of the QIMM by the QI managers revealed that the scope of QI and the breadth of the principles adopted by the QI managers and their HOs in New Zealand is limited.

Practical implications

The importance of QI in health systems cannot be overstated. The proposed QIMM can help HOs diagnose their current state and provide a guide to action achieving a desirable state of quality improvement maturity. This QIMM avoids reliance on any single QI methodology. HOs – using the QIMM – should retain full control over the process of selecting any QI methodology or may even cherry-pick principles to suit their needs as long as they understand and appreciate the true nature and scope of quality overstated. The proposed QIMM can help HOs diagnose their current state and provide a guide to action achieving a desirable state of quality improvement maturity. This QIMM avoids reliance on any single QI methodology. HOs – using the QIMM – should retain full control over the process of selecting any QI methodology or may even cherry-pick principles to suit their needs as long as they understand and appreciate the true nature and scope of quality.

Originality/value

This paper contributes new knowledge by presenting a maturity model with an integrated set of quality principles for HOs and their extended supply networks.

Details

International Journal of Lean Six Sigma, vol. 15 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 1 December 2023

Lina Gharaibeh, Sandra Matarneh, Kristina Eriksson and Björn Lantz

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on…

Abstract

Purpose

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on examining the extent, maturity and actual practices of BIM in the Swedish wood construction industry, by analysing practitioners’ perspectives on the current state of BIM and its perceived benefits.

Design/methodology/approach

A qualitative approach was selected, given the study’s exploratory character. Initially, an extensive review was undertaken to examine the current state of BIM utilisation and its associated advantages within the construction industry. Subsequently, empirical data were acquired through semi-structured interviews featuring open-ended questions, aimed at comprehensively assessing the prevailing extent of BIM integration within the Swedish wood construction sector.

Findings

The research concluded that the wood construction industry in Sweden is shifting towards BIM on different levels, where in some cases, the level of implementation is still modest. It should be emphasised that the wood construction industry in Sweden is not realising the full potential of BIM. The industry is still using a combination of BIM and traditional methods, thus, limiting the benefits that full BIM implementation could offer the industry.

Originality/value

This study provided empirical evidence on the current perceptions and state of practice of the Swedish wood construction industry regarding BIM maturity.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 16 August 2022

Khadija Echefaj, Abdelkabir Charkaoui, Anass Cherrafi, Anil Kumar and Sunil Luthra

The purpose of this study is to identify and prioritize capabilities and practices to ensure a resilient supply chain during an unexpected disruption. In addition, this study…

Abstract

Purpose

The purpose of this study is to identify and prioritize capabilities and practices to ensure a resilient supply chain during an unexpected disruption. In addition, this study ranks maturity factors that influence the main capabilities identified.

Design/methodology/approach

This paper is conducted in three stages. First, capabilities and practices are extracted through a literature review. Second, capabilities and practices are ranked using the analytical hierarchical process method. Third, a gray technique for order preference by similarity to ideal solution method is used to rank maturity factors influencing capabilities.

Findings

The findings indicate that responsiveness, readiness, flexibility and adaptability are the most important capabilities for supply chain resilience. Also, commitment and communication are the highest maturity factors influencing resilience capabilities.

Research limitations/implications

The findings provide a hierarchical vision of capabilities and practices for industries to increase resilience. Limitations of the paper are related to capabilities, practices and number of experts consulted.

Practical implications

This paper highlights the importance of high-maturity practices in resilience capability adoption. The findings of this study will encourage decisions-makers to increase maturity practices to build resilience against disruption.

Originality/value

The paper reveals that developing powerful capabilities, good practices and a high level of maturity improve supply chain resilience.

Details

Journal of Global Operations and Strategic Sourcing, vol. 17 no. 2
Type: Research Article
ISSN: 2398-5364

Keywords

Open Access
Article
Publication date: 18 May 2023

Anna Trubetskaya, Alan Ryan and Frank Murphy

This paper aims to introduce a model using a digital twin concept in a cold heading manufacturing and develop a digital visual management (VM) system using Lean overall equipment…

5477

Abstract

Purpose

This paper aims to introduce a model using a digital twin concept in a cold heading manufacturing and develop a digital visual management (VM) system using Lean overall equipment effectiveness (OEE) tool to enhance the process performance and establish Fourth Industrial Revolution (I4.0) platform in small and medium enterprises (SMEs).

Design/methodology/approach

This work utilised plan, do, check, act Lean methodology to create a digital twin of each machine in a smart manufacturing facility by taking the Lean tool OEE and digitally transforming it in the context of I4.0. To demonstrate the effectiveness of process digitisation, a case study was carried out at a manufacturing department to provide the data to the model and later validate synergy between Lean and I4.0 platform.

Findings

The OEE parameter can be increased by 10% using a proposed digital twin model with the introduction of a Level 0 into VM platform to clearly define the purpose of each data point gathered further replicate in projects across the value stream.

Research limitations/implications

The findings suggest that researchers should look beyond conversion of stored data into visualisations and predictive analytics to improve the model connectivity. The development of strong big data analytics capabilities in SMEs can be achieved by shortening the time between data gathering and impact on the model performance.

Originality/value

The novelty of this study is the application of OEE Lean tool in the smart manufacturing sector to allow SME organisations to introduce digitalisation on the back of structured and streamlined principles with well-defined end goals to reach the optimal OEE.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 14 December 2022

Domenica Barile, Giustina Secundo and Pasquale Del Vecchio

Within food industry several changes and innovations are affecting the management of the entire supply chain (production, logistics, etc.). As strategy for the survival and…

492

Abstract

Purpose

Within food industry several changes and innovations are affecting the management of the entire supply chain (production, logistics, etc.). As strategy for the survival and competition, digitalization has assumed a crucial role during the pandemic emergence by causing the reconfiguration of traditional chains and business models. Framed in these premises, the research analyses how digital technologies have innovated the sub-chains of bakery products and pasta within food industry with reference to customers' interactions, delivery and marketing during the COVID-19 pandemic emergence.

Design/methodology/approach

Moving from a critical literature review about the perspectives of digital technologies within the tradition of food industry, action research has been adopted to analyze in deep a case study of the start-up “ArteBianca Delivery” located in South Italy. Through this method, researchers have been deeply involved within the start-up to face the challenge of transforming the marketing and customer care into digital ones due to the COVID-19 restriction.

Findings

Findings provide empirical evidence about the reconfiguration of the traditional business model of a family firm in the food sector into a digital one with the start-up “ArteBianca Delivery”. The marketing, delivery, e-commerce and customer care components of the business models have been supported and enhanced through the adoption of digital tools, such as mobile applications and social technologies useful both for users and for a more urgent digitization of company.

Practical implications

Implications for practice can be identified into the pattern of digital transformation implemented as well as in the opportunity of replication and contextualization of the results to other companies looking for setting up a digital strategy.

Originality/value

Elements of original contribution can be identified into: (1) the exploration of digital transformation in food family firms caused by the pandemic emergence, (2) the contextualization of the digital transformation to the sub-chains of bakery and pasta and (3) the geographical location of the case.

Details

European Journal of Innovation Management, vol. 27 no. 4
Type: Research Article
ISSN: 1460-1060

Keywords

1 – 10 of 190