Search results

1 – 10 of over 2000
Open Access
Article
Publication date: 26 May 2023

Mpho Trinity Manenzhe, Arnesh Telukdarie and Megashnee Munsamy

The purpose of this paper is to propose a system dynamic simulated process model for maintenance work management incorporating the Fourth Industrial Revolution (4IR) technologies.

1772

Abstract

Purpose

The purpose of this paper is to propose a system dynamic simulated process model for maintenance work management incorporating the Fourth Industrial Revolution (4IR) technologies.

Design/methodology/approach

The extant literature in physical assets maintenance depicts that poor maintenance management is predominantly because of a lack of a clearly defined maintenance work management process model, resulting in poor management of maintenance work. This paper solves this complex phenomenon using a combination of conceptual process modeling and system dynamics simulation incorporating 4IR technologies. A process for maintenance work management and its control actions on scheduled maintenance tasks versus unscheduled maintenance tasks is modeled, replicating real-world scenarios with a digital lens (4IR technologies) for predictive maintenance strategy.

Findings

A process for maintenance work management is thus modeled and simulated as a dynamic system. Post-model validation, this study reveals that the real-world maintenance work management process can be replicated using system dynamics modeling. The impact analysis of 4IR technologies on maintenance work management systems reveals that the implementation of 4IR technologies intensifies asset performance with an overall gain of 27.46%, yielding the best maintenance index. This study further reveals that the benefits of 4IR technologies positively impact equipment defect predictability before failure, thereby yielding a predictive maintenance strategy.

Research limitations/implications

The study focused on maintenance work management system without the consideration of other subsystems such as cost of maintenance, production dynamics, and supply chain management.

Practical implications

The maintenance real-world quantitative data is retrieved from two maintenance departments from company A, for a period of 24 months, representing years 2017 and 2018. The maintenance quantitative data retrieved represent six various types of equipment used at underground Mines. The maintenance management qualitative data (Organizational documents) in maintenance management are retrieved from company A and company B. Company A is a global mining industry, and company B is a global manufacturing industry. The reliability of the data used in the model validation have practical implications on how maintenance work management system behaves with the benefit of 4IR technologies' implementation.

Social implications

This research study yields an overall benefit in asset management, thereby intensifying asset performance. The expected learnings are intended to benefit future research in the physical asset management field of study and most important to the industry practitioners in physical asset management.

Originality/value

This paper provides for a model in which maintenance work and its dynamics is systematically managed. Uncontrollable corrective maintenance work increases the complexity of the overall maintenance work management. The use of a system dynamic model and simulation incorporating 4IR technologies adds value on the maintenance work management effectiveness.

Details

Journal of Quality in Maintenance Engineering, vol. 29 no. 5
Type: Research Article
ISSN: 1355-2511

Keywords

Case study
Publication date: 6 December 2023

Sobhesh Kumar Agarwalla and Ajay Pandey

This case describes the growth of ReNew Power during its first decade of operation. Sumant Sinha, a first-generation entrepreneur and former banker, founded the company, which…

Abstract

This case describes the growth of ReNew Power during its first decade of operation. Sumant Sinha, a first-generation entrepreneur and former banker, founded the company, which grew from a modest generator-cum-developer of wind energy-based electricity to one of India's largest companies in the renewable energy sector. With the entry of large, well-funded players such as Tata Power and Adani Green into the Indian renewable sector by the end of 2020, Sinha had to make a strategic decision: should ReNew continue to organically scale up its presence in an increasingly competitive yet expanding Indian renewable energy sector, should it diversify geographically, or should it pursue emerging opportunities for vertical or horizontal integration within the sector? The case provides an opportunity to discuss how alternative business models and competitive scenarios may facilitate or inhibit the growth of a player in the renewable energy sector.

Details

Indian Institute of Management Ahmedabad, vol. no.
Type: Case Study
ISSN: 2633-3260
Published by: Indian Institute of Management Ahmedabad

Keywords

Article
Publication date: 23 August 2022

Mohammad Nafe Assafi, Md. Mehrab Hossain, Nicholas Chileshe and Shuvo Dip Datta

As a developing nation, Bangladesh still has scarce technological applications in the construction sector, which results in construction delays. This paper aims to propose a…

Abstract

Purpose

As a developing nation, Bangladesh still has scarce technological applications in the construction sector, which results in construction delays. This paper aims to propose a framework that will diminish manual labor, reduce human error and apply four-dimensional (4D) building information modeling (BIM)-based solutions to mitigate and prevent construction project delays.

Design/methodology/approach

First, a systematic literature review was conducted on analyzing the construction delay scenario in the context of Bangladesh and other countries. Next, a 4D BIM-based framework was developed using Autodesk Navisworks Manage. Finally, it was used to run on-site simulations on an ongoing construction project which faced delays because of design errors and inefficient planning.

Findings

Affirmative results were found from applying these methods through real-time project simulation. The current status of the project and the status after using BIM technology were compared. It was observed that during both the preconstruction and execution phases, the application of 4D BIM could reduce the delay posed by design error and inefficient planning.

Practical implications

The project manager and the design engineers can use these frameworks to review their projects. For the design engineers, the preconstruction phase portion of the framework will help identify the probable errors in the design. For the project managers, keeping track of time using the execution phase portion of the framework will be resourceful.

Originality/value

To the best of the authors’ knowledge, this study is the first to assess the significant delay factors endemic in Bangladesh and develop a BIM-based technological solution. This study is solely dedicated to reforming the construction techniques in Bangladesh through the application of 4D BIM technology.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 2 January 2024

Xin Zou and Zhuang Rong

In repetitive projects, repetition offers more possibilities for activity scheduling at the sub-activity level. However, existing resource-constrained repetitive scheduling…

Abstract

Purpose

In repetitive projects, repetition offers more possibilities for activity scheduling at the sub-activity level. However, existing resource-constrained repetitive scheduling problem (RCRSP) models assume that there is only one sequence in performing the sub-activities of each activity, resulting in an inefficient resource allocation. This paper proposes a novel repetitive scheduling model for solving RCRSP with soft logic.

Design/methodology/approach

In this paper, a constraint programming model is developed to solve the RCRSP using soft logic, aiming at the possible relationship between parallel execution, orderly execution or partial parallel and partial orderly execution of different sub activities of the same activity in repetitive projects. The proposed model integrated crew assignment strategies and allowed continuous or fragmented execution.

Findings

When solving RCRSP, it is necessary to take soft logic into account. If managers only consider the fixed logic between sub-activities, they are likely to develop a delayed schedule. The practicality and effectiveness of the model were verified by a housing project based on eight different scenarios. The results showed that the constraint programming model outperformed its equivalent mathematical model in terms of solving speed and solution quality.

Originality/value

Available studies assume a fixed logic between sub-activities of the same activity in repetitive projects. However, there is no fixed construction sequence between sub-activities for some projects, e.g. hotel renovation projects. Therefore, this paper considers the soft logic relationship between sub-activities and investigates how to make the objective optimal without violating the resource availability constraint.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 February 2022

Farzaneh Moshtaghian and Esmatullah Noorzai

This research has been conducted with a view to creating a framework to integrate risk management based on building information modeling (BIM) information.

Abstract

Purpose

This research has been conducted with a view to creating a framework to integrate risk management based on building information modeling (BIM) information.

Design/methodology/approach

In this research, all the information related to the construction of a residential project including 3D, 4D and 5D BIM models and the execution and control phases information was collected, and the risk list was determined for each activity accordingly.

Findings

The present study has suggested a framework for risk management in order to optimize project changes.

Originality/value

The lack of integration between 3D, 4D and 5D modeling besides execution information is a fundamental problem in many projects. The gap between these two groups of information will lead to improper management and late decisions, eventually imposing unforeseen delays and cost overruns. Risk management by the means of adopting a new approach has been addressed in recent studies using new methods, such as BIM and its associated technologies, some of which were mentioned in the review of theoretical literature in this research.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 January 2024

Mohamed Marzouk and Dina Hamdala

The aggressive competition in the real estate market forces real estate developers to tackle the challenge of selecting the best project construction phasing alternative. The real…

100

Abstract

Purpose

The aggressive competition in the real estate market forces real estate developers to tackle the challenge of selecting the best project construction phasing alternative. The real estate industry is characterized by high costs, high profit and high risks. The schedules of real estate projects are also characterized by having large number of repetitive activities that are executed over a long duration. The repetitiveness, long duration of execution, the high amounts of money involved and the high risk made it desirable to leverage the impact of changes in phasing plans on net present value of amounts incurred and received over the long execution and selling duration. This also changes the project progress, and delivery time as well as their respective impact on customer degree of satisfaction. This research addresses the problem of selecting the best phasing alternative for real estate development projects while maximizing customer satisfaction and project profit.

Design/methodology/approach

The research proposes a model that generates all construction phasing alternatives and performs decision-making to rank all possible phasing alternatives. The proposed model consists of five modules: (1) Phasing Sequencing module, (2) Customer Satisfaction module, (3) Cash-In calculation module, (4) Cost Estimation module and (5) Decision-making module. A case study was presented to demonstrate the practicality of the model.

Findings

The proposed model satisfies the real estate market's need for proper construction phasing plans evaluation and selection against the project's main success criteria, customer satisfaction and project profit. The proposed model generates all construction phasing alternatives and performs multi-criteria decision making to rank all possible phasing alternatives. It quantifies the score of the two previously mentioned criteria and ranks all solutions according to their overall score.

Research limitations/implications

The research proposes a model that assist real estate market's need for proper construction phasing plans evaluation and selection against the project's main success criteria, customer satisfaction and project profit. The proposed model can be used to conclude general guidelines and common successful practices to be used by real estate developers when deciding the construction phasing plan. In this study the model is based on business models where all the project units are sold, rental cases are not considered. Also, the budget limitations that might exist when phasing is not considered in the model computations.

Originality/value

The model can be used as a complete platform that can hold all real estate project data, process revenues and cost information for estimating profit, plotting cash flow profiles, quantifying the degree of customer satisfaction attributable to each phasing alternative and providing recommendation showing the best one. The model can be used to conclude general guidelines and common successful practices to be used by real estate developers when tackling the challenge of selecting construction phasing plans.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 30 June 2023

Hana Begić, Mario Galić and Uroš Klanšek

Ready-mix concrete delivery problem (RMCDP), a specific version of the vehicle routing problem (VRP), is a relevant supply-chain engineering task for construction management with…

Abstract

Purpose

Ready-mix concrete delivery problem (RMCDP), a specific version of the vehicle routing problem (VRP), is a relevant supply-chain engineering task for construction management with various formulations and solving methods. This problem can range from a simple scenario involving one source, one material and one destination to a more challenging and complex case involving multiple sources, multiple materials and multiple destinations. This paper presents an Internet of Things (IoT)-supported active building information modeling (BIM) system for optimized multi-project ready-mix concrete (RMC) delivery.

Design/methodology/approach

The presented system is BIM-based, IoT supported, dynamic and automatic input/output exchange to provide an optimal delivery program for multi-project ready-mix-concrete problem. The input parameters are extracted as real-time map-supported IoT data and transferred to the system via an application programming interface (API) into a mixed-integer linear programming (MILP) optimization model developed to perform the optimization. The obtained optimization results are further integrated into BIM by conventional project management tools. To demonstrate the features of the suggested system, an RMCDP example was applied to solve that included four building sites, seven eligible concrete plants and three necessary RMC mixtures.

Findings

The system provides the optimum delivery schedule for multiple RMCs to multiple construction sites, as well as the optimum RMC quantities to be delivered, the quantities from each concrete plant that must be supplied, the best delivery routes, the optimum execution times for each construction site, and the total minimal costs, while also assuring the dynamic transfer of the optimized results back into the portfolio of multiple BIM projects. The system can generate as many solutions as needed by updating the real-time input parameters in terms of change of the routes, unit prices and availability of concrete plants.

Originality/value

The suggested system allows dynamic adjustments during the optimization process, andis adaptable to changes in input data also considering the real-time input data. The system is based on spreadsheets, which are widely used and common tool that most stakeholders already utilize daily, while also providing the possibility to apply a more specialized tool. Based on this, the RMCDP can be solved using both conventional and advanced optimization software, enabling the system to handle even large-scale tasks as necessary.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 25 December 2023

Anna Trubetskaya, Alan Ryan, Daryl John Powell and Connor Moore

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk…

Abstract

Purpose

Output from the Irish Dairy Industry has grown rapidly since the abolition of quotas in 2015, with processors investing heavily in capacity expansion to deal with the extra milk volumes. Further capacity gains may be achieved by extending the processing season into the winter, a key enabler for which being the reduction of duration of the winter maintenance overhaul period. This paper aims to investigate if Lean Six Sigma tools and techniques can be used to enhance operational maintenance performance, thereby releasing additional processing capacity.

Design/methodology/approach

Combining the Six-Sigma Define, Measure, Analyse, Improve, Control (DMAIC) methodology and the structured approach of Turnaround Maintenance (TAM) widely used in process industries creates a novel hybrid model that promises substantial improvement in maintenance overhaul execution. This paper presents a case study applying the DMAIC/TAM model to Ireland’s largest dairy processing site to optimise the annual maintenance shutdown. The objective was to deliver a 30% reduction in the duration of the overhaul, enabling an extension of the processing season.

Findings

Application of the DMAIC/TAM hybrid resulted in process enhancements, employee engagement and a clear roadmap for the operations team. Project goals were delivered, and original objectives exceeded, resulting in €8.9m additional value to the business and a reduction of 36% in the duration of the overhaul.

Practical implications

The results demonstrate that the model provides a structure that promotes systematic working and a continuous improvement focus that can have substantial benefits for wider industry. Opportunities for further model refinement were identified and will enhance performance in subsequent overhauls.

Originality/value

To the best of the authors’ knowledge, this is the first time that the structure and tools of DMAIC and TAM have been combined into a hybrid methodology and applied in an Irish industrial setting.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 23 March 2023

Haftu Hailu Berhe, Hailekiros Sibhato Gebremichael and Kinfe Tsegay Beyene

Existing conceptual, empirical and case studies evidence suggests that manufacturing industries find the joint implementation of Kaizen philosophy initiatives. However, the…

Abstract

Purpose

Existing conceptual, empirical and case studies evidence suggests that manufacturing industries find the joint implementation of Kaizen philosophy initiatives. However, the existing practices rarely demonstrated in a single framework and implementation procedure in a structure nature. This paper, therefore, aims to develop, validate and practically test a framework and implementation procedure for the implementation of integrated Kaizen in manufacturing industries to attain long-term improvement of operational, innovation, business (financial and marketing) processes, performance and competitiveness.

Design/methodology/approach

The study primarily described the problem, extensively reviewed the current state-of-the-art literature and then identified a gap. Based on it, generic and comprehensive integrated framework and implementation procedure is developed. Besides, the study used managers, consultants and academics from various fields to validate a framework and implementation procedure for addressing business concerns. In this case, the primary data was collected through self-administered questionnaire, and 244 valid questionnaires were received and were analyzed. Furthermore, the research verified the practicability of the framework by empirically exploring the current scenario of selected manufacturing companies.

Findings

The research discovered innovative framework and six-phase implementation procedure to fill the existing conceptual gap. Furthermore, the survey-based and exploratory empirical analysis of the research demonstrated that the practice of the proposed framework based on structured procedure is valued and companies attain the middling improvements of productivity, delivery time, quality, 5S practice, waste and accident rate by 61.03, 44, 52.53, 95.19, 80.12, and 70.55% respectively. Additionally, the companies saved a total of 14933446 ETH Birr and 5,658 M2 free spaces. Even though, the practices and improvements vary from company to company, and even companies unable to practice some of the unique techniques of the identified CI initiatives considered in the proposed framework.

Research limitations/implications

All data collected in the survey came from professionals working for Ethiopian manufacturing companies, universities and government. It is important to highlight that n = 244 is high sample size, which is adequate for a preliminary survey but reinforcing still needs further survey in terms of generalization of the results since there are hundreds of manufacturing companies, consultants and academicians implementing and consulting Kaizen. Therefore, a further study on a wider Ethiopian manufacturing companies, consultants and academic scale would be informative.

Practical implications

This work is very important for Kaizen professionals in the manufacturing industry, academic and government but in particular for senior management and leadership teams. Aside from the main findings on framework development, there is some strong evidence that practice of Kaizen resulted in achieving quantitative (monetary and non-monetary) and qualitative results. Thus, senior management teams should use this research out to practice and analyze the effect of Kaizen on their own organizations. Within the academic community, this study is one of the first focusing on development, validating and practically testing and should aid further study, research and understanding of Kaizen in manufacturing industries.

Originality/value

So far, it is rare to find preceding studies proposed, validated and practically test an integrated Kaizen framework with the context of manufacturing industries. Thus, authors understand that this is the very first research focused on the development of the framework for manufacturing industries continuously to be competitive and could help managers, institutions, practitioners and academicians in Kaizen practice.

Details

International Journal of Quality & Reliability Management, vol. 40 no. 10
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 14 February 2023

Sadeq J. Alkhalifah, Firas M. Tuffaha, Laith A. Al Hadidi and Ahmad Ghaithan

The oil and gas construction projects in Saudi Arabia are commonly impacted by the frequent occurrence of change orders. Therefore, this study aims at determining the factors…

Abstract

Purpose

The oil and gas construction projects in Saudi Arabia are commonly impacted by the frequent occurrence of change orders. Therefore, this study aims at determining the factors influencing change orders in the oil and gas construction projects in Saudi Arabia.

Design/methodology/approach

Firstly, the factors are extracted by examining the literature and further refined through experts' feedback. Twenty-one factors were identified in this manner. Thirdly, the factors are prioritized using a questionnaire survey. Responses from 162 professionals have been collected through surveys and ranked using the significance index. The correlation between factor rankings between classes is assessed using Spearman's correlation coefficient. Lastly, using principal component analysis, a change order-related factors conceptual model is developed.

Findings

The five most significant factors were identified and ranked in a general manner or per the category involved. Four main types were involved: project management team (PMT), consultants, contractors and clients. Moreover, a change order-related factors model is proposed. The factors are grouped under four main groups: project definition and planning factors, project stakeholder-related factors, project execution-related factors and project performance and control factors.

Originality/value

Despite the vast factor-related literature in Saudi Arabia. Nevertheless, there has never been a study that investigates the factors influencing change orders in oil and gas projects in Saudi Arabia before. This study not only identifies the change order-related factors but also proposes a model that captures the importance of these factors. This model can aid project professionals in mitigating the impact of the most critical factors encountered during the various phases of the project.

Details

Built Environment Project and Asset Management, vol. 13 no. 3
Type: Research Article
ISSN: 2044-124X

Keywords

1 – 10 of over 2000