Search results

1 – 10 of over 3000
Article
Publication date: 30 August 2023

Jorge Armando López-Lemus, María Teresa De la Garza Carranza, Monica Lucia Reyes-Berlanga and Jose Guadalupe Lopez-Lemus

This study aims to identify the influence exerted by the performance of human resources (HR) through effectiveness and efficiency in the success of business projects in Mexico.

Abstract

Purpose

This study aims to identify the influence exerted by the performance of human resources (HR) through effectiveness and efficiency in the success of business projects in Mexico.

Design/methodology/approach

The methodological design was quantitative, explanatory, observational and transversal, where a sample of 502 was used. A structural equation model (SEM) was developed using the statistical software AMOS v25 to test the hypothesis. SPSS v25 was used for data analysis. Regarding the goodness and fit indices of the SEM, χ2 = 388.83/df = 143; χ2/df = 2.71; p < 0.001; GFI = 0.92; AGFI = 0.91; CFI = 0.96; TLI = 0.95; NFI = 0.94; IFI = 0.96; RMSEA = 0.05; RMR = 0.04; SRMR = 0.03, which turned out to be acceptable.

Findings

Through the results obtained through the SEM, it is shown that there is a positive and significant relationship between the performance of HR through their effectiveness (r = 0.65, p < 0.01) and efficiency (r = 0.64, p < 0.01) with respect to the success of the business projects. Likewise, the effectiveness of HR has a positive and significant influence on the efficiency (ß2 = 0.46; p < 0.001) and the success of business projects (ß3 = 0.89; p < 0.001) in Mexico. In the same way, efficiency positively and significantly influences the success of enterprises (ß4 = 0.35; p < 0.001) in Mexico.

Research limitations/implications

In this research, only the performance of the HR was assessed through efficiency and effectiveness as one of the variables that intervene in the development of the business project, and that is one of the main factors of analysis to achieve the success of the enterprise. In this sense, the results are limited to the extent that the findings can be generalized to business projects that are developed in different entities such as universities, incubators and other instances that promote the development of business projects and thereby guarantee success. In this sense, it is considered to carry out more research regarding these variables and others that can study the phenomenon and generate new scientific research.

Practical implications

HR performance is considered as one of the main factors that allow the success of business projects. However, some practical limitations are determined by the vision, strategies, as well as the orientation that entities such as universities, and incubators, among other organizations, determine to develop the business project and thus guarantee its success. Other practical implications lie in the leadership that the entrepreneur exercises in his/her work team and collaborators to generate synergy between them considering culture and identity, as well as the commitment to the business project.

Originality/value

The findings are relevant and of great value because they support entrepreneurship models, giving an alternative focus in the study to achieve success, specifically in the state of Guanajuato, which represents one of the main states that have with a greater number of ventures focused on the automotive, food, leather and footwear cluster, among other SMEs that promote business projects and is one of the main states of the Mexican Republic that contributes to the economic development of the region as well as the nation. Likewise, the study is relevant because there is currently not enough research focused on the variables analyzed on the success of business projects in the Mexican context.

Details

International Journal of Organizational Analysis, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1934-8835

Keywords

Article
Publication date: 27 February 2024

Zhen Zhang and Min Min

New product development (NPD) projects are strategically important for firms’ operations but suffer from high failure rates. Leadership is a key factor for project success…

Abstract

Purpose

New product development (NPD) projects are strategically important for firms’ operations but suffer from high failure rates. Leadership is a key factor for project success. However, in contrast to positive project leadership, project managers’ knowledge hiding has received little attention. Drawing on the input-mediator-output (IMO) framework and model of work team resilience, we explored the effect of project managers’ destructive knowledge hiding (i.e. evasive hiding and playing dumb) on project team performance (i.e. efficiency and effectiveness) and the serial indirect effect through team psychological safety and transactive memory systems.

Design/methodology/approach

We conducted a time-lagged multiple-sourcing investigation of Chinese high-tech firms and tested the hypotheses using data collected from 105 NPD project teams.

Findings

Our findings demonstrated that project managers’ knowledge hiding negatively affects NPD project team performance and indirectly negatively affects transactive memory systems through team psychological safety. Moreover, project managers’ knowledge hiding exerts a negative indirect effect on team performance through team psychological safety and transactive memory systems in serial.

Originality/value

This study contributes to the literature on operations management (OM) by broadening our understanding of the connection between project managers' destructive knowledge hiding and the failure of NPD projects. In providing such insight, it also offers practical guidance for overcoming team-level obstacles arising from project managers' knowledge hiding.

Details

International Journal of Operations & Production Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0144-3577

Keywords

Article
Publication date: 29 February 2024

Wenque Liu, Albert P.C. Chan, Man Wai Chan, Amos Darko and Goodenough D. Oppong

The successful implementation of hospital projects (HPs) tends to confront sundry challenges in the planning and construction (P&C) phases due to their complexity and…

Abstract

Purpose

The successful implementation of hospital projects (HPs) tends to confront sundry challenges in the planning and construction (P&C) phases due to their complexity and particularity. Employing key performance indicators (KPIs) facilitates the monitoring of HPs to advance their successful delivery. This study aims to comprehensively investigate the KPIs for hospital planning and construction (HPC).

Design/methodology/approach

The KPIs for HPC were identified through a systematic review. Then a comprehensive assessment of these KPIs was performed utilizing a meta-analysis method. In this process, basic statistical analysis, subgroup analysis, sensitive analysis and publication bias analysis were performed.

Findings

Results indicate that all 27 KPIs identified from the literature are significant for executing HPs in P&C phases. Also, some unconventional performance indicators are crucial for implementing HPs, such as “Project monitoring effectiveness” and “Industry innovation and synergy,” as their high significance is reflected in this study. Despite the fact that the findings of meta-analysis are more trustworthy than those of individual studies, a high heterogeneity still exists in the findings. It highlights the inherent uncertainty in the construction industry. Hence, this study applied subgroup analysis to explore the underlying factors causing the high level of heterogeneity and used sensitive analysis to assess the robustness of the findings.

Originality/value

There is no consensus among the prior studies on KPIs for HPC specifically and their degree of significance. Additionally, few reviews in this field have focused on the reliability of the results. This study comprehensively assesses the KPIs for HPC and explores the variability and robustness of the results, which provides a multi-dimensional perspective for practitioners and the research community to investigate the performance of HPs during the P&C stages.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 22 November 2023

Christopher Owen Cox and Hamid Pasaei

According to the Project Management Institute, 70% of projects fail globally. The causes of project failure in many instances can be identified as non-technical or behavioral in…

Abstract

Purpose

According to the Project Management Institute, 70% of projects fail globally. The causes of project failure in many instances can be identified as non-technical or behavioral in nature arising from interactions between participants. These intangible risks can emerge in any project setting but especially in project settings having diversity of cultures, customs, beliefs and traditions of various companies or countries. This paper provides an objective framework to address these intangible risks.

Study design/methodology/approach

This paper presents a structured approach to identify, assess and manage intangible risks to enhance a project team’s ability to meet its objectives. The authors propose a user-friendly framework, Intangible Risk Assessment Methodology for Projects (IRAMP), to address these risks and the factors that cause them. Meta-network (e.g., a network of networks) simulation and established social network analysis (SNA) measures provide a quantitative assessment and ranking of causal events and their influence on the intangible behavior centric risks.

Findings

The proposed IRAMP and meta-network approach were utilized to examine the project delivery process of an international energy firm. Data were gathered using structured interviews, surveys and project team workshops. The use of the IRAMP to highlight intangible risk areas underpinned by the SNA measures led to changes in the company’s organizational structure to enhance project delivery effectiveness.

Originality/value

This work extends the existing project risk management literature by providing a novel objective approach to identify and quantify behavior centric intangible risks and the conditions that cause them to emerge.

Details

International Journal of Industrial Engineering and Operations Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2690-6090

Keywords

Article
Publication date: 28 August 2023

Haiyan Xie, Ying Hong, Mengyang Xin, Ioannis Brilakis and Owen Shi

The purpose of this study is to improve communication success through barrier identification and analysis so that the identified barriers can help project teams establish…

Abstract

Purpose

The purpose of this study is to improve communication success through barrier identification and analysis so that the identified barriers can help project teams establish effective information-exchange strategies.

Design/methodology/approach

The recent publications on construction communication about time management are reviewed. Then, the semi-structured interviews are performed with both questionnaires and audio recordings (n1 = 18). Next, the collected data are analyzed using both statistical measures on the questionnaire survey and qualitative coding analysis on the text transcripts from an audio recording. Particularly, the identified barriers are substantiated using a scientometrics approach based on the published articles (2011–2020, n2 = 52,915) for purposeful information-sharing solutions in construction time management. Furthermore, the intervention strategies from the top 10 most-cited articles are analyzed and validated by comparisons with the results from construction surveys and relevant studies.

Findings

Based on the discussed communication difficulties, five main barriers were identified during time-cost risk management: probability and statistical concepts, availability of data from external resources, details of team member experiences, graphics (and graphical presentation skills), and spatial and temporal (a.k.a. 4D) simulation skills. For the improvement of communication skills and presentation quality regarding probability and statistical concepts, project teams should emphasize context awareness, case studies and group discussions. Details of communication techniques can be adjusted based on the backgrounds, experiences and expectations of team members.

Research limitations/implications

The dataset n1 has both size and duration limits because of the availability of the invited industry professionals. The dataset n2 considers the literature from 2011 to 2020. Any before-the-date and unpublished studies are not included in the study.

Practical implications

A thorough comprehension of communication barriers can help project teams develop speaking, writing and analytical thinking skills that will enable the teams to better deliver ideas, thoughts and meanings. Additionally, the established discussion on barrier-removal strategies may enhance time management effectiveness, reduce project delays, avoid confusion and misunderstanding and save rework costs.

Social implications

This research calls for the awareness of communication barriers in construction project execution and team collaboration. The identified barriers and the established solutions enrich the approaches of construction companies to share information with communities and society.

Originality/value

This is the first identification model for communication barriers in the time management of the construction industry to the authors' knowledge. The influencing factors and the countermeasures of communication difficulties highlighted by the research were not examined systematically and holistically in previous studies. The findings provide a new approach to facilitate the development of powerful communication strategies and to improve project execution.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 January 2024

Mohamed Elkbuli, Nurhidayah Azmy and Chia Kuang Lee

Although there has been an increase in the application of a variety of robust technologies and systems, the oil and gas sector relies on project managers’ soft skills for success…

Abstract

Purpose

Although there has been an increase in the application of a variety of robust technologies and systems, the oil and gas sector relies on project managers’ soft skills for success because of their vital role. Therefore, this study aims to explore the profound influence of project managers’ soft communication skills on successful risk management within Libya’s oil and gas projects.

Design/methodology/approach

A review of relevant literature and a quantitative approach through the administration of a questionnaire were used to determine factors impacting risk management implementation related to managerial communication skills. A total of 246 valid responses were received from the oil and gas companies in Tripoli, Libya. Partial least squares structural equation modelling was used to examine the direct and moderating relationship drawn by the hypotheses.

Findings

The findings suggest that managerial soft skills may be used to improve continuous risk management processes and intra-project communication. It was found that the experience is strengthening the positive relationship between written communication soft skills and project risk management implementation among Libyan oil and gas construction projects.

Originality/value

This study defines project managers’ soft communication skills and analyzes project managers’ soft communication skills with the role of experience as a moderator. This paper presents a valuable contribution by offering original insights tailored explicitly to the Libyan context. The information presented in this paper is relevant to project managers operating within the oil and gas industry. It also offers a novel approach to risk management in the Libyan oil and gas industry that can improve project efficiency and effectiveness.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 11 April 2024

Handan Kunkcu, Kerim Koc and Asli Pelin Gurgun

Work–family conflict is one of the most challenging stressors for construction industry professionals to cope with emotional problems. This study aims to propose a model linking…

Abstract

Purpose

Work–family conflict is one of the most challenging stressors for construction industry professionals to cope with emotional problems. This study aims to propose a model linking work–family conflict and high-quality relationships among project team members and explore mediating effects of life and job satisfactions.

Design/methodology/approach

A theoretical framework was established based on the spillover theory and social exchange theory. Data were obtained by a questionnaire survey conducted with 328 respondents working in construction projects. Structural equation modeling (SEM) was used to test interrelationships among work–family conflict, job satisfaction, life satisfaction and high-quality relationship.

Findings

The results indicate that work–family conflict is negatively associated with both job and life satisfactions of construction professionals. In addition, there were direct and positive relationships between satisfaction domains and high-quality relationship capacity. The findings further support that job satisfaction plays a mediating role between work–family conflict and high-quality relationship among construction professionals, while life satisfaction does not mediate the relationship.

Originality/value

The effects of interrole conflicts on the context of satisfaction have been investigated previously; however, there is a lack of knowledge regarding its influence on high-quality relationship among project team members. This study extends the body of knowledge on high-quality relationships among project team members to understand how conflict and satisfaction factors influence interpersonal relationships in construction project management.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 March 2024

Ramgy Pararajasingam, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar

Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a…

Abstract

Purpose

Construction material management plays a significant role in achieving successful project delivery of a construction project. However, ineffective material management is a critical issue in the construction industry, especially in developing economies, of which Sri Lanka is not an exception. Therefore, this study aims to focus on exploring the causes of ineffective material management practices in civil engineering construction projects in Sri Lanka and their impact on successful project delivery.

Design/methodology/approach

Furthermore, the literature findings were validated through the preliminary survey. Subsequently, a quantitative research approach was adopted to pursue the research aim. Questionnaire responses were obtained from 215 construction professionals in civil engineering projects who were selected using the judgemental and snowball sampling techniques. Collected data were analysed through Statistical Package for the Social Sciences (SPSS) V26 and Microsoft Excel 2016.

Findings

Moreover, the study revealed that material price fluctuation, shortage of material in the market, delay in material procurement, inadequate planning and delays in material delivery are the most frequent causes of ineffective material management in civil engineering projects. In addition, it was evidenced that most ineffective material management practices cause both time and cost overruns in civil engineering construction projects. Most respondents emphasized inadequate planning, inadequate qualified and experienced staff, lack of supervision and lack of leadership as the causes for both time and cost overruns.

Originality/value

The study was concluded by proposing strategies for effective material management. Education/training/enlightenment of staff in charge of materials management, use of software like Microsoft Project, Primavera and similar software to eliminate manual errors in material management, and providing clear specifications to suppliers were the most agreed strategies for effective material management in civil engineering construction projects.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 9 April 2024

Sangok Yoo and Ji Yun Kang

This study aims to explore the effects of expertise diversity on project efficiency and creativity in health-care project teams.

Abstract

Purpose

This study aims to explore the effects of expertise diversity on project efficiency and creativity in health-care project teams.

Design/methodology/approach

This study analyzes hierarchical linear models using multi-source data from 50 project teams in a large health-care organization in the USA. This data set includes self-reported survey responses from 274 team members and human resource information for all 515 members across the 50 teams. Expertise diversity is operationalized by professional diversity and positional diversity reflecting two dimensions, domain and level, of the concept of expertise.

Findings

This study reveals that professional diversity is negatively related to project efficiency and project creativity, whereas positional diversity is positively related to project efficiency.

Originality/value

Successfully managing a project team of experts within a limited time frame is a challenge for organizations. This study advances the understanding of the double-edged sword effect of expertise diversity on project teams, focusing on professional and positional diversity. It provides important insights for human resource development in terms of the composition of project teams regarding members’ expertise.

Details

European Journal of Training and Development, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-9012

Keywords

Article
Publication date: 24 January 2024

Titus Ebenezer Kwofie, Michael Nii Addy, Daniel Yaw Addai Duah, Clinton Ohis Aigbavboa, Emmanuel Banahene Owusu and George Felix Olympio

As public–private partnerships (PPPs) have become preferred and veritable approach to deliver affordable housing, the seemingly lack of understanding of the significant factors…

Abstract

Purpose

As public–private partnerships (PPPs) have become preferred and veritable approach to deliver affordable housing, the seemingly lack of understanding of the significant factors that impact on success has become a notable setback. This study aims to delineate significant factors that can support decisions in affordable PPP public housing delivery.

Design/methodology/approach

Largely, a questionnaire survey was adopted to elicit insights from practitioners, policymakers and experts to develop an evaluative decision support model using an analytical hierarchy process and multi-attribute utility technique approach. Further, an expert illustration was conducted to evaluate and validate the results on the housing typologies.

Findings

The results revealed that energy efficiency and low-cost green building materials scored the highest weighting of all the criteria. Furthermore, multi-storey self-contained flats were found to be the most preferred housing typology and were significantly influenced by these factors. From the model evaluation, the scores on the factors of sustainability, affordability, cultural values and accountability were consistent across all typologies of housing whereas that of benchmarking, governance and transparency were varied.

Originality/value

The decision support factors captured varied dimensions of key factors that impact on affordable PPP housing that have not been considered in an integrated manner. These findings offer objective and systematic support to decision-making in affordable PPP housing delivery.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Access

Year

Last 12 months (3130)

Content type

Earlycite article (3130)
1 – 10 of over 3000