Search results

1 – 10 of over 7000
Open Access
Article
Publication date: 25 July 2024

Per Erik Eriksson

This paper aims to examine how different contextual contingency factors and organizational goals influence construction clients’ decision-making when procuring contractors in the…

Abstract

Purpose

This paper aims to examine how different contextual contingency factors and organizational goals influence construction clients’ decision-making when procuring contractors in the housing sector. More specifically, it investigates how clients’ choice of procurement strategies and organizational control systems is contingent upon various contextual factors and organizational goals.

Design/methodology/approach

It is based on an explorative interview study of clients and contractors in the Swedish housing sector underpinned by a review of organizational control literature.

Findings

The client's knowledge and resources, as well as project complexity and uncertainty, are the most important contextual contingency factors, while property management and sustainable development are the most important organizational goals that housing clients consider when designing procurement strategies.

Research limitations/implications

The paper contributes to the understanding of how construction clients choose procurement strategies, by providing new insights into effects of the mentioned contextual contingency factors and organizational goals on clients’ choice of control systems through their procurement strategies.

Practical implications

Property owners who continuously procure housing projects with sustainability requirements and high degrees of complexity and uncertainty should develop knowledge and resources related to their client role, to enable the design and implementation of appropriate procurement strategies.

Originality/value

Novel aspects of the paper are the demonstration of the value of a holistic approach, considering both contextual contingency factors and organizational goals, when selecting control systems and explicit discussion of how the client's knowledge and resources influence possibilities to implement different control systems.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Open Access
Article
Publication date: 9 July 2018

Nina Detzen, Frank H.M. Verbeeten, Nils Gamm and Klaus Möller

The purpose of this paper is to investigate the effects of two formal controls, namely target rigidity and process autonomy, on team adaptability and project success in new…

2844

Abstract

Purpose

The purpose of this paper is to investigate the effects of two formal controls, namely target rigidity and process autonomy, on team adaptability and project success in new product development (NPD) projects. Target rigidity refers to performance goals that are non-negotiable once they have been set. Process autonomy refers to the extent to which a project team is free to choose ways to achieve its goals. Team adaptability is considered a key factor that explains the relationship between formal controls and project success.

Design/methodology/approach

Two separate models related to resource and cost measures are analysed, since different target types may influence managerial perceptions. This study uses data collected from a survey with 113 project managers as respondents.

Findings

The findings show that target rigidity and process autonomy support team adaptability. Furthermore, team adaptability mediates the impact of formal controls on project success. The effects are more pronounced for cost targets as compared to resource targets.

Practical implications

Firms can increase project success by using formal controls in such a way that they allow project managers to provide their teams with motivating guidelines (target rigidity) and discretion (process autonomy) to adapt to new circumstances.

Originality/value

This study reveals the impact of formal controls on NPD project success through team adaptability. A balanced use of target rigidity and process autonomy may help improving NPD project success.

Details

Management Decision, vol. 56 no. 7
Type: Research Article
ISSN: 0025-1747

Keywords

Open Access
Article
Publication date: 21 July 2022

Anna-Therése Järvenpää, Johan Larsson and Per Erik Eriksson

This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.

Abstract

Purpose

This paper aims to identify how a public client’s use of control systems (process, output and social control) affect innovation possibilities in construction projects.

Design/methodology/approach

Semi-structured interviews about six infrastructure projects were conducted to identify respondents’ views on innovation possibilities. These possibilities were then analyzed from an organizational control perspective within principal–agent relationships between the Swedish Transport Administration (STA) and their contractors.

Findings

How the client uses control systems affects innovation possibilities. Relying on process control could negatively affect innovation opportunities, whereas output control could have a positive influence. In addition, social control seems to have a weak effect, as the STA appears not to use social control to facilitate joint innovation. Public clients must comply with the Public Procurement Act and, therefore, retain the requirements specified in the tendering documents. Much of the steering of the execution is connected to the ex ante phase (before signing the contract), which affects innovation possibilities in the design and execution phases for the contractor.

Research limitations/implications

This study was conducted with only one client, thus limiting its generalizability. However, the findings provide an important stepping stone to further investigation into balancing control systems and creating innovation possibilities in a principal–agent relationship.

Originality/value

Although public procurement has increasingly been emphasized as a major potential source of innovation, studying how a public client’s use of organizational control systems affects innovation possibilities in the construction sector has received scant attention.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 28 June 2022

Sahar Jawad, Ann Ledwith and Rashid Khan

There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and…

1975

Abstract

Purpose

There is growing recognition that effective project control systems (PCS) are critical to the success of projects. The relationship between the individual elements of PCS and successfully achieving project objectives has yet to be explored. This research investigates the enablers and barriers that influence the elements of PCS success and drive project objectives.

Design/methodology/approach

This study adopts a mixed approach of descriptive analysis and regression models to explore the impact of six PCS elements on project outcomes. Petroleum and chemical projects in Saudi Arabia were selected as a case study to validate the research model.

Findings

Data from a survey of 400 project managers in Saudi’s petroleum and chemical industry reveal that successful PCS are the key to achieving all project outcomes, but they are particularly critical for meeting project cost objectives. Project Governance was identified as the most important of the six PCS elements for meeting project objectives. A lack of standard processes emerged as the most significant barrier to achieving effective project governance, while having skilled and experienced project team members was the most significant enabler for implementing earned value.

Practical implications

The study offers a direction for implementing and developing PCS as a strategic tool and focuses on the PCS elements that can improve project outcomes.

Originality/value

This research contributes to project management knowledge and differs from previous attempts in two ways. Firstly, it investigates the elements of PCS that are critical to achieving project scope, schedule and cost objectives; secondly, enablers and barriers of PCS success are examined to see how they influence each element independently.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 10 August 2018

Denise Ann Brady, Patricia Tzortzopoulos, John Rooke, Carlos Torres Formoso and Algan Tezel

The purpose of this paper is to discuss a production planning and control model known as the Lean construction management (LCM) model, which applies a number of visual tools in a…

8564

Abstract

Purpose

The purpose of this paper is to discuss a production planning and control model known as the Lean construction management (LCM) model, which applies a number of visual tools in a systematic way to the planning and control process. The application of the visual tools in this way facilitates the flow of information, thus improving transparency between the interfaces of planning, execution and control.

Design/methodology/approach

Design Science research is adopted for this investigation, which analyses the original development of the model and reports on its testing and refinement over different types of projects. The research is divided into three parts, each part focussing on a different stage of development and construction project type.

Findings

The main findings are related to the benefits of visual management in the construction planning and control process, such as maintaining consistency between different planning levels, so that feasible execution plans are created; control becomes more focussed on prevention rather than correction, and creates opportunities for collaborative problem solving. Moreover, the physical display of the visual tools in a discrete planning area on-site encourages a regular exchange between participants on actual work progress as it unfolds, leading to more timely reaction to the problems at hand.

Originality/value

The problem of a lack of transparency in construction planning and control leads to communication issues on-site, poor process orientation and high levels of waste. LCM improves process transparency by making information related to system-wide processes more readily available to project participants. This enables them to foresee problems in a timely manner and to take necessary measures to resolve them or to adapt the process to current circumstances. The LCM model proposes a new way of applying visual tools and controls systematically to improve transparency in construction planning and control.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 28 October 2021

Gavin Dennehy, Bobby Kennedy and John Spillane

The purpose of this study is to identify the factors relating to the integration and compliance of Building Control (Amendment) Regulations 2014 (BC(A)R 2014) in large Irish…

1118

Abstract

Purpose

The purpose of this study is to identify the factors relating to the integration and compliance of Building Control (Amendment) Regulations 2014 (BC(A)R 2014) in large Irish construction organisations.

Design/methodology/approach

To achieve the aim, a mixed method approach is adopted, initially, providing a critique of the literature review, followed by a combination of 7 semi-structured interviews and 30 questionnaires from industry practitioners.

Findings

Findings demonstrate that BC(A)R has had a significant positive effect on the industry, eliminating previous bad practice, by increasing the accountability for professionals signing-off on new buildings, and highlights the emphasis on certification in successfully achieving practical completion on projects.

Practical implications

The findings provide further justification on the need for compliance, and integration, of BC(A)R in the Irish construction sector, offering further evidence, where needed, on the benefit of its adoption.

Originality/value

The originality and value of this research lies in the limited number of studies in the area, particularly in the context of large Irish construction projects, which this study aims to fulfil.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 1
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Article
Publication date: 19 March 2018

Josana Gabriele Bolzan Wesz, Carlos Torres Formoso and Patricia Tzortzopoulos

The purpose of this paper is to propose a model for planning and controlling the design process in companies that design, manufacture and assemble prefabricated engineer-to-order…

3983

Abstract

Purpose

The purpose of this paper is to propose a model for planning and controlling the design process in companies that design, manufacture and assemble prefabricated engineer-to-order (ETO) building systems. This model was devised as an adaptation of the Last Planner® System for ETO multiple-project environments.

Design/methodology/approach

Design science research, also known as prescriptive research, was the methodological approach adopted in this research. An empirical study was carried out at the design department of a leading steel fabricator from Brazil, in which the proposed model was implemented in six different design teams.

Findings

The main benefits of the proposed model were shielding design work from variability, encouraging collaborative planning, creating opportunities for learning, increasing process transparency, and flexibility according to project status. Two main factors affected the effectiveness of the implementation process commitment and leadership of design managers, and training on design management and project planning and control core concepts and practices.

Research limitations/implications

Some limitations were identified in the implementation process: similarly to some previous studies (Ballard, 2002; Codinhoto and Formoso, 2005), the success of constraint analysis was still limited; some of the metrics produced (e.g. ABI, causes of planning failures) have not been fully used for process improvement; and systematic feedback about project status was not properly implemented and tested.

Originality/value

The main contributions of this study in relation to traditional design planning and control practices are related to the use of two levels of look-ahead planning, the introduction of a decoupling point between conceptual and detail design, the proposition of new metrics for the Last Planner® System, and understanding the potential role of visual management to support planning and control.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 26 November 2019

Kholilah, Vega Wafaretta and Dian Syariati

Entrepreneurship-based learning (EBL) is one of the student-center learningmethods that can answer learning challenges in the era of industrial revolution 4.0. EBL is expected to…

1597

Abstract

Purpose

Entrepreneurship-based learning (EBL) is one of the student-center learningmethods that can answer learning challenges in the era of industrial revolution 4.0. EBL is expected to improve students’ competencies and make students more adaptable to the changes in the world of work in the future. The paper aims to discuss this issue.

Design/methodology/approach

This study uses quasi-experiments and divides classes into project class and control class. The project consists of making business proposals, conducting business, liquidating the partnership, and recording business transaction using the Xero platform. The Wilcoxon Signed Ranks Test, Mann–Whitney Test and independent t-test were carried out to test whether there are differences of cognitive abilities and entrepreneurial (general, social and functional) competencies between the project class and control class.

Findings

The results of the study shows there are differences of understanding of partnership accounting and the achievement of social and functional entrepreneurial competencies between the project class and control class.

Research limitations/implications

This study implies in using EBL to improve entrepreneurial skills for students beyond cognitive abilities.

Originality/value

The novelty of this research is the implementation of EBL in partnership accounting topics.

Details

Asian Journal of Accounting Research, vol. 4 no. 2
Type: Research Article
ISSN: 2443-4175

Keywords

Open Access
Article
Publication date: 20 June 2019

Teemu Mikael Lappi, Kirsi Aaltonen and Jaakko Kujala

This paper aims to increase the current understanding of the connection between operational level information and communication technology (ICT) projects and national level…

12078

Abstract

Purpose

This paper aims to increase the current understanding of the connection between operational level information and communication technology (ICT) projects and national level digital transformation by researching how project governance structures and practices are applied in an e-government context.

Design/methodology/approach

An elaborative qualitative study through public documentary analysis and empirical multi-case research on Finnish central government is used.

Findings

The study constructs a multi-level governance structure with three main functions and applies this in an empirical setting. The results also describe how different governance practices and processes, focusing on project portfolio management, are applied vertically across different organizational levels to connect the ICT projects with the national digitalization strategy.

Originality/value

This study integrates project governance and portfolio management knowledge into public sector digitalization, thus contributing to project management, e-government and ICT research streams by improving the current understanding on the governance of ICT projects as part of a larger-scale digitalization. This study also highlights perceived gaps between current governance practices and provides implications to managers and practitioners working in the field to address these gaps.

Details

Transforming Government: People, Process and Policy, vol. 13 no. 2
Type: Research Article
ISSN: 1750-6166

Keywords

Open Access
Article
Publication date: 3 May 2023

Lars Stehn and Alexander Jimenez

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels…

Abstract

Purpose

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels. The take is that fragmentation of construction is one explanation for the lack of productivity growth, and that IHB could be an integrating method of overcoming horizontal and vertical fragmentation.

Design/methodology/approach

Singe-factor productivity measures are calculated based on data reported by IHB companies and compared to official produced and published research data. The survey covers the years 2013–2020 for IHB companies building multi-storey houses in timber. Generalization is sought through descriptive statistics by contrasting the data samples to the used means to control vertical and horizontal fragmentation formulated as three theoretical propositions.

Findings

According to the results, IHB in timber is on average more productive than conventional housebuilding at the company level, project level, in absolute and in growth terms over the eight-year period. On the company level, the labour productivity was on average 10% higher for IHB compared to general construction and positioned between general construction and general manufacturing. On the project level, IHB displayed an average cost productivity growth of 19% for an employed prefabrication degree of about 45%.

Originality/value

Empirical evidence is presented quantifying so far perceived advantages of IHB. By providing analysis of actual cost and project data derived from IHB companies, the article quantifies previous research that IHB is not only about prefabrication. The observed positive productivity growth in relation to the employed prefabrication degree indicates that off-site production is not a sufficient mean for reaching high productivity and productivity growth. Instead, the capabilities to integrate the operative logic of conventional housebuilding together with logic of IHB platform development and use is a probable explanation of the observed positive productivity growth.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of over 7000