Search results

1 – 10 of over 44000
Article
Publication date: 1 March 1999

ALI JAAFARI and KITSANA MANIVONG

The focus of this paper is on lifecycle objective‐based project management systems in general, and SPMIS in particular. SPMIS (short for Smart Project Management Information…

2166

Abstract

The focus of this paper is on lifecycle objective‐based project management systems in general, and SPMIS in particular. SPMIS (short for Smart Project Management Information System), has been designed: (a) to facilitate the employment of lifecycle objective‐based project management approaches; and (b) to support concurrent engineering and construction, thus promoting greater integration of the processes under which projects are proposed and implemented. In order to validate the functions designed for SPMIS the authors undertook a detailed case study of a large capital project. The actual project management functions employed by the project team on the case project were researched and charted using the best current PM practices as the guide. While this field research shed light on the actual needs and requirements, the design of the SPMIS functions was approached from first principles in order to incorporate the basic shift from the traditional objectives of cost, time, and quality to lifecycle objective functions, such as return on investment, facility operability, and lifecycle integration. This paper describes the fundamental philosophy and framework for the development of lifecycle objective function‐based project management systems in general, and contrasts these with the existing PM methods.

Details

Engineering, Construction and Architectural Management, vol. 6 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 February 2005

Ming‐Huei Chen and Yuan‐Chieh Chang

This research focuses on examining the dynamics of task and interpersonal conflict related to the creativity of teams over five stages of a project's life cycle. Data were…

2180

Abstract

This research focuses on examining the dynamics of task and interpersonal conflict related to the creativity of teams over five stages of a project's life cycle. Data were collected from 142 respondents of information system development project teams of a service‐driven type, and from 106 respondents of new product development teams of a technology‐driven type. Results indicate that interpersonal conflict has a negative impact on creativity for a service‐driven project team. However, task conflict has a positive impact on creativity for a technology‐driven project team. The findings suggest that managing different types of project teams necessitates concern with the variations of conflict and creativity over a project's life cycle.

Details

International Journal of Organizational Analysis, vol. 13 no. 2
Type: Research Article
ISSN: 1934-8835

Keywords

Article
Publication date: 22 March 2019

Jonghyuk Cha and Eunice Maytorena-Sanchez

The purpose of this paper is to investigate the relative importance of project management (PM) competences across the different stages of a software project life cycle to identify…

2381

Abstract

Purpose

The purpose of this paper is to investigate the relative importance of project management (PM) competences across the different stages of a software project life cycle to identify competence development gaps and opportunities.

Design/methodology/approach

A deductive and quantitative approach was adopted to address the research questions with a web-based survey for data collection.

Findings

After reviewing the context of competences and PM competences, the importance of the PM competences overall and for specific stages in the project life cycle was analysed. The result highlights that functional and meta-competences are perceived to be the most important competence dimensions for software project practitioners.

Originality/value

This study makes three contributions. First, it consolidates PM competences into a set of 20 within four competence dimensions. Second, it prioritises these competences across the software project life cycle. Third, it identifies the significance of the inter-relationship between PM competences and project life cycle to reveal PM competence development gaps and opportunities.

Details

International Journal of Managing Projects in Business, vol. 12 no. 4
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 9 November 2020

Seyedhabibollah Sadrinooshabadi, Afshin Taheri, Ibrahim Yitmen and Rogier Jongeling

Each building project demands an integrated method for information and requirement management in its life cycle. The main purpose of this paper is to explore the major obstacles…

Abstract

Purpose

Each building project demands an integrated method for information and requirement management in its life cycle. The main purpose of this paper is to explore the major obstacles in integrated life cycle information management and recognize the potentials of CoClass as the new Swedish digital classification system to tackle them throughout asset life cycle.

Design/methodology/approach

The industry viewpoint toward the current status of asset information management considering ISO 19650-1 principles and the existing obstacles and the industry practitioners' ideas regarding CoClass capabilities and applicability were captured and analyzed. A total of 13 semistructured interviews were conducted with the AECO industry professionals to have an understanding of information requirement management. Then the results were analyzed qualitatively, using the NVivo 12 software. Different attributes of a component (heating panel) in a meeting room according to CoClass and data deviations throughout the asset life cycle were elaborated.

Findings

This study reveals some obstacles in information management process in seven categories in relation to: (1) the need to employ information exchange platforms as common data environments (CDEs) by all actors from early stages; (2) the communication issues caused by lack of utilizing common languages; (3) the costly and time-consuming implementation process; (4) the misunderstandings in terms of data communication between service providers and owners; (5) the definition and fulfillment of information requirements as well as keeping track of data deviations throughout asset life cycle; (6) the information update difficulty; and (7) the need for training practitioners dealing with new systems such as CoClass.

Originality/value

The research explores the major obstacles in information requirement management concerning the practical implementation of the new Swedish classification system, CoClass, supporting the asset life cycle.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 August 2014

Carlos Eduardo Yamasaki Sato and Milton de Freitas Chagas Jr

The purpose of this paper is to propose to redefine the concept of project lead time (PLT) to encompass the time between the project initial idea and the moment in which success…

2690

Abstract

Purpose

The purpose of this paper is to propose to redefine the concept of project lead time (PLT) to encompass the time between the project initial idea and the moment in which success is being assessed, which can be beyond the project close-out, using whatever criteria is appropriate for the stakeholder at that moment in time. The conventional project life cycle does not count for the long-term effects of the megaproject, which can have a significant impact on its perception of success. Thus the megaproject life cycle should include a significant part of the operational life cycle of the end product or result, and the criteria of success should include the long-term benefits of the project (measured along various years after the delivery of the end product or result).

Design/methodology/approach

The paper uses three illustrative cases of megaprojects: Airbus A380, London Heathrow Terminal 5 and London Olympic Games 2012. These megaprojects, despite their problems in achieving objectives of time, cost and quality (the triple constraint), can be viewed as success or failure depending on the performance and benefits of the resulting product/infrastructure analysed over a long period of time after its delivery.

Findings

In order to reconcile the usual distinction between project and product life cycle, and the various definitions of success in different moments of the project/product life cycle, the authors propose to redefine the concept of PLT to encompass the time between the project initial idea and the moment in which success is being assessed, beyond the project close-out, using any criteria which is appropriate for the stakeholder at that moment in time.

Originality/value

When assessing the success of the megaproject it is important to define the PLT under which success is being assessed. As pointed out earlier, in findings, the authors propose to redefine the concept of PLT to encompass the time between the project initial idea and the moment in which success is being assessed, beyond the project close-out, using any criteria which is appropriate for the stakeholder at that moment in time.

Details

International Journal of Managing Projects in Business, vol. 7 no. 4
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 21 December 2023

Libiao Bai, Xuyang Zhao, ShuYun Kang, Yiming Ma and BingBing Zhang

Research and development (R&D) projects are often pursued through a project portfolio (PP). R&D PPs involve many stakeholders, and without proactive management, their interactions…

Abstract

Purpose

Research and development (R&D) projects are often pursued through a project portfolio (PP). R&D PPs involve many stakeholders, and without proactive management, their interactions may lead to conflict risks. These conflict risks change dynamically with different stages of the PP life cycle, increasing the challenge of PP risk management. Existing conflict risk research mainly focuses on source identification but lacks risk assessment work. To better manage the stakeholder conflict risks (SCRs) of R&D PPs, this study employs the dynamic Bayesian network (DBN) to construct its dynamic assessment model.

Design/methodology/approach

This study constructs a DBN model to assess the SCRs in R&D PP. First, an indicator system of SCRs is constructed from the life cycle perspective. Then, the risk relationships within each R&D PPs life cycle stage are identified via interpretative structural modeling (ISM). The prior and conditional probabilities of risks are obtained by expert judgment and Monte Carlo simulation (MCS). Finally, crucial SCRs at each stage are identified utilizing propagation analysis, and the corresponding risk responses are proposed.

Findings

The results of the study identify the crucial risks at each stage. Also, for the crucial risks, this study suggests appropriate risk response strategies to help managers better perform risk response activities.

Originality/value

This study dynamically assesses the stakeholder conflict risks in R&D PPs from a life-cycle perspective, extending the stakeholder risk management research. Meanwhile, the crucial risks are identified at each stage accordingly, providing managerial insights for R&D PPs.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 June 2005

Charles A. Schuman and Alan C. Brent

Asset management is often one of the last options to maximise cost savings in a competitive global economy due to its intrinsic complexity, especially in many developing…

11557

Abstract

Purpose

Asset management is often one of the last options to maximise cost savings in a competitive global economy due to its intrinsic complexity, especially in many developing countries. Asset management in the process industry must consider the commissioning, operational and end‐of‐life phases of physical assets when commencing a design and implementation project. However, current asset management models show inefficiencies in terms of addressing life cycle costs comprehensively, as well as other aspects of sustainable development. An asset life cycle management (ALCM) model is subsequently proposed for assets in the process industry, which integrates the concepts of generic project management frameworks and systems engineering with operational reliability in order to address these inefficiencies.

Design/methodology/approach

Experiences within a large petrochemical company in South Africa are used as a case study to demonstrate and discuss the different components of the proposed ALCM model.

Findings

Operational reliability and systems engineering are the means to achieve optimum value from physical assets over a facility's lifetime. Thereby, activities are identified that should be completed during each stage of the project life cycle. The application of performance measurements for the operation and support stages is proposed to influence decision making in the process industry.

Originality/value

Specific issues pertaining to the ALCM model are highlighted to ensure optimal practicality and incorporation of the model with other management practices in the process industry.

Details

International Journal of Operations & Production Management, vol. 25 no. 6
Type: Research Article
ISSN: 0144-3577

Keywords

Article
Publication date: 3 January 2023

Syahrul Nizam Kamaruzzaman, Sarah Nabiha Suznan and Nik Elyna Myeda

This study aims to leverage the implementation of building information modelling (BIM) in facilities management (FM), and thus the integration of BIM and FM are explored. It looks…

Abstract

Purpose

This study aims to leverage the implementation of building information modelling (BIM) in facilities management (FM), and thus the integration of BIM and FM are explored. It looks at identifying the information needed to implement BIM application in FM, to determine the level of implementation of BIMFM as well as to recommend BIMFM application mapping for building life cycle.

Design/methodology/approach

This study applied qualitative methodology, upon which a purposive sampling to 16 interviewees were conducted among professionals involved in any BIM, FM, BIMFM projects. Final analysis was conducted using thematical analysis by ATLAS.ti software.

Findings

The types of information required to implement BIMFM range from managerial information, commercial information, technical information and all full life cycle data. The implementation of BIMFM is agreed as beneficial, as it builds up efficiency of building performance, able to close gap of loses information, helps to improve FM in terms of data management, mitigates the problems, identifies priority defects and to enhance the FM processes. Respondents also believed that the causes where there is no implementation of BIMFM is in the situations where things are in order and when it becomes very expensive.

Originality/value

This paper has managed to gather the essential elements toward leveraging the implementation of BIMFM in digital construction project which are in the means of information types, the needs of BIMFM implementation and towards the end drawing the BIMFM implementation plan framework that could be used as a reference for the practitioners and industry.

Details

Journal of Facilities Management , vol. 21 no. 4
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 2 July 2018

Jonghyuk Cha, Mike Newman and Graham Winch

This paper highlights that extant project management (PM) bodies of knowledge have not fully addressed organisational transformation enabled by information systems projects. The…

3492

Abstract

Purpose

This paper highlights that extant project management (PM) bodies of knowledge have not fully addressed organisational transformation enabled by information systems projects. The purpose of this paper is to examine the transformation context in the PM disciplines. The authors argue that the execution-oriented PM bodies of knowledge are limited, as they place too much emphasis on the delivery outputs by the supplier rather than the achievement of beneficial outcomes by the project owner.

Design/methodology/approach

As a conceptual paper, this paper reviews extant PM bodies of knowledge, life cycle models, the context of organisational transformation and benefits realisation, and the distinction between a project owner’s and the project supplier’s capabilities.

Findings

A new PM knowledge framework is provided as an advanced research frame for future works by enhancing Peter Morris’ Management of Projects framework by employing the conceptual lens of Winch’s Three Domains of Project Organising model.

Originality/value

The advanced model emphasises the necessity of distinguishing a project owner’s and a supplier’s PM capability and knowledge to achieve successful IS-enabled organisational transformation. Through this effort to resolve the fragmentation and specialisation problems in PM disciplines, the model can be used as a theoretical groundwork for the advancement of PM research.

Details

International Journal of Managing Projects in Business, vol. 11 no. 4
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 7 June 2022

Zhen Li, Yutong Jin, Wenjing Li, Qingfeng Meng and Xin Hu

The impacts of COVID-19 on construction projects have attracted much attention in the construction management research community. Nevertheless, a systematic review of these…

2103

Abstract

Purpose

The impacts of COVID-19 on construction projects have attracted much attention in the construction management research community. Nevertheless, a systematic review of these studies is still lacking. The purpose of this paper is to systematically analyze the impacts of COVID-19 on the different stages of a project life-cycle, and comprehensively sort out the epidemic response measures adopted by project participants. In addition, the study also attempts to explore the challenges and opportunities faced by project management practitioners under the context of COVID-19.

Design/methodology/approach

This study comprehensively demonstrates the systematic review process of COVID-19 related research in the construction industry, systematically summarizes the research status of the impact of COVID-19 on construction projects, and defines the strategies to deal with COVID-19 in project management; and through the visualization research, determines the current key research topics and future research trends.

Findings

This study identifies 11 construction activities in the project management life cycle that are affected by COVID-19 and finds that the COVID-19 epidemic has the greatest impact on construction workers, construction standards, construction contracts and construction performance. The study further summarizes the six main epidemic countermeasures and mitigation measures taken within the construction industry following the arrival of the epidemic. In addition, the results of this study identify opportunities and future trends in intelligent construction technology, rapid manufacturing engineering and project management in the construction industry in the post-epidemic era through literature results, which also provide ideas for related research.

Practical implications

COVID-19 has brought severe challenges to society. It is of great significance for the future sustainable development of the construction industry to identify the impact of COVID-19 on all phases of the project and to promote the development of coping strategies by project stakeholders.

Originality/value

First of all, there is little study comprehensively reviewing the impacts of COVID-19 on the different stages of construction projects and the strategies to deal with the negative impacts. In addition, from a life cycle perspective, the used articles in this study were grouped into different categories based on project stages. This promotes an integrated and comprehensive understanding of historical studies. Moreover, on the basis of a comprehensive review, this paper puts forward future research directions to promote the sustainable development of the construction sector.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 44000