Search results

1 – 10 of 37
Content available
Article
Publication date: 1 September 2001

82

Abstract

Details

Assembly Automation, vol. 21 no. 3
Type: Research Article
ISSN: 0144-5154

Keywords

Content available
Article
Publication date: 1 March 2001

69

Abstract

Details

Assembly Automation, vol. 21 no. 1
Type: Research Article
ISSN: 0144-5154

Keywords

Content available
Article
Publication date: 1 December 1998

83

Abstract

Details

Assembly Automation, vol. 18 no. 4
Type: Research Article
ISSN: 0144-5154

Keywords

Content available

Abstract

Details

Assembly Automation, vol. 19 no. 4
Type: Research Article
ISSN: 0144-5154

Keywords

Open Access
Article
Publication date: 18 May 2023

Anna Trubetskaya, Alan Ryan and Frank Murphy

This paper aims to introduce a model using a digital twin concept in a cold heading manufacturing and develop a digital visual management (VM) system using Lean overall equipment…

5002

Abstract

Purpose

This paper aims to introduce a model using a digital twin concept in a cold heading manufacturing and develop a digital visual management (VM) system using Lean overall equipment effectiveness (OEE) tool to enhance the process performance and establish Fourth Industrial Revolution (I4.0) platform in small and medium enterprises (SMEs).

Design/methodology/approach

This work utilised plan, do, check, act Lean methodology to create a digital twin of each machine in a smart manufacturing facility by taking the Lean tool OEE and digitally transforming it in the context of I4.0. To demonstrate the effectiveness of process digitisation, a case study was carried out at a manufacturing department to provide the data to the model and later validate synergy between Lean and I4.0 platform.

Findings

The OEE parameter can be increased by 10% using a proposed digital twin model with the introduction of a Level 0 into VM platform to clearly define the purpose of each data point gathered further replicate in projects across the value stream.

Research limitations/implications

The findings suggest that researchers should look beyond conversion of stored data into visualisations and predictive analytics to improve the model connectivity. The development of strong big data analytics capabilities in SMEs can be achieved by shortening the time between data gathering and impact on the model performance.

Originality/value

The novelty of this study is the application of OEE Lean tool in the smart manufacturing sector to allow SME organisations to introduce digitalisation on the back of structured and streamlined principles with well-defined end goals to reach the optimal OEE.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Content available
Article
Publication date: 22 May 2009

33

Abstract

Details

Pigment & Resin Technology, vol. 38 no. 3
Type: Research Article
ISSN: 0369-9420

Open Access
Article
Publication date: 7 May 2024

Mohammed Y. Fattah, Mahmood R. Mahmood and Mohammed F. Aswad

The main objective of the present research is to investigate the benefits of using geogrid reinforcement in minimizing the rate of deterioration of ballasted rail track geometry…

Abstract

Purpose

The main objective of the present research is to investigate the benefits of using geogrid reinforcement in minimizing the rate of deterioration of ballasted rail track geometry resting on soft clay and to explore the effect of load amplitude, load frequency, presence of geogrid layer in ballast layer and ballast layer thickness on the behavior of track system. These variables are studied both experimentally and numerically. This paper examines the effect of geogrid reinforced ballast laying on a layer of clayey soil as a subgrade layer, where a half full scale railway tests are conducted as well as a theoretical analysis is performed.

Design/methodology/approach

The experimental tests work consists of laboratory model tests to investigate the reduction in the compressibility and stress distribution induced in soft clay under a ballast railway reinforced by geogrid reinforcement subjected to dynamic load. Experimental model based on an approximate half scale for general rail track engineering practice is adopted in this study which is used in Iraqi railways. The investigated parameters are load amplitude, load frequency and presence of geogrid reinforcement layer. A half full-scale railway was constructed for carrying out the tests, which consists of two rails 800 mm in length with three wooden sleepers (900 mm × 90 mm × 90 mm). The ballast was overlying 500 mm thick clay layer. The tests were carried out with and without geogrid reinforcement, the tests were carried out in a well tied steel box of 1.5 m length × 1 m width × 1 m height. A series of laboratory tests were conducted to investigate the response of the ballast and the clay layers where the ballast was reinforced by a geogrid. Settlement in ballast and clay, was measured in reinforced and unreinforced ballast cases. In addition to the laboratory tests, the application of numerical analysis was made by using the finite element program PLAXIS 3D 2013.

Findings

It was concluded that the settlement increased with increasing the simulated train load amplitude, there is a sharp increase in settlement up to the cycle 500 and after that, there is a gradual increase to level out between, 2,500 and 4,500 cycles depending on the load frequency. There is a little increase in the induced settlement when the load amplitude increased from 0.5 to 1 ton, but it is higher when the load amplitude increased to 2 ton, the increase in settlement depends on the geogrid existence and the other studied parameters. Both experimental and numerical results showed the same behavior. The effect of load frequency on the settlement ratio is almost constant after 500 cycles. In general, for reinforced cases, the effect of load frequency on the settlement ratio is very small ranging between 0.5 and 2% compared with the unreinforced case.

Originality/value

Increasing the ballast layer thickness from 20 cm to 30 cm leads to decrease the settlement by about 50%. This ascertains the efficiency of ballast in spreading the waves induced by the track.

Details

Railway Sciences, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2755-0907

Keywords

Content available
Article
Publication date: 1 June 2004

116

Abstract

Details

Aircraft Engineering and Aerospace Technology, vol. 76 no. 3
Type: Research Article
ISSN: 0002-2667

Keywords

Open Access
Book part
Publication date: 4 May 2018

Salahuddin, Bakhtiar, Yusman and Fadhli

Purpose – This study aims to design and build a wireless supervisory control and data acquisition (SCADA) system based on Protocol AX.25 with the aim of monitoring the performance…

Abstract

Purpose – This study aims to design and build a wireless supervisory control and data acquisition (SCADA) system based on Protocol AX.25 with the aim of monitoring the performance of several parameters in Microhydro Power Plant (MHPP). This system can monitor several MHPP parameters such as voltage, current, frequency, and turbine rotation so that it can be accessed directly at one central location.

Design/Methodology/Approach – The design is done by taking into account the real parameters that exist in the MHPP. Some parameters that become the main object to see the performance of MHPP are voltage, current, frequency, and turbine rotation. The voltage generated by the MHPP must be adjusted to the voltage supplied by State Electricity Company to the consumer, including the phase used. The resulting stream should also be monitored for power to be adjusted to the turbine spin. The generator frequency is kept stable according to the standard frequency of the State Electricity Company generator.

Findings – The remote terminal unit (RTU) system has been simulated using 2 ACS712 current sensors, voltage sensor, zero crossing point, frequency sensor, and rotation sensor functionalized to monitor MHPP parameters. The AX.25 protocol has been applicable in the wireless SCADA network for monitoring the performance of MHPP by embedding in KYL-1020UA transceiver radio using the 433 MHz frequency and the audio frequency shift keying modulation system. Radio transmitter KYL-1020UA has been successfully simulated to send data from sensors to display on the computer through SCADA built applications. The data changes in the RTU section can be displayed properly on the graphic user interface in accordance with the existing display at the MHPP location.

Research Limitations/Implications – There are only two RTUs that will be connected to communicate, in this case MHPP-1 with callsign “RTU-001” and MHPP-2 with callsign “RTU-002.” While the existing devices in the data access section parameters MHPP as master station with callsign “MSSCADA” monitoring the performance of parameters sent from the RTU. There is no collision or error in data transmission. Baudrate is varied at 1,200 bps, 2,400 bps, 4,800 bps, and 9,600 bps for effective throughput calculation and AX.25 protocol efficiency. The transmission distance is varied at 100 m, 200 m, 300 m, and 500 m to see the bit error rate with baudrate 1,200 bps and 9,600 bps.

Practical Implications – This product is expected to be applied to several MHPP locations in Aceh Province so that its monitoring system is more centralized and efficient.

Originality/Value – This research if for the efficient monitoring of several MHPP located far apart and can be monitored in one central location so that operators do not have to be located at the plant site.

Content available
Article
Publication date: 1 December 1999

98

Abstract

Details

Assembly Automation, vol. 19 no. 4
Type: Research Article
ISSN: 0144-5154

Keywords

1 – 10 of 37