Search results

1 – 10 of 905
Content available
Article
Publication date: 2 September 2014

Florence Ling and Carlos Formoso

2102

Abstract

Details

Built Environment Project and Asset Management, vol. 4 no. 4
Type: Research Article
ISSN: 2044-124X

Content available
Article
Publication date: 23 November 2018

Alex Opoku, Peter Guthrie and Vian Ahmed

333

Abstract

Details

Journal of Facilities Management, vol. 16 no. 3
Type: Research Article
ISSN: 1472-5967

Content available
Article
Publication date: 1 June 2000

88

Abstract

Details

Aircraft Engineering and Aerospace Technology, vol. 72 no. 3
Type: Research Article
ISSN: 0002-2667

Keywords

Open Access
Article
Publication date: 26 May 2023

Mpho Trinity Manenzhe, Arnesh Telukdarie and Megashnee Munsamy

The purpose of this paper is to propose a system dynamic simulated process model for maintenance work management incorporating the Fourth Industrial Revolution (4IR) technologies.

2208

Abstract

Purpose

The purpose of this paper is to propose a system dynamic simulated process model for maintenance work management incorporating the Fourth Industrial Revolution (4IR) technologies.

Design/methodology/approach

The extant literature in physical assets maintenance depicts that poor maintenance management is predominantly because of a lack of a clearly defined maintenance work management process model, resulting in poor management of maintenance work. This paper solves this complex phenomenon using a combination of conceptual process modeling and system dynamics simulation incorporating 4IR technologies. A process for maintenance work management and its control actions on scheduled maintenance tasks versus unscheduled maintenance tasks is modeled, replicating real-world scenarios with a digital lens (4IR technologies) for predictive maintenance strategy.

Findings

A process for maintenance work management is thus modeled and simulated as a dynamic system. Post-model validation, this study reveals that the real-world maintenance work management process can be replicated using system dynamics modeling. The impact analysis of 4IR technologies on maintenance work management systems reveals that the implementation of 4IR technologies intensifies asset performance with an overall gain of 27.46%, yielding the best maintenance index. This study further reveals that the benefits of 4IR technologies positively impact equipment defect predictability before failure, thereby yielding a predictive maintenance strategy.

Research limitations/implications

The study focused on maintenance work management system without the consideration of other subsystems such as cost of maintenance, production dynamics, and supply chain management.

Practical implications

The maintenance real-world quantitative data is retrieved from two maintenance departments from company A, for a period of 24 months, representing years 2017 and 2018. The maintenance quantitative data retrieved represent six various types of equipment used at underground Mines. The maintenance management qualitative data (Organizational documents) in maintenance management are retrieved from company A and company B. Company A is a global mining industry, and company B is a global manufacturing industry. The reliability of the data used in the model validation have practical implications on how maintenance work management system behaves with the benefit of 4IR technologies' implementation.

Social implications

This research study yields an overall benefit in asset management, thereby intensifying asset performance. The expected learnings are intended to benefit future research in the physical asset management field of study and most important to the industry practitioners in physical asset management.

Originality/value

This paper provides for a model in which maintenance work and its dynamics is systematically managed. Uncontrollable corrective maintenance work increases the complexity of the overall maintenance work management. The use of a system dynamic model and simulation incorporating 4IR technologies adds value on the maintenance work management effectiveness.

Details

Journal of Quality in Maintenance Engineering, vol. 29 no. 5
Type: Research Article
ISSN: 1355-2511

Keywords

Open Access
Article
Publication date: 21 May 2018

Zul-Atfi Bin Ismail

A key factor adversely affecting contractor social networking performance is the improper handling and information management of contractor’s services delivery on websites…

1908

Abstract

Purpose

A key factor adversely affecting contractor social networking performance is the improper handling and information management of contractor’s services delivery on websites. Contractor social networking is particularly problematic on industrialised building system (IBS) infrastructure maintenance projects where contractor’s certified quality product and firms are not matched with maintenance specialisation services. The paper aims to discuss this issue.

Design/methodology/approach

This paper reports on the early stages of research which is developing a new information and communications technology (ICT)-based approach to managing contractor social networking on IBS infrastructure maintenance schemes. As a precursor to this work, the paper reviews current contractor social networking websites practices on IBS infrastructure maintenance projects and explores the ICT tools and techniques currently being employed on such projects.

Findings

The findings reveal the need for more sophisticated contractor social networking websites solutions which accord with the needs of IBS infrastructure maintenance schemes.

Originality/value

The paper concludes by presenting a research framework for developing such a system in the future.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 16 January 2019

Maheshwaran Gopalakrishnan, Anders Skoogh, Antti Salonen and Martin Asp

The purpose of this paper is to increase productivity through smart maintenance planning by including productivity as one of the objectives of the maintenance organization…

5312

Abstract

Purpose

The purpose of this paper is to increase productivity through smart maintenance planning by including productivity as one of the objectives of the maintenance organization. Therefore, the goals of the paper are to investigate existing machine criticality assessment and identify components of the criticality assessment tool to increase productivity.

Design/methodology/approach

An embedded multiple case study research design was adopted in this paper. Six different cases were chosen from six different production sites operated by three multi-national manufacturing companies. Data collection was carried out in the form of interviews, focus groups and archival records. More than one source of data was collected in each of the cases. The cases included different production layouts such as machining, assembly and foundry, which ensured data variety.

Findings

The main finding of the paper is a deeper understanding of how manufacturing companies assess machine criticality and plan maintenance activities. The empirical findings showed that there is a lack of trust regarding existing criticality assessment tools. As a result, necessary changes within the maintenance organizations in order to increase productivity were identified. These are technological advancements, i.e. a dynamic and data-driven approach and organizational changes, i.e. approaching with a systems perspective when performing maintenance prioritization.

Originality/value

Machine criticality assessment studies are rare, especially empirical research. The originality of this paper lies in the empirical research conducted on smart maintenance planning for productivity improvement. In addition, identifying the components for machine criticality assessment is equally important for research and industries to efficient planning of maintenance activities.

Details

International Journal of Productivity and Performance Management, vol. 68 no. 5
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 20 July 2023

Andrew Ebekozien, Clinton Aigbavboa, Mohamad Shaharudin Samsurijan, Mohd Isa Rohayati and Nor Malina Malek

Inadequate strategic planning and maintenance budget may undermine the maintenance of the Higher Education Institution Building (HEIB). Studies have shown that a customised…

Abstract

Purpose

Inadequate strategic planning and maintenance budget may undermine the maintenance of the Higher Education Institution Building (HEIB). Studies have shown that a customised maintenance concept such as Soft System Methodology (SSM) can improve public building maintenance operations. There is a paucity of studies regarding public HEIB maintenance in Nigeria via an SSM approach. Therefore, the research investigated the state of public HEIB and developed a framework to improve public HEIB maintenance practices in Nigeria.

Design/methodology/approach

The research adopted SSM to understand Nigeria’s public HEIB maintenance practices. The SSM permitted a substitute approach to improve public HEIB maintenance practices via a developed framework. Data were collated via virtual interviews with experts, and findings were presented in line with the SSM seven steps.

Findings

Findings show that besides the shoddy state of public HEIB maintenance, there is no public digitalised HEIB framework to improve maintenance practices across Nigeria’s higher education institutions. The study developed a digitalised framework with the support of Computerised Maintenance Management System from the findings. It would reposition the public HEIB and stir up various agencies/departments/units managing maintenance for better service delivery via integrated delivery, practical, methodological and managerial aspects.

Originality/value

The research investigated Nigeria’s public HEIB maintenance practices via SSM to identify the required document and propose a feasible framework to improve Nigeria’s HEIB maintenance practices. Besides the developed conceptual framework, Nigeria’s HEIB maintenance practitioners and higher institution chief executives can use the recommended framework as guidelines to improve HEIB maintenance practices.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 6
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Article
Publication date: 3 October 2016

Jon Bokrantz, Anders Skoogh, Torbjörn Ylipää and Johan Stahre

A common understanding of what events to regard as production disturbances (PD) are essential for effective handling of PDs. Therefore, the purpose of this paper is to answer the…

5208

Abstract

Purpose

A common understanding of what events to regard as production disturbances (PD) are essential for effective handling of PDs. Therefore, the purpose of this paper is to answer the two questions: how are individuals with production or maintenance management positions in industry classifying different PD factors? Which factors are being measured and registered as PDs in the companies monitoring systems?

Design/methodology/approach

A longitudinal approach using a repeated cross-sectional survey design was adopted. Empirical data were collected from 80 companies in 2001 using a paper-based questionnaire, and from 71 companies in 2014 using a web-based questionnaire.

Findings

A diverging view of 21 proposed PD factors is found between respondents in manufacturing industry, and there is also a lack of correspondence with existing literature. In particular, planned events are not classified and registered to the same extent as downtime losses. Moreover, the respondents are often prone to classify factors as PDs compared to what is actually registered. This diverging view has been consistent for over a decade, and hinders companies to develop systematic and effective strategies for handling of PDs.

Originality/value

There has been no in-depth investigation, especially not from a longitudinal perspective, of the personal interpretation of PDs from people who play a central role in achieving high reliability of production systems.

Details

Journal of Manufacturing Technology Management, vol. 27 no. 8
Type: Research Article
ISSN: 1741-038X

Keywords

Open Access
Article
Publication date: 21 December 2021

Mirka Kans and Anders Ingwald

The purpose is to describe new business opportunities within the Swedish railway industry and to support the development of business models that corresponds with the needs and…

1977

Abstract

Purpose

The purpose is to describe new business opportunities within the Swedish railway industry and to support the development of business models that corresponds with the needs and requirements of Industry 4.0, here denoted as Service Management 4.0.

Design/methodology/approach

The study is an in-depth and descriptive case study of the Swedish railway system with specific focus on a railway vehicle maintainer. Public reports, statistics, internal documents, interviews and dialogues forms the basis for the empirical findings.

Findings

The article describes the complex business environment of the deregulated Swedish railway industry. Main findings are in the form of identified business opportunities and new business model propositions for one of the key actors, a vehicle maintainer.

Originality/value

The article provides valuable understanding of business strategy development within complex business environments and how maintenance related business models could be developed for reaching Service Management 4.0.

Details

Journal of Quality in Maintenance Engineering, vol. 29 no. 5
Type: Research Article
ISSN: 1355-2511

Keywords

Open Access
Article
Publication date: 30 April 2021

Camilla Lundgren, Jon Bokrantz and Anders Skoogh

Technological advancements are reshaping the manufacturing industry toward digitalized manufacturing. Despite the importance of top-class maintenance in such systems, many…

4323

Abstract

Purpose

Technological advancements are reshaping the manufacturing industry toward digitalized manufacturing. Despite the importance of top-class maintenance in such systems, many industrial companies lack a clear strategy for maintenance in digitalized manufacturing. The purpose of this paper is to facilitate the implementation of maintenance in digitalized manufacturing by proposing a strategy development process for the Smart Maintenance concept.

Design/methodology/approach

This study is designed as a multiple-case study, where the strategy development in three industrial cases is analyzed. Several methods were used to collect data on the case companies' development of smart maintenance strategies. The data were analyzed with an inductive approach.

Findings

A process of strategy development for smart maintenance is proposed, including six steps: benchmarking, setting clear goals, setting strategic priority, planning key activities, elevating implementation and follow-up.

Practical implications

The proposed process provides industry practitioners with a step-by-step guide for the development of a clear smart maintenance strategy, based on the current state of their maintenance organization. This creates employee engagement and is a new way of developing maintenance strategies.

Originality/value

Maintenance strategies are traditionally regarded as a selection of corrective/reactive and preventive maintenance actions using a top-down approach. By contrast, the proposed process is starting from the current state of the maintenance organization and allows a mixture of top-down and bottom-up approaches, supporting organizational development. This is a rare perspective of maintenance strategies and will make maintenance organizations ready for the demands of digitalized manufacturing.

Details

Journal of Manufacturing Technology Management, vol. 32 no. 9
Type: Research Article
ISSN: 1741-038X

Keywords

Access

Only content I have access to

Year

Content type

Article (905)
1 – 10 of 905