Search results

1 – 10 of over 2000
Article
Publication date: 18 August 2023

Peng Nie, Kalani C. Dahanayake and Nipuni Sumanarathna

This paper aims to explore UAE's transition towards circular economy (CE) through construction and demolition waste (CDW) management in the pre-construction stage. The extent of…

Abstract

Purpose

This paper aims to explore UAE's transition towards circular economy (CE) through construction and demolition waste (CDW) management in the pre-construction stage. The extent of circularity is assessed by five key aspects of CE, such as policies and strategic frameworks, design for waste prevention, design for disassembly or deconstruction, use of prefabricated elements and CDW management plans.

Design/methodology/approach

Multiple case studies were conducted in the context of the Dubai construction industry (UAE). Three significant and unique construction projects were selected as the cases. Semi-structured interviews were carried out to collect data, and the thematic analysis technique and NVIVO 12 software were used for data analysis.

Findings

Findings reveal several positive initiatives towards CE in the UAE context; yet it is identified that the transition is still at the initial stage. Selected case studies, the best-case scenarios of UAE (i.e. influential cases), demonstrated adequate measures in relation to four key CE aspects out of five. For instance, (a) policies and strategic frameworks such as lean standards, green building standards and standards developed by the local authorities, (b) design for waste prevention (e.g. adherence to the 3R principle, and construction planning with BIM), (c) use of prefabricated elements and application of innovative construction technologies (e.g. 3DPC, DfMA) and (d) CDW management planning such as 3R principle were evident. However, the selected cases hardly showcase designing for disassembly or deconstruction.

Research limitations/implications

The existing CDW practices are mostly conventional, as most constructions in UAE are procured through conventional building materials and methods. Therefore, there is a necessity of encouraging CE principles in CDW management. Even though the transition towards CE was evident in four key CE aspects out of five, the UAE construction industry has yet to adopt more effective CE-based CDW management practices to accelerate the circularity. Hence, it is necessary to enforce standard waste management guidelines, including the 3R principle, to standardise CDW management in UAE and encourage construction practitioners to adhere to CE principles.

Originality/value

The findings of this study provide valuable insights for decision-making processes around CDW management towards a CE. This paper contributes to the literature by bridging the CE concept with CDW management in the pre-construction stage. The study provides insights for industry practitioners for planning CE in terms of policies and strategic frameworks, CDW management planning, construction planning and application of innovative construction technologies.

Details

Smart and Sustainable Built Environment, vol. 13 no. 2
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 3 November 2022

Bruno Lot Tanko, Wyom Paul Zakka and Wee Nie Heng

The purpose of this study is to explore existing literature on Building Information Modelling (BIM) in Malaysia and examine the perception of practitioners about the potential of…

591

Abstract

Purpose

The purpose of this study is to explore existing literature on Building Information Modelling (BIM) in Malaysia and examine the perception of practitioners about the potential of BIM applications in reducing construction waste and enhancing productivity.

Design/methodology/approach

First, using 244 bibliographic data extracted from the Scopus database, the paper used scientometric analysis and VOSviewer mapping technique to assess the most impactful publication literature on BIM in Malaysia to identify the existing research gaps. Second, using a structured questionnaire, a total of 100 questionnaires were distributed to practising practitioners who incorporate BIM in the delivery of their projects. Descriptive analysis using cross-tabulation in SPSS software, radar chart, relative importance index and Pearson’s correlation were used to analyze the data.

Findings

The research gaps are in the fields of construction projects, buildings, energy efficiency, lifecycle and housing. The findings of the survey indicate that quantity take-off, clash detection, site utilization planning, digital fabrication as well as 4D stimulation were the main BIM applications used among the practitioners in Johor and Selangor.

Practical implications

By assessing the state-of-the-art of BIM and BIM applications in this region, the practical implications of this study provide useful insights to construction stakeholders, funding organizations, policymakers, research institutions, professionals, journal editors, reviewers and researchers to understand the overall trend of BIM in Malaysia and its usage.

Originality/value

This paper is the first to use science mapping using scientometrics to reveal the current BIM research in “Malaysia only”. Relying on the identified gaps, the study further examined the usage of BIM applications in Malaysian construction projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 September 2022

Visar Hoxha and Veli Lecaj

The purpose of this paper is to highlight the regulatory barriers to achieving sustainable buildings in Kosovo. The present paper focuses on regulatory barriers viewed from the…

Abstract

Purpose

The purpose of this paper is to highlight the regulatory barriers to achieving sustainable buildings in Kosovo. The present paper focuses on regulatory barriers viewed from the perspective of construction industry experts in achieving sustainable buildings.

Design/methodology/approach

The present study uses a qualitative research method and semi-structured interviews as a research instrument. The present study interviews around 20 experts in construction and property management, property development, spatial planning and energy management.

Findings

The study finds that Kosovo building laws and regulations provide for the materials assessment criteria, but the materials assessment criteria are only for mechanic strength. The study further finds that the sustainability concept is not included and incorporated in Kosovo's urban planning laws and regulations. The study also finds that despite specific clauses mentioning energy performance certificates in the Law on Energy Performance of Buildings in Kosovo, energy performance certificates appears to be not enforced and the nature of the barrier is more organizational rather than regulatory. Finally, the study finds that Kosovo laws are silent as far as green labeling of building materials is concerned.

Practical implications

The implication of the present finding is that policymakers in Kosovo not only should include clear sustainable materials assessment criteria in the law, but also enforce those criteria through testing and inspection mechanisms included in the law and implemented in practice through funding and organizational support. Nonetheless, policymakers in Kosovo should contemplate amending the urban planning laws in Kosovo and include both the term of sustainability at the planning level and conformity guidelines for sustainable design that can be done at the administrative directive level. Further, the clauses in the law do not suffice if the clauses are not accompanied by specific systemic and organizational support in the issuance of energy performance certificates. Policymakers in Kosovo should be proactive in designing clauses that specify green labeling standards for materials; however, these labeling standards should not adversely affect the cost of construction and reduce the demand for real estate.

Originality/value

The study is the first qualitative study about the perception of construction professionals in Kosovo, regarding the regulatory barriers of sustainable buildings in Kosovo.

Details

Property Management, vol. 42 no. 2
Type: Research Article
ISSN: 0263-7472

Keywords

Article
Publication date: 30 January 2024

Frank Ato Ghansah and Weisheng Lu

While the COVID-19 pandemic has impacted the construction industry, it is still unclear from prior studies about adequately positioning the quality assurance (QA) for the…

Abstract

Purpose

While the COVID-19 pandemic has impacted the construction industry, it is still unclear from prior studies about adequately positioning the quality assurance (QA) for the post-pandemic era and future pandemics, especially cross-border construction logistics and supply chain (Cb-CLSC). Thus, this study aims to develop a managerial framework to position the QA of Cb-CLSC during pandemics and post-pandemics by taking lessons from how COVID-19 has impacted the existing QA systems and has been managed successfully.

Design/methodology/approach

This is achieved pragmatically through an embedded mixed-method design involving a literature review, survey and interview from experts within the Hong Kong SAR–Mainland China links, typically known as the world’s factory. The design is further integrated with the partial least squares structural equation modelling (PLS-SEM) approach.

Findings

The study revealed 10 critical managerial practices (MPs) to position the QA to be adequate for the post-pandemic and during future pandemics, with the top three including “strict observance of government regulations (MP1)”, “planning ahead the period of quality assurance with the quarantine days in host countries (MP6)” and “modification of contract to cater for uncertainties (MP4)”. This attained a relatively good percentage agreement of 53% between the industry and academia. However, the top four MPs regarded as very effective include “implementing digital collaborative inspections with subcontractors and trades (MP8)”, “implementing a digital centralized document and issue management system (MP7)”, “strict observance to government regulations, including vaccination of workers, social distancing, use of prescribed nose masks, etc. (MP1)” and “planning ahead the period of quality assurance with the quarantine days in host countries (MP6)”. Two underlying components of the MPs were revealed as policy-process (PP)-related practices and people-technology-process (PTP)-related practices, and these can be modelled into a managerial framework capable of effectively positioning the QA to be adequate during pandemics through to the post-pandemic era.

Practical implications

The findings of this study depicted significant theoretical and practical contributions to the proactive management of QA activities during pandemics through to the post-pandemic era. It could empower organisations to pay attention to smartly and innovatively balancing people, processes, pandemic policy and technology to inform decisions to effectively position the QA for the post-pandemic era and survive the risks of future pandemics.

Originality/value

The study contributes to the body of knowledge in that it develops a managerial framework to position the QA of Cb-CLSC during pandemics and post-pandemics by taking lessons from how COVID-19 has impacted the existing QA systems and has been managed successfully. It is original research with invaluable primary data in the form of surveys and interviews from experts within the Hong Kong SAR–Mainland China links, typically known as the world’s factory.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 March 2024

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman and Md. Istiak Jahan

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of…

Abstract

Purpose

In Bangladesh (BD), delays in infrastructure are common. Many previous studies have explored the causes of infrastructure delays. However, this study investigated the causes of delays by taking responses from the stakeholders who are responsible for planning, design, funding, approval and implementation. There are few studies that have related infrastructure project delays to heterogeneity in stakeholders’ perceptions.

Design/methodology/approach

A structural equation (SE) model is developed with 350 normally distributed data points to understand the heterogeneity in stakeholders’ perceptions regarding delays in infrastructure projects in BD. Additionally, the relative importance index (RII) approach is used to assess the responses, validating the SE model.

Findings

The study finds that among the three latent variables, “Project itself related delay” has more influence on delays in infrastructure projects. Among the observed variables under the “project itself related delay” latent variable, “DPP approval process” has the most significance. From the heterogeneity analysis, the study found differences in responses among the stakeholders from “the Engineering Department,” “the Planning Office” and “the Construction Firm/Industry.” An important class of stakeholders believes that their stage is not being delayed and that other stages require attention.

Research limitations/implications

The data sample is 350. More data can improve the accuracy of the findings. Most of the respondents are civil engineers (74%) and represent the owner of the project. Sample data from more stakeholders’ will enhance the accuracy of the result.

Practical implications

This study addresses the requirements of Bangladeshi project stakeholders and how their interactions cause delays in projects. Furthermore, the opinions of other stakeholders are taken into consideration when determining the specific factors of individual stakeholders that are causing delays. Practically, the distance between stakeholders should be reduced. A project manager can play a role in this regard. Initiatives should be taken on how to complete the project quickly by eliminating the requirements discussed among the stakeholders and bureaucratic complications. Instead of placing blame on one another, stakeholders should take the initiative to figure out how to work together to finish the project on schedule. The Planning Commission’s approval of the Development Project Proposal (DPP) and Revised Development Project Proposal (RDPP) should be obtained as soon as possible by owner stakeholders. In order to avoid frequently changing the DPP, owners should also exercise greater caution when choosing contractors. Contractor stakeholders should use efficient and proper manpower and equipment so that unexpected delays are not created during the execution of work. Since the role of the contractor stakeholder is the most important among the three types of stakeholders, the contractor should raise awareness and urge the owners to get the RDPP approved quickly.

Originality/value

The findings from the study can help mitigate delays in infrastructure projects in BD, taking into account the perceptions of various stakeholders.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 March 2024

Keyu Chen, Beiyu You, Yanbo Zhang and Zhengyi Chen

Prefabricated building has been widely applied in the construction industry all over the world, which can significantly reduce labor consumption and improve construction…

Abstract

Purpose

Prefabricated building has been widely applied in the construction industry all over the world, which can significantly reduce labor consumption and improve construction efficiency compared with conventional approaches. During the construction of prefabricated buildings, the overall efficiency largely depends on the lifting sequence and path of each prefabricated component. To improve the efficiency and safety of the lifting process, this study proposes a framework for automatically optimizing the lifting path of prefabricated building components using building information modeling (BIM), improved 3D-A* and a physic-informed genetic algorithm (GA).

Design/methodology/approach

Firstly, the industry foundation class (IFC) schema for prefabricated buildings is established to enrich the semantic information of BIM. After extracting corresponding component attributes from BIM, the models of typical prefabricated components and their slings are simplified. Further, the slings and elements’ rotations are considered to build a safety bounding box. Secondly, an efficient 3D-A* is proposed for element path planning by integrating both safety factors and variable step size. Finally, an efficient GA is designed to obtain the optimal lifting sequence that satisfies physical constraints.

Findings

The proposed optimization framework is validated in a physics engine with a pilot project, which enables better understanding. The results show that the framework can intuitively and automatically generate the optimal lifting path for each type of prefabricated building component. Compared with traditional algorithms, the improved path planning algorithm significantly reduces the number of nodes computed by 91.48%, resulting in a notable decrease in search time by 75.68%.

Originality/value

In this study, a prefabricated component path planning framework based on the improved A* algorithm and GA is proposed for the first time. In addition, this study proposes a safety-bounding box that considers the effects of torsion and slinging of components during lifting. The semantic information of IFC for component lifting is enriched by taking into account lifting data such as binding positions, lifting methods, lifting angles and lifting offsets.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 April 2024

Zul-Atfi Ismail

This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes. Maintenance…

Abstract

Purpose

This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes. Maintenance planning and management are integral components of the construction sector, serving the broader purpose of post-construction activities and processes. However, as Precast Concrete (PC) construction projects increase in scale and complexity, the interconnections among these activities and processes become apparent, leading to planning and performance management challenges. These challenges specifically affect the monitoring of façade components for corrective and preventive maintenance actions.

Design/methodology/approach

The concept of maintenance planning for façades, along with the main features of information and communication technology tools and techniques using building information modeling technology, is grounded in the analysis of numerous literature reviews in PC building scenarios.

Findings

This research focuses on an integrated system designed to analyze information and support decision-making in maintenance planning for PC buildings. It is based on robust data collection regarding concrete façades' failures and causes. The system aims to provide appropriate planning decisions and minimize the risk of façade failures throughout the building's lifetime.

Originality/value

The study concludes that implementing a research framework to develop such a system can significantly enhance the effectiveness of maintenance planning for façade design, construction and maintenance operations.

Details

Facilities , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 17 November 2022

Asli Pelin Gurgun, Kerim Koc and Handan Kunkcu

Completing construction projects within the planned schedule has widely been considered as one of the major project success factors. This study investigates the use of…

1052

Abstract

Purpose

Completing construction projects within the planned schedule has widely been considered as one of the major project success factors. This study investigates the use of technologies to address delays in construction projects and aims to address three research questions (1) to identify the adopted technologies and proposed solutions in the literature, (2) to explore the reasons why the delays cannot be prevented despite disruptive technologies and (3) to determine the major strategies to prevent delays in construction projects.

Design/methodology/approach

In total, 208 research articles that used innovative technologies, methods, or tools to avoid delays in construction projects were investigated by conducting a comprehensive literature review. An elaborative content analysis was performed to cover the implemented technologies and their transformation, highlighted research fields in relation to selected technologies, focused delay causes and corresponding delay mitigation strategies and emphasized project types with specific delay causes. According to the analysis results, a typological framework with appropriate technological means was proposed.

Findings

The findings revealed that several tools such as planning, imaging, geo-spatial data collection, machine learning and optimization have widely been adopted to address specific delay causes. It was also observed that strategies to address various delay causes throughout the life cycle of construction projects have been overlooked in the literature. The findings of the present research underpin the trends and technological advances to address significant delay causes.

Originality/value

Despite the technological advancements in the digitalization era of Industry 4.0, many construction projects still suffer from poor schedule performance. However, the reason of this is questionable and has not been investigated thoroughly.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 April 2024

Paulo Alberto Sampaio Santos, Breno Cortez and Michele Tereza Marques Carvalho

Present study aimed to integrate Geographic Information Systems (GIS) and Building Information Modeling (BIM) in conjunction with multicriteria decision-making (MCDM) to enhance…

Abstract

Purpose

Present study aimed to integrate Geographic Information Systems (GIS) and Building Information Modeling (BIM) in conjunction with multicriteria decision-making (MCDM) to enhance infrastructure investment planning.

Design/methodology/approach

This analysis combines GIS databases with BIM simulations for a novel highway project. Around 150 potential alternatives were simulated, narrowed to 25 more effective routes and 3 options underwent in-depth analysis using PROMETHEE method for decision-making, based on environmental, cost and safety criteria, allowing for comprehensive cross-perspective comparisons.

Findings

A comprehensive framework proposed was validated through a case study. Demonstrating its adaptability with customizable parameters. It aids decision-making, cost estimation, environmental impact analysis and outcome prediction. Considering these critical factors, this study holds the potential to advance new techniques for assessment and planning railways, power lines, gas and water.

Research limitations/implications

The study acknowledges limitations in GIS data quality, particularly in underdeveloped areas or regions with limited technology access. It also overlooks other pertinent variables, like social, economic, political and cultural issues. Thus, conclusions from these simulations may not entirely represent reality or diverse potential scenarios.

Practical implications

The proposed method automates decision-making, reducing subjectivity, aids in selecting effective alternatives and considers environmental criteria to mitigate negative impacts. Additionally, it minimizes costs and risks while demonstrating adaptability for assessing diverse infrastructures.

Originality/value

By integrating GIS and BIM data to support a MCDM workflow, this study proposes to fill the existing research gap in decision-making prioritization and mitigate subjective biases.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 February 2024

Moslem Sheikhkhoshkar, Hind Bril El Haouzi, Alexis Aubry and Farook Hamzeh

In academics and industry, significant efforts have been made to lead planners and control teams in evaluating project performance and control. In this context, numerous control…

Abstract

Purpose

In academics and industry, significant efforts have been made to lead planners and control teams in evaluating project performance and control. In this context, numerous control metrics have been devised and put into practice, often with little emphasis on analyzing their underlying concepts. To cover this gap, this research aims to identify and analyze a holistic list of control metrics and their functionalities in the construction industry.

Design/methodology/approach

A multi-step analytical approach was conducted to achieve the study’s objectives. First, a holistic list of control metrics and their functionalities in the construction industry was identified. Second, a quantitative analysis based on social network analysis (SNA) was implemented to discover the most important functionalities.

Findings

The results revealed that the most important control metrics' functionalities (CMF) could differ depending on the type of metrics (lagging and leading) and levels of control. However, in general, the most significant functionalities include managing project progress and performance, evaluating the look-ahead level’s performance, measuring the reliability and stability of workflow, measuring the make-ready process, constraint management and measuring the quality of construction flow.

Originality/value

This research will assist the project team in getting a comprehensive sensemaking of planning and control systems and their functionalities to plan and control different dynamic aspects of the project.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

1 – 10 of over 2000