Search results

1 – 10 of 13
Content available
Book part
Publication date: 30 May 2024

Dan Paiuc

Abstract

Details

Developing Multicultural Leadership Using Knowledge Dynamics and Cultural Intelligence
Type: Book
ISBN: 978-1-83549-432-5

Article
Publication date: 3 May 2024

Maria Cleofe Giorgino and Federico Barnabè

Drawing motivation from the greater exposure to uncertainty and condition changes that affect large projects due to their long lifecycle, this paper aims to investigate how the…

Abstract

Purpose

Drawing motivation from the greater exposure to uncertainty and condition changes that affect large projects due to their long lifecycle, this paper aims to investigate how the time factor affects the use of governance mechanisms to pursue the success of these projects.

Design/methodology/approach

To pursue its aim, the article applies the dichotomization between the hard and soft mechanisms of project governance to the analysis of a historical case study, whose findings are organized over the short, medium and long periods. The case selected is referred to the peculiar water system, made up of tunnels named “bottini,” that was in use in Siena (Italy) as the old aqueduct. Specifically, the study focuses on the project of expansion of this water system that was realized during the 14th century for the construction of the “Bottino maestro di Fontegaia.”

Findings

This article highlights the different relevance that, during the lifecycle of large projects, is assumed by hard and soft governance mechanisms, with the former having main relevance in a short and medium period, and the latter usually emerging in the medium period and, subsequently, playing a growing role for the project success in the long period.

Originality/value

The article contributes to the literature on large projects by providing novel insights about how the time factor impacts the governance of these projects. Furthermore, the case study, with its unique history, highlights the relevance of combining effectively the hard and the soft dimensions of project governance to pursue success.

Details

Journal of Management History, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1751-1348

Keywords

Article
Publication date: 13 October 2023

Eduardo André Cândido Da Silva, Flávio Santino Bizarrias, Renato Penha, Luciano Ferreira da Silva and Cristiane Drebes Pedron

Despite the significant interest from researchers and practitioners, the literature on project value measurement from the perspective of the customer is non-existent. This study…

Abstract

Purpose

Despite the significant interest from researchers and practitioners, the literature on project value measurement from the perspective of the customer is non-existent. This study aims to address this gap by developing and validating a scale to measure project value through a customer lens called the customer perception of project value scale.

Design/methodology/approach

A list of items was initially generated based on 762 sample responses through a systematic review of the literature and with the participation of specialists. Exploratory and confirmatory factorial analyses and structural equation modelling were used to develop and validate the scale.

Findings

The authors formulated a four-dimension scale. The dimensions used to measure the second-order construct are customer centrality, process, delivery and cost-benefit. This was validated using a nomological structure.

Research limitations/implications

The non-consensual nature of what is value in projects restricts the results of this study to the context of a specific group of stakeholders only, that is, the consumers of the projects. The authors also see limitations in the absence of competing scales, which do not allow the comparison of the instrument with alternative measures.

Practical implications

This study allows project managers and other professionals to measure a project’s perceived value from the customer’s point of view and manage the improvement of this perception.

Originality/value

To the best of the authors’ knowledge, this is the first study to propose a scale to measure project value, which advances the literature on project management and value and contributes to academic knowledge and practice by measuring project value from the customer standpoint.

Details

European Business Review, vol. 36 no. 3
Type: Research Article
ISSN: 0955-534X

Keywords

Article
Publication date: 23 January 2023

Amir Naser Ghanbaripour, Craig Langston, Roksana Jahan Tumpa and Greg Skulmoski

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating…

487

Abstract

Purpose

Despite considerable research on the subject, there is still some misunderstanding about what characterizes successful project delivery in construction projects. Evaluating project delivery success is crucial for organizations since it enables them to prepare for future growth through more effective project management mechanisms and rank the organization's projects for continuous improvement. There is considerable disagreement over a set of success criteria that can be applied to all kinds of projects when evaluating project delivery success, making it a complicated procedure for practitioners and scholars. This research seeks to alleviate the problem by validating and testing a systematic project delivery success model (3D integration model) in the Australian construction industry. The aim is to establish a dependable approach built upon prior research and reliable in evaluating delivery success for any project type.

Design/methodology/approach

Based on a novel project delivery success model, this research applies a case study methodology to analyse 40 construction projects undertaken by a single Australian project management consultancy. The research utilizes a mixed-method research approach and triangulates three sets of data. First, the project delivery success (PDS) scores of the projects are calculated by the model. Second, a qualitative analysis targeting the performance of the same projects using a different system called the performance assessment review (PAR) scores was obtained. These culminate in two sets of ranking. The third step seeks validation of results from the head of the partnering organization that has undertaken the projects.

Findings

The findings of this study indicate that the 3D integration model is accurate and reliable in measuring the success of project delivery in construction projects of various sizes, locations and durations. While the model uses six key performance indicators (KPIs) to measure delivery success, it is evident that three of these may significantly improve the likelihood of PDS: value, speed and impact. Project managers should focus on these priority aspects of performance to generate better results.

Research limitations/implications

Restrictions inherent to the case study approach are identified for this mixed-method multiple-case study research. There is a limitation on the sample size in this study. Despite the researcher's best efforts, no other firm was willing to share such essential data; therefore, only 40 case studies could be analysed. Nonetheless, the number of case studies met the literature's requirements for adequate units for multiple-case research. This research only looked at Australian construction projects. Thus, the conclusions may not seem applicable to other countries or industries. The authors investigated testing the PDS in the construction sector. It can assist in improving efficiency and resource optimization in this area. Nonetheless, the same technique may be used to analyse and rank the success of non-construction projects.

Originality/value

Despite the research conducted previously on the PDS of construction projects, there is still confusion among researchers and practitioners about what constitutes a successful project delivery. Although several studies have attempted to address this confusion, no consensus on consistent performance metrics or a practical project success model has been formed. More importantly, (1) the ability to measure success across multiple project types, (2) the use of triple bottom line (TBL) to incorporate sustainability in evaluating delivery success and (3) the use of a complexity measurement tool to adjust delivery success scores set the 3D integration model apart from others.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 10 May 2024

Qianqian Ju, Yan Wang, Hui Liu, Xiaoyun Du and Yifei Li

Stakeholders in complex capital projects are characterized by complicated interactions, adversarial short-term relationships and cooperative demand for deliverables. Unhealthy…

Abstract

Purpose

Stakeholders in complex capital projects are characterized by complicated interactions, adversarial short-term relationships and cooperative demand for deliverables. Unhealthy interfaces between stakeholders often lead to significant interface conflicts, which gradually become apparent in the construction stage. However, stakeholder interface health (SIH) has not been well understood and measured in the construction industry by either scholars or practitioners. It is essential to identify unhealthy interface relationships between stakeholders by comprehensively assessing SIH for enhancing project performance.

Design/methodology/approach

The study provided a comprehensive framework to assess SIH. The assessment was based on Wuli-Shili-Renli theory. Moreover, the CRITIC and Grey-TOPSIS methodologies were applied to precisely evaluate the SIH level. Besides, graph-based interface networks were developed to visualize SIH. At last, the framework was applied to a mass rapid transit project in China to test the validity of the study.

Findings

The result showed that stakeholder interfaces with strict contract constraints are healthier. On the other hand, IM behaviors make up for the soft coordination mechanism without contract constraints to a certain extent. The results of the case study were consistent with the actual project practices. The proposed framework provided a useful IM tool for assessing and visualizing SIH.

Research limitations/implications

The limitation of this study is that only the mass rapid transit project was selected for empirical analysis to validate the effectiveness of the proposed framework. It is recommended that the proposed framework be applied to other types of complex capital projects to further discussions in IM.

Practical implications

Theoretically, this study introduces a comprehensive framework to measure the health of stakeholder interfaces in complex capital projects, which helps to provide a theoretical basis and methodological support for stakeholder interface management.

Social implications

Practically, applying SIH assessment to existing interface management procedures can help the project manager identify interface conflicts between stakeholders in time and eventually contribute to the improvement of PM performance. At the same time, the interface management team tracks the responsibilities of unhealthy interface stakeholders and requires them to take measures to improve the SIH level. Stakeholder interfaces with lower health scores should be given more attention. The proposed framework can serve as a novel IM approach to identify weaknesses in IM and take targeted management measures to alleviate unhealthy stakeholder interface relationships.

Originality/value

The study provides an innovative method for scientifically and accurately assessing SIH. This research can help scholars and practitioners in the project management field facilitate the diagnosis of unhealthy interface relationships and provide decision support for the project management theoretical foundation.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 7 May 2024

Yazeed A. Alragabah and Mohd. Ahmed

There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of…

Abstract

Purpose

There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of this paper is to assess the impact of CSFs on the government construction projects in Saudi Arabia. The success factors are investigated from a broader consideration of failure criteria, from consideration of most effectiveness in successful project completion and also from consideration of the impact of implementing control processes for successful project completion.

Design/methodology/approach

This study has analysed the impact of success factors on construction projects in Saudi Arabia using a descriptive methodology. An exhaustive literature survey is undertaken to identify the success and failure factors related to government construction projects in Saudi Arabia. The survey data are sorted out and analysed by cost, schedule, technical, context and finance dimensions of the projects based on project types, engineering complexity, size, modality, jurisdictional control and funding approach. To evaluate the influence of success factors implementation, qualitative data were collected in a survey via a web-based questionnaire that was sent to officials working and occupying a responsible position in national project guidelines organizations and in government construction organizations in Saudi Arabia. In all, 28 CSFs were identified, ranked and evaluated for their impact on project success. The four identified factors belong to process categories of construction projects, nine factors belong to management of construction projects and 15 success factors are identified for impact assessment of implementation in construction projects.

Findings

The study's findings have identified and ranked the top five CSFs that significantly influence project outcomes, including meeting time targets, adhering to financial budgets, delivering desired outcomes for all stakeholders, effectively managing risks and assembling the appropriate team while optimizing resource allocation. Additionally, the research indicates that hindrances to projects primarily stem from execution, economic, human and political factors. The study advocates for strict controls over incomplete engineering designs and advises against contractors independently handling design work to ensure project success. Additionally, addressing contractors' qualifications and financial matters is crucial for project success. By highlighting these CSFs and challenges, the research provides actionable insights to enhance project management practices in the construction industry.

Research limitations/implications

This study is limited to the infrastructure projects constructed by governmental bodies with the participation of officials from government organizations. Further study, including private projects and officials working on private projects, may be needed to generalized the research outcome.

Originality/value

Numerous studies have investigated CSFs in construction projects, but few have examined their relevance to Saudi Arabian government projects. This study aims to fill this gap by identifying key CSFs specific to Saudi Arabian public sector construction projects and assessing their impact on project success. It advocates for stringent controls in the Saudi Arabian construction sector, emphasizing the importance of preventing incomplete or altered engineering designs by contractors to increase the success rate of public sector projects. This research offers practical insights to stakeholders, advancing project management practices in Saudi Arabia's construction sector for improved outcomes and resource utilization.

Details

Frontiers in Engineering and Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2634-2499

Keywords

Article
Publication date: 26 April 2024

William Henry Collinge

The paper aims to apply social practice theory to clarify the process of innovation design and delivery from one successful digital innovation: the building information modelling…

Abstract

Purpose

The paper aims to apply social practice theory to clarify the process of innovation design and delivery from one successful digital innovation: the building information modelling (BIM) risk library. The paper clarifies the practices surrounding construction innovation and provides a schema useful for practitioners and technology designers through a social practice analysis.

Design/methodology/approach

The paper applies Schatzki's “organisation of practice” concepts to a construction project innovation to clarify how the practice of innovation revolves around understandings, rules and teleoaffectivities (emotive behaviours). Sources for the study include notes from meetings, workshops with experts and the shared artefacts of innovation.

Findings

The practice of innovation design and delivery are clarified through a social practice analysis: a distinct “field of practice” and a “schema” of generalisable prescriptions and preferences for innovation delivery being presented.

Practical implications

The paper informs the practice and process of innovation design and delivery; the insights clarify how collective understandings and rules of use evolve over time, becoming formalised into contracts, agreements and workplans. Practically, processes whereby innovation “sayings” evolve into innovation “doings” are clarified: a schema detailing prescriptions and preferences of practitioners and developers being presented.

Originality/value

The social practice analysis of one successful construction innovation is an original contribution to the body of knowledge, adding a level of detail regarding innovation design and delivery often missing from reported research.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 23 April 2024

Anna Kadefors, Kirsi Aaltonen, Stefan Christoffer Gottlieb, Ole Jonny Klakegg, Pertti Lahdenperä, Nils O.E. Olsson, Lilly Rosander and Christian Thuesen

Relational contracting is increasingly being applied to complex and uncertain construction projects. However, it has proved hard to achieve stable performance and industry-level…

Abstract

Purpose

Relational contracting is increasingly being applied to complex and uncertain construction projects. However, it has proved hard to achieve stable performance and industry-level learning in this field. This paper employs an institutional perspective to analyze how legitimacy for relational contracting has been produced and challenged in Denmark, Finland, Norway and Sweden, including implications for dissemination and learning.

Design/methodology/approach

A collaborative case study design is used, where longitudinal accounts of the developments in relational contracting over more than 25 years in four Nordic countries were developed by scholars based in each country. The descriptions are underpinned by literature sources from research, practice and policy.

Findings

The countries share similar problem perceptions that have triggered the de-institutionalization of traditional contracting practices. Models and policies developed elsewhere are important sources of knowledge and legitimacy. Most countries have seen pendulum movements, where dissemination of relational contracting is followed by backlashes when projects fail to meet projected outcomes. Before long, however, relational contracting tends to re-emerge under new labels and in slightly new forms. Such a proliferation of concepts presents further obstacles to learning. Successful institutionalization is found to rely on realistic goals in combination with broad competence development at the organizational and industry levels.

Practical implications

In seeking inspiration from other countries, policymakers should go beyond contract models to also consider strategies to manage industry-level learning.

Originality/value

The paper provides a unique longitudinal cross-country perspective on the field of relational contracting. As such, it contributes to the small stream of literature on long-term institutional change in the construction sector.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 27 February 2024

Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…

Abstract

Purpose

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.

Design/methodology/approach

Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.

Findings

The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.

Originality/value

Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 9 January 2024

Fadoua Benhamza Hlihel, Youness Chater and Abderrazak Boumane

Competencies are significant predictors of employee outcome. Nowadays, new technologies are changing maintenance processes and workflow. The role of employees and their…

Abstract

Purpose

Competencies are significant predictors of employee outcome. Nowadays, new technologies are changing maintenance processes and workflow. The role of employees and their competencies will therefore undergo decisive changes in the future. Therefore, a well-designed competency model for maintenance departments is important. The purpose of this paper is to develop a maintenance 4.0 competency model applicable to all industrial sectors by adapting it to the specificities of each sector.

Design/methodology/approach

The research methods consist of a comprehensive literature review on the main characteristics of the competency model and the individual competencies needed for the maintenance 4.0 employees. Interviews were conducted in order to validate and prioritize the required competencies for maintenance 4.0 employees identified in the literature.

Findings

The maintenance 4.0 competency model combines the required competencies in maintenance 4.0 and crosses the three hierarchical levels: managers, engineers and technicians. These competencies are organized in terms of four categories: technical, personal, social and methodological. In addition, a degree of importance for each competency is assigned as very important, moderately important and slightly important. As a result, this study identified the essential competencies for maintenance 4.0 stakeholders, where 12 competencies are considered very important for maintenance 4.0 technicians, 19 for engineers and 18 for managers.

Research limitations/implications

This work has some limitations. First, although the articles related to competencies and their classification were selected very carefully, it is difficult to eliminate the probability of overlooking publications. Second, the limitation of the study is based on the difficulty of implementing the model in a case study, given that a minority of industrial companies have implemented maintenance 4.0 technologies in Morocco.

Practical implications

This work has practical implications for both individuals and institutions (companies and academies) to cope with new competency requirements in maintenance 4.0. Organizations can use the model in the recruitment process and for the identification of training needs. The results of the research will also contribute to identifying the scope of competencies of the maintenance 4.0 actors (engineer, manager and technician), which, in practice, contributes to the creation of requirements for the candidates applying for a job in the maintenance department. Additionally, educational institutions should make the necessary changes to their curricula to suitably prepare students for the required maintenance 4.0 competencies.

Social implications

The social implications of the article result from the contribution to the development of maintenance competencies. Individuals can use this model for their own personal development. Furthermore, companies can use this model to define job profiles for vacancies in M4.0. Therefore, using the model for training program implementation has a positive effect on employee job satisfaction and employees ’morale.

Originality/value

This research develops a novel maintenance 4.0 competency model by categorizing the maintenance workforce into three hierarchical levels: managers, engineers and technicians. In addition, the competency requirement is prioritized to three degrees: very important, moderately important and slightly important. According to the previous studies conducted on maintenance 4.0 and employees' competencies, this study revealed that no research has developed a competency model for maintenance 4.0. Hence, this model is unique, generic and integrative since it presents the most relevant competencies for the three hierarchical levels. Moreover, this work combines the results of the literature review and the experts' returns. This model can be useful in the recruitment of new maintenance employees, the evaluation of their performance and the identification of training needs to cope with new changes in maintenance competencies.

Details

International Journal of Quality & Reliability Management, vol. 41 no. 6
Type: Research Article
ISSN: 0265-671X

Keywords

1 – 10 of 13