Article
Publication date: 8 July 2024

Antonina Tsvetkova and Britta Gammelgaard

This study aims to explore how operational resilience can be achieved within supply ecosystems in the delicate yet harsh natural environments of the Arctic.

Abstract

Purpose

This study aims to explore how operational resilience can be achieved within supply ecosystems in the delicate yet harsh natural environments of the Arctic.

Design/methodology/approach

An in-depth, multiple qualitative case study of offshore supply operations in Arctic oil and gas field projects is conducted. Data from semi-structured interviews, personal observations and archival materials are analysed through institutional work and logics approaches.

Findings

The findings suggest that achieving social-ecological resilience depends on the interaction between social and natural (irreversible) systems, which are shaped and influenced by various institutional dynamics. Different resilience solutions were detected.

Research limitations/implications

This study develops a comprehensive understanding of how social-ecological resilience emerges in supply ecosystems through institutional dynamics. The study’s empirical basis is limited to offshore oil and gas projects in the Arctic. However, due to anticipated future growth of Arctic economic activities, other types of supply ecosystems may benefit from the study’s results.

Originality/value

This research contributes with empirical knowledge about how social-ecological resilience is created through institutional interaction within supply ecosystems to prevent disruptions of both social and ecological ecosystems under the harsh natural conditions of the Arctic.

Details

International Journal of Operations & Production Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0144-3577

Keywords

Article
Publication date: 19 August 2024

António Miguel Martins, Pedro Correia and Ricardo Gouveia

This paper aims to examine the short-term market impact of the beginning of the military conflict between Russia and Ukraine (24 February 2022), the world’s largest oil and gas…

Abstract

Purpose

This paper aims to examine the short-term market impact of the beginning of the military conflict between Russia and Ukraine (24 February 2022), the world’s largest oil and gas companies.

Design/methodology/approach

The authors examine the world’s 100 largest listed oil and gas companies at and around the beginning of the military conflict between Russia and Ukraine using an event study methodology.

Findings

The authors observe a positive and statistically significant stock price reaction at and around the military conflict. These results are consistent with the asset pricing perspective. Conversely, the stock market returns of Russian oil and gas companies, as well as those companies that were “forced” to divest in Russia due to corporate activism, exhibit a negative and statistically significant impact from the conflict. These reactions are reinforced or mitigated by company-specific characteristics such as size, profitability and institutional ownership. Finally, the findings indicate that companies engaged in oil and gas exploration and production report abnormally higher returns compared to firms in the other two subsectors of the industry.

Originality/value

The effect of the war on stock markets has been relatively little examined in the financial theory. This study intends to fill this gap in the literature.

Details

International Journal of Islamic and Middle Eastern Finance and Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1753-8394

Keywords

Expert briefing
Publication date: 30 July 2024

Labour’s renewable energy plans are more ambitious than those of the previous Conservative government. They focus on doubling onshore wind, trebling solar and quadrupling offshore…

Details

DOI: 10.1108/OXAN-DB288633

ISSN: 2633-304X

Keywords

Geographic
Topical
Article
Publication date: 6 February 2023

G. Edward Gibson, Mounir El Asmar, Abdulrahman Yussef and David Ramsey

Assessing front end engineering design (FEED) accuracy is significant for project owners because it can support informed decision-making, including confidence in cost and schedule…

231

Abstract

Purpose

Assessing front end engineering design (FEED) accuracy is significant for project owners because it can support informed decision-making, including confidence in cost and schedule predictions. A framework to measure FEED accuracy does not exist in the literature or in practice, not does systematic data directly linking FEED accuracy to project performance. This paper aims to focus first on gauging and quantifying FEED accuracy, and second on measuring its impact on project performance in terms of cost change, schedule change, change performance, financial performance and customer satisfaction.

Design/methodology/approach

A novel measurement scheme was developed for FEED accuracy as a comprehensive assessment of factors related to the project leadership and execution teams, management processes and resources; to assess the environment surrounding FEED. The development of this framework built on a literature review and focus groups, and used the research charrettes methodology, guided by a research team of 20 industry professionals and input from 48 practitioners representing 31 organizations. Data were collected from 33 large industrial projects representing over $8.8 billion of installed cost, allowing for a statistical analysis of the framework's impact on performance.

Findings

This paper describes: (1) twenty-seven critical FEED accuracy factors; (2) an objective and scalable method to measure FEED accuracy; and (3) data showing that projects with high FEED accuracy outperformed projects with low FEED accuracy by 20 percent in terms of cost growth in relation to their approved budgets.

Practical implications

FEED accuracy is defined as the degree of confidence in the measured level of maturity of the FEED deliverables to serve as a basis of decision at the end of detailed scope, prior to detailed design. Assessing FEED accuracy is significant for project owners because it can support informed decision-making, including confidence in cost and schedule predictions.

Originality/value

FEED accuracy has not been assessed before, and it turned out to have considerable project performance implications. The new framework presented in this paper is the first of its kind, it has been tested rigorously, and it contributes to both the literature body of knowledge as well as to practice. As one industry leader recently stated, “it not only helped to assess the quality and adequacy of the technical documentation required, but also provided an opportunity to check the organization's readiness before making a capital investment decision.”

Details

Engineering, Construction and Architectural Management, vol. 31 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 August 2024

Abdulrahman Alhassan, Lakshmi Kalyanaraman and Hanan Mohammed Alhussayen

This study aims to evaluate the resource curse hypothesis in an oil-dependent economy, Saudi Arabia, through examining the impact of oil price volatility on foreign ownership…

Abstract

Purpose

This study aims to evaluate the resource curse hypothesis in an oil-dependent economy, Saudi Arabia, through examining the impact of oil price volatility on foreign ownership among Saudi listed firms.

Design/methodology/approach

The study analyzes a unique data set of firm-level data on foreign ownership for the period 2009–2015. A multivariate regression model was applied to analyze the relationships under study.

Findings

The analysis reveals a negative association between oil price volatility and foreign ownership in firms with high leverage and low stock volatility.

Research limitations/implications

Policymakers are encouraged to develop policies to control shocks in the supply and demand of oil and enforce economic diversification. Investors can better understand the dynamics of an oil-based economy stock market based on the investment behavior of foreign investors and their response to oil price shocks.

Originality/value

This study adds to the literature by analyzing the relationship understudy in an oil-rich and oil-dependent emerging economy, where its critical economic parameters are influenced by oil price volatility and it has the largest and the most liquid stock exchange in the MENA region.

Details

International Journal of Islamic and Middle Eastern Finance and Management, vol. 17 no. 5
Type: Research Article
ISSN: 1753-8394

Keywords

Article
Publication date: 10 July 2024

Ahsan Waqar, Idris Bin Othman and Muhammad Shoaib Mansoor

The primary objective of this study is to analyze the correlation between the application of building information modeling (BIM), the construction project success (CPS) and…

Abstract

Purpose

The primary objective of this study is to analyze the correlation between the application of building information modeling (BIM), the construction project success (CPS) and project control. Additionally, this research aims to explore the potential mediating effect of project control on the link between BIM and construction project success in the Malaysian construction industry.

Design/methodology/approach

The present study employs a quantitative research methodology and adheres to a positivist research philosophy in order to examine the influence of BIM implementation on the CPS and project control within the Malaysian construction sector. The data were collected by structured questionnaire survey from 200 respondents using a purposive sampling strategy, and the results were analyzed by using partial least square (PLS)-structural equation modeling (SEM). The study's findings are all the more noteworthy since, despite the small sample size, 218 persons genuinely participated thanks to the purposive sampling approach.

Findings

The findings of this study indicate that there are notable and positive associations between various variables related to the implementation of BIM. These variables include accurate quantities and estimations, risk management, facility management integration, optimized resource allocation and real-time monitoring. Furthermore, these relationships are observed to have a significant impact on both CPS and project control. The study revealed that project control serves as a mediator in the relationship between the deployment of BIM and the CPS in the Malaysian construction sector, with the exception of its influence on risk management.

Originality/value

The originality of this research consists in examining the mediating function of project control in the relationship between BIM implementation and CPS. This study contributes to the existing knowledge by enhancing our understanding of the processes via which BIM positively influences project outcomes.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 July 2024

Mahesh Babu Purushothaman, Leo Neil Resurreccion San Pedro and Ali GhaffarianHoseini

This review paper aims to highlight the causes of delays (COD) and their interactions in construction projects, potentially aiding in timely completion and waste reduction through…

Abstract

Purpose

This review paper aims to highlight the causes of delays (COD) and their interactions in construction projects, potentially aiding in timely completion and waste reduction through early anticipation.

Design/methodology/approach

Forty-seven global literature were examined in detail to identify CODS and its interactions using the systematic literature review (SLR) method that utilised the PRISMA guidelines to ensure the studies reviewed were adequate to safeguard the robustness and comprehensiveness. Three-way analysis, such as Pareto, degree of centrality and loops, was undertaken to identify the critical Level 1,2 and 3 CODS that affect the Construction projects.

Findings

The research findings demonstrate that 65 CODs in eight categories affect construction projects. The CODs act in coherence rather than silos; the CLD displays complex interconnections of 44 factors obtained through the pairwise comparison of the 47 identified literature of the SLR. Through its systematic analysis of interaction loops, this research identified Ten level 1 critical CODs, two second-level critical CODs and 4 Third-level critical CODs. “Contractors' excessive workload/beyond potential/inadequate experience” emerged as the top COD that affects scheduling and project delay.

Research limitations/implications

The study limitations include using only English articles and a restricted number of databases. However, the chosen databases were reputable and underwent thorough peer review processes. This study may have limitations due to the SLR, which means that factors affecting COD and interactions may vary by country, and future research is suggested for validation.

Practical implications

This study identified interactions of construction delays that potentially support scheduling risk management during the early stage of the project and reduce waste to improve sustainability. The theoretical implications of SLR-based research include helping develop a framework that would potentially have all COD in the current scenario and aid future academic and industrial research factor-wise and country-wise in aiding sustainability. This will support and provide construction professionals and academia with knowledge of the COD related to factors and their interactions to be considered in the early assessment and management of future projects and improve sustainability.

Originality/value

Most literature studies the factors or causes of construction delays that affect construction projects. The CODs primarily do not operate in silos but combine with other causes to enhance their influence on delays. Hence, it is of utmost importance to study the interactions of COD to enhance the knowledge in the construction field that would aid in schedule repair and, in turn, on-time project delivery. The study is the first related to COD and their interactions in construction projects in the digital era.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 2 August 2024

Shadrack Samwel Mwaiseje, Alban Dismas Mchopa and Faustine Peter Panga

The study’s purpose is to contribute to the supply risk management literature by examining its implications in Tanzania, specifically in the timely completion of force account…

Abstract

Purpose

The study’s purpose is to contribute to the supply risk management literature by examining its implications in Tanzania, specifically in the timely completion of force account construction projects in Local Government Authorities (LGAs).

Design/methodology/approach

A cross-sectional survey design was employed to gather data from 318 respondents in primary schools within the Dodoma region. A covariance-based structural equation modelling (CB-SEM) structural equation modelling was employed to examine the relationship of the variables.

Findings

The study’s findings underscore the crucial role of supply risk management, including multi-sourcing, effective supplier selection, post-qualification of suppliers, and effective communication with suppliers in the timely completion of FA construction projects. Notably, effective supplier selection emerges as the most influential factor, significantly contributing to the timely completion of these projects.

Research limitations/implications

The study focused on LGAs in Tanzania. It is important to exercise caution when making broad generalizations about the findings. Also, the study was based on a cross sectional survey design; future research could consider a longitudinal design approach.

Practical implications

This study offers practical insights for procurement practitioners and members of the Force Account committee in the public sector, offering guidance on how to improve the management of supply risks and, consequently, enhance the timely completion of construction projects.

Originality/value

This study stands out in the literature by examining the implications of supply risk management on the timely completion of force account construction projects in Tanzania. It significantly enriches the existing knowledge of supply risk management, particularly in the context of effective supplier selection in public procurement. These insights are of great value to researchers, practitioners, and policymakers in the field.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 12 July 2024

Jianyao Jia, Shan Jiang, Liang Xiao and Fei Lu

The adoption of emerging information and communication technologies in construction project teams has engendered numerous virtual spaces, characterized by communication visibility…

Abstract

Purpose

The adoption of emerging information and communication technologies in construction project teams has engendered numerous virtual spaces, characterized by communication visibility and content persistence. As a result, the knowledge exchanged in these virtual spaces serves as a team’s digital resources. However, the extant literature mostly takes a process-based approach to examine the impact of knowledge sharing, thus failing to fully comprehend the process of converting digital resources into performance, resulting in a gap in the literature.

Design/methodology/approach

This study employs team resource-based theory to construct a theoretical model and develop hypotheses. Specifically, knowledge integration capability and team efficacy are hypothesized as two types of critical capabilities that mediate the links between knowledge sharing (quantity and quality) in virtual spaces and management performance. Data from 128 middle and senior construction project managers were collected to test the proposed theoretical model.

Findings

The results suggest that relationships between knowledge sharing (quantity and quality) and project management performance are both mediated by knowledge integration capability. Moreover, team efficacy could only partially translate knowledge sharing quantity into performance and couldn’t transform knowledge sharing quality into performance. Besides, knowledge integration is found to strengthen the link between knowledge sharing quantity and performance but weaken the relationship between knowledge sharing quality and performance.

Originality/value

This study explores how knowledge shared in virtual spaces could be leveraged for improving management performance in construction project teams. The findings in this study enhance the understanding of knowledge sharing in digital environments and afford important insights into transforming digital resources into performance within construction project teams.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Book part
Publication date: 25 September 2024

Bahrooz Jaafar Jabbar

The Kurdistan Region of Iraq (KRI) stands as a significant player in the hydrocarbon landscape of the Middle East, necessitating an in-depth analysis of its role in the…

Abstract

The Kurdistan Region of Iraq (KRI) stands as a significant player in the hydrocarbon landscape of the Middle East, necessitating an in-depth analysis of its role in the exportation process to Turkey and Mediterranean ports, thereby fostering economic and political ties and projecting toward the future. Situated as a semi-autonomous entity in northern Iraq, the Kurdistan Region boasts abundant natural gas resources, attracting interest from Russian firms and Turkish stakeholders. However, Iran’s influence in Iraq and the wider region poses a regional threat to the Kurdistan Region’s natural resources. This chapter meticulously examines the oil and gas blocks within the Kurdistan Region amidst the backdrop of transformative global energy market shifts, including the impacts of the COVID-19 pandemic and the Russian–Ukrainian conflict. Through this lens, it seeks to delineate the Kurdistan Region’s political and economic positioning within the evolving regional order.

Details

Deciphering the Eastern Mediterranean's Hydrocarbon Dynamics: Unravelling Regional Shifts
Type: Book
ISBN: 978-1-83608-142-5

Keywords