Article
Publication date: 26 June 2019

Titus Ebenezer Kwofie, Clinton Ohis Aigbavboa and Seja Olgah Machethe

Non-traditional procurement is thought to offer enhanced benefits over traditional contracts. However, several factors significantly impacting the optimization of the benefits…

736

Abstract

Purpose

Non-traditional procurement is thought to offer enhanced benefits over traditional contracts. However, several factors significantly impacting the optimization of the benefits have been suggested. Even though effective communication is ranked high among these factors, not enough empirical insights have been given to the nature of communication performance in non-traditional procurements in construction project delivery. The purpose of this paper is to focus on understanding the taxonomy of communication performance in non-traditional procurements in the South African Construction Industry, given the centrality of communication to team effectiveness, performance, project success and managerial efficiency.

Design/methodology/approach

Adopting a deductive research approach, an empirical questionnaire survey was conducted drawing on the practical communication experience of project teams engaged in projects using non-traditional procurement systems.

Findings

Using aggregated mean scores and inter-rater agreement index and Mann‒Whitney tests, the results revealed inaccuracies, barriers and procedural challenges as frequently occurring in the interpersonal and organizational communication in the adopted non-traditional procurement systems. Additionally, untimeliness and distorted information were noted to be occurring occasionally, whereas incomplete communication, misunderstood information and gatekeeping rarely occurred. Lastly, protocol-related communication challenges were deemed to have never occurred in their interpersonal and organizational communication in their project delivery. In the assessment of communication performance, the less frequently occurring assessment indicator is a testament to good communication performance, whereas the frequently occurring indicator represents a poor performance in the communication.

Originality/value

This systematic approach toward understanding the taxonomy of the interpersonal and organizational communication performance in non-traditional procurement is very significant toward communication performance improvement in the industry. The insight given by the findings may help construction project practitioners to focus their attention on the necessary aspects of communication in non-traditional procurements to optimize their benefits over traditional procurement models.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 October 2008

Peter E.D. Love, Peter R. Davis, David J. Edwards and David Baccarini

Choosing the appropriate procurement system for construction projects is a complex and challenging task for clients particularly when professional advice has not been sought. To…

8229

Abstract

Purpose

Choosing the appropriate procurement system for construction projects is a complex and challenging task for clients particularly when professional advice has not been sought. To assist with the decision‐making process, a range of procurement selection tools and techniques have been developed by both academic and industry bodies. Public sector clients in Western Australia (WA) remain uncertain about the pairing of procurement method to bespoke construction project and how this decision will ultimately impact upon project success. This paper seeks to examine “how and why” a public sector agency selected particular procurement methods.

Design/methodology/approach

An analysis of two focus group workshops (with 18 senior project and policy managers involved with procurement selection) is reported upon.

Findings

The traditional lump sum (TLS) method is still the preferred procurement path even though alternative forms such as design and construct, public‐private‐partnerships could optimize the project outcome. Paradoxically, workshop participants agreed that alternative procurement forms should be considered, but an embedded culture of uncertainty avoidance invariably meant that TLS methods were selected. Senior managers felt that only a limited number of contractors have the resources and experience to deliver projects using the non‐traditional methods considered.

Practical implications

The research identifies a need to develop a framework that public sector clients can use to select an appropriate procurement method. Learning from previous experiences with regard to procurement selection will further provide public sector clients with knowledge about how to best deliver their projects.

Originality/value

The paper adds insight as to how public sector agencies select particular procurement methods.

Details

International Journal of Public Sector Management, vol. 21 no. 7
Type: Research Article
ISSN: 0951-3558

Keywords

Article
Publication date: 1 August 2001

Y.J. Shen and D.H.T. Walker

Discusses the issue of developing a project design that adequately addresses the practicality of delivering integrated construction knowledge and experience in planning…

6278

Abstract

Discusses the issue of developing a project design that adequately addresses the practicality of delivering integrated construction knowledge and experience in planning, engineering, procurement and field operations. There are few practical examples in the literature that explain how non‐traditional construction project procurement approaches can be utilised to organise an integrated project management system incorporating occupational health and safety (OHS), environmental management (EM) and quality management (QM) systems. Reports on a case study that helps fill that gap. Shows how the adoption of a design and construct procurement approach, together with appropriate management techniques, on a successful major freeway project in Melbourne, Australia, was driven by a sound construction planning process, and integrated the construction planning system with OHS, EM and QM systems.

Details

The TQM Magazine, vol. 13 no. 4
Type: Research Article
ISSN: 0954-478X

Keywords

Article
Publication date: 6 October 2020

Ayman Ahmed Ezzat Othman and Lamis Yasser Wagih Youssef

This paper aims to develop a framework for implementing the integrated project delivery (IPD) approach during the design process in architecture design firms (ADFs) in Egypt.

Abstract

Purpose

This paper aims to develop a framework for implementing the integrated project delivery (IPD) approach during the design process in architecture design firms (ADFs) in Egypt.

Design/methodology/approach

A research methodology consists of literature review, case studies and survey questionnaire was designed to achieve the abovementioned aim. First, literature review was used to identify and categorise the challenges of implementing IPD during the design process. Second, four case studies were analysed to investigate the values delivered to the client or missed due to the use of IPD or traditional procurement approaches, respectively. Finally, a survey questionnaire was carried out with a representative sample of ADFs in Egypt to investigate their perception towards the challenges of IPD implementation in Egypt. Based on the results of the above, the research developed a framework to facilitate the implementation of IPD in ADFs in Egypt.

Findings

Through literature review, the research identified 30 challenges that hamper the implementation of IPD in ADFs. These challenges were categorised due to their nature into five groups, namely, integration, cooperation, commitment and trust challenges, knowledge, experience skills and decision-making challenges, cultural challenges, legal and contractual challenges and technical and financial challenges. Results of data analysis showed that “poor communication and spirit of collaboration between project stakeholders” was ranked the highest influential challenge as IPD is based on collaboration and trust between project participants. In addition, “lack of training and motivation in investing for using IPD” was ranked the lowest influential challenge due to the poor attention paid to training in the construction industry. Moreover, despite the benefits of IPD implementations in many countries worldwide, it is not implemented in the Egyptian context. This necessitated taking action towards developing a framework to facilitate IPD implementation in ADFs in Egypt.

Research limitations/implications

The research focussed on ADFs in Egypt.

Practical implications

Adopting the proposed framework developed through this research will help implementing IPD during the design process in ADFs.

Originality/value

The research identified, categorised and analysed the challenges that obstruct the implementation of IPD in ADFs. The research tackled a topic that received scant attention in construction literature in the Middle East generally and Egypt in particular. In addition, this paper presented a framework to facilitate the implementation of IPD during the design process, which represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.

Article
Publication date: 29 May 2009

Peter R. Davis, Peter E.D. Love and David Baccarini

Traditional Lump Sum (TLS) methods have been the primary procurement method within Australia. Yet, their use is beginning to wane in states such as: Queensland, New South Wales…

4397

Abstract

Purpose

Traditional Lump Sum (TLS) methods have been the primary procurement method within Australia. Yet, their use is beginning to wane in states such as: Queensland, New South Wales and Victoria where Design and Construct, Construction Management and hybrids thereof have become the norm. Considering the demands of clients, the increasing propensity to use non‐traditional methods, the quality of drawings that are being produced, and the role of software applications such as Computer‐Aided Design in directly generating quantities, this paper seeks to examine the role Bills of Quantities (BoQs) serve and how effective they are as a pre‐contract and post‐contract tool.

Design/methodology/approach

Only limited empirical research has addressed the role and effectiveness of BoQs, particularly in Australia. With this in mind, the research adopted an exploratory approach to gain insights from industry practitioners about BoQs. A questionnaire survey was developed from the literature and used to solicit the opinions of practitioners about their role and effectiveness as a pre‐contract and post‐contract tool.

Findings

The distributed questionnaire survey resulted in 86 responses from industry practitioners – quantity surveyors, building contractors, and project managers. The findings fundamentally reveal that the use of Bill of Quantities prepared in accordance with the standard method of measurement is on the decline and only useful as a tool for post‐contract control.

Originality/value

The research has revealed that there is a need for industry to embrace alternative forms of measuring quantities in building projects. Abridged bills and builders' quantities are being increasingly demanded in Australia. Thus, it is suggested that this demand could drive the need for alternative forms of pricing in building projects and lead to the increasing use of non‐traditional methods of measurement.

Details

Structural Survey, vol. 27 no. 2
Type: Research Article
ISSN: 0263-080X

Keywords

Article
Publication date: 1 March 2010

Ahmed Doko Ibrahim, Andrew Price, Malik M. A. Khalfan and Andrew Dainty

In the UK healthcare sector, funding and provision of public care facilities has been primarily the responsibility of government through the National Health Service (NHS). After…

Abstract

In the UK healthcare sector, funding and provision of public care facilities has been primarily the responsibility of government through the National Health Service (NHS). After decades of under-investment and consequent effects on the quality of care, new procurement routes are currently being used to improve the standards of facilities to meet the requirements of modern care services. This paper critically reviews these new procurement routes in terms of concepts and suitable areas of application, and examines how the principal procurement methods have evolved into the forms used for UK healthcare facilities. The paper outlines recommendations for further research in assessing the suitability or otherwise of these new procurement methods, both for construction projects generally and specifically for healthcare facilities.

Details

Journal of Public Procurement, vol. 10 no. 1
Type: Research Article
ISSN: 1535-0118

Article
Publication date: 1 March 1999

SUNIL M. DISSANAYAKA and MOHAN M. KUMARASWAMY

Time and cost are usually critical to construction clients. Given the many contributory factors, improved quantitative models of time and cost may help clients to predict project…

1093

Abstract

Time and cost are usually critical to construction clients. Given the many contributory factors, improved quantitative models of time and cost may help clients to predict project outcomes at the outset, and also at different stages of the project life span. These can also help to compare deviations in significant contributory factors, and to suggest corrective actions. Multiple linear regression (MLR) and artificial neural networks (ANN) were applied in developing such quantitative models in a research project based in Hong Kong. A comparative study indicated that ANN had better prediction capabilities than MLR by itself. Significant factors identified through quantitative models developed, indicated that time over‐run levels were mainly governed by non‐procurement related factors (e.g. project characteristics and client/client representative characteristics), while cost over‐run levels were significantly influenced by both procurement and non‐procurement related factors (e.g. project characteristics, client/client representative characteristics and contractual payment modalities). A parallel approach yielded interesting comparisons of the variations of mean time and cost over‐runs, when comparing groups of projects using different procurement sub‐systems, from the Hong Kong sample.

Details

Engineering, Construction and Architectural Management, vol. 6 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 September 2013

Muhammad Ali Noor, Malik M.A. Khalfan and Tayyab Maqsood

The purpose of this paper is to report on a research thesis that investigates the role of procurement practices in effective implementation of infrastructure projects in a…

3238

Abstract

Purpose

The purpose of this paper is to report on a research thesis that investigates the role of procurement practices in effective implementation of infrastructure projects in a developing country, i.e. Pakistan. The research investigated and explored the issues and barriers to effective implementation of different procurement methods, the environment and its suitability for implementing different forms of procurement in context of public sector in Pakistan.

Design/methodology/approach

The research was carried out in two stages in the first stage archival analysis was conducted of government documents, reports including reports by international organisations, policy documents and literature. During the second stage case studies were selected based on archival analysis. The unit of analysis is the basis for the case and for this study, it was the procurement of infrastructure projects in public sector in Pakistan and that was the boundary of the research. Eight project case studies were selected from six public sector organizations (organizational case studies). A total of 24 respondents participated from these six organisations.

Findings

The research has identified the different procurement choices and reasons for a particular choice, the issues in procurement choice and the issues in procurement implementation in the public sector organisations in Pakistan. It has also described the impact of procurement practice on successful project outcomes. As a result multiple issues have been identified which affects the choice of procurement such as the need for efficiency and finances, client objectives, timely policy decisions, clarity of clients needs, delays in bidding and response, delays in approvals, proposal and bid evaluation procedures, need for relaxation of rules and project characteristics. The major barriers and constraints to implementation of procurement have been reported to be regulatory and legal, risks and contract management, principles of procurement, political, culture, inter and intra organisational issues, conditions of the country, lack of understanding, land acquisition, project revenue and finance issues. Procurement had a direct impact on successful outcomes of the project, the procurement systems in these organisations had a direct relationship and impact on performance and success of the project.

Originality/value

As a result of this analysis a vivid big picture of road map of the ongoing processes and practice of procurement in public sector in Pakistan has been created which vividly portrays the issues and barriers of the procurement practice in Pakistan.

Details

International Journal of Managing Projects in Business, vol. 6 no. 4
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 1 March 2006

Kishor Vaidya, A. S. M. Sajeev and Guy Callender

This paper presents the results of a literature survey developed to support a proposed model of the Critical Success Factors (CSFs) likely to impact the success of e-Procurement

1460

Abstract

This paper presents the results of a literature survey developed to support a proposed model of the Critical Success Factors (CSFs) likely to impact the success of e-Procurement initiatives in the public sector. It identifies a number of relevant variables for each CSF and presents a model for future research. It also analyses the relative importance of different CSFs and observes that organization and management factors are the most important category for success of e-Procurement initiatives. If e-Procurement initiatives in the public sector are to assist the development of e-Procurement across the information economy, there should be wider discussion and agreement on what constitutes the relevant CSFs and how the achievement of success can be assessed.

Details

Journal of Public Procurement, vol. 6 no. 1/2
Type: Research Article
ISSN: 1535-0118

Article
Publication date: 1 March 2007

Wendell C. Lawther

The effectiveness of innovative procurement practices, illustrated at the US federal level by Performance Based Service Contracting and other best value approaches, depends upon…

Abstract

The effectiveness of innovative procurement practices, illustrated at the US federal level by Performance Based Service Contracting and other best value approaches, depends upon changes in the public procurement organizational culture. These changes require agency officials to establish new relationships with contractors, as the challenges of acquiring complex as well as highly customized goods/services is best met through flexibility and negotiation throughout the life of the acquisition. Using procurement approaches that provide maximum flexibility provide challenges to public managers, as choices regarding negotiation include the content as well as the intensity and duration of negotiation sessions. The use of the Invitation to Negotiate (ITN) approach by the State of Florida is one example of an approach that allows flexibility and facilitates different relationships with contractors. Two case studies, from the Departments of Transportation and Management Services illustrate the use of ITN.

Details

Journal of Public Procurement, vol. 7 no. 2
Type: Research Article
ISSN: 1535-0118