Search results

1 – 10 of over 2000
Article
Publication date: 26 August 2024

Marcos Buestan, Cinthia C. Perez and Denise Rodríguez-Zurita

Health-care organisations face many challenges in delivering safe, high-quality services while experiencing significant pressure to increase productivity and reduce costs. In this…

Abstract

Purpose

Health-care organisations face many challenges in delivering safe, high-quality services while experiencing significant pressure to increase productivity and reduce costs. In this context, hospitals have implemented lean six sigma (LSS) programmes to improve their performance. This study aims to explore the application of LSS in three different non-profit Ecuadorian hospitals to comprehend the effectiveness of the methodology under this context.

Design/methodology/approach

A multiple-case analysis was performed in four phases: selecting the cases, defining a data collection protocol, performing a within-case analysis of each case and performing a cross-case analysis.

Findings

This research found that the LSS application positively impacts hospital performance indicators by reducing service time. The most frequently used tools include the supplier input process output customer diagram, value stream mapping, cause-and-effect diagram, five-why analysis, Gemba walk and paired two-sample test. Lastly, the results show that the most common challenges faced were lack of top management engagement, technical training and data availability.

Research limitations/implications

The study is limited by the constraint of a single Latin American country from which the cases were analysed. Collaboration with external partners, like universities, and government policies promoting training in continuous improvement methodologies are crucial for success. Academic implications stress the importance of integrating soft skills in LSS implementation and engineering education.

Originality/value

This study shows a multiple-case analysis of LSS in a Latin American country highlighting the most commonly used tools, their impact on performance and the challenges of implementing LSS in health-care organisations in non-profit Ecuadorian hospitals.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

Open Access
Article
Publication date: 24 July 2024

Gijsbert van de Waerdt, Leentje Volker, Lynn Vosman and Hans Voordijk

The aim of this research is to explore how a programmatic multi-project context influences project-based firms (PBFs) in organizing their relations with other PBFs and suppliers…

Abstract

Purpose

The aim of this research is to explore how a programmatic multi-project context influences project-based firms (PBFs) in organizing their relations with other PBFs and suppliers in a project-based industry.

Design/methodology/approach

A multiple case study research is conducted. Data are collected from two case studies in the construction infrastructure sector. Eleven interviews with contractors and other suppliers are the primary source of data collection. The data are complemented by procurement documents and expert consultations.

Findings

The findings show that within a programmatic multi-project context, PBFs settle relations with (1) key partners for program management capacity, PBFs establish relations with (2) main contractors to divide projects and (innovation) tasks, and PBFs intensify relations with (3) suppliers to ensure continuity and expertise.

Research limitations/implications

The study contributes to the body of project management literature by exploring PBF’s relations with other PBFs and suppliers in a multi-project context. Based on empirical data, the study provides a distinction in layers presenting distinct levels of PBF’s supplier relations. This layer structure provides an excellent starting point for future studies exploring the program perspective of PBFs in the integrated supply chain.

Originality/value

Given the increase in programmatic multi-project context for project-based domains, discussed in both literature and practice, this study explores the effect of programs on relations of PBFs with other PBFs and suppliers. The study distinguishes PBF’s relations with the different suppliers in three layers and discusses the characteristics of these relations.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 2 February 2024

Quntao Wu, Qiushi Bo, Lan Luo, Chenxi Yang and Jianwang Wang

This study aims to obtain governance strategies for managing the complexity of megaprojects by analyzing the impact of individual factors and their configurations using the…

Abstract

Purpose

This study aims to obtain governance strategies for managing the complexity of megaprojects by analyzing the impact of individual factors and their configurations using the fuzzy-set qualitative comparative analysis (fsQCA) method and to provide references for project managers.

Design/methodology/approach

With the continuous development of the economy, society and construction industry, the number and scale of megaprojects are increasing, and the complexity is becoming serious. Based on the relevant literature, the factors affecting the complexity of megaprojects are determined through case analysis, and the paths of factors affecting the complexity are constructed for megaprojects. Then, the fsQCA method is used to analyze the factors affecting the complexity of megaprojects through 245 valid questionnaires from project engineers in this study.

Findings

The results support the correlation between the complexity factors of megaprojects, with six histological paths leading to high complexity and seven histological paths leading to low complexity.

Originality/value

It breaks the limitations of the traditional project complexity field through a “configuration perspective” and concludes that megaproject complexity is a synergistic effect of multiple factors. The study is important for enriching the theory of megaproject complexity and providing complexity governance strategies for managers in megaproject decision-making.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 October 2023

Amos Kalua

This study sought to populate a concise set of guidelines for use of the case study research methodology and evaluate the adequacy with which the methodology has been used…

Abstract

Purpose

This study sought to populate a concise set of guidelines for use of the case study research methodology and evaluate the adequacy with which the methodology has been used previously within both the positivist and interpretivist domains of architectural research.

Design/methodology/approach

Firstly, the study set out to establish, from the literature, the nature of the case study methodology. Thereafter, a set of guidelines for adequate use of the methodology was populated. The study, then, proceeded to examine selected architectural research papers that had used the case study methodology in order to evaluate the adequacy with which they had used the methodology. The research papers were randomly drawn from two major architectural research journals publishing scholarly work within the positivist and interpretivist paradigms.

Findings

Within the interpretivist domain of architectural research, the study found that there might exist some inadequacy in the way in which the case study methodology has been used.

Originality/value

Despite the popularity of the case study methodology, there have only been limited scholarly attempts at developing a set of guidelines with which to evaluate the adequacy of its usage, particularly within the context of architectural research. This lack of a concise set of guidelines might lead to inappropriate usage of the methodology. This study sought to undertake a review of the usage of the methodology within architectural research with two objectives, namely, populating a concise set of guidelines for use of the methodology and evaluating the adequacy with which the methodology has been used previously.

Details

Open House International, vol. 49 no. 4
Type: Research Article
ISSN: 0168-2601

Keywords

Open Access
Article
Publication date: 11 June 2024

Julian Rott, Markus Böhm and Helmut Krcmar

Process mining (PM) has emerged as a leading technology for gaining data-based insights into organizations’ business processes. As processes increasingly cross-organizational…

Abstract

Purpose

Process mining (PM) has emerged as a leading technology for gaining data-based insights into organizations’ business processes. As processes increasingly cross-organizational boundaries, firms need to conduct PM jointly with multiple organizations to optimize their operations. However, current knowledge on cross-organizational process mining (coPM) is widely dispersed. Therefore, we synthesize current knowledge on coPM, identify challenges and enablers of coPM, and build a socio-technical framework and agenda for future research.

Design/methodology/approach

We conducted a literature review of 66 articles and summarized the findings according to the framework for Information Technology (IT)-enabled inter-organizational coordination (IOC) and the refined PM framework. The former states that within inter-organizational relationships, uncertainty sources determine information processing needs and coordination mechanisms determine information processing capabilities, while the fit between needs and capabilities determines the relationships’ performance. The latter distinguishes three categories of PM activities: cartography, auditing and navigation.

Findings

Past literature focused on coPM techniques, for example, algorithms for ensuring privacy and PM for cartography. Future research should focus on socio-technical aspects and follow four steps: First, determine uncertainty sources within coPM. Second, design, develop and evaluate coordination mechanisms. Third, investigate how the mechanisms assist with handling uncertainty. Fourth, analyze the impact on coPM performance. In addition, we present 18 challenges (e.g. integrating distributed data) and 9 enablers (e.g. aligning different strategies) for coPM application.

Originality/value

This is the first article to systematically investigate the status quo of coPM research and lay out a socio-technical research agenda building upon the well-established framework for IT-enabled IOC.

Details

Business Process Management Journal, vol. 30 no. 8
Type: Research Article
ISSN: 1463-7154

Keywords

Open Access
Article
Publication date: 29 August 2024

Marjut Hirvonen, Katri Kauppi and Juuso Liesiö

Although it is commonly agreed that prescriptive analytics can benefit organizations by enabling better decision-making, the deployment of prescriptive analytics tools can be…

Abstract

Purpose

Although it is commonly agreed that prescriptive analytics can benefit organizations by enabling better decision-making, the deployment of prescriptive analytics tools can be challenging. Previous studies have primarily focused on methodological issues rather than the organizational deployment of analytics. However, successful deployment is key to achieving the intended benefits of prescriptive analytics tools. Therefore, this study aims to identify the enablers of successful deployment of prescriptive analytics.

Design/methodology/approach

The authors examine the enablers for the successful deployment of prescriptive analytics through five organizational case studies. To provide a comprehensive view of the deployment process, each case includes interviews with users, managers and top management.

Findings

The findings suggest the key enablers for successful analytics deployment are strong leadership and management support, sufficient resources, user participation in development and a common dialogue between users, managers and top management. However, contrary to the existing literature, the authors found little evidence of external pressures to develop and deploy analytics. Importantly, the success of deployment in each case was related to the similarity with which different actors within the organization viewed the deployment process. Furthermore, end users tended to highlight user participation, skills and training, whereas managers and top management placed greater emphasis on the importance of organizational changes.

Originality/value

The results will help practitioners ensure that key enablers are in place to increase the likelihood of the successful deployment of prescriptive analytics.

Details

European Business Review, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0955-534X

Keywords

Open Access
Article
Publication date: 19 December 2023

Nadia Arshad, Rotem Shneor and Adele Berndt

Crowdfunding is an increasingly popular channel for project fundraising for entrepreneurial ventures. Such efforts require fundraisers to develop and manage a crowdfunding…

1557

Abstract

Purpose

Crowdfunding is an increasingly popular channel for project fundraising for entrepreneurial ventures. Such efforts require fundraisers to develop and manage a crowdfunding campaign over a period of time and several stages. Thus, the authors aim to identify the stages fundraisers go through in their crowdfunding campaign process and how their engagement evolves throughout this process.

Design/methodology/approach

Following a multiple case study research design analysing six successful campaigns, the current study suggests a taxonomy of stages the fundraisers go through in their crowdfunding campaign management process while identifying the types of engagement displayed and their relative intensity at each of these stages.

Findings

The study proposes a five-stage process framework (pre-launch, launch, mid-campaign, conclusion and post-campaign), accompanied by a series of propositions outlining the relative intensity of different types of engagement throughout this process. The authors show that engagement levels appear with high intensity at pre-launch, and to a lesser degree also at the post-launch stage while showing low intensity at the stages in between them. More specifically, cognitive and behavioural engagement are most prominent at the pre- and post-launch stages. Emotional engagement is highest during the launch, mid-launch and conclusion stages. And social engagement maintains moderate levels of intensity throughout the process.

Originality/value

This study focuses on the campaign process using engagement theory, thus identifying the differing engagement patterns throughout the dynamic crowdfunding campaign management process, not just in one part.

Details

International Journal of Entrepreneurial Behavior & Research, vol. 30 no. 11
Type: Research Article
ISSN: 1355-2554

Keywords

Open Access
Article
Publication date: 14 May 2024

Moreno Frau and Tamara Keszey

Since previous literature provides fragmented and conflicting results about the use of digital data for product innovation, the article aims to comprehensively explore and shed…

Abstract

Purpose

Since previous literature provides fragmented and conflicting results about the use of digital data for product innovation, the article aims to comprehensively explore and shed light on how agri-food firms utilise external and internal digital data sources when dealing with different product innovations, such as incremental, architecture and radical innovation.

Design/methodology/approach

This paper adopts an exploratory multiple-case study and a theory-building process, focussing on the agri-food industry. We collected primary and secondary data from eight manufacturing companies.

Findings

The findings of this research show an empirical framework of six agri-food firms’ digital data utilisation behaviours: the supervisor, the passive supervisor, the developer, the passive developer, the pathfinder and the conjunction behaviour. These digital data utilisation behaviours vary according to a combination of data sources, such as internal data related to inside phenomenon measures (e.g. data generated by sensors installed in the production plan) or external data (e.g., market trends, overall sector sales), and innovation purposes.

Practical implications

This article offers guiding principles that assist agri-food companies when utilising internal and external digital data sources for specific product innovation outcomes such as incremental, architectural and radical innovation.

Originality/value

The significance of external and internal data sources in stimulating product innovation has garnered substantial attention within academic discussions, highlighting the critical importance of analysing digital data for driving such innovation. Nonetheless, the predominant approach is to study a single innovation outcome through the lens of digital technology. In contrast, our study stands out by adopting a fundamental perspective on data sources, enabling a more nuanced explanation of the overall product innovation outcomes within the agri-food sector.

Details

British Food Journal, vol. 126 no. 13
Type: Research Article
ISSN: 0007-070X

Keywords

Open Access
Article
Publication date: 3 July 2024

Anna af Hällström

Managing megaprojects is challenging due to their inherent complexity and uncertainty. Collaborative project delivery models have been introduced as an alternative to traditional…

Abstract

Purpose

Managing megaprojects is challenging due to their inherent complexity and uncertainty. Collaborative project delivery models have been introduced as an alternative to traditional project management in public infrastructure megaprojects and are often realized through collaborative contracts. These project organizations act as institutional arenas for logic interaction as actors with differing institutional backgrounds interact within the project. This paper aims to study the delivery phase of three megaprojects through an institutional lens, investigating the institutional interaction and alignment of logics therein.

Design/methodology/approach

A multiple case study was employed to reach deep insight into the phenomenon. Sixty-one interviews were conducted over 3 cases with representatives from all levels of the project hierarchy. Respondents were selected through snowball sampling. In two cases, observations of the shared project office were conducted. Data analysis built on first-order codes and second-order themes, collected into a theoretical framework.

Findings

The empirical evidence demonstrates the dynamics shaping institutional logics and gives evidence for changing logics in projects with a well-applied collaborative contract. However, there is a risk of resistance and a return to traditional logics since institutional change is slow and an unsuitably applied collaborative contract can lead to adherence to the conventional way of work.

Originality/value

Current research has focused on the regulatory framework and procurement phase of such models, but little attention has been given to the delivery phase and the interaction of conflicting logics. This paper can serve as an exemplar of the different logics found within public infrastructure projects and their interaction and alignment. Contributions include a heightened emphasis on the start of the project as a meeting point for differing institutional logics and the role change necessary when using a collaborative contract.

Article
Publication date: 30 August 2024

Franck Marle and François Robin

This paper aims to propose an accurate and efficient decision-making process adapted to the specific context of Claim Management situations, implying partners engaged in a…

Abstract

Purpose

This paper aims to propose an accurate and efficient decision-making process adapted to the specific context of Claim Management situations, implying partners engaged in a high-involvement relationship.

Design/methodology/approach

We used a three-step approach: first, an inductive phase based on 12 past case studies. Second, a theory-building phase. Third, a theory-testing phase based on an ongoing case study to observe and test our propositions.

Findings

Proposal 1: Partner’s Strategic Value is an influential decision parameter that must be incorporated into Claim Management-related decision-making processes in high-involvement relationships. Proposal 2: The Fast-and-Frugal Heuristic is adapted to the intense, interactive and iterative nature of the Claim Management context. Our final proposal combines these two findings, i.e. a Fast-and-Frugal Heuristic incorporating the Partner’s Strategic Value and based on using decision criteria as a sequence, not simultaneously.

Originality/value

In the context of high-involvement business relationships and Claim Management, this study introduces the importance of selecting an appropriate decision methodology and integrating a strategic decision parameter (Partner’s Strategic Value) into an operational decision-making context. Furthermore, the principle of considering decision parameters in a specific sequence corresponds to the iterative and interactive nature of the Claim Management processes.

Details

Management Decision, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0025-1747

Keywords

1 – 10 of over 2000