Open Access
Article
Publication date: 18 May 2022

Salman Ashkanani and Robert Franzoi

There is a large amount of published literature on project management. However, there exists a gap between the existing literature and current…

5424

Abstract

Purpose

There is a large amount of published literature on project management. However, there exists a gap between the existing literature and current practices in the industry for the development and execution of megaprojects. Existing literature generally focuses on individual elements applicable to project management in general. This article aims to provide an overview of the project management system components used in industrial megaprojects and identify the gaps between theory and practice, which can be used as input for further research on the topic.

Design/methodology/approach

The topic of megaproject management is reviewed based on available literature sources on megaproject management systems to identify the main gaps in the literature between theory and practice. Based on the findings, an analysis is provided to discuss the improvements required in distinct project management areas and phases.

Findings

There are multiple gaps associated with issues, failures, successes and challenges in industrial megaprojects. Improvements are needed in distinct management areas and over the entire project lifetime. Further guidelines are required for achieving improved megaproject management systems. Such concepts could benefit researchers and practitioners in streamlining their research toward the most relevant and critical areas of improvement of megaproject management systems.

Originality/value

This study addresses the literature gaps between theory and practices on megaproject management systems with an overview that provides helpful guidance for industrial applications and future research. A holistic analysis identifies gaps and critical drives in the body of knowledge, revealing avenues for future research focused on quality as the central pillar that affects the entire megaproject management system.

Details

Management Matters, vol. 19 no. 2
Type: Research Article
ISSN: 2752-8359

Keywords

Article
Publication date: 18 July 2022

Salman Ashkanani and Robert Franzoi

This paper aims to present a structured and comprehensive review of relevant works, collected through a systematic methodology and clustered into nine meaningful categories on…

1098

Abstract

Purpose

This paper aims to present a structured and comprehensive review of relevant works, collected through a systematic methodology and clustered into nine meaningful categories on megaproject management systems and the current requirements for improved industrial megaprojects.

Design/methodology/approach

The methodology employed in this paper retrieves relevant works from available online citation indexes that are published in peer-reviewed journals and other reliable sources from 2000 to 2021.

Findings

It has been observed that the literature on megaproject management is still premature and requires further research to understand better the main gaps and effects of large-scale and typically complex megaprojects. Significant improvements are needed towards covering gaps to address the project management system holistically over the entire project life cycle. There are no clear guidelines for achieving a complete and conclusive project management system and enhancing future megaprojects' management capabilities.

Originality/value

This paper provides a clear picture of the existing literature on megaproject management systems, contributing insights for successful megaproject projects. Additionally, the holistic analysis identifies gaps in the body of knowledge, revealing avenues for future research.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 February 2024

Quntao Wu, Qiushi Bo, Lan Luo, Chenxi Yang and Jianwang Wang

This study aims to obtain governance strategies for managing the complexity of megaprojects by analyzing the impact of individual factors and their configurations using the…

Abstract

Purpose

This study aims to obtain governance strategies for managing the complexity of megaprojects by analyzing the impact of individual factors and their configurations using the fuzzy-set qualitative comparative analysis (fsQCA) method and to provide references for project managers.

Design/methodology/approach

With the continuous development of the economy, society and construction industry, the number and scale of megaprojects are increasing, and the complexity is becoming serious. Based on the relevant literature, the factors affecting the complexity of megaprojects are determined through case analysis, and the paths of factors affecting the complexity are constructed for megaprojects. Then, the fsQCA method is used to analyze the factors affecting the complexity of megaprojects through 245 valid questionnaires from project engineers in this study.

Findings

The results support the correlation between the complexity factors of megaprojects, with six histological paths leading to high complexity and seven histological paths leading to low complexity.

Originality/value

It breaks the limitations of the traditional project complexity field through a “configuration perspective” and concludes that megaproject complexity is a synergistic effect of multiple factors. The study is important for enriching the theory of megaproject complexity and providing complexity governance strategies for managers in megaproject decision-making.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 March 1998

MOHAN M KUMARASWAMY

The findings from a set of related investigations into construction megaproject management were integrated into models, frameworks and basic guidelines that would help to improve…

Abstract

The findings from a set of related investigations into construction megaproject management were integrated into models, frameworks and basic guidelines that would help to improve and integrate (1) work packaging, (2) project participant selection and (3) operational management subsystems. More creative approaches to work packaging and participant selection were seen to significantly support construction industry development and the consequent longer‐term benefits in developing countries. A paradigm of ‘technology exchange’ is proposed as the basis of more viable and mutually beneficial joint ventures which would also facilitate the innovative packaging and integrated management of megaprojects in developing countries. Additionally, it is recommended that hitherto isolated initiatives related to quality, safety or dispute resolution/avoidance should be integrated into synergistic management systems which also incorporate built‐in monitoring and evaluation sub‐systems. In turn, the latter would trigger both short‐ and long‐term remedial measures related to improved project packaging, for example, as well as to personnel training and organizational development programmes.

Details

Engineering, Construction and Architectural Management, vol. 5 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 October 2022

Gizem Bilgin, Huseyin Erol, Guzide Atasoy, Irem Dikmen and M. Talat Birgonul

Megaprojects are known as complex projects that involve high levels of uncertainty. This interpretive study explores and portrays perceived complexity in mega construction…

Abstract

Purpose

Megaprojects are known as complex projects that involve high levels of uncertainty. This interpretive study explores and portrays perceived complexity in mega construction projects by lived experiences of project managers.

Design/methodology/approach

This study utilises a ground theory approach to analyse data gathered from semi-structured interviews with 18 professionals involved in 11 megaprojects.

Findings

Complexity in mega construction projects is defined as a project property that stems from the interaction of project features, uncertain variables/conditions, and managerial actions forming a pattern, which emerges over time, based on the reflections of construction practitioners.

Originality/value

This study defines complexity based on the reflections of the practitioners in the construction industry and uniquely identifies complexity patterns that may have implications for project management, particularly risk management.

Details

International Journal of Managing Projects in Business, vol. 15 no. 7
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 25 August 2023

Sepani Senaratne, Abhishek KC and Siryana Rai

Megaprojects are financially large and complex in scope, which require engagement of stakeholders from various institution and communities. With increased concerns from…

Abstract

Purpose

Megaprojects are financially large and complex in scope, which require engagement of stakeholders from various institution and communities. With increased concerns from stakeholders on sustainability related issues, from environmental to socio-economic perspective, managing megaprojects has become quite challenging. Hence, there should be proactive approaches in active engagement of stakeholders from the start of the projects to overcome such issues. Currently, there is a knowledge gap on stakeholder management strategies specific to megaprojects on managing sustainability issues.

Design/methodology/approach

This research has adopted review of secondary data from case studies to identify stakeholder management challenges and strategies in megaprojects around Sydney area. The documents related to three different projects were reviewed and data were collected through qualitative content analysis and coding with use of NVivo software for within case analysis and was followed by thematic approach for cross case analysis.

Findings

Every case study project's sustainability-related stakeholder issues are more similar than different to others. Differences are mostly in terms of intensity of impact of any issue in a particular project, and/or intensity of impact at certain phase of any project. Moreover, significant sectors and strategies have been identified for key focus to manage environment and socioeconomic issues. Whatever be the strategies, in case of megaprojects, they need to be mostly proactive.

Originality/value

This research has extended the knowledge on stakeholder management, in relation to managing sustainability-related issues of megaprojects during their design, construction and operation phases. This research offers useful strategies for project teams of megaprojects to develop a proactive stakeholder management plan, addressing unavoidable sustainability challenges.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 19 September 2016

Shahin Karimidorabati, Carl T. Haas and Joel Gray

Current processes to manage changes are subject to failure since they are heavily dependent on human discipline. The purpose of this paper is to evaluate and quantify the…

1888

Abstract

Purpose

Current processes to manage changes are subject to failure since they are heavily dependent on human discipline. The purpose of this paper is to evaluate and quantify the difference between levels of automation of change management processes and to provide input for determining the use of automation systems for change management.

Design/methodology/approach

Three generations of change management processes are defined to represent progressive practices used in major capital projects over the past few decades. Discrete event simulation was used to model these processes to capture their behavior and compare their performance according to time and compliance metrics. An oil and gas megaproject served to validate the findings of this modeling and analysis.

Findings

The results showed that automated processes can bring more compliance and real-time traceability, but not a significant time reduction in the change process. This contributes to the understanding of the impact of workflow-based automation on construction process performance. The validity of the conclusions are limited by the breadth of sectors studied and the inability to capture off-line time allocations of the personnel involved. Future research may build on the work presented here by studying additional processes such as requests for information, project change notices, requests for scaffolding, and interface management in various industry sectors.

Originality/value

A new approach for modeling and evaluating construction management process automation is contributed and the specific results of the paper indicate that automated workflow-based change management processes should be implemented in megaprojects.

Details

Engineering, Construction and Architectural Management, vol. 23 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 10 February 2023

Wujuan Zhai, Florence Yean Yng Ling, Jiyong Ding and Zhuofu Wang

Megaprojects have large impact on the environment and stakeholders should take collective action to ensure that these projects are developed in a socially responsible manner…

Abstract

Purpose

Megaprojects have large impact on the environment and stakeholders should take collective action to ensure that these projects are developed in a socially responsible manner. Hitherto, it is not known whether group and subjective norms and social identity could compel stakeholders to take socially responsible collective actions in megaprojects. The aim of this study is to design and test a model to boost stakeholders' intention to take socially responsible collective action in the context of mega water transfer projects in China.

Design/methodology/approach

A quasi-experimental causal research design was adopted to establish cause–effect relationships among the dependent variable (we-intention) and independent variables (subjective norms, group norms, social identity and desire). This study adopts the belief–desire–intention model and social influence theory to empirically investigate how to boost the stakeholders' intention to participate in socially responsible collective action. An online questionnaire survey was conducted and data was collected from 365 respondents who were involved in mega water transfer projects in China. The partial least squares structural equation modeling technique was employed to analyze the data.

Findings

The results from partial least squares analyses indicate that the presence of subjective norms, group norms and social identity (collectively known as social influence process) could increase stakeholders' intention to take socially responsible collective action. In addition, the desire to be socially responsible also boosts stakeholders' intention to take collective action. Desire partially mediates the relationship between social influence process and intention to take socially responsible collective action.

Originality/value

This study adds to existing knowledge by discovering social influence process as an antecedent to taking socially responsible collective action in megaprojects. Strong group norms and subjective norms could propel stakeholders to be more socially responsible. The study also adds to knowledge by discovering that stakeholders' desire to fulfill social responsibility also leads them to take concrete actions. Implications and recommendations are provided on how to manipulate different types of social influence processes to facilitate stakeholders to adopt socially responsible collective action in the process of managing megaprojects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 27 February 2024

Vartenie Aramali, George Edward Gibson, Hala Sanboskani and Mounir El Asmar

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on…

Abstract

Purpose

Earned value management systems (EVMS), also called integrated project and program management systems, have been greatly examined in the literature, which has typically focused on their technical aspects rather than social. This study aims to hypothesize that improving both the technical maturity of EVMS and the social environment elements of EVMS applications together will significantly impact project performance outcomes. For the first time, empirical evidence supports a strong relationship between EVMS maturity and environment.

Design/methodology/approach

Data was collected from 35 projects through four workshops, attended by 31 industry practitioners with an average of 19 years of EVMS experience. These experts, representing 23 organizations, provided over 2,800 data points on sociotechnical integration and performance outcomes, covering projects totaling $21.8 billion. Statistical analyses were performed to derive findings on the impact of technical maturity and social environment on project success.

Findings

The results show statistically significant differences in cost growth, compliance, meeting project objectives and business drivers and customer satisfaction, between projects with high EVMS maturity and environment and projects with poor EVMS maturity and environment. Moreover, the technical and social dimensions were found to be significantly correlated.

Originality/value

Key contributions include a novel and tested performance-driven framework to support integrated project management using EVMS. The adoption of this detailed assessment framework by government and industry is driving a paradigm shift in project management of some of the largest and most complex projects in the U.S.; specifically transitioning from a project assessment based upon a binary approach for EVMS technical maturity (i.e. compliant/noncompliant to standards) to a wide-ranging scale (i.e. 0–1,000) across two dimensions.

Details

International Journal of Managing Projects in Business, vol. 17 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 18 September 2023

Miftachul Huda

In recent years, issues like untrusted or questionable sources of information are indisputably rampant in the digital era. The quality of information is now found to be…

Abstract

Purpose

In recent years, issues like untrusted or questionable sources of information are indisputably rampant in the digital era. The quality of information is now found to be challenging with its kind of issues, crisis and also clarity in which it requires to have a strategic scenario and practice to enhance quality assurance in order to creating safe cyber-spaces. The initiative to organise information at the organisational stage has widely emerged on the cyberspace. This paper aims to examine the insights of the element of trust in quality communication and information management to drive key performance indicator to support organisational sustainability. This approach is likely to play a significant role in enhancing critical inquiry in to issue of trust in information to ensure untainted integrity and quality assurance of the source of the information.

Design/methodology/approach

The preparation of this paper used a systematic literature review according to four phases, namely, identification, assessment or examination, extraction and interpretation. This approach was selected to advance critical inquiry into the most current topic on the trust for quality of information as way of strategic communication management to achieve safe cyber-organisational sustainability. The process was made through the various sources of peer-reviewed articles including journals, book chapters, books and conference proceedings. The literature review was carried out through the search for keywords such as trust in information, strategic communication and safe cyber-organisational sustainability.

Findings

The results revealed that the trust in quality of information with its wide range of initiatives could be enhanced as an initial attempt to embrace comprehensive approach in establishing strategic communication to ensure organisational sustainability and quality assurance of safe cyber space. The result further indicated three points, which follows development of virtual interaction with information management for safe cyberspace, enhancing continued predictability assessment in digital information process and practice and developing trust in information and quality of communication for organisational sustainability.

Research limitations/implications

This paper is expected to give an insightful value in contributing to quality measurement of the strategic communication to promote trust in quality of information. Hence, the design to expand strategic management to support digital social connections in the cyber space. As a result, the profound contribution would also lead to enhancement of organisational sustainability in the digital era, amid technological trends.

Practical implications

The need to develop an approach to strengthen the trust in information in the digital cyberspace should focus on providing insights into the quality of information, authenticity and integrity to develop quality assurance for social connection. The awareness raising process in consolidating the trust in information has to start with exploring early social interaction in the digital age. This approach provides quality assurance to linking digital connection to develop trust in the quality of information. This would enable feedback to ensure accessibility and accuracy of quality of information dealing with critical elements relating to organisational sustainability.

Originality/value

The entire awareness in expanding the trust as information quality indicator has to be started with exploring the early social interaction in the digital age, to achieve quality basis on linking the digital connection as an attempt to build the information quality. This would give a feedback in ensuring the accessibility and accuracy of information quality together with dealing with an ultimate element to lead to the organisational longevity.

Details

International Journal of Organizational Analysis, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1934-8835