Search results

1 – 10 of over 2000
Open Access
Article
Publication date: 20 July 2023

Andrew Ebekozien, Clinton Aigbavboa, Mohamad Shaharudin Samsurijan, Mohd Isa Rohayati and Nor Malina Malek

Inadequate strategic planning and maintenance budget may undermine the maintenance of the Higher Education Institution Building (HEIB). Studies have shown that a customised…

Abstract

Purpose

Inadequate strategic planning and maintenance budget may undermine the maintenance of the Higher Education Institution Building (HEIB). Studies have shown that a customised maintenance concept such as Soft System Methodology (SSM) can improve public building maintenance operations. There is a paucity of studies regarding public HEIB maintenance in Nigeria via an SSM approach. Therefore, the research investigated the state of public HEIB and developed a framework to improve public HEIB maintenance practices in Nigeria.

Design/methodology/approach

The research adopted SSM to understand Nigeria’s public HEIB maintenance practices. The SSM permitted a substitute approach to improve public HEIB maintenance practices via a developed framework. Data were collated via virtual interviews with experts, and findings were presented in line with the SSM seven steps.

Findings

Findings show that besides the shoddy state of public HEIB maintenance, there is no public digitalised HEIB framework to improve maintenance practices across Nigeria’s higher education institutions. The study developed a digitalised framework with the support of Computerised Maintenance Management System from the findings. It would reposition the public HEIB and stir up various agencies/departments/units managing maintenance for better service delivery via integrated delivery, practical, methodological and managerial aspects.

Originality/value

The research investigated Nigeria’s public HEIB maintenance practices via SSM to identify the required document and propose a feasible framework to improve Nigeria’s HEIB maintenance practices. Besides the developed conceptual framework, Nigeria’s HEIB maintenance practitioners and higher institution chief executives can use the recommended framework as guidelines to improve HEIB maintenance practices.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 6
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Article
Publication date: 26 May 2023

Mpho Trinity Manenzhe, Arnesh Telukdarie and Megashnee Munsamy

The purpose of this paper is to propose a system dynamic simulated process model for maintenance work management incorporating the Fourth Industrial Revolution (4IR) technologies.

1743

Abstract

Purpose

The purpose of this paper is to propose a system dynamic simulated process model for maintenance work management incorporating the Fourth Industrial Revolution (4IR) technologies.

Design/methodology/approach

The extant literature in physical assets maintenance depicts that poor maintenance management is predominantly because of a lack of a clearly defined maintenance work management process model, resulting in poor management of maintenance work. This paper solves this complex phenomenon using a combination of conceptual process modeling and system dynamics simulation incorporating 4IR technologies. A process for maintenance work management and its control actions on scheduled maintenance tasks versus unscheduled maintenance tasks is modeled, replicating real-world scenarios with a digital lens (4IR technologies) for predictive maintenance strategy.

Findings

A process for maintenance work management is thus modeled and simulated as a dynamic system. Post-model validation, this study reveals that the real-world maintenance work management process can be replicated using system dynamics modeling. The impact analysis of 4IR technologies on maintenance work management systems reveals that the implementation of 4IR technologies intensifies asset performance with an overall gain of 27.46%, yielding the best maintenance index. This study further reveals that the benefits of 4IR technologies positively impact equipment defect predictability before failure, thereby yielding a predictive maintenance strategy.

Research limitations/implications

The study focused on maintenance work management system without the consideration of other subsystems such as cost of maintenance, production dynamics, and supply chain management.

Practical implications

The maintenance real-world quantitative data is retrieved from two maintenance departments from company A, for a period of 24 months, representing years 2017 and 2018. The maintenance quantitative data retrieved represent six various types of equipment used at underground Mines. The maintenance management qualitative data (Organizational documents) in maintenance management are retrieved from company A and company B. Company A is a global mining industry, and company B is a global manufacturing industry. The reliability of the data used in the model validation have practical implications on how maintenance work management system behaves with the benefit of 4IR technologies' implementation.

Social implications

This research study yields an overall benefit in asset management, thereby intensifying asset performance. The expected learnings are intended to benefit future research in the physical asset management field of study and most important to the industry practitioners in physical asset management.

Originality/value

This paper provides for a model in which maintenance work and its dynamics is systematically managed. Uncontrollable corrective maintenance work increases the complexity of the overall maintenance work management. The use of a system dynamic model and simulation incorporating 4IR technologies adds value on the maintenance work management effectiveness.

Details

Journal of Quality in Maintenance Engineering, vol. 29 no. 5
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 19 December 2023

Zul-Atfi Ismail

Operation and maintenance (O&M) processes projects such as identification, assessment, planning and execution, embody a variety of standards such as technical (method of…

Abstract

Purpose

Operation and maintenance (O&M) processes projects such as identification, assessment, planning and execution, embody a variety of standards such as technical (method of statement), environmental, economic (campus development) and social (health and wellbeing). Because these standards have proven to be challenging to integrate, local governments are increasingly experimenting with social innovation (SI) as a bottom-up form of standard integration. This study aims to apply the concept of SI to the O&M processes of facilities management at polytechnics in Malaysia to identify problems with conventional working practices in this area and to recommend potential solutions.

Design/methodology/approach

The paper reviews evidence that conventional working methods generate significant problems related to paper-based forms, improper database management and flawed decision-making processes. Because of the lack knowledge about different ways of how standard integration is achieved, the comparison of three polytechnic institutions which are Rensselaer Polytechnic Institute (RPI) and Southern Polytechnic College of Engineering and Engineering Technology (SPCEET) in USA as well as Seberang Perai Polytechnic, Pulau Pinang (PSP) in Malaysia shares the ambition to realise standard integration of O&M through SI.

Findings

The findings reveal that SI leads to four ways of standard integration: computerised maintenance management system, online customer complaint, electronic form and relational database. Application of the concept of SI reveals the need for more sophisticated management solutions in the O&M processes of facilities management.

Originality/value

These standard integration arrangements unfortunately seem to mainly contribute to greater alignment between standard rather than true standard integration. The concept of SI will guide future improvements and developments in maintenance management systems to fulfil requirements in this area.

Details

Journal of Global Responsibility, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2041-2568

Keywords

Article
Publication date: 22 September 2023

Mulatu Tilahun Gelaw, Daniel Kitaw Azene and Eshetie Berhan

This research aims to investigate critical success factors, barriers and initiatives of total productive maintenance (TPM) implementation in selected manufacturing industries in…

Abstract

Purpose

This research aims to investigate critical success factors, barriers and initiatives of total productive maintenance (TPM) implementation in selected manufacturing industries in Addis Ababa, Ethiopia.

Design/methodology/approach

This study built and looked into a conceptual research framework. The potential barriers and success factors to TPM implementation have been highlighted. The primary study techniques used to collect relevant data were a closed-ended questionnaire and semi-structured interview questions. With the use of SPSS version 23 and SmartPLS 3.0 software, the data were examined using descriptive statistics and the inferential Partial Least Square Structural Equation Modeling (PLS-SEM) techniques.

Findings

According to the results of descriptive statistics and multivariate analysis using PLS-SEM, the case manufacturing industries' TPM implementation initiative is in its infancy; break down maintenance is the most widely used maintenance policy; top managers are not dedicated to the implementation of TPM; and there are TPM pillars that have been weakly and strongly addressed by the case manufacturing companies.

Research limitations/implications

The small sample size is a limitation to this study. It is therefore challenging to extrapolate the research findings to other industries. The only manufacturing KPI utilized in this study is overall equipment effectiveness (OEE). It is possible to add more parameters to the manufacturing performance measurement KPI. The relationships between TPM and other lean production methods may differ from those observed in this cross-sectional study. Longitudinal experimental studies and in-depth analyses of TPM implementations may shed further light on this.

Practical implications

Defining crucial success factors and barriers to TPM adoption, as well as identifying the weak and strong TPM pillars, will help companies in allocating their scarce resources exclusively to the most important areas. TPM is not a quick solution. It necessitates a change in both the company's and employees' attitude and their values, which takes time to bring about. Hence, it entails a long-term planning. The commitment of top managers is very important in the initiatives of TPM implementation.

Originality/value

This study is unique in that, it uses a new conceptual research model and the PLS-SEM technique to analyze relationships between TPM pillars and OEE in depth.

Details

Journal of Quality in Maintenance Engineering, vol. 30 no. 1
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 1 November 2022

Patrícia Maria Bozola, Thais V. Nunhes, Luís César Ferreira Motta Barbosa, Marcio C. Machado and Otavio José Oliveira

In 2016, the ISO/TS 16949 quality management standard for the automotive industry evolved to IATF 16949. The update brought new requirements that need to be analyzed before being…

Abstract

Purpose

In 2016, the ISO/TS 16949 quality management standard for the automotive industry evolved to IATF 16949. The update brought new requirements that need to be analyzed before being implemented in organizations. Therefore, the purpose of this article is to propose guidelines to assist organizations in the automotive sector in the implementation of the elements added in the update to the IATF 16949 standard.

Design/methodology/approach

To fulfill this objective, the identification and analysis of the elements added in the evolution from ISO/TS 16949 to IATF 16949 was carried out, and four case studies were conducted in Brazilian automotive companies.

Findings

The main elements added to IATF 16949 with the update of the standard are the use of process failure mode effects analysis (PFMEA) for risk analysis; the development of a communication channel for employees to report cases of misconduct and non-conformities; procedures for controlling repaired/reworked products and temporary changes; and the inclusion of autonomous maintenance for the full implementation of total productive maintenance (TPM).

Originality/value

The main practical implication/contribution of the research is the proposed guidelines, which can support managers and automotive companies that want to implement, or will go through, the IATF certification process. The article's originality lies in the combination of a theoretical framework and case study analyses to develop the guidelines.

Details

Benchmarking: An International Journal, vol. 30 no. 9
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 29 September 2023

Beatriz Campos Fialho, Ricardo Codinhoto and Márcio Minto Fabricio

Facilities management (FM) plays a key role in the performance of businesses to ensure the comfort of users and the sustainable use of natural resources over operation and…

Abstract

Purpose

Facilities management (FM) plays a key role in the performance of businesses to ensure the comfort of users and the sustainable use of natural resources over operation and maintenance. Nevertheless, reactive maintenance (RM) services are characterised by delays, waste and difficulties in prioritising services and identifying the root causes of failures; this is mostly caused by inefficient asset information and communication management. While linking building information modelling and the Internet of Things through a digital twin has demonstrated potential for improving FM practices, there is a lack of evidence regarding the process requirements involved in their implementation. This paper aims to address this challenge, as it is the first to statistically characterise RM services and processes to identify the most critical RM problems and scenarios for digital twin implementation. The statistical data analytics approach also constitutes a novel practical approach for a holistic analysis of RM occurrences.

Design/methodology/approach

The research strategy was based on multiple case studies, which adopted university campuses as objects for investigation. A detailed literature review of work to date and documental analysis assisted in generating data on the FM sector and RM services, where qualitative and statistical analyses were applied to approximately 300,000 individual work requests.

Findings

The work provides substantial evidence of a series of patterns across both cases that were not evidenced prior to this study: a concentration of requests within main campuses; a balanced distribution of requests per building, mechanical and electrical service categories; a predominance of low priority level services; a low rate of compliance in attending priority services; a cumulative impact on the overall picture of five problem subcategories (i.e. Building-Door, Mechanical-Plumbing, Electrical-Lighting, Mechanical-Heat/Cool/Ventilation and Electrical-Power); a predominance of problems in student accommodation facilities, circulations and offices; and a concentration of requests related to unlisted buildings. These new patterns form the basis for business cases where maintenance services and FM sectors can benefit from digital twins. It also provides a new methodological approach for assessing the impact of RM on businesses.

Practical implications

The findings provide new insights for owners and FM staff in determining the criticality of RM services, justifying investments and planning the digital transformation of services for a smarter provision.

Originality/value

This study represents a unique approach to FM and provides detailed evidence to identify novel RM patterns of critical service provision and activities within organisations for efficient digitalised data management over a building’s lifecycle.

Details

Facilities, vol. 42 no. 3/4
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 30 January 2024

Mahnaz Ensafi, Walid Thabet and Deniz Besiktepe

The aim of this paper was to study current practices in FM work order processing to support and improve decision-making. Processing and prioritizing work orders constitute a…

Abstract

Purpose

The aim of this paper was to study current practices in FM work order processing to support and improve decision-making. Processing and prioritizing work orders constitute a critical part of facilities and maintenance management practices given the large amount of work orders submitted daily. User-driven approaches (UDAs) are currently more prevalent for processing and prioritizing work orders but have challenges including inconsistency and subjectivity. Data-driven approaches can provide an advantage over user-driven ones in work-order processing; however, specific data requirements need to be identified to collect and process the functional data needed while achieving more consistent and accurate results.

Design/methodology/approach

This paper presents the findings of an online survey conducted with facility management (FM) experts who are directly or indirectly involved in processing work orders in building maintenance.

Findings

The findings reflect the current practices of 71 survey participants on data requirements, criteria selection, rankings, with current shortcomings and challenges in prioritizing work orders. In addition, differences between criteria and their ranking within participants’ experience, facility types and facility sizes are investigated. The findings of the study provide a snapshot of the current practices in FM work order processing, which aids in developing a comprehensive framework to support data-driven decision-making and address the challenges with UDAs.

Originality/value

Although previous studies have explored the use of selected criteria for processing and prioritizing work orders, this paper investigated a comprehensive list of criteria used by various facilities for processing work orders. Furthermore, previous studies are focused on the processing and prioritization stage, whereas this paper explored the data collected following the completion of the maintenance tasks and the benefits it can provide for processing future work orders. In addition, previous studies have focused on one specific stage of work order processing, whereas this paper investigated the common data between different stages of work order processing for enhanced FM.

Details

Facilities , vol. 42 no. 5/6
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 22 September 2023

Tahmineh Raoofi and Sahin Yasar

This study aims to elaborate on the existing link between maintenance practices and the digital world while also highlighting any unaddressed potential for digital transformation…

Abstract

Purpose

This study aims to elaborate on the existing link between maintenance practices and the digital world while also highlighting any unaddressed potential for digital transformation in aircraft maintenance. Additionally, explore how digital technologies contribute to optimizing efficiency within the continuing airworthiness management (CAM) processes.

Design/methodology/approach

A literature review was performed to provide a precise review of the authority regulations on CAM processes and existing literature on digital transformation, including artificial intelligence, machine learning, neural network and big data in civil aircraft maintenance and continuing airworthiness processes. This method is used to organize, analyze and structure the body of literature to identify research gaps in the selected scope of the study.

Findings

The high position of digital technologies in preventive and predictive maintenance and the need for legislative development for using them in CAM are emphasized. Moreover, it is shown in which area of CAM scientific research has been performed regarding the application of frontier digital technologies. In addition, the gaps between maintenance practices and the digital world, along with the potential scopes of digital transformation which has not been well addressed, are identified. And finally, how digital technologies can effectively increase efficiency in CAM processes is discussed.

Originality/value

To the best of our knowledge, no study comprehensively determined the body of existing knowledge on the aspects of digitalization related to the field of continuing airworthiness management and aircraft maintenance. The results of this study provide a positive contribution to airlines, policymakers, manufacturers and maintenance organizations achieving additional benefits from the implementation of digital technologies in the CAM processes.

Details

Aircraft Engineering and Aerospace Technology, vol. 95 no. 10
Type: Research Article
ISSN: 1748-8842

Keywords

Article
Publication date: 11 December 2023

Chukwuka Christian Ohueri, Md. Asrul Nasid Masrom, Hadina Habil and Mohamud Saeed Ambashe

The Internet of Things-based digital twin (IoT-DT) technologies offer a transformative approach to building retrofitting for reducing operational carbon (ROC) emissions. However…

Abstract

Purpose

The Internet of Things-based digital twin (IoT-DT) technologies offer a transformative approach to building retrofitting for reducing operational carbon (ROC) emissions. However, a notable gap exists between the potential and adoption of the two emerging technologies, further exacerbated by the nascent state of research in this domain. This research aims to establish the best practices that innovatively strengthen the identified enablers to decisively tackle challenges, ensuring the efficient implementation of IoT-DT for ROC emissions in buildings.

Design/methodology/approach

This study adopted a mixed-method approach. Questionnaire data from 220 multidiscipline professionals were analysed via structural equation modelling analysis, while interview data obtained from 18 stakeholders were analysed using thematic content analysis. The findings were triangulated for cohesive interpretation.

Findings

After the analysis of questionnaire data, a structural model was established, depicting the critical challenges (inadequate data security, limited technical expertise and scalability issues) and key enablers (robust data security measures, skill development and government incentives) of implementing IoT-DT for ROC. Sequentially, analysis of in-depth interview data revealed the IoT-based DT best practices (safeguarding data, upskilling and incentivization). Upon triangulating the questionnaire and interview findings, this study explicitly highlights the potential of the established best practices to strategically strengthen enablers, thereby mitigating challenges and ensuring the successful implementation of IoT-based DT for ROC emissions in buildings.

Originality/value

This study provides practical guidance for stakeholders to effectively implement IoT-DT in ROC in buildings and contributes significantly to climate change mitigation.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 April 2024

Chao-chao Liu, Miao Wang, Zhanwen Niu and Xun Mo

The view that dynamic capabilities theory can help explain how lean organizations improve has been put forward by scholars. However, there is still a lack of research on the…

Abstract

Purpose

The view that dynamic capabilities theory can help explain how lean organizations improve has been put forward by scholars. However, there is still a lack of research on the matching relationship between the application of lean practice and the internal elements of enterprise organization from the perspective of dynamic capabilities. The purpose of this study is to validate the moderating effect of dynamic capabilities on the relationship between lean practices and operational performance.

Design/methodology/approach

This study used the method of survey and empirical research to collect sample data from 263 enterprises in China. Through literature review, this study put forward the moderating hypotheses around dynamic capabilities, lean practices and operation performance and used the method of regression analysis to validate these hypotheses.

Findings

The results showed that dynamic capabilities have a partially moderating effect on the application of lean practices. Specifically, dynamic capabilities have a significant moderating effect on the relationship between just-in-time, total quality management, total preventive maintenance and operational performance, while dynamic capabilities have no significant moderating effect on the relationship between human resource management and operational performance.

Originality/value

The research conclusion complements and enriches the lean practices literature from the perspective of dynamic capabilities. Existing studies mainly focus on the moderating role of external environmental factors, while there is a lack of empirical research on the role of dynamic capabilities in lean practices literature. The research results will help enterprises further understand the matching relationship between lean practices and dynamic capabilities and then improve the success of lean practices application.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

1 – 10 of over 2000