This paper aims to overcome the inability of both comparing loss costs and accounting for production resource losses of Overall Equipment Effectiveness (OEE)-related approaches.

1584

Abstract

Purpose

This paper aims to overcome the inability of both comparing loss costs and accounting for production resource losses of Overall Equipment Effectiveness (OEE)-related approaches.

Design/methodology/approach

The authors conducted a literature review about the studies focusing on approaches combining OEE with monetary units and/or resource issues. The authors developed an approach based on Overall Equipment Cost Loss (OECL), introducing a component for the production resource consumption of a machine. A real case study about a smart multicenter three-spindle machine is used to test the applicability of the approach.

Findings

The paper proposes Resource Overall Equipment Cost Loss (ROECL), i.e. a new KPI expressed in monetary units that represents the total cost of losses (including production resource ones) caused by inefficiencies and deviations of the machine or equipment from its optimal operating status occurring over a specific time period. ROECL enables to quantify the variation of the product cost occurring when a machine or equipment changes its health status and to determine the actual product cost for a given production order. In the analysed case study, the most critical production orders showed an actual production cost about 60% higher than the minimal cost possible under the most efficient operating conditions.

Originality/value

The proposed approach may support both production and cost accounting managers during the identification of areas requiring attention and representing opportunities for improvement in terms of availability, performance, quality, and resource losses.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 11
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 12 May 2023

Marcello Braglia, Mosè Gallo, Leonardo Marrazzini and Liberatina Carmela Santillo

This paper proposes a new metric, named Operational Space Efficiency (OpSE), intended to diagnose and quantify the inefficient use of floor space for stocking materials in…

Abstract

Purpose

This paper proposes a new metric, named Operational Space Efficiency (OpSE), intended to diagnose and quantify the inefficient use of floor space for stocking materials in industrial workstations. OpSE presents a formulation analogous to the well-known Overall Equipment Effectiveness and can be obtained as the product of three distinct indicators: Standard Compliance Effectiveness, Standards Selection Effectiveness and Design Space-usage Effectiveness.

Design/methodology/approach

This indicator scrutinizes how usefully floor space in workstations is used to temporarily stock materials in the form of raw materials, semi-finished products, parts and components. It is suited for analyzing fixed-position layouts as well as product layouts typical of repetitive manufacturing settings, such as assembly lines in the automotive sector. The proposed indicator leverages an appropriate loss structure that features those factors affecting floor space utilization in workstations with regard to supplying and stocking materials.

Findings

An Italian manufacturer in the field of electro-technology was used as an industrial case study for the application of the methodology. The application shows how the three indicators work in practice, the effectiveness of OpSE and the methodology as a whole, in diagnosing floor space usage inefficiencies and in properly addressing improvement actions of the internal logistics in industrial settings.

Originality/value

The paper scrutinizes some important Key Performance Indicators (KPIs) dealing with space usage efficiency and identifies some significant drawbacks. Then it suggests a new, inclusive structure of losses and a KPI that not only measures efficiency but also allows to identify viable countermeasures.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 4
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 15 January 2024

Marcello Braglia, Francesco Di Paco, Roberto Gabbrielli and Leonardo Marrazzini

This paper presents a new and well-structured framework that aims to assess the current environmental impact from a Greenhouse Gas (GHG) emissions perspective. This tool includes…

607

Abstract

Purpose

This paper presents a new and well-structured framework that aims to assess the current environmental impact from a Greenhouse Gas (GHG) emissions perspective. This tool includes a new set of Lean Key Performance Indicators (KPIs), which translates the well-known logic of Overall Equipment Effectiveness in the field of GHG emissions, that can progressively detect industrial losses that cause GHG emissions and support decision-making for implementing improvements.

Design/methodology/approach

The new metrics are presented with reference to two different perspectives: (1) to highlight the deviation of the current value of emissions from the target; (2) to adopt a diagnostic orientation not only to provide an assessment of current performance but also to search for the main causes of inefficiencies and to direct improvement implementations.

Findings

The proposed framework was applied to a major company operating in the plywood production sector. It identified emission-related losses at each stage of the production process, providing an overall performance evaluation of 53.1%. The industrial application shows how the indicators work in practice, and the framework as a whole, to assess GHG emissions related to industrial losses and to proper address improvement actions.

Originality/value

This paper scrutinizes a new set of Lean KPIs to assess the industrial losses causing GHG emissions and identifies some significant drawbacks. Then it proposes a new structure of losses and KPIs that not only quantify efficiency but also allow to identify viable countermeasures.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 11
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 19 March 2024

Rouhollah Khakpour, Ahmad Ebrahimi and Seyed-Mohammad Seyed-Hosseini

This paper recommends a method entitled “SMED 4.0” as a development of conventional single minute exchange of die (SMED) to avoid defect occurrence during production and improve…

Abstract

Purpose

This paper recommends a method entitled “SMED 4.0” as a development of conventional single minute exchange of die (SMED) to avoid defect occurrence during production and improve sustainability, besides reducing setup time.

Design/methodology/approach

The method builds upon an extensive literature review and in-depth explorative research in SMED and zero defect manufacturing (ZDM). SMED 4.0 incorporates an evolutionary stage that employs predict-prevent strategies using Industry 4.0 technologies including the Internet of Things (IoT) and machine learning (ML) algorithms.

Findings

It presents the applicability of the proposed approach in (1) identifying the triple bottom line (TBL) criteria, which are affected by defects; (2) predicting the time of defect occurrence if any; (3) preventing defective products by performing online setting on machines during production as needed; (4) maintaining the desired quality of the product during the production and (5) improving TBL sustainability in manufacturing processes.

Originality/value

The extended view of SMED 4.0 in this research, as well as its analytical approach, helps practitioners develop their SMED approaches in a more holistic way. The practical application of SMED 4.0 is illustrated by implementing it in a real-life manufacturing case.

Details

Journal of Manufacturing Technology Management, vol. 35 no. 3
Type: Research Article
ISSN: 1741-038X

Keywords

Article
Publication date: 21 December 2022

Prashan Bandara Wijesinghe and Prasanna Illankoon

The purpose of this study was to improve the overall equipment effectiveness (OEE) of the production process of the shredder operation of ABC company, an industrial waste…

Abstract

Purpose

The purpose of this study was to improve the overall equipment effectiveness (OEE) of the production process of the shredder operation of ABC company, an industrial waste management company which supplies pre-processed industrial waste as alternative fuel to a cement plant.

Design/methodology/approach

This case study investigated all possible availability and performance losses that caused the shredder system’s OEE and various problem-solving techniques, such as root cause analysis and Pareto analysis, were used to find the root cause of the reduced OEE.

Findings

After analysing this case study, three significant loss factors were identified from all the availability and performance losses, which caused the shredder system’s OEE losses. Practical solutions were found for the effect of those loss factors to improve the machine’s OEE and productivity.

Research limitations/implications

This case study has been concentrated on only analysing of losses and improvement of OEE in the production process and not about cost analysis between loss and improvements.

Originality/value

This paper shows how to improve the OEE of a production process through various problem-solving techniques by identifying its losses and how to achieve the best solutions for those losses in a practical manner.

Details

Journal of Global Operations and Strategic Sourcing, vol. 17 no. 2
Type: Research Article
ISSN: 2398-5364

Keywords

Article
Publication date: 27 March 2024

Temesgen Agazhie and Shalemu Sharew Hailemariam

This study aims to quantify and prioritize the main causes of lean wastes and to apply reduction methods by employing better waste cause identification methodologies.

Abstract

Purpose

This study aims to quantify and prioritize the main causes of lean wastes and to apply reduction methods by employing better waste cause identification methodologies.

Design/methodology/approach

We employed fuzzy techniques for order preference by similarity to the ideal solution (FTOPSIS), fuzzy analytical hierarchy process (FAHP), and failure mode effect analysis (FMEA) to determine the causes of defects. To determine the current defect cause identification procedures, time studies, checklists, and process flow charts were employed. The study focuses on the sewing department of a clothing industry in Addis Ababa, Ethiopia.

Findings

These techniques outperform conventional techniques and offer a better solution for challenging decision-making situations. Each lean waste’s FMEA criteria, such as severity, occurrence, and detectability, were examined. A pairwise comparison revealed that defect has a larger effect than other lean wastes. Defects were mostly caused by inadequate operator training. To minimize lean waste, prioritizing their causes is crucial.

Research limitations/implications

The research focuses on a case company and the result could not be generalized for the whole industry.

Practical implications

The study used quantitative approaches to quantify and prioritize the causes of lean waste in the garment industry and provides insight for industrialists to focus on the waste causes to improve their quality performance.

Originality/value

The methodology of integrating FMEA with FAHP and FTOPSIS was the new contribution to have a better solution to decision variables by considering the severity, occurrence, and detectability of the causes of wastes. The data collection approach was based on experts’ focus group discussion to rate the main causes of defects which could provide optimal values of defect cause prioritization.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 28 February 2023

Jamiu A. Dauda, Saheed Ajayi, Temitope Omotayo, Olayiwola O. Oladiran and Olusegun M. Ilori

Small- and medium-sized enterprises (SMEs) within the construction sector are highly vulnerable to disruptions caused by political and economic decisions or even pandemics. This…

Abstract

Purpose

Small- and medium-sized enterprises (SMEs) within the construction sector are highly vulnerable to disruptions caused by political and economic decisions or even pandemics. This study evaluated the current operations of selected SMEs providing engineering design and consultancy services against Toyota Production System (TPS) lean tool. The purpose is to juxtapose SME operations and processes with TPS to ascertain the level of their operations conformity to the established TPS lean thinking tool.

Design/methodology/approach

This study used a qualitative data collection and analysis approach to evaluate the current processes of participating SMEs against Liker's 14 management principles of TPS. The data collected were analysed using thematic analysis to identify patterns and themes that emerged from the qualitative data.

Findings

The analysis revealed that focus on short-term goals, immediate profit and duplication of effort resulting from insufficient collaboration is currently creating waste in participating SMEs' operations. Hence, the implementation of TPS was recommended as a lean tool and a framework based on TPS lean tool was developed for improving the operations of SMEs.

Research limitations/implications

The study is limited to SMEs operating only as consultants providing project planning design within the construction industry. Data collection is limited to qualitative even though observations would improve the outcome of the study.

Originality/value

The study advances contemporary issues in promoting lean implementation in construction sector and developed an improved framework based on the TPS to enhance the performance of SME construction businesses.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 12 May 2023

Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…

79369

Abstract

Purpose

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.

Design/methodology/approach

A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.

Findings

An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.

Research limitations/implications

The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.

Originality/value

This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.