Search results

1 – 10 of over 1000
Article
Publication date: 16 November 2021

Saeid Jafarzadeh Ghoushchi, Iman Hushyar and Kamyar Sabri-Laghaie

A circular economy (CE) is an economic system that tries to eliminate waste and continually use resources. Due to growing environmental concerns, supply chain (SC) design should…

450

Abstract

Purpose

A circular economy (CE) is an economic system that tries to eliminate waste and continually use resources. Due to growing environmental concerns, supply chain (SC) design should be based on the CE considerations. In addition, responding and satisfying customers are the challenges managers constantly encounter. This study aims to improve the design of an agile closed-loop supply chain (CLSC) from the CE point of view.

Design/methodology/approach

In this research, a new multi-stage, multi-product and multi-period design of a CLSC network under uncertainty is proposed that aligns with the goals of CE and SC participants. Recycling of goods is an important part of the CLSC. Therefore, a multi-objective mixed-integer linear programming model (MILP) is proposed to formulate the problem. Besides, a robust counterpart of multi-objective MILP is offered based on robust optimization to cope with the uncertainty of parameters. Finally, the proposed model is solved using the e-constraint method.

Findings

The proposed model aims to provide the strategic choice of economic order to the suppliers and third-party logistic companies. The present study, which is carried out using a numerical example and sensitivity analysis, provides a robust model and solution methodology that are effective and applicable in CE-related problems.

Practical implications

This study shows how all upstream and downstream units of the SC network must work integrated to meet customer needs considering the CE context.

Originality/value

The main goal of the CE is to optimize resources, reduce the use of raw materials, and revitalize waste by recycling. In this study, a comprehensive model that can consider both SC design and CE necessities is developed that considers all SC participants.

Details

Journal of Enterprise Information Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0398

Keywords

Article
Publication date: 28 December 2023

Cláudia Rafaela Saraiva de Melo Simões Nascimento, Adiel Teixeira de Almeida-Filho and Rachel Perez Palha

This paper proposes selecting a construction project portfolio in the context of a public institution, which makes it possible to assess quantitative and qualitative criteria…

Abstract

Purpose

This paper proposes selecting a construction project portfolio in the context of a public institution, which makes it possible to assess quantitative and qualitative criteria, thereby meeting the needs of the institution and the existing constraints.

Design/methodology/approach

The research design follows a framework using technique for order preference by similarity to ideal solution (TOPSIS) associated with integer linear programming.

Findings

The method involves a flow of assessments allowing criteria and weights to be elicited where outcomes are based on the experts' intra-criteria assessment of alternatives and decision-makers' inter-criteria assessment. This is of utmost interest to public organizations, where selections must result in benefits and lower costs, integrating the experts' technical and management perspectives.

Social implications

Public institutions are characterized by having limited financial and personnel resources for project development despite having a high demand for requests not associated with profits, making it essential to have a framework that enables using multiple criteria to better evaluate the benefits related to these decisions.

Originality/value

The main contributions of this article are: (1) the proposition of a framework for selecting construction project portfolios considering the organization's strategic needs; (2) identifying quantitative and qualitative assessment criteria for project selection; (3) integrating TOPSIS with an optimization process for selecting the construction project portfolios and (4) providing a structured decision process for selecting the portfolio that best represents the interests of the institution within its limited resources and personnel.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 September 2023

Önder Halis Bettemir and M. Talat Birgonul

Exact solution of time–cost trade-off problem (TCTP) by the state-of-the-art meta-heuristic algorithms can be obtained for small- and medium-scale problems, while satisfactory…

Abstract

Purpose

Exact solution of time–cost trade-off problem (TCTP) by the state-of-the-art meta-heuristic algorithms can be obtained for small- and medium-scale problems, while satisfactory results cannot be obtained for large construction projects. In this study, a hybrid heuristic meta-heuristic algorithm that adapts the search domain is developed to solve the large-scale discrete TCTP more efficiently.

Design/methodology/approach

Minimum cost slope–based heuristic network analysis algorithm (NAA), which eliminates the unfeasible search domain, is embedded into differential evolution meta-heuristic algorithm. Heuristic NAA narrows the search domain at the initial phase of the optimization. Moreover, activities with float durations higher than the predetermined threshold value are eliminated and then the meta-heuristic algorithm starts and searches the global optimum through the narrowed search space. However, narrowing the search space may increase the probability of obtaining a local optimum. Therefore, adaptive search domain approach is employed to make reintroduction of the eliminated activities to the design variable set possible, which reduces the possibility of converging into local minima.

Findings

The developed algorithm is compared with plain meta-heuristic algorithm with two separate analyses. In the first analysis, both algorithms have the same computational demand, and in the latter analysis, the meta-heuristic algorithm has fivefold computational demand. The tests on case study problems reveal that the developed algorithm presents lower total project costs according to the dependent t-test for paired samples with α = 0.0005.

Research limitations/implications

In this study, TCTP is solved without considering quality or restrictions on the resources.

Originality/value

The proposed method enables to adapt the number of parameters, that is, the search domain and provides the opportunity of obtaining significant improvements on the meta-heuristic algorithms for other engineering optimization problems, which is the theoretical contribution of this study. The proposed approach reduces the total construction cost of the large-scale projects, which can be the practical benefit of this study.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 May 2023

Pankaj Kumar Detwal, Rajat Agrawal, Ashutosh Samadhiya, Anil Kumar and Jose Arturo Garza-Reyes

The literature that is presently available on sustainable supply chain management (SSCM) combining optimization and industry 4.0 techniques falls short in its depictions of the…

446

Abstract

Purpose

The literature that is presently available on sustainable supply chain management (SSCM) combining optimization and industry 4.0 techniques falls short in its depictions of the recent developments, budding pertinent areas and the importance of SSCM in the growth of industrial economies around the world. This article's main objective is to analyze current trends, highlight the latest initiatives and perform a meta-analysis of the literature that is currently accessible in the SSCM area with a special focus on optimization and industry 4.0 techniques. The paper also proposes a conceptual framework that will assist in illuminating how the ideas of optimization and industry 4.0 may contribute to realizing sustainability in supply chains.

Design/methodology/approach

The proposed study systematically reviews 85 research publications published between 2010 and 2022 in referenced peer-reviewed journals in diverse fields, including engineering, business and management, services and healthcare. Numerous categories are considered throughout the examination of the literature, including year-wise publications, prominent journals, type of research design, concerned industry and research technique used.

Findings

The study demonstrates a deeper comprehension of the literature in the field and its evolution throughout numerous industry sectors, which is helpful for both practitioners and academics. The results from the content analysis highlight various future research opportunities in the domain.

Originality/value

This is one of the first research articles that have attempted to establish, analyze and highlight the current trends and initiatives in the SSCM domain from an optimization and industry 4.0 techniques viewpoint. The cluster-based future research propositions also enhance the novelty of the study.

Details

Benchmarking: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 2 November 2022

Ashis Mitra

The present study aims to demonstrate the application of newly developed combinative distance-based assessment (CODAS) approach for grading and selection of Tossa jute fibres…

Abstract

Purpose

The present study aims to demonstrate the application of newly developed combinative distance-based assessment (CODAS) approach for grading and selection of Tossa jute fibres, which possesses some unique features uncommon to other variants of multi-criteria decision-making (MCDM) method.

Design/methodology/approach

The CODAS method was used in this study to rank/grade ten candidate lots of Tossa fibres on the basis of six apposite jute fibre properties, namely, fibre defect, root content, fineness, strength, colour and density. These six fibre properties were considered as the six decision criteria, here, and they were assigned weights as determined previously by an earlier researcher using analytic hierarchy process. The grading of jute fibres was done based on a comprehensive single index known as the assessment scores (Hi), in descending order of magnitude.

Findings

Among the 10 Tossa jute lots, T2 was ranked 1 (top grade) because of the highest assessment score of 6.887, followed by T1 with Rank 2 (assessment score 1.830). Because of the least assessment score of −2.795, the candidate lot T4 was considered as the worst, and hence ranked 10. The overall ranking pattern given by the CODAS method was similar to the TOPSIS approach done by Ghosh and Das (2013). This study was supported by various sensitivity analyses to judge the efficacy of the present approach. No occurrence of rank reversal during the sensitivity analyses obviously corroborates the robustness and stability of the CODAS method.

Practical implications

Jute pricing is fixed solely by the quality for which grading of fibre is prerequisite. The traditional “Hand and Eye” method or Bureau of Indian Standards (BIS) system for jute grading is basically subjective assessment and need domain expertise. MCDM is reported as the most viable solution which gives due importance to the fibre parameters while grading the fibres based on a single index. The present study demonstrates the maiden application of CODAS to address the fibre grading problems for jute industries. This approach can also be extended to solve other decision problems of textile industry, in general.

Originality/value

CODAS is a recently developed exponent of MCDM. Uniqueness of the present study lies in the fact that this is the first ever application of CODAS in the domain of textile industry, in general, and jute industry, in particular. CODAS approach is very simple involving a few simple mathematical equations yet a potent tool of decision-making. This method possesses some features uncommon in other variants of MCDM. Moreover, the efficacy of CODAS method is investigated through various sensitivity analyses, which has been ignored in the earlier approaches.

Details

Research Journal of Textile and Apparel, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1560-6074

Keywords

Article
Publication date: 26 January 2024

Mohsen Rajabzadeh, Seyed Meysam Mousavi and Farzad Azimi

This paper investigates a problem in a reverse logistics (RLs) network to decide whether to dispose of unsold goods in primary stores or re-commercialize them in outlet centers…

Abstract

Purpose

This paper investigates a problem in a reverse logistics (RLs) network to decide whether to dispose of unsold goods in primary stores or re-commercialize them in outlet centers. By deducting the costs associated with each policy from its revenue, this study aims to maximize the profit from managing unsold goods.

Design/methodology/approach

A new mixed-integer linear programming model has been developed to address the problem, which considers the selling prices of products in primary and secondary stores and the costs of transportation, cross-docking and returning unwanted items. As a result of uncertain nature of the cost and time parameters, gray numbers are used to deal with it. In addition, an innovative uncertain solution approach for gray programming problems is presented that considers objective function satisfaction level as an indicator of optimism.

Findings

According to the results, higher costs, including transportation, cross-docking and return costs, make sending goods to outlet centers unprofitable and more goods are disposed of in primary stores. Prices in primary and secondary stores heavily influence the number of discarded goods. Higher prices in primary stores result in more disposed of goods, while higher prices in secondary stores result in fewer. As a result of the proposed method, the objective function satisfaction level can be viewed as a measure of optimism.

Originality/value

An integral contribution of this study is developing a new mixed-integer linear programming model for selecting the appropriate goods for re-commercialization and choosing the best outlet center based on the products' price and total profit. Another novelty of the proposed model is considering the matching percentage of boxes with secondary stores’ desired product lists and the probability of returning goods due to non-compliance with delivery dates. Moreover, a new uncertain solution approach is developed to solve mathematical programming problems with gray parameters.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 13 July 2023

S.M. Taghavi, V. Ghezavati, H. Mohammadi Bidhandi and S.M.J. Mirzapour Al-e-Hashem

This paper proposes a two-level supply chain including suppliers and manufacturers. The purpose of this paper is to design a resilient fuzzy risk-averse supply portfolio selection…

Abstract

Purpose

This paper proposes a two-level supply chain including suppliers and manufacturers. The purpose of this paper is to design a resilient fuzzy risk-averse supply portfolio selection approach with lead-time sensitive manufacturers under partial and complete supply facility disruption in addition to the operational risk of imprecise demand to minimize the mean-risk costs. This problem is analyzed for a risk-averse decision maker, and the authors use the conditional value-at-risk (CVaR) as a risk measure, which has particular applications in financial engineering.

Design/methodology/approach

The methodology of the current research includes two phases of conceptual model and mathematical model. In the conceptual model phase, a new supply portfolio selection problem is presented under disruption and operational risks for lead-time sensitive manufacturers and considers resilience strategies for risk-averse decision makers. In the mathematical model phase, the stages of risk-averse two-stage fuzzy-stochastic programming model are formulated according to the above conceptual model, which minimizes the mean-CVaR costs.

Findings

In this paper, several computational experiments were conducted with sensitivity analysis by GAMS (General algebraic modeling system) software to determine the efficiency and significance of the developed model. Results show that the sensitivity of manufacturers to the lead time as well as the occurrence of disruption and operational risks, significantly affect the structure of the supply portfolio selection; hence, manufacturers should be taken into account in the design of this problem.

Originality/value

The study proposes a new two-stage fuzzy-stochastic scenario-based mathematical programming model for the resilient supply portfolio selection for risk-averse decision-makers under disruption and operational risks. This model assumes that the manufacturers are sensitive to lead time, so the demand of manufacturers depends on the suppliers who provide them with services. To manage risks, this model also considers proactive (supplier fortification, pre-positioned emergency inventory) and reactive (revision of allocation decisions) resilience strategies.

Article
Publication date: 20 September 2021

Kazhal Gharibi and Sohrab Abdollahzadeh

To maximize the network total profit by calculating the difference between costs and revenue (first objective function). To maximize the positive impact on the environment by…

Abstract

Purpose

To maximize the network total profit by calculating the difference between costs and revenue (first objective function). To maximize the positive impact on the environment by integrating GSCM factors in RL (second objective function). To calculate the efficiency of disassembly centers by SDEA method, which are selected as suppliers and maximize the total efficiency (third objective function). To evaluate the resources and total efficiency of the proposed model to facilitate the allocation resource process, to increase resource efficiency and to improve the efficiency of disassembly centers by Inverse DEA.

Design/methodology/approach

The design of a closed-loop logistics network for after-sales service for mobile phones and digital cameras has been developed by the mixed-integer linear programming method (MILP). Development of MILP method has been performed by simultaneously considering three main objectives including: total network profit, green supply chain factors (environmental sustainability) and maximizing the efficiency of disassembly centers. The proposed model of study is a six-level, multi-objective, single-period and multi-product that focuses on electrical waste. The efficiency of product return centers is calculated by SDEA method and the most efficient centers are selected.

Findings

The results of using the model in a case mining showed that, due to the use of green factors in network design, environmental pollution and undesirable disposal of some electronic waste were reduced. Also, with the reduction of waste disposal, valuable materials entered the market cycle and the network profit increased.

Originality/value

(1) Design a closed-loop reverse logistics network for after-sales services; (2) Introduce a multi-objective multi-echelon mixed integer linear programming model; (3) Sensitivity analysis use Inverse-DEA method to increase the efficiency of inefficient units; (4) Use the GSC factors and DEA method in reverse logistics network.

Details

Journal of Enterprise Information Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0398

Keywords

Article
Publication date: 26 March 2024

Jing An, Suicheng Li and Xiao Ping Wu

Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study…

Abstract

Purpose

Project managers bear the responsibility of selecting and developing resource scheduling methods that align with project requirements and organizational circumstances. This study focuses on resource-constrained project scheduling in multi-project environments. The research simplifies the problem by adopting a single-project perspective using gain coefficients.

Design/methodology/approach

It employs uncertainty theory and multi-objective programming to construct a model. The optimal solution is identified using Matlab, while LINGO determines satisfactory alternatives. By combining these methods and considering actual construction project situations, a compromise solution closely approximating the optimal one is derived.

Findings

The study provides fresh insights into modeling and resolving resource-constrained project scheduling issues, supported by real-world examples that effectively illustrate its practical significance.

Originality/value

The research highlights three main contributions: effective resource utilization, project prioritization and conflict management, and addressing uncertainty. It offers decision support for project managers to balance resource allocation, resolve conflicts, and adapt to changing project demands.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 30 June 2023

Hana Begić, Mario Galić and Uroš Klanšek

Ready-mix concrete delivery problem (RMCDP), a specific version of the vehicle routing problem (VRP), is a relevant supply-chain engineering task for construction management with…

Abstract

Purpose

Ready-mix concrete delivery problem (RMCDP), a specific version of the vehicle routing problem (VRP), is a relevant supply-chain engineering task for construction management with various formulations and solving methods. This problem can range from a simple scenario involving one source, one material and one destination to a more challenging and complex case involving multiple sources, multiple materials and multiple destinations. This paper presents an Internet of Things (IoT)-supported active building information modeling (BIM) system for optimized multi-project ready-mix concrete (RMC) delivery.

Design/methodology/approach

The presented system is BIM-based, IoT supported, dynamic and automatic input/output exchange to provide an optimal delivery program for multi-project ready-mix-concrete problem. The input parameters are extracted as real-time map-supported IoT data and transferred to the system via an application programming interface (API) into a mixed-integer linear programming (MILP) optimization model developed to perform the optimization. The obtained optimization results are further integrated into BIM by conventional project management tools. To demonstrate the features of the suggested system, an RMCDP example was applied to solve that included four building sites, seven eligible concrete plants and three necessary RMC mixtures.

Findings

The system provides the optimum delivery schedule for multiple RMCs to multiple construction sites, as well as the optimum RMC quantities to be delivered, the quantities from each concrete plant that must be supplied, the best delivery routes, the optimum execution times for each construction site, and the total minimal costs, while also assuring the dynamic transfer of the optimized results back into the portfolio of multiple BIM projects. The system can generate as many solutions as needed by updating the real-time input parameters in terms of change of the routes, unit prices and availability of concrete plants.

Originality/value

The suggested system allows dynamic adjustments during the optimization process, andis adaptable to changes in input data also considering the real-time input data. The system is based on spreadsheets, which are widely used and common tool that most stakeholders already utilize daily, while also providing the possibility to apply a more specialized tool. Based on this, the RMCDP can be solved using both conventional and advanced optimization software, enabling the system to handle even large-scale tasks as necessary.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 1000