Search results

1 – 10 of 146
Article
Publication date: 1 June 2023

Nihar J. Gonsalves, Anthony Yusuf, Omobolanle Ogunseiju and Abiola Akanmu

Concrete workers perform physically demanding work in awkward postures, exposing their backs to musculoskeletal disorders. Back-support exoskeletons are promising ergonomic…

Abstract

Purpose

Concrete workers perform physically demanding work in awkward postures, exposing their backs to musculoskeletal disorders. Back-support exoskeletons are promising ergonomic interventions designed to reduce the risks of back disorders. However, the suitability of exoskeletons for enhancing performance of concrete workers has not been largely explored. This study aims to assess a passive back-support exoskeleton for concrete work in terms of the impact on the body, usability and benefits of the exoskeleton, and potential design modifications.

Design/methodology/approach

Concrete workers performed work with a passive back-support exoskeleton. Subjective and qualitative measures were employed to capture their perception of the exoskeleton, at the middle and end of the work, in terms of discomfort to their body parts, ease of use, comfort, performance and safety of the exoskeleton, and their experience using the exoskeleton. These were analyzed using descriptive statistics and thematic analysis.

Findings

The exoskeleton reduced stress on the lower back but caused discomfort to other body parts. Significant correlations were observed between perceived discomfort and usability measures. Design modifications are needed to improve the compatibility of the exoskeleton with the existing safety gears, reduce discomfort at chest and thigh, and improve ease of use of the exoskeleton.

Research limitations/implications

The study was conducted with eight concrete workers who used the exoskeleton for four hours.

Originality/value

This study contributes to existing knowledge on human-wearable robot interaction and provides suggestions for adapting exoskeleton designs for construction work.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 September 2023

Abhay Kumar Grover and Muhammad Hasan Ashraf

Despite its potential, warehouse managers still struggle to successfully assimilate autonomous mobile robots (AMRs) in their operations. This paper means to identify the…

561

Abstract

Purpose

Despite its potential, warehouse managers still struggle to successfully assimilate autonomous mobile robots (AMRs) in their operations. This paper means to identify the moderating factors of AMR assimilation for production warehouses that influence the digital transformation of their intralogistics via AMRs.

Design/methodology/approach

Drawing on innovation of assimilation theory (IAT), this study followed an explorative approach using the principles of the case study method in business research. The cases comprised of four AMR end users and six AMR service providers. Data were collected through semi-structured interviews.

Findings

Four clusters of moderators that affect each stage of AMR assimilation were identified. These clusters include organizational attributes of end users (i.e. production warehouses), service attributes of service providers, technology attributes of AMRs and relational attributes between the AMR service providers and the AMR end users.

Originality/value

The authors extend the IAT framework by identifying various moderating factors between different stages of the AMR assimilation process. To the authors' knowledge, this is the first study to introduce the perspective of AMR end users in conjunction with AMR service providers to the “Industry 4.0” technology assimilation literature. The study propositions regarding these factors guide future intralogistics and AMR research.

Details

The International Journal of Logistics Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0957-4093

Keywords

Article
Publication date: 12 September 2023

Shumank Deep, Sushant Vishnoi, Radhika Malhotra, Smriti Mathur, Hrishikesh Yawale, Amit Kumar and Anju Singla

Augmented Reality (AR) and Virtual Reality (VR) technologies possess the potential to transform the scenario of making real estate investment decisions through the immersive…

Abstract

Purpose

Augmented Reality (AR) and Virtual Reality (VR) technologies possess the potential to transform the scenario of making real estate investment decisions through the immersive experience they offer. From the literature it was observed that the research in this domain is still emergent and there is a need to identify the latent variables that influence real estate investment decisions. Therefore, by examining the effects of these technologies on investment decision-making, the purpose of the study is to provide valuable insights into how AR and VR could be applied to enhance customers' property buying experiences and assist in their decision-making process.

Design/methodology/approach

From an extensive review of the literature four latent variables and their measure were identified, and based on these a survey instrument was developed. The survey was distributed online and received 300 responses from the respondents including home buyers, developers, AEC professionals and real estate agents. To validate the latent variables exploratory factor analysis was used whereas to establish their criticality second-order confirmatory factor analysis was used.

Findings

From the results, the four latent constructs were identified based on standard factor loadings (SFL) that is Confident Value Perception (CVP, SFL = 0.70), Innovative Investment Appeal (IIA, SFL = 0.60), Trusted Property Transactions (TPT, SFL = 0.58) and Effortless Property Engagement (EPE, SFL = 0.54), that significantly influence investor decision-making and property purchase experience.

Originality/value

This study contributes to the literature on real estate investment decisions by providing empirical evidence on the role of AR and VR technologies. The identified key variables provided practical guidelines for developers, investors and policymakers in understanding and leveraging the potential of AR and VR technologies in the real estate industry.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 November 2023

Felix Preshanth Santhiapillai and R.M. Chandima Ratnayake

The purpose of this study is to investigate the integrated application of business process modeling and notation (BPMN) and value stream mapping (VSM) to improve knowledge work…

Abstract

Purpose

The purpose of this study is to investigate the integrated application of business process modeling and notation (BPMN) and value stream mapping (VSM) to improve knowledge work performance and productivity in police services. In order to explore the application of the hybrid BPMN-VSM approach in police services, this study uses the department of digital crime investigation (DCI) in one Norwegian police district as a case study.

Design/methodology/approach

Service process identification was the next step after selecting an appropriate organizational unit for the case study. BPMN-VSM-based current state mapping, including time and waste analyses, was used to determine cycle and lead time and identify value-adding and nonvalue-adding activities. Subsequently, improvement opportunities were identified, and the current state process was re-designed and constructed through future state mapping.

Findings

The study results indicate a 44.4% and 83.0% reduction in process cycle and lead time, respectively. This promising result suggests that the hybrid BPMN-VSM approach can support the visualization of bottlenecks and possible causes of increased lead times, followed by the systematic identification and proposals of avenues for future improvement and innovation to remedy the discovered inefficiencies in a complex knowledge-work environment.

Research limitations/implications

This study focused on one department in a Norwegian police district. However, the experience gained can support researchers and practitioners in understanding lean implementation through an integrated BPMN and VSM model, offering a unique insight into the ability to investigate complex systems.

Originality/value

Complex knowledge work processes generally characterize police services due to a high number of activities, resources and stakeholder involvement. Implementing lean thinking in this context is significantly challenging, and the literature on this topic is limited. This study addresses the applicability of the hybrid BPMN-VSM approach in police services with an original public sector case study in Norway.

Details

International Journal of Productivity and Performance Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 5 April 2024

Kai Rüdele, Matthias Wolf and Christian Ramsauer

Improving productivity and efficiency has always been crucial for industrial companies to remain competitive. In recent years, the topic of environmental impact has become…

Abstract

Purpose

Improving productivity and efficiency has always been crucial for industrial companies to remain competitive. In recent years, the topic of environmental impact has become increasingly important. Published research indicates that environmental and economic goals can enforce or rival each other. However, few papers have been published that address the interaction and integration of these two goals.

Design/methodology/approach

In this paper, we identify both, synergies and trade-offs based on a systematic review incorporating 66 publications issued between 1992 and 2021. We analyze, quantify and cluster examples of conjunctions of ecological and economic measures and thereby develop a framework for the combined improvement of performance and environmental compatibility.

Findings

Our findings indicate an increased significance of a combined consideration of these two dimensions of sustainability. We found that cases where enforcing synergies between economic and ecological effects were identified are by far more frequent than reports on trade-offs. For the individual categories, cost savings are uniformly considered as the most important economic aspect while, energy savings appear to be marginally more relevant than waste reduction in terms of environmental aspects.

Originality/value

No previous literature review provides a comparable graphical treatment of synergies and trade-offs between cost savings and ecological effects. For the first time, identified measures were classified in a 3 × 3 table considering type and principle.

Details

Management of Environmental Quality: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1477-7835

Keywords

Article
Publication date: 16 January 2024

Nasim Babazadeh, Jochen Teizer, Hans-Joachim Bargstädt and Jürgen Melzner

Construction activities conducted in urban areas are often a source of significant noise disturbances, which cause psychological and health issues for residents as well as…

122

Abstract

Purpose

Construction activities conducted in urban areas are often a source of significant noise disturbances, which cause psychological and health issues for residents as well as long-term auditory impairments for construction workers. The limited effectiveness of passive noise control measures due to the close proximity of the construction site to surrounding neighborhoods often results in complaints and eventually lawsuits. These can then lead to delays and cost overruns for the construction projects.

Design/methodology/approach

The paper proposes a novel approach to integrating construction noise as an additional dimension into scheduling construction works. To achieve this, a building information model, including the three-dimensional construction site layout object geometry, resource allocation and schedule information, is utilized. The developed method explores further project data that are typically available, such as the assigned equipment to a task, its precise location, and the estimated duration of noisy tasks. This results in a noise prediction model by using noise mapping techniques and suggesting less noisy alternative ways of construction. Finally, noise data obtained from sensors in a case study contribute real values for validating the proposed approach, which can be used later to suggest solutions for noise mitigation.

Findings

The results of this study indicate that the proposed approach can accurately predict construction noise given a few available parameters from digital project planning and sensors installed on a construction site. Proactively integrating construction noise control measures into the planning process has benefits for both residents and construction managers, as it reduces construction noise-related disturbances, prevents unexpected legal issues and ensures the health and well-being of the workforce.

Originality/value

While previous research has concentrated on real-time data collection using sensors, a more effective solution would also involve addressing and mitigating construction noise during the pre-construction work planning phase.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 26 January 2024

Mohamed Marzouk and Dina Hamdala

The aggressive competition in the real estate market forces real estate developers to tackle the challenge of selecting the best project construction phasing alternative. The real…

105

Abstract

Purpose

The aggressive competition in the real estate market forces real estate developers to tackle the challenge of selecting the best project construction phasing alternative. The real estate industry is characterized by high costs, high profit and high risks. The schedules of real estate projects are also characterized by having large number of repetitive activities that are executed over a long duration. The repetitiveness, long duration of execution, the high amounts of money involved and the high risk made it desirable to leverage the impact of changes in phasing plans on net present value of amounts incurred and received over the long execution and selling duration. This also changes the project progress, and delivery time as well as their respective impact on customer degree of satisfaction. This research addresses the problem of selecting the best phasing alternative for real estate development projects while maximizing customer satisfaction and project profit.

Design/methodology/approach

The research proposes a model that generates all construction phasing alternatives and performs decision-making to rank all possible phasing alternatives. The proposed model consists of five modules: (1) Phasing Sequencing module, (2) Customer Satisfaction module, (3) Cash-In calculation module, (4) Cost Estimation module and (5) Decision-making module. A case study was presented to demonstrate the practicality of the model.

Findings

The proposed model satisfies the real estate market's need for proper construction phasing plans evaluation and selection against the project's main success criteria, customer satisfaction and project profit. The proposed model generates all construction phasing alternatives and performs multi-criteria decision making to rank all possible phasing alternatives. It quantifies the score of the two previously mentioned criteria and ranks all solutions according to their overall score.

Research limitations/implications

The research proposes a model that assist real estate market's need for proper construction phasing plans evaluation and selection against the project's main success criteria, customer satisfaction and project profit. The proposed model can be used to conclude general guidelines and common successful practices to be used by real estate developers when deciding the construction phasing plan. In this study the model is based on business models where all the project units are sold, rental cases are not considered. Also, the budget limitations that might exist when phasing is not considered in the model computations.

Originality/value

The model can be used as a complete platform that can hold all real estate project data, process revenues and cost information for estimating profit, plotting cash flow profiles, quantifying the degree of customer satisfaction attributable to each phasing alternative and providing recommendation showing the best one. The model can be used to conclude general guidelines and common successful practices to be used by real estate developers when tackling the challenge of selecting construction phasing plans.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 February 2024

Sherly de Yong, Murni Rachmawati and Ima Defiana

This paper aims to identify aspects of how work-life interaction has changed in the post-pandemic situations and propose strategies of the security concept for living-working…

Abstract

Purpose

This paper aims to identify aspects of how work-life interaction has changed in the post-pandemic situations and propose strategies of the security concept for living-working patterns in the post-pandemic interior as future disease prevention.

Design/methodology/approach

We conducted a systematic literature search and review to select previous research systematically and relate concepts by coding the data and synthesising the data critically. The systematic literature search and review considered 90 papers (35 were studied).

Findings

The findings identify three strategies: hybrid activity patterns, new layout for hybrid and changing behaviour and culture. Each strategy demonstrates the connection between the hybrid living-working interior spaces in the post-pandemic period and security-pandemic variables. The results on security design factors focused on interior control, detection and deterrence; connection to nature creates a safer environment to prevent further variables; and hybrid activity requires more elements to govern users' behaviour and culture.

Research limitations/implications

Limitations of this study are as follows: excluded papers that are not written in English/Bahasa or do not have gold/green open access; some aspects were not discussed (such as social distancing); the articles included in this review are up to April 2023 (and there is the possibility of recent papers). Future studies can be developed to update building certification for post-pandemic interiors or research with psychological, social equity or family vitality issues.

Originality/value

The study offers strategies and the holistic relationship between the post-pandemic concept and security-pandemic design variables within the built environment, especially in the users' culture and behaviour context.

Details

International Journal of Workplace Health Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1753-8351

Keywords

Article
Publication date: 19 December 2022

Emmanuel Chidiebere Eze, Douglas Omoregie Aghimien, Clinton Ohis Aigbavboa and Onyinye Sofolahan

This paper aims to present the result of an assessment of the potential effect of building information modelling (BIM) adoption on the reduction of construction waste (CW) from a…

Abstract

Purpose

This paper aims to present the result of an assessment of the potential effect of building information modelling (BIM) adoption on the reduction of construction waste (CW) from a developing country's perspective. This was done with a view to reducing the waste generated in construction projects particularly at the design and pre-contract stages.

Design/methodology/approach

The study adopted a post-positivism philosophical approach, which informed the use of a quantitative research design and a questionnaire as instrument for data collection. The data gathered from construction professionals in the Nigeria construction industry were analysed using an array of statistical tools such as frequency, percentage, Kruskal–Wallis H-test, Kendall's coefficient of concordance, chi-square and exploratory factors analysis.

Findings

The study revealed five major groups of factors causing CW at the design and pre-contract stages that can be avoided or minimised through BIM implementation. These are; (1) errors in design and documentation, (2) specification and quality factors, (3) estimating and site condition factors, (4) planning of work factors and (5) procurement related factors.

Practical implications

The findings of the study offer practical insight for industry participants on the need for BIM implementation to reduce CW by identifying the diverse areas responsible for these waste generation.

Originality/value

While there has been significant literature on BIM implementation, contributions on the effect of this technology in reducing waste generation particular at the design and pre-contract stages in developing countries has been almost non-existent. This study strives to fill in this gap by showcasing the major waste generating activities that can be avoided through the use of BIM.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 April 2024

Xiaobo Shi, Yaning Qiao, Xinyu Zhao, Yan Liu, Chenchen Liu, Ruopeng Huang and Yuanlong Cui

Modern subway transportation systems need to satisfy increasing safety demands to rapidly evacuate passengers under hazardous emergency circumstances, such as fires, accidents or…

Abstract

Purpose

Modern subway transportation systems need to satisfy increasing safety demands to rapidly evacuate passengers under hazardous emergency circumstances, such as fires, accidents or terrorist attacks, to reduce passenger injuries or life losses. The emergency evacuation capacity (EEC) of a subway station needs to be revised timely, in case passenger demand increases or the evacuation route changes in the future. However, traditional ways of estimating EEC, e.g. fire drills are time- and resource-consuming and are difficult to revise from time to time. The purpose of this study is to establish an intuitive modelling approach to increase the EEC of subway stations in a stepwised manner.

Design/methodology/approach

This study develops an approach to combine agent-based evacuation modelling and building information modelling (BIM) technology to estimate the total evacuation time of a subway station.

Findings

Evacuation time can be saved (33% in the studied case) from iterative improvements including stopping escalators running against the evacuation flow and modifying the geometry around escalator exits. Such iterative improvements rely on integrating agent-based modelling and BIM.

Originality/value

The agent-based model can provide a more realistic simulation of intelligent individual movements under emergency circumstances and provides precise feedback on locations of evacuation bottlenecks. This study also examined the effectiveness of two rounds of stepwise improvements in terms of operation or design to increase the EEC of the station.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of 146