Search results
1 – 10 of 146Nihar J. Gonsalves, Anthony Yusuf, Omobolanle Ogunseiju and Abiola Akanmu
Concrete workers perform physically demanding work in awkward postures, exposing their backs to musculoskeletal disorders. Back-support exoskeletons are promising ergonomic…
Abstract
Purpose
Concrete workers perform physically demanding work in awkward postures, exposing their backs to musculoskeletal disorders. Back-support exoskeletons are promising ergonomic interventions designed to reduce the risks of back disorders. However, the suitability of exoskeletons for enhancing performance of concrete workers has not been largely explored. This study aims to assess a passive back-support exoskeleton for concrete work in terms of the impact on the body, usability and benefits of the exoskeleton, and potential design modifications.
Design/methodology/approach
Concrete workers performed work with a passive back-support exoskeleton. Subjective and qualitative measures were employed to capture their perception of the exoskeleton, at the middle and end of the work, in terms of discomfort to their body parts, ease of use, comfort, performance and safety of the exoskeleton, and their experience using the exoskeleton. These were analyzed using descriptive statistics and thematic analysis.
Findings
The exoskeleton reduced stress on the lower back but caused discomfort to other body parts. Significant correlations were observed between perceived discomfort and usability measures. Design modifications are needed to improve the compatibility of the exoskeleton with the existing safety gears, reduce discomfort at chest and thigh, and improve ease of use of the exoskeleton.
Research limitations/implications
The study was conducted with eight concrete workers who used the exoskeleton for four hours.
Originality/value
This study contributes to existing knowledge on human-wearable robot interaction and provides suggestions for adapting exoskeleton designs for construction work.
Details
Keywords
Abhay Kumar Grover and Muhammad Hasan Ashraf
Despite its potential, warehouse managers still struggle to successfully assimilate autonomous mobile robots (AMRs) in their operations. This paper means to identify the…
Abstract
Purpose
Despite its potential, warehouse managers still struggle to successfully assimilate autonomous mobile robots (AMRs) in their operations. This paper means to identify the moderating factors of AMR assimilation for production warehouses that influence the digital transformation of their intralogistics via AMRs.
Design/methodology/approach
Drawing on innovation of assimilation theory (IAT), this study followed an explorative approach using the principles of the case study method in business research. The cases comprised of four AMR end users and six AMR service providers. Data were collected through semi-structured interviews.
Findings
Four clusters of moderators that affect each stage of AMR assimilation were identified. These clusters include organizational attributes of end users (i.e. production warehouses), service attributes of service providers, technology attributes of AMRs and relational attributes between the AMR service providers and the AMR end users.
Originality/value
The authors extend the IAT framework by identifying various moderating factors between different stages of the AMR assimilation process. To the authors' knowledge, this is the first study to introduce the perspective of AMR end users in conjunction with AMR service providers to the “Industry 4.0” technology assimilation literature. The study propositions regarding these factors guide future intralogistics and AMR research.
Details
Keywords
Shumank Deep, Sushant Vishnoi, Radhika Malhotra, Smriti Mathur, Hrishikesh Yawale, Amit Kumar and Anju Singla
Augmented Reality (AR) and Virtual Reality (VR) technologies possess the potential to transform the scenario of making real estate investment decisions through the immersive…
Abstract
Purpose
Augmented Reality (AR) and Virtual Reality (VR) technologies possess the potential to transform the scenario of making real estate investment decisions through the immersive experience they offer. From the literature it was observed that the research in this domain is still emergent and there is a need to identify the latent variables that influence real estate investment decisions. Therefore, by examining the effects of these technologies on investment decision-making, the purpose of the study is to provide valuable insights into how AR and VR could be applied to enhance customers' property buying experiences and assist in their decision-making process.
Design/methodology/approach
From an extensive review of the literature four latent variables and their measure were identified, and based on these a survey instrument was developed. The survey was distributed online and received 300 responses from the respondents including home buyers, developers, AEC professionals and real estate agents. To validate the latent variables exploratory factor analysis was used whereas to establish their criticality second-order confirmatory factor analysis was used.
Findings
From the results, the four latent constructs were identified based on standard factor loadings (SFL) that is Confident Value Perception (CVP, SFL = 0.70), Innovative Investment Appeal (IIA, SFL = 0.60), Trusted Property Transactions (TPT, SFL = 0.58) and Effortless Property Engagement (EPE, SFL = 0.54), that significantly influence investor decision-making and property purchase experience.
Originality/value
This study contributes to the literature on real estate investment decisions by providing empirical evidence on the role of AR and VR technologies. The identified key variables provided practical guidelines for developers, investors and policymakers in understanding and leveraging the potential of AR and VR technologies in the real estate industry.
Details
Keywords
Felix Preshanth Santhiapillai and R.M. Chandima Ratnayake
The purpose of this study is to investigate the integrated application of business process modeling and notation (BPMN) and value stream mapping (VSM) to improve knowledge work…
Abstract
Purpose
The purpose of this study is to investigate the integrated application of business process modeling and notation (BPMN) and value stream mapping (VSM) to improve knowledge work performance and productivity in police services. In order to explore the application of the hybrid BPMN-VSM approach in police services, this study uses the department of digital crime investigation (DCI) in one Norwegian police district as a case study.
Design/methodology/approach
Service process identification was the next step after selecting an appropriate organizational unit for the case study. BPMN-VSM-based current state mapping, including time and waste analyses, was used to determine cycle and lead time and identify value-adding and nonvalue-adding activities. Subsequently, improvement opportunities were identified, and the current state process was re-designed and constructed through future state mapping.
Findings
The study results indicate a 44.4% and 83.0% reduction in process cycle and lead time, respectively. This promising result suggests that the hybrid BPMN-VSM approach can support the visualization of bottlenecks and possible causes of increased lead times, followed by the systematic identification and proposals of avenues for future improvement and innovation to remedy the discovered inefficiencies in a complex knowledge-work environment.
Research limitations/implications
This study focused on one department in a Norwegian police district. However, the experience gained can support researchers and practitioners in understanding lean implementation through an integrated BPMN and VSM model, offering a unique insight into the ability to investigate complex systems.
Originality/value
Complex knowledge work processes generally characterize police services due to a high number of activities, resources and stakeholder involvement. Implementing lean thinking in this context is significantly challenging, and the literature on this topic is limited. This study addresses the applicability of the hybrid BPMN-VSM approach in police services with an original public sector case study in Norway.
Details
Keywords
Kai Rüdele, Matthias Wolf and Christian Ramsauer
Improving productivity and efficiency has always been crucial for industrial companies to remain competitive. In recent years, the topic of environmental impact has become…
Abstract
Purpose
Improving productivity and efficiency has always been crucial for industrial companies to remain competitive. In recent years, the topic of environmental impact has become increasingly important. Published research indicates that environmental and economic goals can enforce or rival each other. However, few papers have been published that address the interaction and integration of these two goals.
Design/methodology/approach
In this paper, we identify both, synergies and trade-offs based on a systematic review incorporating 66 publications issued between 1992 and 2021. We analyze, quantify and cluster examples of conjunctions of ecological and economic measures and thereby develop a framework for the combined improvement of performance and environmental compatibility.
Findings
Our findings indicate an increased significance of a combined consideration of these two dimensions of sustainability. We found that cases where enforcing synergies between economic and ecological effects were identified are by far more frequent than reports on trade-offs. For the individual categories, cost savings are uniformly considered as the most important economic aspect while, energy savings appear to be marginally more relevant than waste reduction in terms of environmental aspects.
Originality/value
No previous literature review provides a comparable graphical treatment of synergies and trade-offs between cost savings and ecological effects. For the first time, identified measures were classified in a 3 × 3 table considering type and principle.
Details
Keywords
Nasim Babazadeh, Jochen Teizer, Hans-Joachim Bargstädt and Jürgen Melzner
Construction activities conducted in urban areas are often a source of significant noise disturbances, which cause psychological and health issues for residents as well as…
Abstract
Purpose
Construction activities conducted in urban areas are often a source of significant noise disturbances, which cause psychological and health issues for residents as well as long-term auditory impairments for construction workers. The limited effectiveness of passive noise control measures due to the close proximity of the construction site to surrounding neighborhoods often results in complaints and eventually lawsuits. These can then lead to delays and cost overruns for the construction projects.
Design/methodology/approach
The paper proposes a novel approach to integrating construction noise as an additional dimension into scheduling construction works. To achieve this, a building information model, including the three-dimensional construction site layout object geometry, resource allocation and schedule information, is utilized. The developed method explores further project data that are typically available, such as the assigned equipment to a task, its precise location, and the estimated duration of noisy tasks. This results in a noise prediction model by using noise mapping techniques and suggesting less noisy alternative ways of construction. Finally, noise data obtained from sensors in a case study contribute real values for validating the proposed approach, which can be used later to suggest solutions for noise mitigation.
Findings
The results of this study indicate that the proposed approach can accurately predict construction noise given a few available parameters from digital project planning and sensors installed on a construction site. Proactively integrating construction noise control measures into the planning process has benefits for both residents and construction managers, as it reduces construction noise-related disturbances, prevents unexpected legal issues and ensures the health and well-being of the workforce.
Originality/value
While previous research has concentrated on real-time data collection using sensors, a more effective solution would also involve addressing and mitigating construction noise during the pre-construction work planning phase.
Details
Keywords
Mohamed Marzouk and Dina Hamdala
The aggressive competition in the real estate market forces real estate developers to tackle the challenge of selecting the best project construction phasing alternative. The real…
Abstract
Purpose
The aggressive competition in the real estate market forces real estate developers to tackle the challenge of selecting the best project construction phasing alternative. The real estate industry is characterized by high costs, high profit and high risks. The schedules of real estate projects are also characterized by having large number of repetitive activities that are executed over a long duration. The repetitiveness, long duration of execution, the high amounts of money involved and the high risk made it desirable to leverage the impact of changes in phasing plans on net present value of amounts incurred and received over the long execution and selling duration. This also changes the project progress, and delivery time as well as their respective impact on customer degree of satisfaction. This research addresses the problem of selecting the best phasing alternative for real estate development projects while maximizing customer satisfaction and project profit.
Design/methodology/approach
The research proposes a model that generates all construction phasing alternatives and performs decision-making to rank all possible phasing alternatives. The proposed model consists of five modules: (1) Phasing Sequencing module, (2) Customer Satisfaction module, (3) Cash-In calculation module, (4) Cost Estimation module and (5) Decision-making module. A case study was presented to demonstrate the practicality of the model.
Findings
The proposed model satisfies the real estate market's need for proper construction phasing plans evaluation and selection against the project's main success criteria, customer satisfaction and project profit. The proposed model generates all construction phasing alternatives and performs multi-criteria decision making to rank all possible phasing alternatives. It quantifies the score of the two previously mentioned criteria and ranks all solutions according to their overall score.
Research limitations/implications
The research proposes a model that assist real estate market's need for proper construction phasing plans evaluation and selection against the project's main success criteria, customer satisfaction and project profit. The proposed model can be used to conclude general guidelines and common successful practices to be used by real estate developers when deciding the construction phasing plan. In this study the model is based on business models where all the project units are sold, rental cases are not considered. Also, the budget limitations that might exist when phasing is not considered in the model computations.
Originality/value
The model can be used as a complete platform that can hold all real estate project data, process revenues and cost information for estimating profit, plotting cash flow profiles, quantifying the degree of customer satisfaction attributable to each phasing alternative and providing recommendation showing the best one. The model can be used to conclude general guidelines and common successful practices to be used by real estate developers when tackling the challenge of selecting construction phasing plans.
Details
Keywords
Sherly de Yong, Murni Rachmawati and Ima Defiana
This paper aims to identify aspects of how work-life interaction has changed in the post-pandemic situations and propose strategies of the security concept for living-working…
Abstract
Purpose
This paper aims to identify aspects of how work-life interaction has changed in the post-pandemic situations and propose strategies of the security concept for living-working patterns in the post-pandemic interior as future disease prevention.
Design/methodology/approach
We conducted a systematic literature search and review to select previous research systematically and relate concepts by coding the data and synthesising the data critically. The systematic literature search and review considered 90 papers (35 were studied).
Findings
The findings identify three strategies: hybrid activity patterns, new layout for hybrid and changing behaviour and culture. Each strategy demonstrates the connection between the hybrid living-working interior spaces in the post-pandemic period and security-pandemic variables. The results on security design factors focused on interior control, detection and deterrence; connection to nature creates a safer environment to prevent further variables; and hybrid activity requires more elements to govern users' behaviour and culture.
Research limitations/implications
Limitations of this study are as follows: excluded papers that are not written in English/Bahasa or do not have gold/green open access; some aspects were not discussed (such as social distancing); the articles included in this review are up to April 2023 (and there is the possibility of recent papers). Future studies can be developed to update building certification for post-pandemic interiors or research with psychological, social equity or family vitality issues.
Originality/value
The study offers strategies and the holistic relationship between the post-pandemic concept and security-pandemic design variables within the built environment, especially in the users' culture and behaviour context.
Details
Keywords
Emmanuel Chidiebere Eze, Douglas Omoregie Aghimien, Clinton Ohis Aigbavboa and Onyinye Sofolahan
This paper aims to present the result of an assessment of the potential effect of building information modelling (BIM) adoption on the reduction of construction waste (CW) from a…
Abstract
Purpose
This paper aims to present the result of an assessment of the potential effect of building information modelling (BIM) adoption on the reduction of construction waste (CW) from a developing country's perspective. This was done with a view to reducing the waste generated in construction projects particularly at the design and pre-contract stages.
Design/methodology/approach
The study adopted a post-positivism philosophical approach, which informed the use of a quantitative research design and a questionnaire as instrument for data collection. The data gathered from construction professionals in the Nigeria construction industry were analysed using an array of statistical tools such as frequency, percentage, Kruskal–Wallis H-test, Kendall's coefficient of concordance, chi-square and exploratory factors analysis.
Findings
The study revealed five major groups of factors causing CW at the design and pre-contract stages that can be avoided or minimised through BIM implementation. These are; (1) errors in design and documentation, (2) specification and quality factors, (3) estimating and site condition factors, (4) planning of work factors and (5) procurement related factors.
Practical implications
The findings of the study offer practical insight for industry participants on the need for BIM implementation to reduce CW by identifying the diverse areas responsible for these waste generation.
Originality/value
While there has been significant literature on BIM implementation, contributions on the effect of this technology in reducing waste generation particular at the design and pre-contract stages in developing countries has been almost non-existent. This study strives to fill in this gap by showcasing the major waste generating activities that can be avoided through the use of BIM.
Details
Keywords
Xiaobo Shi, Yaning Qiao, Xinyu Zhao, Yan Liu, Chenchen Liu, Ruopeng Huang and Yuanlong Cui
Modern subway transportation systems need to satisfy increasing safety demands to rapidly evacuate passengers under hazardous emergency circumstances, such as fires, accidents or…
Abstract
Purpose
Modern subway transportation systems need to satisfy increasing safety demands to rapidly evacuate passengers under hazardous emergency circumstances, such as fires, accidents or terrorist attacks, to reduce passenger injuries or life losses. The emergency evacuation capacity (EEC) of a subway station needs to be revised timely, in case passenger demand increases or the evacuation route changes in the future. However, traditional ways of estimating EEC, e.g. fire drills are time- and resource-consuming and are difficult to revise from time to time. The purpose of this study is to establish an intuitive modelling approach to increase the EEC of subway stations in a stepwised manner.
Design/methodology/approach
This study develops an approach to combine agent-based evacuation modelling and building information modelling (BIM) technology to estimate the total evacuation time of a subway station.
Findings
Evacuation time can be saved (33% in the studied case) from iterative improvements including stopping escalators running against the evacuation flow and modifying the geometry around escalator exits. Such iterative improvements rely on integrating agent-based modelling and BIM.
Originality/value
The agent-based model can provide a more realistic simulation of intelligent individual movements under emergency circumstances and provides precise feedback on locations of evacuation bottlenecks. This study also examined the effectiveness of two rounds of stepwise improvements in terms of operation or design to increase the EEC of the station.
Details