Search results
1 – 4 of 4Eziaku Onyeizu Rasheed, Maryam Khoshbakht and George Baird
This paper aims to illustrate the extensive benefits of qualitative data analysis as a rarely undertaken process in post-occupancy evaluation surveys. As a result, there is…
Abstract
Purpose
This paper aims to illustrate the extensive benefits of qualitative data analysis as a rarely undertaken process in post-occupancy evaluation surveys. As a result, there is limited evidence of what occupants say about their buildings, especially for operational parameters, as opposed to how they rate them. While quantitative analyses provide useful information on how workers feel about workplace operational factors, qualitative analyses provide richer information on what aspects of the workplace workers identify as influential to their comfort, well-being and productivity.
Design/methodology/approach
The authors analysed 6,938 comments from office buildings worldwide on workers’ perception of workplace operational factors: design, storage, needs, space at desks and storage in their work environments. These factors were analysed based on the buildings’ design intent and use, and the associated comments were coded into positive, negative and balanced comments. The authors used a combination of coding, descriptive analysis, content analysis and word cloud to dissect the comments.
Findings
The findings showed that whereas workers rated these operational factors favourably, there were significantly more negative comments about each factor. Also, the Chi-square test showed a significant association (p < 0.01) between the satisfaction scale and the type of comments received for all the operational factors. This means that when a factor is rated high in the satisfaction score (5–7), there were fewer negative and more positive comments and vice versa. The word cloud analysis highlighted vital aspects of the office environment the workers mostly commented on, such as open plan design, natural lighting, space and windows, toilets, facilities, kitchens, meeting room booking systems, storage and furniture.
Research limitations/implications
This study highlights the importance of dissecting building occupants’ comments as integral to building performance monitoring and measurement. These emphasise the richness and value of respondents’ comments and the importance of critically analysing them. A limitation is that only 6,938 comments were viable for analysis because most comments were either incomplete with no meaning or were not provided. This underlines the importance of encouraging respondents to comment and express their feelings in questionnaire surveys. Also, the building use studies questionnaire data set presents extensive opportunities for further analyses of interrelationships between demographics, building characteristics and environmental and operational factors.
Practical implications
The findings from this study can be applied to future projects and facility management to maintain and improve office buildings throughout their life cycle. Also, these findings are essential in predicting the requirements of future workplaces for robust workplace designs and management.
Originality/value
The authors identified specific comments on the performance of workplaces across the globe, showing similarities and differences between sustainable, conventional, commercial and institutional buildings. Specifically, the analysis showed that office workers’ comments do not always corroborate the ratings they give their buildings. There was a significantly higher percentage of negative comments than positive comments despite the high satisfaction scores of the operational factors.
Details
Keywords
Set-based design (SBD) is a lean tool widely adopted for improving design processes and providing value maximization to clients. The purpose of this paper is to present the…
Abstract
Purpose
Set-based design (SBD) is a lean tool widely adopted for improving design processes and providing value maximization to clients. The purpose of this paper is to present the development and testing of a lean simulation game that incorporated point-based and SBD principles. The objective of the game was to enhance learning of lean design management among construction students.
Design/methodology/approach
After a thorough and comprehensive literature review consisting of secondary data in journal papers, books, thesis references and primary data in the form of interviews with lean practitioners, the simulation game prototype was developed. The testing of the game was carried out with a study group. Data were collected during the gameplay with the help of a questionnaire survey on a confidence scale and Likert scale and assessed using the Wilcoxon signed-rank test, histogram, one-sample t-test and false discovery rate (Benjamini–Hochberg) correction method.
Findings
The data collected both pre- and post-simulation showed an increase in average confidence in understanding from 3.33 to 3.89, a 16.7% rise. The data was further interpreted by using Wilcoxon signed-rank test, indicating that the post-simulation learning experience was significantly better than the pre-simulation one. Promising positive results were obtained for the questions on game design, engagement and understanding of point-based design and SBD concepts.
Originality/value
The simulation game helps bridge the gap between knowledge building and real-life by effectively imitating the process. The game facilitates a dynamic and critical approach toward developing new educational simulation games and their successful incorporation in propagating lean principles in the construction industry.
Details
Keywords
Hezekiah Farayola Olaniran and Bolatito Folasade Akinbile
Despite the contributions of both the oil and gas and construction industries to the gross domestic product (GDP) of the country, both industries are still marred by incessant…
Abstract
Purpose
Despite the contributions of both the oil and gas and construction industries to the gross domestic product (GDP) of the country, both industries are still marred by incessant accidents. Therefore, the aim of this study is to compare the health and safety practises of the construction and oil and gas industries in Nigeria in order to suggest the best approach to health and safety practices.
Design/methodology/approach
A survey questionnaire was developed and administered to professionals working in the construction and oil and gas industries. Data were analysed using the relative importance index (RII). An independent sample t-test was also conducted to determine whether there was a significant difference in the construction and oil and gas industries.
Findings
The study revealed that the rate at which health and safety are practised in the oil and gas industry is comparatively high compared to how they are practised in the construction industry. Proper site layout and planning, provision of a safe working environment, proper health and safety risk assessment were more predominantly practised in the oil and gas industry, while proper site layout and planning, disallowing unauthorised entry into site and the provision of a safe working environment were predominantly practised in the construction industry.
Originality/value
This study is the first to compare the health and safety practises of the construction and oil and gas industries in Nigeria. This study was significant because it would provide insight into construction and oil and gas managers, as well as other decision-makers in both industries, on how to improve health and safety practices.
Francis Nuako, Frank Ato Ghansah and Thomas Adusei
It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been…
Abstract
Purpose
It is widely accepted that one criterion for determining if a construction project is successful is whether it is completed within the expected budget. There have been advancements in the management of building projects throughout time but cost overruns remain a key concern in the construction sector internationally, particularly in emerging economies such as Ghana. This study aims to answer the question, “What are the critical success factors (CSFs) that can assist reduce cost overruns in public sector infrastructure projects in the Ghanaian construction industry?”
Design/methodology/approach
This study used a quantitative survey method. The questionnaire was pre-tested by interviewing 15 contractors to ascertain the validity of the content. Factor analysis and multiple regression were adopted to analyze the data.
Findings
This study discovered that the critical factors that can reduce cost overruns in construction projects in Ghana are directly linked to five themes: early contractor involvement in the project planning stage, adequate funding, good project team relations, competent managers/supervisors and project participant incentives/bonuses. This study identifies indestructible, empirically measurable important success criteria for reducing cost overruns in public building projects in Ghana.
Practical implications
When well thought through from the project initiation stage to completion, these critical successes can also be used to deal with damaging economic effects such as allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation, project failure and total abandonment.
Originality/value
The uniqueness of this research resides in the fact that it is, to the best of the authors’ knowledge, a first-of-its-kind investigation of the CSFs for reducing cost overruns in public building projects in developing countries.
Details