Article
Publication date: 3 November 2023

Qiuwen Ma, Sai On Cheung and Shan Li

Integrated project delivery (IPD) project that does not use multiparty agreement is identified as IPD-ish. The use of IPD-ish arrangement by incorporating integration practices in…

Abstract

Purpose

Integrated project delivery (IPD) project that does not use multiparty agreement is identified as IPD-ish. The use of IPD-ish arrangement by incorporating integration practices in conventional contract can be viewed as the part of the adoption process of IPD. Moreover, inappropriate integration practices invite new forms of risks and the absence of multiparty agreement adds to the challenges of risk management in IPD-ish projects. This study discusses such challenges and proposes the use of joint risk management to address the potential pitfalls in IPD-ish arrangement.

Design/methodology/approach

A mixed research method was applied. First, the criticality of IPD-ish general and integration-specific risks was examined through a survey. Second, a real IPD-ish project was used to exemplify the use of joint risk management (JRM) to manage IPD-ish risks.

Findings

Two types of risks, namely integration risks (IRs) and general risks (GRs), are identified in IPD-ish projects. Two major findings for the IRs: (1) the most critical IRs are related to unbalanced incentivization and inefficient multidisciplinary teams; and (2) only team formation related pre-contract JRM strategies affect IRs. As for the GRs, the most critical ones are associated with design issues and can be effectively mitigated by post-contract JRM.

Originality/value

Using IPD-ish arrangement is an inevitable part of implementation of full IPD. This happens as many change-averse owners would like to test the integration principles using a conventional contract that they are familiar with. In fact, success in IPD-ish would pave the path for further adoption of IPD. This study offers insight into categorization of risks in IPD-ish projects. Appropriate use of post-contract and organization related pre-contract JRM would improve the chance of teasing out the values of IPD through IPD-ish arrangements. Care should be taken to introduce some contracting integration initiatives, such as risk/reward sharing incentive.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 June 2023

Ahmed Nouh, Elsayed Elkasaby and Omnia Wageh

Innovative design and execution approaches are employed in infrastructure sectors and planning to enhance the integrated project delivery system, assure the sustainability of…

Abstract

Purpose

Innovative design and execution approaches are employed in infrastructure sectors and planning to enhance the integrated project delivery system, assure the sustainability of infrastructure projects, and meet the demands of the dynamic, changing environment. Delivery methods must incorporate new technologies. By combining digital technology, teamwork, and mass manufacturing, a greater degree of exceptional quality, sustainability, and resilience in the environment will be generated. As a result, a new approach does not rely on the reaction policy, but instead considers alternative scenarios and employs a simulation model to determine the best course of action.

Design/methodology/approach

In the paper, the system dynamics approach to construction management is validated in light of pertinent research. Additionally, it describes the difficulties facing the infrastructure projects' delivery system. Additionally, the strategy for system dynamics creation is described. This strategy includes a causal loop diagram, generates a stock-flow diagram, and simulates forecasts of model behavior over time. Next, the optimization model's validation process is used to create a system dynamics model for choosing the best infrastructure project delivery system project and controlling it to maximize sustainability, mass production, digital integration, and team integration. The dynamic complexity of project management is growing.

Findings

The primary goal is to present a system dynamics (SD) simulation to look at how well infrastructure projects perform in terms of choosing the best method for delivering infrastructure projects. One of the most ideal methods for delivering projects is integrated project delivery. An effective methodology for making strategic decisions on the choice of the best project delivery method. In order to enhance certain infrastructure project delivery system metrics for sustainability, mass production, digital integration, and team integration, the model included building strategy and sophisticated system dynamics simulation. According to the construction strategy, the outcomes have been satisfactory.

Originality/value

System dynamics research has been done to replicate the idea of contemporary construction in order to determine the best approach for delivering infrastructure. The government and decision-makers would benefit from understanding this research as they decide on the best delivery method for boosting the sustainability and productivity of infrastructure projects in Egypt.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 June 2024

Erim Ergene and Steven W. Floyd

Decision comprehensiveness is an important process in determining the outcomes of strategic decision-making. While recent research began to explore its individual level…

Abstract

Purpose

Decision comprehensiveness is an important process in determining the outcomes of strategic decision-making. While recent research began to explore its individual level antecedents, a fundamental aspect of organizational life, heterogeneous goals, have not been investigated for their effects on comprehensiveness. In this study, our purpose is to study the impact of goal heterogeneity on decision comprehensiveness and explore behavioral integration as a potential mediator in this relationship.

Design/methodology/approach

To test our hypotheses, we utilize a survey-based study with a sample of teams undertaking a business simulation. Our longitudinal data collection process captures team data across the initial-, mid-, and the ending-stages of the simulation.

Findings

Our findings show that goal heterogeneity negatively impacts behavioral integration and decision comprehensiveness. Moreover, the negative impact of goal heterogeneity on decision comprehensiveness is mediated through behavioral integration.

Originality/value

Given that many strategic decisions are undertaken by groups of individuals, it is imperative to understand the factors that impact team-level decision-making processes. Extending the literature, we empirically show the negative effects of goal heterogeneity on decision comprehensiveness. While doing so, we also show that behavioral integration – a team trait that can endure over time, as opposed to a one-time state – can be crucial in dampening this negative effect. Our findings suggest researchers, and managers, to be cautious in assuming decision comprehensiveness may easily be achieved in any given team context.

Details

Management Decision, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0025-1747

Keywords

Article
Publication date: 28 June 2023

Nipuni Sumanarathna, Bismark Duodu, Shoeb Ahmed Memon and Steve Rowlinson

This study aims to explore the innovation deployment of construction contracting firms through exploratory–exploitative learning and organisational ambidexterity.

Abstract

Purpose

This study aims to explore the innovation deployment of construction contracting firms through exploratory–exploitative learning and organisational ambidexterity.

Design/methodology/approach

Firstly, a literature-based conceptual framework was developed to explain innovation implementation through exploratory–exploitative learning and organisational ambidexterity. A prominent Hong Kong construction contracting firm was then selected as the case study to explore its innovation deployment at different organisational levels (i.e. firm and project levels). Qualitative data were attained by conducting 12 semi-structured interviews with industry experts and document analysis. The thematic analysis using NVivo 12 software was adopted to analyse data.

Findings

Findings reveal that the case study firm successfully fosters innovation when ambidexterity is achieved through the balance between exploratory (i.e. radical innovation) and exploitative learnings (i.e. incremental innovation).

Research limitations/implications

Establishing uniform ambidexterity (i.e. 50:50) at the firm or project level is not mandatory to deploy innovation successfully. The ratio can vary based on the characteristics and requirements of construction firms.

Practical implications

This paper shall motivate construction practitioners to adopt radical–incremental innovation ambidexterity in firms and ultimately enhance the productivity and efficiency of the construction industry.

Originality/value

Previous construction innovation research has frequently explored firm or project-level innovation separately. This study identified a multi-level focus on innovation. Through the lens of exploratory–exploitative theory, different forms of innovation ambidexterity for different levels are suggested rather than one specific ambidexterity.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 18 July 2024

Lorenzo Pirrone, Mark Grothkopp, Lukas Budde and Thomas Friedli

Although benefits are promising, many companies face problems leveraging synergies between Lean and Digitalization at the program management level. This paper aims to identify…

Abstract

Purpose

Although benefits are promising, many companies face problems leveraging synergies between Lean and Digitalization at the program management level. This paper aims to identify activities to manage the boundaries of Lean and Digitalization programs.

Design/methodology/approach

The research design follows a cross-industry multiple-case study approach. A total of 14 interviews were conducted with Lean and Digitalization experts from 10 companies. Interview quotes were mapped on a pre-defined list of descriptive codes and iteratively merged and excluded.

Findings

We identified 12 activities by which companies manage the boundaries of their Lean and Digitalization programs. Three distinct boundary management approaches could be identified: collaborative, configurational, and competitive. A collaborative approach fosters governance, the belief in synergies, and the development of combined artifacts. A configurational approach creates combined responsibilities, assesses areas of collaboration, and fosters interaction across the organization. A competitive approach creates unclear responsibilities and exchange, perceives no added value in integration and follows separated implementation of Lean and Digitalization programs.

Originality/value

This study sheds light on the boundaries of Lean and Digitalization programs and identifies activities to manage them. We derive propositions for the Lean and Digitalization program management. Moreover, this study positions itself at the forefront of research investigating how integration of Lean and Digitalization actually occurs or does not occur.

Details

Journal of Manufacturing Technology Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-038X

Keywords

Article
Publication date: 12 July 2024

Jianyao Jia, Shan Jiang, Liang Xiao and Fei Lu

The adoption of emerging information and communication technologies in construction project teams has engendered numerous virtual spaces, characterized by communication visibility…

Abstract

Purpose

The adoption of emerging information and communication technologies in construction project teams has engendered numerous virtual spaces, characterized by communication visibility and content persistence. As a result, the knowledge exchanged in these virtual spaces serves as a team’s digital resources. However, the extant literature mostly takes a process-based approach to examine the impact of knowledge sharing, thus failing to fully comprehend the process of converting digital resources into performance, resulting in a gap in the literature.

Design/methodology/approach

This study employs team resource-based theory to construct a theoretical model and develop hypotheses. Specifically, knowledge integration capability and team efficacy are hypothesized as two types of critical capabilities that mediate the links between knowledge sharing (quantity and quality) in virtual spaces and management performance. Data from 128 middle and senior construction project managers were collected to test the proposed theoretical model.

Findings

The results suggest that relationships between knowledge sharing (quantity and quality) and project management performance are both mediated by knowledge integration capability. Moreover, team efficacy could only partially translate knowledge sharing quantity into performance and couldn’t transform knowledge sharing quality into performance. Besides, knowledge integration is found to strengthen the link between knowledge sharing quantity and performance but weaken the relationship between knowledge sharing quality and performance.

Originality/value

This study explores how knowledge shared in virtual spaces could be leveraged for improving management performance in construction project teams. The findings in this study enhance the understanding of knowledge sharing in digital environments and afford important insights into transforming digital resources into performance within construction project teams.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 July 2024

Yishuo Jiao, Renhong Zhu, Jialiang Fu, Xiaowei Li and Yichao Wang

The rapid development of digital technologies drives digital entrepreneurs to pivot, a behavior that allows entrepreneurs to adjust original opportunities and explore new…

Abstract

Purpose

The rapid development of digital technologies drives digital entrepreneurs to pivot, a behavior that allows entrepreneurs to adjust original opportunities and explore new opportunities. This study aims to investigate the effect of the structural characteristics of digital entrepreneurial teams, the functional heterogeneity, on pivoting from the perspective of digital agility. Moreover, this study also examines the moderating effect of knowledge sharing.

Design/methodology/approach

Two-phase survey data were sourced from Chinese digital entrepreneurial teams through the entrepreneurial networks of MBA programs of a Chinese business school and entrepreneurial support organizations in China. The sample of 272 teams with 708 entrepreneurs was collected to test the hypotheses.

Findings

The functional heterogeneity of digital entrepreneurial teams, including industry background heterogeneity and occupational experience heterogeneity, positively impacts pivoting by providing heterogeneous knowledge and resources. Moreover, this relationship is mediated by the digital agility of the digital team, and knowledge sharing moderates the relationship between functional heterogeneity and digital agility.

Originality/value

While existing studies have mainly focused on the external factors, this study empirically investigates the team-level internal factors of digital pivoting in digital entrepreneurial teams, enriching the research perspective of pivoting. Moreover, the current study bridges the literature on digital agility with pivoting, broadening the theoretical mechanism of pivoting and expanding the theoretical boundaries of digital agility.

Details

Business Process Management Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-7154

Keywords

Article
Publication date: 21 May 2024

Neda Kiani Mavi, Kerry Brown, Richard Glenn Fulford and Mark Goh

The global construction industry has a history of poor project success, with evident and frequent overruns in cost and schedule. This industry is a highly interconnected and…

Abstract

Purpose

The global construction industry has a history of poor project success, with evident and frequent overruns in cost and schedule. This industry is a highly interconnected and complex system in which the components, i.e. suppliers, contractors, end-users, and stakeholders, are delicately linked to each other, the community, and the environment. Therefore, defining and measuring project success can be challenging for sponsors, contractors, and the public. To address this issue, this study develops and analyzes a more comprehensive set of success criteria for medium and large construction projects.

Design/methodology/approach

After reviewing the existing literature, this study identified 19 success criteria for medium and large construction projects, which were categorized into five groups. The fuzzy decision-making trial and evaluation laboratory (fuzzy DEMATEL) method was used to gain further insight into the interrelationships between these categories and explain the cause-and-effect relationships among them. Next, this study applied the modified logarithmic least squares method to determine the importance weight of these criteria using the fuzzy analytic hierarchy process.

Findings

28 project managers working in the construction industries in Australia and New Zealand participated in this study. Results suggest that “project efficiency” and “impacts on the project team” are cause criteria that affect “business success,” “impacts on stakeholders,” and “impacts on end-users.” Effective risk management emerged as the most crucial criterion in project efficiency, while customer satisfaction and return on investment are top criteria in “impacts on end-users” and “business success.”

Originality/value

Although numerous studies have been conducted on project success criteria, multicriteria analyses of success criteria are rare. This paper presents a comprehensive set of success criteria tailored to medium and large construction projects. The aim is to analyze their interrelationships and prioritize them thoroughly, which will aid practitioners in focusing on the most important criteria for achieving higher success rates.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 10 September 2024

Shitao Jin

Architectural programming, as a critical phase in construction projects, has been widely recognized for its importance and advantages throughout the construction process. With the…

Abstract

Purpose

Architectural programming, as a critical phase in construction projects, has been widely recognized for its importance and advantages throughout the construction process. With the rapid development of the socioeconomic landscape, architectural programming has garnered increasing attention from various other disciplines, becoming a key trend in interdisciplinary collaboration. This study aims to provide a comprehensive understanding of the current status and future directions of architectural programming from an interdisciplinary perspective through scientometric analysis and systematic review.

Design/methodology/approach

This study first collected English journal articles on architectural programming published between 1975 and 2024 from the Web of Science and Scopus databases. After an initial screening of titles and abstracts, 515 articles were selected for scientometric analysis to reveal the current state and advantages of architectural programming research in multidisciplinary fields. Subsequently, a second screening of full-text articles identified 75 journal articles for systematic review, focusing on research topics and challenges in interdisciplinary applications.

Findings

The study reveals an exponential increase in the number of papers related to architectural programming between 1975 and 2024, particularly in the last decade. Six key research topics of architectural programming in multidisciplinary fields were identified: (1) performance optimization and evaluation, (2) digitalization and automation development, (3) project management and decision support, (4) improvement of human and social welfare, (5) sustainable resources and environment and (6) educational practices of architectural programming. Additionally, the study identified the main challenges in the interdisciplinary application of architectural programming, including (1) incompatibility among disciplines, (2) limitations of data and methodologies and (3) insufficient social engagement. To address these challenges, three potential future directions were proposed: (1) establishing interdisciplinary teams and platforms, (2) enhancing multi-source data integration and digital transformation and (3) improving governance mechanisms and educational training.

Originality/value

By combining quantitative and qualitative methods, this study provides a comprehensive review of architectural programming research and applications in multidisciplinary fields, offering theoretical foundations and practical references for the future development of architectural programming. This review not only aids in understanding the overall status of current architectural programming research but also offers valuable insights and recommendations for future research directions and practical applications.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 July 2023

Aziz Yousif Shaikh, Robert Osei- kyei, Mary Hardie and Matt Stevens

This paper systematically reviewed research work on drivers of teamwork, which will reinforce construction work teams to enhance workers’ safety performance. This study adds to…

Abstract

Purpose

This paper systematically reviewed research work on drivers of teamwork, which will reinforce construction work teams to enhance workers’ safety performance. This study adds to the existing but limited understanding of teamwork drivers on construction workers’ safety performance. This paper presents scholars and industry-based professionals with critical initiatives that have to be implemented in organisations to get positive results in safety while working in teams with an emphasis on systems drivers of teamwork on safety performance at the organisational level, which will help in providing information on the functioning of the teams and contribute towards improved safety performance of team workers.

Design/methodology/approach

This study aims to systematically examine the existing body of knowledge on drivers of teamwork by analysing 53 publications from the years 1997–2021. The Scopus search engine was used to conduct a systematic review and germane publications were collated.

Findings

According to the findings of the review, since 1997, there has been a burgeoning concern in the research of drivers of teamwork and its impact on workers’ safety performance. After performing a systematic review, 37 drivers of teamwork were identified. The top five drivers are effective communications, team workers’ relations, leadership, shared knowledge and information, and team training. Moreover, it was noted that the United States and Australia have been the international regions of focus for most of the research in the area of drivers of teamwork from the years 1997–2021. The 37 drivers of teamwork are distributed into six major socio-technical components: people drivers; culture drivers; metrics drivers; organisational and management practices and procedures drivers; infrastructure drivers and technology drivers.

Practical implications

The results reported present research scholars and professional practitioners with an overview of the drivers of teamwork that could be implemented in the construction industry to streamline potential implementations and improve safety performance of construction workers.

Originality/value

A list of teamwork drivers has been developed to ratify potential empirical research in the area of construction safety. The results would contribute to the existing but restricted understanding of drivers of teamwork in the construction industry.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords