Search results

1 – 10 of 243
Content available
Article
Publication date: 1 June 2005

156

Abstract

Details

Aircraft Engineering and Aerospace Technology, vol. 77 no. 3
Type: Research Article
ISSN: 0002-2667

Keywords

Open Access
Article
Publication date: 5 October 2020

Truong An Dang

The purpose of this study is to evaluate the rainfall intensities and their limits for durations from 0.25 to 8 h with return periods from 2 to 100 years for Ca Mau City in…

1598

Abstract

Purpose

The purpose of this study is to evaluate the rainfall intensities and their limits for durations from 0.25 to 8 h with return periods from 2 to 100 years for Ca Mau City in Vietnam.

Design/methodology/approach

First, the quality of the historical rainfall data series in 44 years (1975–2018) at Ca Mau station was assessed using the standard normal homogeneity test and the Pettitt test. Second, the appraised rainfall data series are used to establish the rainfall intensity-duration-frequency curve for the study area.

Findings

Based on the findings, a two-year return period, the extreme rainfall intensities (ERIs) ranged from 9.1 mm/h for 8 h rainstorms to 91.2 mm/h for 0.25 h. At a 100-year return period, the ERIs ranged from 18.4 mm/h for 8 h rainstorms to 185.8 mm/h for 0.25 h. The results also show that the narrowest uncertainty level between the lower and upper limits recorded 1.6 mm at 8 h for the two-year return period while the widest range is at 42.5 mm at 0.25 h for the 100-year return period. In general, the possibility of high-intensity rainfall values compared to the extreme rainfall intensities is approximately 2.0% at the 100-year return period.

Originality/value

The results of the rainfall IDF curves can provide useful information for policymakers to make the right decisions in controlling and minimizing flooding in the study area.

Details

International Journal of Climate Change Strategies and Management, vol. 12 no. 5
Type: Research Article
ISSN: 1756-8692

Keywords

Open Access
Article
Publication date: 23 December 2022

Rouzbeh Shabani, Tobias Onshuus Malvik, Agnar Johansen and Olav Torp

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end…

2079

Abstract

Purpose

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end and managing uncertainty in the construction phase. In contrast, UM components in the design phase have received less attention. This research aims to improve knowledge about the key components of UM in the design phase of large road projects.

Design/methodology/approach

This study adopted a literature review and case study. The literature review was used to identify relevant criteria for UM. These criteria helped to design the interview guide. Multiple case study research was conducted, and data were collected through document study and interviews with project stakeholders in two road projects. Each case's owners, contractors and consultants were interviewed individually.

Findings

The data analysis obtained helpful information on the involved parties, process and exploit tools and techniques during the design phase. Johansen's (2015) framework [(a) human and organisation, (b) process and (c) tools and techniques)] was completed and developed by identifying relevant criteria (such as risk averse or risk-taker, culture and documentation level) for each component. These criteria help to measure UM performance. The authors found that owners and contractors are major formal UM actors, not consultants. Empirical data showed the effectiveness of Web-based tools in UM.

Research limitations/implications

The studied cases were Norwegian, and this study focussed on uncertainties in the project's design phase. Relevant criteria did not cover all the criteria for evaluating the performance of UM. Qualitative evaluation of criteria allows further quantitative analysis in the future.

Practical implications

This paper gave project owners and managers a better understanding of relevant criteria for measuring UM in the owners and managers' projects. The paper provides policy-makers with a deeper understanding of creating rigorous project criteria for UM during the design phase. This paper also provides a guideline for UM in road projects.

Originality/value

This research gives a holistic evaluation of UM by noticing relevant criteria and criteria's interconnection in the design phase.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Content available
Article
Publication date: 1 August 1998

G.P. Hammond

58

Abstract

Details

Industrial Lubrication and Tribology, vol. 50 no. 4
Type: Research Article
ISSN: 0036-8792

Keywords

Content available
Article
Publication date: 1 April 2004

474

Abstract

Details

Aircraft Engineering and Aerospace Technology, vol. 76 no. 2
Type: Research Article
ISSN: 0002-2667

Keywords

Content available

Abstract

Details

Industrial Lubrication and Tribology, vol. 57 no. 4
Type: Research Article
ISSN: 0036-8792

Keywords

Content available
Article
Publication date: 1 April 2006

62

Abstract

Details

Assembly Automation, vol. 26 no. 2
Type: Research Article
ISSN: 0144-5154

Keywords

Content available
Article
Publication date: 1 February 2004

225

Abstract

Details

Aircraft Engineering and Aerospace Technology, vol. 76 no. 1
Type: Research Article
ISSN: 0002-2667

Keywords

Content available
Article
Publication date: 1 November 2006

87

Abstract

Details

Industrial Lubrication and Tribology, vol. 58 no. 6
Type: Research Article
ISSN: 0036-8792

Keywords

Abstract

Details

Industrial Robot: An International Journal, vol. 25 no. 6
Type: Research Article
ISSN: 0143-991X

Keywords

1 – 10 of 243