Search results

1 – 10 of over 2000
Article
Publication date: 1 July 2022

Jingkuang Liu, Yuqing Li, Ying Li, Chen Zibo, Xiaotong Lian and Yingyi Zhang

The purpose of this study is to discuss the principles and factors that influence the site selection of emergency medical facilities for public health emergencies. This paper…

398

Abstract

Purpose

The purpose of this study is to discuss the principles and factors that influence the site selection of emergency medical facilities for public health emergencies. This paper discusses the selection of the best facilities from the available facilities, proposes the capacity of new facilities, presents a logistic regression model and establishes a site selection model for emergency medical facilities for public health emergencies in megacities.

Design/methodology/approach

Using Guangzhou City as the research object, seven alternative facility points and the points' capacities were preset. Nine demand points were determined, and two facility locations were selected using genetic algorithms (GAs) in MATLAB for programing simulation and operational analysis.

Findings

Comparing the results of the improved GA, the results show that the improved model has fewer evolutionary generations and a faster operation speed, and that the model outperforms the traditional P-center model. The GA provides a theoretical foundation for determining the construction location of emergency medical facilities in megacities in the event of a public health emergency.

Research limitations/implications

First, in this case study, there is no scientific assessment of the establishment of the capacity of the facility point, but that is a subjective method based on the assumption of the capacity of the surrounding existing hospitals. Second, because this is a theoretical analysis, the model developed in this study does not consider the actual driving speed and driving distance, but the speed of the unified average driving distance and the driving distance to take the average of multiple distances.

Practical implications

The results show that the method increases the selection space of decision-makers, provides them with stable technical support, helps them quickly determine the location of emergency medical facilities to respond to disaster relief work and provides better action plans for decision makers.

Social implications

The results show that the algorithm performs well, which verifies the applicability of this model. When the solution results of the improved GA are compared, the results show that the improved model has fewer evolutionary generations, faster operation speed and better model than the intermediate model GA. This model can more successfully find the optimal location decision scheme, making that more suitable for the location problem of megacities in the case of public health emergencies.

Originality/value

The research findings provide a theoretical and decision-making basis for the location of government emergency medical facilities, as well as guidance for enterprises constructing emergency medical facilities.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 May 2023

Sanjib Chowdhury

This paper aims to deal with a real-life strategic conflict in joint operations (JOs) for facility location decision and planning in an oil and gas field that stretches over two…

Abstract

Purpose

This paper aims to deal with a real-life strategic conflict in joint operations (JOs) for facility location decision and planning in an oil and gas field that stretches over two countries and tries to develop a basis for mitigating such conflict.

Design/methodology/approach

This paper develops a novel approach using integer linear programming (ILP) to determine optimal facility location considering technical, economic and environmental factors. Strategic decision-making in JOs is also influenced by business priorities of individual partner, sociopolitical issues and other covert factors. The cost-related quantitative factors are normalized using inverse normalization function as these are to be minimized, and qualitative factors that are multi-decision-making criteria are maximized, thus transforming both qualitative and quantitative factors as a single objective of maximization in ILP model.

Findings

The model identifies the most suitable facility location based on a wide range of factors that would provide maximum benefit in the long term, which will help decision-makers and managers.

Research limitations/implications

The model can be expanded incorporating other quantitative and qualitative factors such as tax incentives by the government, local bodies and government regulations.

Practical implications

The applicability of the model is not limited to JOs or oil/gas field, but is applicable to a wide range of sectors.

Originality/value

The model is transparent and based on rational and scientific basis, which would help in building consensus among the dissenting parties and aid in mitigating strategic conflict. Such type of model for mitigating strategic conflict has not been reported/used before.

Details

Journal of Global Operations and Strategic Sourcing, vol. 16 no. 3
Type: Research Article
ISSN: 2398-5364

Keywords

Article
Publication date: 24 April 2024

Mohsen Jami, Hamidreza Izadbakhsh and Alireza Arshadi Khamseh

This study aims to minimize the cost and time of blood delivery in the whole blood supply chain network (BSCN) in disaster conditions. In other words, integrating all strategic…

Abstract

Purpose

This study aims to minimize the cost and time of blood delivery in the whole blood supply chain network (BSCN) in disaster conditions. In other words, integrating all strategic, tactical and operational decisions of three levels of blood collection, processing and distribution leads to satisfying the demand at the right time.

Design/methodology/approach

This paper proposes an integrated BSCN in disaster conditions to consider four categories of facilities, including temporary blood collection centers, field hospitals, main blood processing centers and medical centers, to optimize demand response time appropriately. The proposed model applies the location of all permanent and emergency facilities in three levels: blood collection, processing and distribution. Other essential decisions, including multipurpose facilities, emergency transportation, inventory and allocation, were also used in the model. The LP metric method is applied to solve the proposed bi-objective mathematical model for the BSCN.

Findings

The findings show that this model clarifies its efficiency in the total cost and blood delivery time reduction, which results in a low carbon transmission of the blood supply chain.

Originality/value

The researchers proposed an integrated BSCN in disaster conditions to minimize the cost and time of blood delivery. They considered multipurpose capabilities for facilities (e.g. field hospitals are responsible for the three purposes of blood collection, processing and distribution), and so locating permanent and emergency facilities at three levels of blood collection, processing and distribution, support facilities, emergency transportation and traffic on the route with pollution were used to present a new model.

Details

Journal of Modelling in Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1746-5664

Keywords

Open Access
Article
Publication date: 19 April 2023

Hasina Tabassum Chowdhury, Shuva Ghosh, Shaim Mahamud, Fazlul Hasan Siddiqui and Sabah Binte Noor

The earth is facing challenges to work for the survival of human life during domino effect disasters. The emergency resource storage locations should be selected considering the…

Abstract

Purpose

The earth is facing challenges to work for the survival of human life during domino effect disasters. The emergency resource storage locations should be selected considering the probability of domino effect disasters. The first purpose of this study is to select the storage locations where domino effect probability is less. And second, facility development cost and transportation costs and costs for unutilized capacity have been optimized.

Design/methodology/approach

The work is a multiobjective optimization problem and solved with weighted sum approach. At first, the probabilities of domino effect due to natural disasters are calculated based on the earthquake zones. Then with that result along with other necessary data, the location to set up storage facilities and the quantities of resources that need to be transported has been determined.

Findings

The work targeted a country, Bangladesh for example. The authors have noticed that Bangladesh is currently storing relief items at warehouse which is under the domino effect prone region. The authors are proposing to avoid this location and identified the optimized cost for setting up the facilities. In this work, the authors pointed out which location has high probability of domino effect and after avoiding this location whether cost can be optimized, and the result demonstrated that this decision can be economical.

Originality/value

Disaster response authorities should try to take necessary proactive steps during cascading disasters. The novelty of this work is determining the locations to select storage facilities if the authors consider the probability of the domino effect. Then a facility location optimization model has been developed to minimize the costs. This paper can support policymakers to assess the strategies for selecting the location of emergency resource facilities.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. 13 no. 4
Type: Research Article
ISSN: 2042-6747

Keywords

Article
Publication date: 20 December 2023

Abhishek Raj, Vinaytosh Mishra, Ajinkya Tanksale and Cherian Samuel

The purpose of this study is to solve the problem of healthcare waste management in developing countries. The buildup of medical waste has attracted the attention of all spheres…

Abstract

Purpose

The purpose of this study is to solve the problem of healthcare waste management in developing countries. The buildup of medical waste has attracted the attention of all spheres of society due to the expanding population and developing economy. Timely collection and processing of medical waste are extremely important due to its potential hazards. Although the problem of planning medical waste management has been addressed in developed countries, it persists in several developing countries. This research is motivated by an example of a city in India characterized by a dense population, abundant health-care facilities and a lack of planning for managing large medical waste generated daily.

Design/methodology/approach

The authors address the problem of designing the network of collection and processing facilities for medical waste and optimizing the vehicle route that collects and transfers the waste between facilities. Due to distinct topographic restrictions in the considered city, the collection and transfer process needs to be conducted in two echelons – from hospitals to collection centers using smaller vehicles and then to the processing facilities using trucks. This work addresses these two problems as a two-echelon location-routing problem.

Findings

A mixed-integer programming model is developed to minimize the cost of opening the facilities and transporting medical waste. Several managerial insights are drawn up to assist planners and decision-makers.

Originality/value

This study follows a case study approach to provide a descriptive and prescriptive approach to hospital waste management in the ancient city of Varanasi. The city has witnessed unplanned growth over the years and is densely populated. The health-care facilities in the city have a large catchment area and attract patients from neighboring districts. The situation analysis based on secondary data and unstructured interviews of the stakeholders suggests that the ad hoc approach prevails in present hospital waste management in the city.

Details

Facilities , vol. 42 no. 5/6
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 9 April 2024

Gul Imamoglu, Ertugrul Ayyildiz, Nezir Aydin and Y. Ilker Topcu

Blood availability is critical for saving lives in various healthcare services. Ensuring blood availability can only be achieved through efficient management of the blood supply…

Abstract

Purpose

Blood availability is critical for saving lives in various healthcare services. Ensuring blood availability can only be achieved through efficient management of the blood supply chain (BSC). A key component of the BSC is bloodmobiles, which are responsible for a significant portion of blood donation collections. The most crucial factor affecting the efficacy of bloodmobiles is their location selection. Therefore, detailed decision analyses are essential for the location selection of bloodmobiles. This study proposes a comprehensive approach to bloodmobile location selection for resilient BSCs.

Design/methodology/approach

This study provides a novel integration of the spherical fuzzy analytical hierarchy process (SF-AHP) and spherical fuzzy complex proportional assessment (SF-COPRAS) methodologies. In this framework, the criteria are weighted using SF-AHP. The alternatives are then evaluated using SF-COPRAS, employing criteria weights obtained from SF-AHP without defuzzification.

Findings

The results show that supply conditions and resilience are the most important criteria for a bloodmobile location selection. Additionally, the validation analyses confirm the stability of the solution.

Practical implications

This study presents several managerial implications that can aid mid-level managers in the BSC during the decision-making process for bloodmobile location selection. The critical factors revealed, along with their importance in choosing bloodmobile locations, serve as a comprehensive guide. Additionally, the framework proposed in this study offers decision-makers (DMs) an effective method for ranking potential bloodmobile locations.

Originality/value

This study presents the first application of multi-criteria decision-making (MCDM) for bloodmobile location selection. In this manner, several aspects of bloodmobile location selection are considered for the first time in the existing literature. Furthermore, from the methodological aspect, this study provides a novel SF-AHP-integrated SF-COPRAS methodology.

Details

Journal of Enterprise Information Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0398

Keywords

Article
Publication date: 4 April 2022

Irappa Basappa Hunagund, Madhusudanan Pillai and Kempaiah U.N.

The purpose of this article is to develop a bi-directional relaxed flexible bay structure (BRFBS) in the layout for the unequal area facility layout problems (UA-FLPs) and test…

Abstract

Purpose

The purpose of this article is to develop a bi-directional relaxed flexible bay structure (BRFBS) in the layout for the unequal area facility layout problems (UA-FLPs) and test the suitability of the proposed approach using literature data.

Design/methodology/approach

This research adopts a two-stage solution approach for UA-FLPs to form BRFBS in the layout. The solution to UA-FLPs is carried out in discrete space. The proposed heuristic method optimises the layout plan for minimising the material handling cost (MHC), and also, it indirectly optimises the space utilisation by reducing the empty space in the layout. The first stage of layout design assumes that all facilities are equal in size and uses quadratic assignment problem (QAP) model. QAP is solved with a simulated annealing heuristic method. In the second stage, a heuristic method is proposed to find the optimum width for each bay and the dimension for facilities. The proposed heuristic method is tested with numerical data available in the literature. Results are compared with the results obtained by layout planning software, and with the simulated annealing algorithm for flexible bay structure (SA-FBS) heuristic procedure for continuous space UA-FLPs.

Findings

The proposed two-stage solution approach gives the BRFBS for the UA-FLPs. BRFBS helps to create proper aisle structure in the layout plan. The layout configuration and solution of the proposed method is better than the layout planning software solution and SA-FBS solution. The application of the proposed heuristic method to case data gave lesser MHC, better space utilisation and better aisle formation than the existing layout.

Research limitations/implications

The proposed approach has the limitation that it can be applied only to UA-FLPs solved in discrete space. When the UA-FLPs are solved in continuous space, then it is not possible to make application of this approach to form bi-directional relaxed flexible bays in the layout plan.

Practical implications

Most of the modern industries are automated, and they use material handling equipment (MHE) like automated guided vehicles (AGVs). Design of layout plans that help to create proper aisle structure for AGV’s in the layout plan is a challenging to the researchers. The BRFBS configuration is more suitable in the flexible manufacturing system where AGVs are used for material transportation.

Originality/value

This paper proposes a novel two-stage heuristic method for solving the UA-FLPs in discrete space. The proposed approach generates a BRFBS in the layout plan. The BRFBS helps to create a proper aisle structure suitable for better material handling operations. Hence, this type of layout helps in easy interaction of the MHE (e.g. AGVs) with the boundaries of the facilities touching the aisle.

Details

Journal of Facilities Management , vol. 21 no. 5
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 17 February 2022

Kamran Zolfi and Javid Jouzdani

As far as the authors know, no research has already been carried out on the multi-floor dynamic facility layout problem (MF-DFLP) in the continuous form regarding the flexible bay…

Abstract

Purpose

As far as the authors know, no research has already been carried out on the multi-floor dynamic facility layout problem (MF-DFLP) in the continuous form regarding the flexible bay structure, the number and the variable location of the elevator. Therefore, the present paper models the given problem and attempts to find a sub-optimal solution for it using a meta-heuristic simulated annealing (SA) algorithm.

Design/methodology/approach

The efficient use of resources has always been a prominent matter for decision-makers. Many reasons including land use, construction considerations and proximity of departments have led to the design of multi-floor facilities. On the other hand, their fast-evolving environment calls for dynamic planning. Therefore, in this paper, a model and the SA algorithm for MF-DFLP are presented.

Findings

After presenting a mathematical model, the problem was solved precisely in a small size using the GAMS software. Also, a near-optimal solution method using a SA meta-heuristic algorithm is suggested and the proposed algorithm was run in the MATLAB software. To evaluate the presented model and the proposed solution, some test cases were considered in two aspects. The first aspect was the test cases that are newly generated in small, medium and large sizes to compare the exact optimal solution with the results of the meta-heuristic algorithm. Eight test cases with small sizes were solved using the GAMS software, the optimum solutions were obtained in a reasonable time, and the cost of their solutions was equal to that of the SA algorithm. Eight test cases with medium sizes were run in the GAMS software with the time limit of 80,000 s, and the SA algorithm had performed better for these test cases. Two test cases were also considered in large size that GAMS could not solve them, whereas the SA algorithm successfully found a proper solution for each. The second aspect included the test cases from the literature. The result showed that suggested algorithm is more capable of finding best solutions than compared algorithms.

Originality/value

In this paper, an unequal area MF-DFLP was studied in a continuous layout form in which the location and number of the elevators were considered to be variable, and the layouts were considered with flexible bay structure. These conditions were investigated for the first time.

Details

Journal of Facilities Management , vol. 21 no. 3
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 24 July 2023

Su-Ling Fan, Wei-San Ong, Chun-Tin Wu, Nuria Forcada Matheu and Hamidreza Alavi

The purpose of this paper is to address the problems of the current facilities maintenance management (FMM) system in finding necessary information, identifying defective…

Abstract

Purpose

The purpose of this paper is to address the problems of the current facilities maintenance management (FMM) system in finding necessary information, identifying defective facilities and prioritizing maintenance work orders.

Design/methodology/approach

In this paper, in conjunction with building information modeling, a system is proposed to perform a preliminary inspection of each maintenance request, provide FMM staff with the location of the faulty facility and its associated details and provide recommendations for prioritizing repair work orders. Unity and Revit are used to implement the proposed system and a case study is conducted to demonstrate its effectiveness.

Findings

An augmented reality (AR)-FMM system was developed using the AR technique in this paper. This system provides the related information even if the FMM receives a problem report without facility information from the occupant and performs a preliminary inspection so that the faulty facility and the route to it are identified. In addition, a work order sequence of pending requests was provided. The visualization of the facility using AR technology has brought great convenience and ease to FMM staff.

Originality/value

This paper addresses the problems encountered in the current facility maintenance management system concerning AR technology.

Details

Facilities , vol. 41 no. 13/14
Type: Research Article
ISSN: 0263-2772

Keywords

Open Access
Article
Publication date: 25 March 2024

Hossein Shakibaei, Seyyed Amirmohammad Moosavi, Amir Aghsami and Masoud Rabbani

Throughout human history, the occurrence of disasters has been inevitable, leading to significant human, financial and emotional consequences. Therefore, it is crucial to…

Abstract

Purpose

Throughout human history, the occurrence of disasters has been inevitable, leading to significant human, financial and emotional consequences. Therefore, it is crucial to establish a well-designed plan to efficiently manage such situations when disaster strikes. The purpose of this study is to develop a comprehensive program that encompasses multiple aspects of postdisaster relief.

Design/methodology/approach

A multiobjective model has been developed for postdisaster relief, with the aim of minimizing social dissatisfaction, economic costs and environmental damage. The model has been solved using exact methods for different scenarios. The objective is to achieve the most optimal outcomes in the context of postdisaster relief operations.

Findings

A real case study of an earthquake in Haiti has been conducted. The acquired results and subsequent management analysis have effectively assessed the logic of the model. As a result, the model’s performance has been validated and deemed reliable based on the findings and insights obtained.

Originality/value

Ultimately, the model provides the optimal quantities of each product to be shipped and determines the appropriate mode of transportation. Additionally, the application of the epsilon constraint method results in a set of Pareto optimal solutions. Through a comprehensive examination of the presented solutions, valuable insights and analyses can be obtained, contributing to a better understanding of the model’s effectiveness.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2042-6747

Keywords

1 – 10 of over 2000